121 permits since 2000: 91 completed, 4 in progress, 14 never finaled, 12 expired or cancelled. Typically 3 days from filing to permit and 122 days from permit to final inspection. Of the 14 never-finaled permits, 2 are 5 to 10 years old, 12 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Oct 2000 to Oct 2026
- Last 24 months: 9 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 1 | 0 | 0 | 0 |
| 2002 | 1 | 0 | 0 | 0 |
| 2003 | 2 | 0 | 0 | 1 |
| 2004 | 0 | 0 | 1 | 0 |
| 2007 | 3 | 0 | 0 | 0 |
| 2008 | 1 | 0 | 0 | 0 |
| 2009 | 2 | 0 | 0 | 0 |
| 2010 | 8 | 0 | 4 | 1 |
| 2011 | 13 | 0 | 0 | 2 |
| 2013 | 6 | 0 | 2 | 0 |
| 2014 | 6 | 0 | 2 | 0 |
| 2015 | 4 | 0 | 2 | 2 |
| 2016 | 3 | 0 | 1 | 1 |
| 2017 | 3 | 0 | 1 | 0 |
| 2018 | 5 | 0 | 1 | 0 |
| 2019 | 4 | 0 | 0 | 0 |
| 2020 | 2 | 0 | 0 | 1 |
| 2021 | 4 | 0 | 0 | 4 |
| 2022 | 8 | 0 | 0 | 0 |
| 2023 | 5 | 1 | 0 | 0 |
| 2024 | 4 | 1 | 0 | 0 |
| 2025 | 3 | 1 | 0 | 0 |
| 2026 | 3 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 35 | 27 | 2 | 4 | 2 | 4 | 195 |
| Deck | 8 | 7 | 0 | 1 | 0 | 5 | 287 |
| Stairs | 18 | 15 | 1 | 0 | 2 | 18 | 194 |
| Bathroom remodel | 45 | 36 | 2 | 3 | 4 | 5 | 190 |

## Most recent permits

The 100 most recent of 121.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202610059030](https://www.permitgraph.org/p/202610059030) | Oct 5, 2026 | In progress: issued Oct 2026 | [313 Los Palmos Dr](https://www.permitgraph.org/a/3002/004) | kitchen remodel, demo partial wall & add one island. no exterior change. no work @ ground fl. | $40,000 |
| [202608196865](https://www.permitgraph.org/p/202608196865) | Aug 19, 2026 | Completed: final sign-off Oct 2026 | [961 Lombard St](https://www.permitgraph.org/a/0072/018) | revision to approved application #202311080472 to change floor plan layout per plan at ground floor. | $1,000 |
| [202605261903](https://www.permitgraph.org/p/202605261903) | May 26, 2026 | Completed: final sign-off Aug 2026 | [74 Aztec St](https://www.permitgraph.org/a/5521/001) | one bathroom remodel of 2nd floor.; change all plumbing fixture. install all floor and wall tile in kind. no moving walls. all work in kind. approx. 49 sq ft. | $20,000 |
| [202601023157](https://www.permitgraph.org/p/202601023157) | Jan 2, 2026 | Completed: final sign-off May 2026 | [486 Molimo Dr](https://www.permitgraph.org/a/3010/035) | 2nd flr: two bathroom remodels, replace floor and wall tiles, plumbing, electrical, 1 bathroom tub to shower conversion. | $35,000 |
| [202510298392](https://www.permitgraph.org/p/202510298392) | Oct 29, 2025 | Completed: final sign-off Nov 2025 | [3609 21st St](https://www.permitgraph.org/a/3620/065) | partial bathroom remodel in kind for (2) bathrooms - remove second floor & third floor bathroom floor tiles and replace with new tiles in same area, in kind. no change to wall layout. no change to fl… | $8,000 |
| [202505206877](https://www.permitgraph.org/p/202505206877) | May 20, 2025 | Completed: final sign-off Jul 2025 | [457 43rd Av](https://www.permitgraph.org/a/1475/009D) | remodel the two bedroom, dining room, and living room by removing plaster and lather, due to cracking and loose. re-dry wall w/ 5/8" type x with 5d cool nail at same area with insulation in ceiling a… | $30,000 |
| [202505146449](https://www.permitgraph.org/p/202505146449) | May 14, 2025 | Completed: final sign-off Jun 2025 | [2396 27th Av](https://www.permitgraph.org/a/2355/013) | install a partition wall at laundry area per plan. | $4,000 |
| [202503202622](https://www.permitgraph.org/p/202503202622) | Mar 20, 2025 | In progress: issued Jun 2025 | [39 Gladeview Wy](https://www.permitgraph.org/a/2823A/025) | relocate kitchen, living & dining rooms to 1st fl. leave 1 car garage space, 4 bedrooms, 3 baths, laundry room on 2nd fl. add a master bath. reconfigure interior stairs to 1st fl. relocate 2 columns,… | $169,000 |
| [202412116568](https://www.permitgraph.org/p/202412116568) | Dec 11, 2024 | Completed: final sign-off Apr 2026 | [479 27th Av](https://www.permitgraph.org/a/1459/004B) | structural revision to pa # 202103116315: revise steel beam along gridline 3 on 1/f. update foundation work due to field conditions. add new window @ 1/f. |  |
| [202408088229](https://www.permitgraph.org/p/202408088229) | Aug 8, 2024 | Completed: final sign-off Nov 2024 | [1259 40th Av](https://www.permitgraph.org/a/1710/012) | to comply with nov # 202419021 add a rear deck, reinstall landscape area in front yard per approved permit 201703282612 | $9,000 |
| [202405293243](https://www.permitgraph.org/p/202405293243) | May 29, 2024 | Completed: final sign-off Aug 2024 | [261 Downey St](https://www.permitgraph.org/a/1269/053A) | 2nd fl. bath room remodel, convert the bath tub to shower stall, replace wall and floor tile, replace water closet and vanity | $15,000 |
| [202403077333](https://www.permitgraph.org/p/202403077333) | Mar 7, 2024 | In progress: filed Mar 2024, not yet issued | [3198 Fulton St](https://www.permitgraph.org/a/1650/052) | in-kind remodel with 2 children toliets and 2 sinks. new paint in area of work. no serving of food. | $10,000 |
| [202401043439](https://www.permitgraph.org/p/202401043439) | Jan 4, 2024 | Completed: final sign-off Jun 2024 | [3224 Steiner St](https://www.permitgraph.org/a/0510/034) | kitchen remodel: replace all cabinets, countertop, appliances. one full bathroom remodeled. change all plumbing fixtures. tile. | $30,000 |
| [202311080472](https://www.permitgraph.org/p/202311080472) | Nov 8, 2023 | In progress: issued Oct 2025 | [961 Lombard St](https://www.permitgraph.org/a/0072/018) | construct new family room, office, den, and bathroom at ground floor. replace (e) foundation per plan at ground floor. | $120,000 |
| [202307273176](https://www.permitgraph.org/p/202307273176) | Jul 27, 2023 | Completed: final sign-off Dec 2023 | [940 Cayuga Av](https://www.permitgraph.org/a/6953/006) | reconfigure and rebuild front entry stairs and landing per plans, replace / repair front siding / waterproofing. | $5,000 |
| [202307212747](https://www.permitgraph.org/p/202307212747) | Jul 21, 2023 | Completed: final sign-off Apr 2024 | [834 40th Av](https://www.permitgraph.org/a/1682/022) | replace 3 windows in kind in front, wood alum clad, and 5 windows in back. remodel second floor full bathroom, replace tile and plumbing fixtures. replace one side door in kitchen. | $30,000 |
| [202306150211](https://www.permitgraph.org/p/202306150211) | Jun 15, 2023 | Completed: final sign-off Nov 2023 | [2226 40th Av](https://www.permitgraph.org/a/2310/015) | replace 2 front windows in kind, wood aluminum clad | $1,000 |
| [202306089627](https://www.permitgraph.org/p/202306089627) | Jun 8, 2023 | Completed: final sign-off Apr 2024 | [2187 26th Av](https://www.permitgraph.org/a/2191/008G) | revision to permit 202304135687. 1/f: relocate washer and dryer. 2/f: remove door to the deck. 3/f: reconfigure layout. rebuild interior stair between 2nd and 3rd floor. | $5,000 |
| [202304135687](https://www.permitgraph.org/p/202304135687) | Apr 13, 2023 | Completed: final sign-off Apr 2024 | [2187 26th Av](https://www.permitgraph.org/a/2191/008G) | 1/f: add 1 den, 1 full bath and family. 2/f: remodel kitchen and bathroom 3/f: remodel bathroom. | $80,000 |
| [202212239130](https://www.permitgraph.org/p/202212239130) | Dec 23, 2022 | Completed: final sign-off Dec 2022 | [2067 29th Av](https://www.permitgraph.org/a/2149/002G) | to obtain final inspection for work approved under pa# 202107275166 & 202109087953. all work is complete. |  |
| [202212239131](https://www.permitgraph.org/p/202212239131) | Dec 23, 2022 | Completed: final sign-off Dec 2022 | [2067 29th Av](https://www.permitgraph.org/a/2149/002G) | to obtain final inspection for work approved under pa# 202106293454 & 202108277285. all work is complete. |  |
| [202210063934](https://www.permitgraph.org/p/202210063934) | Oct 6, 2022 | Completed: final sign-off Aug 2023 | [59 Bannock St](https://www.permitgraph.org/a/6970/008) | g/f: bathroom remodel convert tub to shower stall. | $5,000 |
| [202207219026](https://www.permitgraph.org/p/202207219026) | Jul 21, 2022 | Completed: final sign-off Apr 2023 | [2369 Market St](https://www.permitgraph.org/a/3563/036) | to otain final inspection for work approved under pa#2019-0207-2420. all work is complete. |  |
| [202207138400](https://www.permitgraph.org/p/202207138400) | Jul 13, 2022 | Completed: final sign-off Jul 2023 | [1680 Oakdale Av](https://www.permitgraph.org/a/5311/012) | 1st fl - add 1 unit, 1 bedroom, kitchen and 1 full bath | $48,000 |
| [202207067863](https://www.permitgraph.org/p/202207067863) | Jul 6, 2022 | Completed: final sign-off Sep 2024 | [107 Hahn St](https://www.permitgraph.org/a/6297/044) | legalize horizontal add & 2nd unit. build out new separate entrance. relocate bath, add egress window for gnd fl unit. no remodeling on 2nd fl except for new ext stair from (e) roof 262to rear c | $105,000 |
| [202206075822](https://www.permitgraph.org/p/202206075822) | Jun 7, 2022 | Completed: final sign-off Feb 2023 | [605 28th Av](https://www.permitgraph.org/a/1571/001) | 3rd floor interior remodel: remodel kitchen & bath. convert (e) dining rm into bedroom. remodel and cap steam radiator & install new heating and tankless unit. decreasing the size of one unit and inc… | $29,500 |
| [202201266726](https://www.permitgraph.org/p/202201266726) | Jan 26, 2022 | Completed: final sign-off Jul 2025 | [1518 Quesada Av](https://www.permitgraph.org/a/5325/007B) | legalize as built unwarranted building envelope expansion at rear of building: 1 storage space on 1st fl, 1 laundry room on 2nd fl per plan. unpermitted 1st fl dwelling unit to be legalalized under s… | $20,000 |
| [202109239028](https://www.permitgraph.org/p/202109239028) | Sep 23, 2021 | Completed: final sign-off Aug 2022 | [1278 20th Av](https://www.permitgraph.org/a/1731/027) | change of use to educational use d.b.a new journey preschool. | $10,000 |
| [202109087953](https://www.permitgraph.org/p/202109087953) | Sep 8, 2021 | Expired or cancelled: expired Dec 2022 | [2067 29th Av](https://www.permitgraph.org/a/2149/002G) | revision to 2021 0727 5166. replace front windows |  |
| [202108277285](https://www.permitgraph.org/p/202108277285) | Aug 27, 2021 | Expired or cancelled: expired Dec 2022 | [2067 29th Av](https://www.permitgraph.org/a/2149/002G) | new underpin footing & pressure grouting @ north property line. revision to 2021 0427 9424 | $10,000 |
| [202107275166](https://www.permitgraph.org/p/202107275166) | Jul 27, 2021 | Expired or cancelled: expired Dec 2022 | [2067 29th Av](https://www.permitgraph.org/a/2149/002G) | revision to pa #202104279424. replacing foundation and front windows. grid on windows to be true or full simulated divided lites. | $2,500 |
| [202107154432](https://www.permitgraph.org/p/202107154432) | Jul 15, 2021 | Completed: final sign-off Jul 2025 | [1518 Quesada Av](https://www.permitgraph.org/a/5325/007B) | legalize unwarranted dwelling unit at ground floor per government code section 65852.2 | $30,000 |
| [202106293454](https://www.permitgraph.org/p/202106293454) | Jun 29, 2021 | Expired or cancelled: expired Dec 2022 | [2067 29th Av](https://www.permitgraph.org/a/2149/002G) | rev to pa 202104279424 reconfigure interior stairs and skylights. |  |
| [202104279424](https://www.permitgraph.org/p/202104279424) | Apr 27, 2021 | Completed: final sign-off Dec 2022 | [2067 29th Av](https://www.permitgraph.org/a/2149/002G) | 1st fl: add bedrooms, 1 full bath, family & office. 2nd fl: remodel kitchen & bath. add 1 full bath. add deck at rear. reconfigure interior stair. | $60,000 |
| [202103116315](https://www.permitgraph.org/p/202103116315) | Mar 11, 2021 | Completed: final sign-off Apr 2026 | [479 27th Av](https://www.permitgraph.org/a/1459/004B) | addition to the rear of building, infill lightwell area, new deck and 2nd floor w/ staircase to rear yard. | $280,000 |
| [202012080500](https://www.permitgraph.org/p/202012080500) | Dec 8, 2020 | Expired or cancelled: cancelled Aug 2026 | [479 27th Av](https://www.permitgraph.org/a/1459/004B) | repair front main staircase landing due to water damage to the wood frame below. size of landing about 4x4ft. less than 50%. | $6,800 |
| [202010166615](https://www.permitgraph.org/p/202010166615) | Oct 16, 2020 | Completed: final sign-off Nov 2020 | [871 Vallejo St](https://www.permitgraph.org/a/0148/020) | repair (e) wooden staircase at rear of building. repair work to be approx 40% of (e), with like to like replacement. | $5,000 |
| [202003056323](https://www.permitgraph.org/p/202003056323) | Mar 5, 2020 | Completed: final sign-off Jan 2021 | [1257 Ulloa St](https://www.permitgraph.org/a/2414/010) | to obtain a final inspection for work approved udner pa201103081595. allwork is approved. |  |
| [201911056537](https://www.permitgraph.org/p/201911056537) | Nov 5, 2019 | Completed: final sign-off Jan 2021 | [27 Brazil Av](https://www.permitgraph.org/a/6014/022) | renovate existing (rear) single family residence, new floor, slab & finish, walls, plumbing & electrical, bathroom & kitchen, new hot water heater & room heater. | $75,000 |
| [201909262794](https://www.permitgraph.org/p/201909262794) | Sep 26, 2019 | Completed: final sign-off Sep 2020 | [62 02nd St](https://www.permitgraph.org/a/3707/008) | add ada restroom and office on 2nd fl w/ kitchenette. existing hvac & lighting systems to remain. upgrade front door for ada. | $20,000 |
| [201905019414](https://www.permitgraph.org/p/201905019414) | May 1, 2019 | Completed: final sign-off Oct 2019 | [671 35th Av](https://www.permitgraph.org/a/1578/011) | unit #1 on 2nd fl interior remodel: add a full bath room, remodel (e) kitchen. | $25,000 |
| [201903215954](https://www.permitgraph.org/p/201903215954) | Mar 21, 2019 | Completed: final sign-off Jan 2023 | [1284 04th Av](https://www.permitgraph.org/a/1752/015) | replace existing stairway at rear yard | $8,000 |
| [201811155976](https://www.permitgraph.org/p/201811155976) | Nov 15, 2018 | Completed: final sign-off Mar 2019 | [824 42nd Av](https://www.permitgraph.org/a/1684/004G) | remodel (e) 2 bathrooms and replace countertop at 2nd flr. painting entire floor. | $10,000 |
| [201804136366](https://www.permitgraph.org/p/201804136366) | Apr 13, 2018 | Never finaled: issued Apr 2018, no final | [3049 Clement St](https://www.permitgraph.org/a/1463/044) | demo only to an (e) ground fl. tenant space, oringally a laundry business on ground fl. per ab-017 | $8,000 |
| [201803274773](https://www.permitgraph.org/p/201803274773) | Mar 27, 2018 | Completed: final sign-off May 2018 | [600 41st Av](https://www.permitgraph.org/a/1583/046) | unit #6: replace sheetrock approx 390 sf @ bedrooms on 3rd floor. replace sink, vanity and toilet. replace (e) electrical panel. rewire electrical at bedrooms. replace fire damage hardwood floor. | $3,000 |
| [201803163892](https://www.permitgraph.org/p/201803163892) | Mar 16, 2018 | Completed: final sign-off Nov 2018 | [240 26th Av](https://www.permitgraph.org/a/1385/027) | revision to app#201709198948 at kitchen area at 2nd floor. | $500 |
| [201802221944](https://www.permitgraph.org/p/201802221944) | Feb 22, 2018 | Completed: final sign-off Oct 2018 | [600 41st Av](https://www.permitgraph.org/a/1583/046) | 4th flr - unit #9 - repair fire damaged walls, ceiling and floors | $5,000 |
| [201802131133](https://www.permitgraph.org/p/201802131133) | Feb 13, 2018 | Completed: final sign-off Mar 2019 | [509 Holyoke St](https://www.permitgraph.org/a/6053/034) | 1st flr rear addition with a guestroom & full bath. to comply with complaint #201828861. | $28,000 |
| [201712196910](https://www.permitgraph.org/p/201712196910) | Dec 19, 2017 | Never finaled: issued Mar 2018, no final | [1398 Marin St](https://www.permitgraph.org/a/4353/013) | convert partial storage area in e warehouse to new catering services business maher not req. alter one existing unisex restroom to meet accessiblity requirements. | $60,000 |
| [201707101438](https://www.permitgraph.org/p/201707101438) | Jul 10, 2017 | Completed: final sign-off Jul 2017 | [238 Urbano Dr](https://www.permitgraph.org/a/6913/012) | to obtain final inspection for work approved under pa#201509237768 & 201504153636 all work is complete. |  |
| [201706199753](https://www.permitgraph.org/p/201706199753) | Jun 19, 2017 | Completed: final sign-off Jul 2017 | [336 Valley St](https://www.permitgraph.org/a/6613/013) | replace siding at rear side of bldg. approx 400 sq ft. light kind & not visible from street. | $3,000 |
| [201703282612](https://www.permitgraph.org/p/201703282612) | Mar 28, 2017 | Completed: final sign-off Oct 2019 | [1259 40th Av](https://www.permitgraph.org/a/1710/012) | horizontal addition @ rear and side. interior remodel. | $100,000 |
| [201610240968](https://www.permitgraph.org/p/201610240968) | Oct 24, 2016 | Completed: final sign-off Sep 2017 | [164 Jules Av](https://www.permitgraph.org/a/6986/030) | remodel/relocate kitchen & one bathroom, add one new bathroom, convert (e) kitchen space into bedroom, construct interior staircase at 2/f. construct 2 bedrooms, 2 bathrooms & storage at g/f. | $68,000 |
| [201609137561](https://www.permitgraph.org/p/201609137561) | Sep 13, 2016 | Completed: final sign-off Sep 2016 | [331 Judah St](https://www.permitgraph.org/a/1845/044) | revision to pa #201601066507 - change moment frame to other location, add shear wall. |  |
| [201608124890](https://www.permitgraph.org/p/201608124890) | Aug 12, 2016 | Completed: final sign-off Feb 2017 | [2230 47th Av](https://www.permitgraph.org/a/2303/039) | replace kitchen floor tile, replace top cabinet & replace island counter top. replace windows at the rear side of building. | $8,000 |
| [201601268022](https://www.permitgraph.org/p/201601268022) | Jan 26, 2016 | Expired or cancelled: expired Jan 2017 | [930 Grove St](https://www.permitgraph.org/a/0798/031) | remodel existing floor 1, 2, and 3. remove doors, non bearing partition walls, bath and kitchen fixtures, furnishings, equipment. construct new doors, partiton walls, bath, kitchen fixtures, furnishi… | $200,000 |
| [201601197393](https://www.permitgraph.org/p/201601197393) | Jan 19, 2016 | Never finaled: issued Jan 2016, no final | [55 Saint Elmo Wy](https://www.permitgraph.org/a/3049/028) | to obtain final inspection for work approved under pa# 200904216699. all work is complete. |  |
| [201507212090](https://www.permitgraph.org/p/201507212090) | Jul 21, 2015 | Never finaled: issued Aug 2015, no final | [1163 Jackson St](https://www.permitgraph.org/a/0189/022) | remodel existing bedroom and add study room & powder room at #1163 | $12,000 |
| [201506259902](https://www.permitgraph.org/p/201506259902) | Jun 25, 2015 | Completed: final sign-off Nov 2015 | [1325 47th Av](https://www.permitgraph.org/a/1802/038) | to comply nov# 201409581, replace 2 column & front joist as marked on plan, clean up all the deck, wall, paint. | $10,000 |
| [201506239643](https://www.permitgraph.org/p/201506239643) | Jun 23, 2015 | Completed: final sign-off May 2016 | [846 25th Av](https://www.permitgraph.org/a/1667/038) | replace kitchen cabient & countertop @ 2nd floor. exisitng bath change tub, toilet & sink @ 3rd floor. change existing closet to bathroom w/new tub, toilet & sink. | $25,000 |
| [201506199485](https://www.permitgraph.org/p/201506199485) | Jun 19, 2015 | Expired or cancelled: cancelled Aug 2016 | [1260 Fulton St](https://www.permitgraph.org/a/1180/011) | renew expired building permit 200412131306 for final inspection. compliance with maher ordinance no 155-13 not required. |  |
| [201506199484](https://www.permitgraph.org/p/201506199484) | Jun 19, 2015 | Expired or cancelled: cancelled Aug 2016 | [1260 Fulton St](https://www.permitgraph.org/a/1180/011) | renew expired building permit 09621037 for final inspection. compliance with maher ordinane no 155-13 not required. |  |
| [201506199486](https://www.permitgraph.org/p/201506199486) | Jun 19, 2015 | Never finaled: issued Jun 2015, no final | [1260 Fulton St](https://www.permitgraph.org/a/1180/011) | to comply with physical inspection inspection final report cc-7972 | $1,000 |
| [201504214250](https://www.permitgraph.org/p/201504214250) | Apr 21, 2015 | Completed: final sign-off Jan 2016 | [494 Molimo Dr](https://www.permitgraph.org/a/3010/038) | remodel (e) master and both bathrooms on 2nd flr | $16,000 |
| [201501085182](https://www.permitgraph.org/p/201501085182) | Jan 8, 2015 | Completed: final sign-off Mar 2015 | [195 Merced Av](https://www.permitgraph.org/a/2924/009) | rev. pa#201404113002, add one wet bar @ 2/f bedroom. | $1,000 |
| [201412234374](https://www.permitgraph.org/p/201412234374) | Dec 23, 2014 | Completed: final sign-off Jun 2017 | [2440 23rd Av](https://www.permitgraph.org/a/2403/029) | horizontal & vertical addition. 1st fl: convert (e) spaces to have a family rm, a guest rm, a bath. 2nd flr: remodel (e) space to have (2) bedrms,two baths, kitchen, living & dining area. 3rd flrl ma… | $200,000 |
| [201410098578](https://www.permitgraph.org/p/201410098578) | Oct 9, 2014 | Completed: final sign-off Jan 2015 | [4820 Anza St](https://www.permitgraph.org/a/1505/016) | remodel (e) kitchen - replace cabinets, counter top. | $4,500 |
| [201409176560](https://www.permitgraph.org/p/201409176560) | Sep 17, 2014 | Completed: final sign-off Oct 2014 | [275 Claremont Bl](https://www.permitgraph.org/a/2986/011) | install plywood 8'x61' at garage | $500 |
| [201408083389](https://www.permitgraph.org/p/201408083389) | Aug 8, 2014 | Completed: final sign-off Aug 2016 | [1161 Jackson St](https://www.permitgraph.org/a/0189/022) | install private residential elevator to 2 existing units; all interior, no pent house | $30,000 |
| [201406259509](https://www.permitgraph.org/p/201406259509) | Jun 25, 2014 | Never finaled: issued Jun 2014, no final | [607 28th Av](https://www.permitgraph.org/a/1571/001) | repair dry rotted at front left side of the building - approximately 200 square feet. | $5,000 |
| [201405024801](https://www.permitgraph.org/p/201405024801) | May 2, 2014 | Never finaled: issued May 2014, no final | [607 28th Av](https://www.permitgraph.org/a/1571/001) | provide interior remodel to unit 607, 1 or 4 units in building complex. add 1 new bathroom, convert dining room to bedroom 2, remodel kitchen, replace furnace and water heater and general electrical… | $30,000 |
| [201404163433](https://www.permitgraph.org/p/201404163433) | Apr 16, 2014 | Completed: final sign-off Jun 2014 | [2206 46th Av](https://www.permitgraph.org/a/2304/020) | comply with nov. 201455731. remodel extg bathroom on ground floor. no habitable rooms on ground floor. | $13,000 |
| [201404113002](https://www.permitgraph.org/p/201404113002) | Apr 11, 2014 | Completed: final sign-off Mar 2015 | [195 Merced Av](https://www.permitgraph.org/a/2924/009) | demolish one existing bath room & build 2 new bathrooms @ same location. | $12,000 |
| [201312184544](https://www.permitgraph.org/p/201312184544) | Dec 18, 2013 | Completed: final sign-off Jan 2014 | [465 Castro St](https://www.permitgraph.org/a/3582/061) | rear stairway repair less than 50% | $2,500 |
| [201308013301](https://www.permitgraph.org/p/201308013301) | Aug 1, 2013 | Completed: final sign-off Jun 2014 | [1255 23rd Av](https://www.permitgraph.org/a/1727/011) | revision to appl #2011.12.09.0437 - remove wall @ 2nd floor kitchen & relocate the shear wall @ 2nd floor. |  |
| [201307021036](https://www.permitgraph.org/p/201307021036) | Jul 2, 2013 | Completed: final sign-off Jun 2014 | [1255 23rd Av](https://www.permitgraph.org/a/1727/011) | kitchen & bathroom remodel-replace sheetrock in dining room, living room & bedroom. | $20,000 |
| [201306270684](https://www.permitgraph.org/p/201306270684) | Jun 27, 2013 | Completed: final sign-off Jul 2013 | [130 Cresta Vista Dr](https://www.permitgraph.org/a/3005C/021) | comply w/nov #201259541 - rebuild existing front stairway. | $6,000 |
| [201306210141](https://www.permitgraph.org/p/201306210141) | Jun 21, 2013 | Completed: final sign-off Jan 2020 | [363 21st Av](https://www.permitgraph.org/a/1453/013) | erect 4-story, 3-unit dwelling residence | $500,000 |
| [201305096535](https://www.permitgraph.org/p/201305096535) | May 9, 2013 | Completed: final sign-off Nov 2013 | [1501 Monterey Bl](https://www.permitgraph.org/a/3260/025) | remodel (e) kitchen @ 1st flr, remodel, 2 (e) bathrooms @ 2nd flr, no wall remove; replace (e) exh fans & reconnect to (e) vent ducts, lighting in kitchen & bathroom shall comply with cec 150(k)8,10 | $20,000 |
| [201303132161](https://www.permitgraph.org/p/201303132161) | Mar 13, 2013 | Never finaled: issued Mar 2013, no final | [2286 45th Av](https://www.permitgraph.org/a/2305/025) | repair front wood deck - replace dry rot lumbers and reinforce post footing - less than 50% | $4,000 |
| [201301188363](https://www.permitgraph.org/p/201301188363) | Jan 18, 2013 | Never finaled: issued Jan 2013, no final | [2286 45th Av](https://www.permitgraph.org/a/2305/025) | kitchen & bathroom remodel at 2nd floor, interior paint. no change in walls & opening | $13,000 |
| [201112160890](https://www.permitgraph.org/p/201112160890) | Dec 16, 2011 | Completed: final sign-off Jul 2012 | [1477 Underwood Av](https://www.permitgraph.org/a/4810/020) | remodel (e) bathroom @ 2nd. flr. convert (e) closet to bathroom on 2nd. flr. replace lath & plaster to 5/8" type "x" @ bedrooms and living rm at 2nd. flr. repair exterior stairs less than 50% of enti… | $50,000 |
| [201112090437](https://www.permitgraph.org/p/201112090437) | Dec 9, 2011 | Completed: final sign-off Jun 2014 | [1255 23rd Av](https://www.permitgraph.org/a/1727/011) | vertical addition over (3) 2-story bldg at rear of 3rd floor. add 1 (n) bath & storage room, replace (e) concrete slab w/ (n) at ground floor. | $50,000 |
| [201111239554](https://www.permitgraph.org/p/201111239554) | Nov 23, 2011 | Completed: final sign-off Aug 2012 | [9 Balceta Av](https://www.permitgraph.org/a/2890/024) | add two bedrooms, one and half bathroom, laundry room & entertainment at first floor; approx 498 sq ft. | $36,000 |
| [201111169068](https://www.permitgraph.org/p/201111169068) | Nov 16, 2011 | Completed: final sign-off Mar 2012 | [1850 09th Av](https://www.permitgraph.org/a/2045/032) | remodel (e) 1 kitchen & 1 bath at 2nd floor. | $12,000 |
| [201111169071](https://www.permitgraph.org/p/201111169071) | Nov 16, 2011 | Completed: final sign-off Jan 2012 | [34 Cervantes Bl](https://www.permitgraph.org/a/0443A/002) | remodel (e) kitchen at third floor. | $6,000 |
| [201111038254](https://www.permitgraph.org/p/201111038254) | Nov 3, 2011 | Completed: final sign-off Jul 2013 | [130 Cresta Vista Dr](https://www.permitgraph.org/a/3005C/021) | remodel (e) kitchen @ 2nd. flr. remodel (e) bathroom & master bathroom @ 3rd. flr. relocate (e) laundry area @ 1st. flr. remodel (e) bathroom @ 1st. flr. paint exterior, replace (e) windows at front… | $20,000 |
| [201108313629](https://www.permitgraph.org/p/201108313629) | Aug 31, 2011 | Completed: final sign-off May 2012 | [140 Merced Av](https://www.permitgraph.org/a/2886/008) | add 1 bath at ground floor | $5,000 |
| [201107150378](https://www.permitgraph.org/p/201107150378) | Jul 15, 2011 | Completed: final sign-off May 2012 | [710 Kearny St](https://www.permitgraph.org/a/0208/011) | replace floor and wall tiles at kitchen and dining area. new hand sink and prep sink at kitchen. provide (n) service coutner 36" wide x 34" high. | $12,000 |
| [201106077634](https://www.permitgraph.org/p/201106077634) | Jun 7, 2011 | Completed: final sign-off Jul 2011 | [246 20th Av](https://www.permitgraph.org/a/1414/034) | replace (e) window at front building, total 6 windows, replace 12 rear window with vinyl | $2,000 |
| [201104224633](https://www.permitgraph.org/p/201104224633) | Apr 22, 2011 | Completed: final sign-off Sep 2011 | [1343 Gilman Av](https://www.permitgraph.org/a/4941/034) | add 2 bedrooms, half bath and storage at 1st floor. new deck and stairs at rear side of the building | $30,000 |
| [201104204486](https://www.permitgraph.org/p/201104204486) | Apr 20, 2011 | Completed: final sign-off Jun 2011 | [9 Balceta Av](https://www.permitgraph.org/a/2890/024) | remodel (e) kitchen on second floor. remove (e) cabinets; flooring, plumbing fixtures & appliances. remove bedrooms, dining room, living room, ceiling plaster & latches & (n) insulationr r-30. 50% fl… | $9,000 |
| [201103252878](https://www.permitgraph.org/p/201103252878) | Mar 25, 2011 | Expired or cancelled: expired Jan 2017 | [930 Grove St](https://www.permitgraph.org/a/0798/031) | repair lath & plaster in unit's 6,7,8,9,10 & 11. repair unit's crack ceiling to comply nov#201079911. revision to appl.#201005202917; modify & relocate bathroom fixtures within same space per plans. | $7,000 |
| [201103081595](https://www.permitgraph.org/p/201103081595) | Mar 8, 2011 | Expired or cancelled: expired Jan 2021 | [1257 Ulloa St](https://www.permitgraph.org/a/2414/010) | add horizontal addition at new basement & ground floor. add new 3rd story addition & remodel (e) bedrooms & add 1 new bathroom @ 2nd story & remodel (e). add new bedroom, office, bathroom & family ro… | $140,000 |
| [201103011173](https://www.permitgraph.org/p/201103011173) | Mar 1, 2011 | Completed: final sign-off Apr 2011 | [775 43rd Av](https://www.permitgraph.org/a/1601/008A) | replace dry wall at 2 bedrooms on 2nd flr, new insulation work r-13 | $1,000 |
| [201102281103](https://www.permitgraph.org/p/201102281103) | Feb 28, 2011 | Completed: final sign-off Apr 2011 | [653 Cayuga Av](https://www.permitgraph.org/a/6795C/012) | add 2 bedrooms, 2 full bathrooms and storage room at 1st floor. replace 2 windows at rear side of building | $30,000 |
| [201012207046](https://www.permitgraph.org/p/201012207046) | Dec 20, 2010 | Never finaled: issued Dec 2010, no final | [1622 34th Av](https://www.permitgraph.org/a/1910/046) | renew pa #200808088724 to continue work & obtain final inspection. |  |
| [201012176963](https://www.permitgraph.org/p/201012176963) | Dec 17, 2010 | Never finaled: issued Dec 2010, no final | [1622 34th Av](https://www.permitgraph.org/a/1910/046) | legalize (e) master batroom at 2nd floor. | $4,500 |
| [201012106504](https://www.permitgraph.org/p/201012106504) | Dec 10, 2010 | Completed: final sign-off Mar 2011 | [1622 34th Av](https://www.permitgraph.org/a/1910/046) | renew pa#2008-09-19-2083 for final inspection |  |
| [201010082641](https://www.permitgraph.org/p/201010082641) | Oct 8, 2010 | Completed: final sign-off Dec 2010 | [268 Desmond St](https://www.permitgraph.org/a/6309C/010) | repair stucco & dry-rot at front of building, approx. 40 sq.ft. | $1,000 |

---