# Sgv Group Construction

Contractor license 996802. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/sgv-group-construction-996802
- JSON: https://www.permitgraph.org/api/contractor?license=996802
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=996802

61 permits since 2000: 55 completed, 1 in progress, 3 never finaled, 2 expired or cancelled. Typically 64 days from filing to permit and 153 days from permit to final inspection. Of the 3 never-finaled permits, 3 are 5 to 10 years old.

- Based in: San Francisco
- On San Francisco permits: Dec 2014 to Sep 2026
- Last 24 months: 5 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2014 | 1 | 0 | 0 | 0 |
| 2015 | 3 | 0 | 0 | 0 |
| 2016 | 14 | 0 | 1 | 1 |
| 2017 | 16 | 0 | 0 | 1 |
| 2018 | 4 | 0 | 0 | 0 |
| 2019 | 2 | 0 | 1 | 0 |
| 2020 | 1 | 0 | 1 | 0 |
| 2021 | 3 | 0 | 0 | 0 |
| 2022 | 4 | 0 | 0 | 0 |
| 2023 | 2 | 0 | 0 | 0 |
| 2024 | 1 | 0 | 0 | 0 |
| 2025 | 2 | 1 | 0 | 0 |
| 2026 | 2 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 4 | 4 | 0 | 0 | 0 | 7 | 110 |
| Deck | 3 | 3 | 0 | 0 | 0 | 14 | 196 |
| Bathroom remodel | 4 | 3 | 0 | 1 | 0 | 18 | 331 |
| Kitchen remodel | 4 | 2 | 1 | 0 | 1 | 18 | 264 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202609027589](https://www.permitgraph.org/p/202609027589) | Sep 2, 2026 | Completed: final sign-off Nov 2026 | [842 24th Av](https://www.permitgraph.org/a/1666/037) | infill under (e) rear cantilvered habitable space for new 137.5 sf storage room. | $20,000 |
| [202602176028](https://www.permitgraph.org/p/202602176028) | Feb 17, 2026 | Completed: final sign-off Mar 2026 | [4390 17th St](https://www.permitgraph.org/a/2646/027) | ref pa # 2025-1219-2280: shoring plan for replacement of (e) brick foundation w/a reinforced concrete foundation | $5,000 |
| [202512192280](https://www.permitgraph.org/p/202512192280) | Dec 19, 2025 | Completed: final sign-off Mar 2026 | [4390 17th St](https://www.permitgraph.org/a/2646/027) | replace the existing brick foundation with a reinforced concrete foundation. | $80,000 |
| [202511129367](https://www.permitgraph.org/p/202511129367) | Dec 9, 2025 | In progress: issued May 2026 | [5530 Mission St](https://www.permitgraph.org/a/7066/033) | per unit legalization ord# 43-14. legalize one (3 bedroom) unit. remove & install exterior doors & windows. remove (e) kitchen & install new kitchen. fire rated assemblies. egress & eero path improve… | $100,000 |
| [202504305554](https://www.permitgraph.org/p/202504305554) | Apr 30, 2025 | Completed: final sign-off Nov 2025 | [456 Diamond St](https://www.permitgraph.org/a/2768/009) | infill (e) lightwell (3rd fl only) new door and windows (rear only) new skylight, extension of rear deck (side only) at 2nd fl. repairs in kind to front stair, remodeled kitchen and bathroom. new pow… | $104,162 |
| [202409301965](https://www.permitgraph.org/p/202409301965) | Oct 29, 2024 | Completed: final sign-off Jul 2025 | [2390 Francisco St](https://www.permitgraph.org/a/0927/019) | to comply w/ nov# 202302572, seismic retrofit of (e) building that has a garage level with brick perimeter walls and steel framing and 3-stories of wood frame above. to comply with chapter sfebc 5b a… | $80,000 |
| [202307111910](https://www.permitgraph.org/p/202307111910) | Jul 11, 2023 | Completed: final sign-off Mar 2024 | [456 Diamond St](https://www.permitgraph.org/a/2768/009) | revision to pa 2023-0509-7423 installing 1 long beam instead of 2 beams | $5,000 |
| [202305097423](https://www.permitgraph.org/p/202305097423) | May 9, 2023 | Completed: final sign-off Mar 2024 | [456 Diamond St](https://www.permitgraph.org/a/2768/009) | reduce scope of pa#: 202212077788; replacing only about 1/2 foundation. replacing part of wall with new beam. elminating seismic retrofit |  |
| [202212077788](https://www.permitgraph.org/p/202212077788) | Dec 7, 2022 | Completed: final sign-off Mar 2024 | [456 Diamond St](https://www.permitgraph.org/a/2768/009) | foundation replacement, replace central wall 3/new beam, 1/f seismic retrofit per sfbc 503.11, rear window install @ 1st floor uf<0.3 | $120,000 |
| [202211307390](https://www.permitgraph.org/p/202211307390) | Nov 30, 2022 | Completed: final sign-off Dec 2022 | [2706 Hyde St](https://www.permitgraph.org/a/0024/011B) | in-kind repair decks and/ or stairs in rear (less than 50%) | $1,000 |
| [202204011407](https://www.permitgraph.org/p/202204011407) | Apr 1, 2022 | Completed: final sign-off Aug 2024 | [2555 39th Av](https://www.permitgraph.org/a/2440/014) | revision to bpa 202010196785. 1/f: convert approved 3-fixture bathroom into water closet. reconfigure 4-fixture bathroom layout. enlarge bedroom closet. |  |
| [202203160145](https://www.permitgraph.org/p/202203160145) | Mar 16, 2022 | Completed: final sign-off Apr 2022 | [2395 Vallejo St](https://www.permitgraph.org/a/0563/018) | at garage lateral walls (20 lf). bolt mudsill 5/8 all thread at 16" on center min. 7" embedment. add plywood nail with 10d shorts 4" edge 12" field. add clips at joists to top plate. plywood to cover… | $5,000 |
| [202110130332](https://www.permitgraph.org/p/202110130332) | Oct 13, 2021 | Completed: final sign-off Sep 2022 | [64 Agua Wy](https://www.permitgraph.org/a/2959/021) | interior remodel of existing single family home. new rear deck & stairs to garden. two new bathrooms and 2 new bedrooms downstairs. kitchen remoel on upper floor. | $250,000 |
| [202108206876](https://www.permitgraph.org/p/202108206876) | Aug 20, 2021 | Completed: final sign-off Sep 2021 | [1791 48th Av](https://www.permitgraph.org/a/2001/020) | to obtain a final inspection for work approved under pa 201601227714. all work is complete. |  |
| [202103086060](https://www.permitgraph.org/p/202103086060) | Mar 8, 2021 | Completed: final sign-off Mar 2021 | [1221 02nd Av](https://www.permitgraph.org/a/1748/030) | repair stairway. 50% repair or less. | $1,000 |
| [202008151883](https://www.permitgraph.org/p/202008151883) | Aug 15, 2020 | Never finaled: issued Sep 2020, no final | [701 Hampshire St](https://www.permitgraph.org/a/4078/018) | demo of existing sheetrock on walls and replacement of existing wall sheetrock in 4 units (101/102/103/203). replace rusted plumbing, install flooring and install cabinetry (like for like replacement… | $8,000 |
| [202002134455](https://www.permitgraph.org/p/202002134455) | Feb 13, 2020 | Completed: final sign-off Jun 2021 | [701 Hampshire St](https://www.permitgraph.org/a/4078/018) | revision 201710030297, foundation revision to include mat slab |  |
| [201912068877](https://www.permitgraph.org/p/201912068877) | Dec 6, 2019 | Completed: final sign-off Jun 2020 | [2690 Great Hy](https://www.permitgraph.org/a/2449/026) | to obtain final inspection for work approved. all work is complete |  |
| [201910174843](https://www.permitgraph.org/p/201910174843) | Oct 17, 2019 | Completed: final sign-off Sep 2020 | [875 Vermont St](https://www.permitgraph.org/a/4093/080) | revision to pa 201709117647. replace 2 planned steel frames w/ shear walls |  |
| [M1142767](https://www.permitgraph.org/p/M1142767) | Sep 25, 2019 | Never finaled: issued Sep 2019, no final | [875 Vermont St](https://www.permitgraph.org/a/4093/080) | street space |  |
| [201808137204](https://www.permitgraph.org/p/201808137204) | Aug 13, 2018 | Completed: final sign-off Sep 2019 | [160 Graystone Tr](https://www.permitgraph.org/a/2719B/008) | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $60,000 |
| [201806040846](https://www.permitgraph.org/p/201806040846) | Jun 4, 2018 | Completed: final sign-off Mar 2019 | [1725 Hyde St](https://www.permitgraph.org/a/0153/007) | revision to pa# 201709077202; shear wall relocation |  |
| [201805250177](https://www.permitgraph.org/p/201805250177) | May 25, 2018 | Completed: final sign-off Sep 2018 | [590 South Van Ness Av](https://www.permitgraph.org/a/3570/008) | voluntary seismic upgrade at gr fl per 2016 cebc appendix a4 | $33,000 |
| [201804186656](https://www.permitgraph.org/p/201804186656) | Apr 18, 2018 | Completed: final sign-off Sep 2019 | [471 Haight St](https://www.permitgraph.org/a/0859/038) | comple with nov 201854761 - sub sidewalk repair repair structure supporting sidewalk work | $25,000 |
| [201712136374](https://www.permitgraph.org/p/201712136374) | Dec 13, 2017 | Completed: final sign-off Aug 2020 | [4100 Fulton St](https://www.permitgraph.org/a/1660/019A) | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $100,000 |
| [201711305194](https://www.permitgraph.org/p/201711305194) | Nov 30, 2017 | Completed: final sign-off Oct 2019 | [62 Sheridan St](https://www.permitgraph.org/a/3519/035A) | compliance with mandatory seismic retrofit program per 2016 sfebc chapter 4d & 2016 cebc appex a-4. ** maher: n/a ** | $60,000 |
| [201710030297](https://www.permitgraph.org/p/201710030297) | Oct 3, 2017 | Completed: final sign-off Jun 2021 | [701 Hampshire St](https://www.permitgraph.org/a/4078/018) | soft story retrofit per sfebc ch 4d. 2015 iebc app a4 | $60,000 |
| [201709158427](https://www.permitgraph.org/p/201709158427) | Sep 15, 2017 | Completed: final sign-off Nov 2018 | [3822 19th St](https://www.permitgraph.org/a/3585/087) | soft story retrofit per sfebc chapter 4d, engineering criteria: 2016 cebc appendix a-4. | $40,000 |
| [201709148321](https://www.permitgraph.org/p/201709148321) | Sep 14, 2017 | Completed: final sign-off Jun 2022 | [5530 Mission St](https://www.permitgraph.org/a/7066/033) | (commercial) soft story retrofit per 2016 iebc appendix ch a4. no actual construction work required to be done at commercial space. ref pa# 200104116608 |  |
| [201709148324](https://www.permitgraph.org/p/201709148324) | Sep 14, 2017 | Completed: final sign-off Jun 2022 | [5530 Mission St](https://www.permitgraph.org/a/7066/033) | (residential) soft story retrofit per 2016 iebc app ch a4 | $45,000 |
| [201709137901](https://www.permitgraph.org/p/201709137901) | Sep 13, 2017 | Completed: final sign-off Feb 2019 | [267 San Jose Av](https://www.permitgraph.org/a/6514/017) | compliance with mandatory soft story retrofit program, cebc 2016 app a4 & sfebc 2016 chp 4d. | $65,000 |
| [201709127812](https://www.permitgraph.org/p/201709127812) | Sep 12, 2017 | Completed: final sign-off Jun 2019 | [2447 Vallejo St](https://www.permitgraph.org/a/0562/031) | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $45,000 |
| [201709117647](https://www.permitgraph.org/p/201709117647) | Sep 11, 2017 | Completed: final sign-off Sep 2020 | [875 Vermont St](https://www.permitgraph.org/a/4093/080) | soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4. | $70,000 |
| [201709117546](https://www.permitgraph.org/p/201709117546) | Sep 11, 2017 | Expired or cancelled: expired May 2024 | [1840 Franklin St](https://www.permitgraph.org/a/0623/007A) | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 | $90,000 |
| [201709087330](https://www.permitgraph.org/p/201709087330) | Sep 8, 2017 | Completed: final sign-off Mar 2018 | [198 Dolores St](https://www.permitgraph.org/a/3544/014) | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $65,000 |
| [201709087347](https://www.permitgraph.org/p/201709087347) | Sep 8, 2017 | Completed: final sign-off Feb 2020 | [2912 Fillmore St](https://www.permitgraph.org/a/0540/035) | soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. | $40,000 |
| [201709077202](https://www.permitgraph.org/p/201709077202) | Sep 7, 2017 | Completed: final sign-off Mar 2019 | [1725 Hyde St](https://www.permitgraph.org/a/0153/007) | soft story retrofit per sfebc chapter 4d: asce 41-06 | $25,000 |
| [201709016793](https://www.permitgraph.org/p/201709016793) | Sep 1, 2017 | Completed: final sign-off Sep 2019 | [1848 Franklin St](https://www.permitgraph.org/a/0623/007B) | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. maher na | $90,000 |
| [201707192302](https://www.permitgraph.org/p/201707192302) | Jul 19, 2017 | Completed: final sign-off Oct 2017 | [3233 Scott St](https://www.permitgraph.org/a/0936/006) | revision to soft story pa #201602018445. additional grade beam. as-built grade beam lengths. maher n/a |  |
| [201704244649](https://www.permitgraph.org/p/201704244649) | Apr 24, 2017 | Completed: final sign-off Oct 2018 | [2400 Webster St](https://www.permitgraph.org/a/0589/015) | soft story retrofit per 2016 cebc appendix a4 | $50,000 |
| [201702018422](https://www.permitgraph.org/p/201702018422) | Feb 1, 2017 | Completed: final sign-off Dec 2017 | [1246 Sacramento St](https://www.permitgraph.org/a/0221/004B) | soft story retrofit per 2012 iebc apendix a-4. | $90,000 |
| [201612286002](https://www.permitgraph.org/p/201612286002) | Dec 28, 2016 | Completed: final sign-off Apr 2018 | [3 Commonwealth Av](https://www.permitgraph.org/a/1038/001) | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4; n/a maher | $75,000 |
| [201612134799](https://www.permitgraph.org/p/201612134799) | Dec 13, 2016 | Completed: final sign-off Dec 2017 | [861 Hayes St](https://www.permitgraph.org/a/0821/031) | stregthening bldg to comform to soft story ordinance ab107, part f, iebc appx a4. basis of rational analysis. ** maher: n/a ** | $60,000 |
| [201611152764](https://www.permitgraph.org/p/201611152764) | Nov 15, 2016 | Never finaled: issued Nov 2016, no final | [926 Haight St](https://www.permitgraph.org/a/1237/011) | revision to pa 201607122055; moving a shear wall by 3 ft. |  |
| [201611031828](https://www.permitgraph.org/p/201611031828) | Nov 3, 2016 | Completed: final sign-off Aug 2017 | [1526 Filbert St](https://www.permitgraph.org/a/0522/003) | soft story retrofit per sfbc ch 34b based on 2012 iebc appendix a-4. | $53,000 |
| [201608084483](https://www.permitgraph.org/p/201608084483) | Aug 8, 2016 | Completed: final sign-off Apr 2019 | [1915 Bush St](https://www.permitgraph.org/a/0675/028) | revision to ref pa 201605096948 relocate steel frame to avoid utility conflict |  |
| [201608084484](https://www.permitgraph.org/p/201608084484) | Aug 8, 2016 | Completed: final sign-off Aug 2016 | [1065 South Van Ness Av](https://www.permitgraph.org/a/3614/065) | revision to ref pa 201510139462 add new steel frame to avoid utility conflict. per field inspection comments - clarification | $2,000 |
| [201607122055](https://www.permitgraph.org/p/201607122055) | Jul 12, 2016 | Completed: final sign-off Dec 2016 | [926 Haight St](https://www.permitgraph.org/a/1237/011) | soft story retrofit per sfbc chapther 34b engineering criteria 2012 iebc appendix a-4 | $47,000 |
| [201605096948](https://www.permitgraph.org/p/201605096948) | May 9, 2016 | Completed: final sign-off Oct 2016 | [1915 Bush St](https://www.permitgraph.org/a/0675/028) | soft story retrofit per sfbc chapter 34b, per 2012 iebc appendix a4. | $30,000 |
| [201604205227](https://www.permitgraph.org/p/201604205227) | Apr 20, 2016 | Completed: final sign-off Nov 2016 | [2433 Larkin St](https://www.permitgraph.org/a/0524/005) | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4 | $40,000 |
| [201604154915](https://www.permitgraph.org/p/201604154915) | Apr 15, 2016 | Completed: final sign-off Jun 2018 | [471 Vallejo St](https://www.permitgraph.org/a/0144/027) | soft story to comply with program using appex a4 of 2012 iebc. include 1/2 address, 475 1/2 & 477 1/2 in addition to those listed on permit | $50,000 |
| [201603293381](https://www.permitgraph.org/p/201603293381) | Mar 29, 2016 | Completed: final sign-off Jan 2020 | [289 Chestnut St](https://www.permitgraph.org/a/0061/021) | soft story retrofit per sfbc chapter 34 b engineering criterioa iebc appendix a4. reinforce w gr level shear walls. add plywood, foundation anchors, holdowns, ties | $6,000 |
| [201602169706](https://www.permitgraph.org/p/201602169706) | Feb 16, 2016 | Completed: final sign-off Apr 2016 | [2448 15th St](https://www.permitgraph.org/a/2612/024) | soft story retrofit per sfbc ch 34b; based on iebc appendiex chapter a4 | $50,000 |
| [201602109223](https://www.permitgraph.org/p/201602109223) | Feb 10, 2016 | Completed: final sign-off Oct 2022 | [250 Connecticut St](https://www.permitgraph.org/a/4004/007) | soft story retrofit per sfbc chapter 34b enginerring criteria: 2012 iebc appendix a4. soft story mitigation for sf wood-frane seismic retrofit program. add 2 new shear walls and footings | $10,000 |
| [201602018446](https://www.permitgraph.org/p/201602018446) | Feb 1, 2016 | Completed: final sign-off May 2017 | [430 44th Av](https://www.permitgraph.org/a/1475/033) | soft story retrofit per sfbc chapter 34b; iebc appendix ch a-4 | $50,000 |
| [201602018445](https://www.permitgraph.org/p/201602018445) | Feb 1, 2016 | Completed: final sign-off Oct 2017 | [3233 Scott St](https://www.permitgraph.org/a/0936/006) | soft story retrofit per sfbc chapter 34b, iebc appendix ch a-4; maher n/a | $50,000 |
| [201601227714](https://www.permitgraph.org/p/201601227714) | Jan 22, 2016 | Expired or cancelled: expired Sep 2021 | [1791 48th Av](https://www.permitgraph.org/a/2001/020) | remove and replace drywall patches to install electrical light fixtures and repct. repair water damaged floors. replace kitchen cabinets and fixtures (sink, hood, dishwasher, range). repair water dam… | $9,000 |
| [201511243448](https://www.permitgraph.org/p/201511243448) | Nov 24, 2015 | Completed: final sign-off Aug 2016 | [965 Alvarado St](https://www.permitgraph.org/a/2801/026) | soft story retrofit to strengthen bldg to conform to sfbc chapter 34b, iebc appendix a-4. | $70,000 |
| [201510139462](https://www.permitgraph.org/p/201510139462) | Oct 13, 2015 | Completed: final sign-off Aug 2016 | [1065 South Van Ness Av](https://www.permitgraph.org/a/3614/065) | soft story retrofit per mandated program | $50,000 |
| [201502117985](https://www.permitgraph.org/p/201502117985) | Feb 11, 2015 | Completed: final sign-off Apr 2015 | [180 Dolores St](https://www.permitgraph.org/a/3544/013A) | revision to pa #201412163842: revised structural detail for sf soft story |  |
| [201412163842](https://www.permitgraph.org/p/201412163842) | Dec 16, 2014 | Completed: final sign-off Apr 2015 | [180 Dolores St](https://www.permitgraph.org/a/3544/013A) | soft story compliance mandatory seismic retrofit per sfbc chapter 34b, foundation, building reinforcement on ground floor, add anchor bolts to foundation, add new simpson strong walls to front openin… | $50,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.