# Seapoint Construction

Contractor license 896999. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/seapoint-construction-896999
- JSON: https://www.permitgraph.org/api/contractor?license=896999
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=896999

38 permits since 2000: 24 completed, 2 in progress, 10 never finaled, 2 expired or cancelled. Typically 15 days from filing to permit and 186 days from permit to final inspection. Of the 10 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 2 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Apr 2012 to May 2026
- Last 24 months: 3 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2012 | 0 | 0 | 1 | 0 |
| 2014 | 0 | 0 | 0 | 1 |
| 2016 | 1 | 0 | 3 | 0 |
| 2017 | 2 | 0 | 1 | 0 |
| 2018 | 5 | 0 | 2 | 0 |
| 2019 | 1 | 0 | 0 | 0 |
| 2020 | 4 | 0 | 2 | 0 |
| 2022 | 6 | 0 | 1 | 0 |
| 2023 | 3 | 0 | 0 | 1 |
| 2024 | 1 | 0 | 0 | 0 |
| 2025 | 1 | 0 | 0 | 0 |
| 2026 | 0 | 2 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Deck | 5 | 4 | 0 | 0 | 1 | 244 | 224 |
| Kitchen remodel | 9 | 7 | 1 | 1 | 0 | 61 | 448 |
| Bathroom remodel | 13 | 10 | 1 | 2 | 0 | 61 | 186 |
| Stairs | 5 | 5 | 0 | 0 | 0 | 23 | 921 |
| Roof deck | 1 | 1 | 0 | 0 | 0 | 361 | 921 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202605271943](https://www.permitgraph.org/p/202605271943) | May 27, 2026 | In progress: issued May 2026 | [2708 Union St](https://www.permitgraph.org/a/0947/042) | 2 bathroom remodels, remove all finished, new plumbing and electrical, new drywall, tiles, paint. new insulation | $70,000 |
| [202603308498](https://www.permitgraph.org/p/202603308498) | Mar 30, 2026 | In progress: issued Apr 2026 | [1471 43rd Av](https://www.permitgraph.org/a/1810/014) | 152 sf kitchen remodel of existing single-family residence. no work visible from street or back yard. no structural work, mep permits by others. remove existing kitchen and associated elements. repla… | $54,000 |
| [202510238054](https://www.permitgraph.org/p/202510238054) | Oct 23, 2025 | Completed: final sign-off Apr 2026 | [1187 Stanyan St](https://www.permitgraph.org/a/2644/006) | in-kind remodeling of 5 bathroom(s) in 1st fl, 2nd fl, 3rd fl with 2 shower pan(s). | $150,000 |
| [202403288802](https://www.permitgraph.org/p/202403288802) | Mar 28, 2024 | Completed: final sign-off Jun 2024 | [4340 25th St](https://www.permitgraph.org/a/6540/016) | minor dry rot repair and replace in kind. remove damaged window sill and siding under large fixed solarium glass fixture. paint. non visible to the street | $2,000 |
| [202308224937](https://www.permitgraph.org/p/202308224937) | Aug 22, 2023 | Completed: final sign-off Mar 2024 | [636 Diamond St](https://www.permitgraph.org/a/2805/005) | revision to pa# 202306210514. to document wall framing replacement at rear 1st fl & height change at property line 1-hr deck * | $500 |
| [202306210514](https://www.permitgraph.org/p/202306210514) | Jun 21, 2023 | Completed: final sign-off Mar 2024 | [636 Diamond St](https://www.permitgraph.org/a/2805/005) | interior remodel at rear of house. new rear door and 2 windows. new deck at rear yard | $115,000 |
| [202304034931](https://www.permitgraph.org/p/202304034931) | Apr 3, 2023 | Expired or cancelled: cancelled Jan 2026 | [1950 Mcallister St](https://www.permitgraph.org/a/1159/012) | the project consist of a new wood framed deck with a finished surface 30" or less from adjacent finished grade and a new 1 hour rated firewall at the property line. the firewall is 7' 7 1/2" from ave… | $7,000 |
| [202303143650](https://www.permitgraph.org/p/202303143650) | Mar 14, 2023 | Completed: final sign-off Aug 2023 | [1950 Mcallister St](https://www.permitgraph.org/a/1159/012) | apt 2: new kitchen and bathroom remodel ,new paint, tile and kitchen cabinets, new bathroom vanity. no exterior work. no changes to wall layout. | $30,000 |
| [202211176741](https://www.permitgraph.org/p/202211176741) | Nov 17, 2022 | Completed: final sign-off May 2026 | [161 Beaver St](https://www.permitgraph.org/a/2614/089A) | remodel one bedroom,2 baths,1 kitchen,reconstruct laundry room fl,northwall and roof,add gangway(sloping roof deck)over new laundry roof(laundry room in kind const)no increase in footprint or height)… | $62,455 |
| [202209162625](https://www.permitgraph.org/p/202209162625) | Sep 16, 2022 | Completed: final sign-off Dec 2023 | [59 Potomac St](https://www.permitgraph.org/a/0865/008) | composition shingle roof replacement in kind. repair, replacement in kind, and alterations at front elevation. removal of (e) concrete curbs and driveway and replacement with (n) concrete curbs, plan… | $100 |
| [202207158615](https://www.permitgraph.org/p/202207158615) | Jul 15, 2022 | Completed: final sign-off Jul 2022 | [2062 Pine St](https://www.permitgraph.org/a/0651/065) | renew for final 201704264926, 201612215650 all work is complete. ref 201603232872 |  |
| [202205265093](https://www.permitgraph.org/p/202205265093) | May 26, 2022 | Never finaled: issued May 2022, no final | [1251 07th Av](https://www.permitgraph.org/a/1743/011) | to obtain a final inspection for work approved under preous permit applications numbers 200606305545, 200702164356 & 200701161742. all work is complete. |  |
| [202205255003](https://www.permitgraph.org/p/202205255003) | May 25, 2022 | Completed: final sign-off Oct 2024 | [4340 25th St](https://www.permitgraph.org/a/6540/016) | interior remodel at ground floor - addition of new kitchen, new bathroom and storage area at ground floor. **building envelope will not be englarged. no new unit added. | $50,000 |
| [202205124107](https://www.permitgraph.org/p/202205124107) | May 12, 2022 | Completed: final sign-off Oct 2022 | [224 Upper Tr](https://www.permitgraph.org/a/2629/004) | replace front siding with cove cedar wood siding. remove & replace needed building elements. | $130,000 |
| [202204071833](https://www.permitgraph.org/p/202204071833) | Apr 7, 2022 | Completed: final sign-off Oct 2024 | [4338 25th St](https://www.permitgraph.org/a/6540/015) | replace rear decks on 1st and 2nd floor. kitchen and existing bath renovation. | $45,000 |
| [202010217073](https://www.permitgraph.org/p/202010217073) | Oct 21, 2020 | Completed: final sign-off Jan 2024 | [59 Potomac St](https://www.permitgraph.org/a/0865/008) | new rear windows & doors at second level, new windows at attic, infill lightwell at 2nd level and shifted exterior stair location. 3 new skylights. rev to bpa 201804196759. | $1,500 |
| [202010055871](https://www.permitgraph.org/p/202010055871) | Oct 5, 2020 | Completed: final sign-off Dec 2020 | [108 Corbett Av](https://www.permitgraph.org/a/2652/004) | demo existing stucco at inside of exterior stair wall. waterproof and finish to match existing. caulk & paint exterior steps w/ elastomeric product designed for masonry surfaces. non visible to street | $3,700 |
| [202010055870](https://www.permitgraph.org/p/202010055870) | Oct 5, 2020 | Completed: final sign-off Nov 2020 | [1729 Stockton St](https://www.permitgraph.org/a/0089/007) | remove & replace in kind all dry rot damaged treads, risers, railings, and joists on exterior wood stairs. rear not visible to street | $7,895 |
| [202007099897](https://www.permitgraph.org/p/202007099897) | Jul 9, 2020 | Never finaled: issued Apr 2022, no final | [1056 Potrero Av](https://www.permitgraph.org/a/4153/008) | alter site: revise unit count and configuration as approved under bpa # 201612165168. create 3 dwelling units and 6 adu's within previously approved building envelope. previous permit had 4 dwelling… |  |
| [202005127446](https://www.permitgraph.org/p/202005127446) | May 12, 2020 | Completed: final sign-off Sep 2020 | [3431 Fillmore St](https://www.permitgraph.org/a/0467A/020) | kitchen bath remodel. new kitchen cabinets, replace in kind. new recessed cans in ceiling. partial bath remodel. replace tile in guest bath floor and shower area and install new recessed cans and fan… | $32,450 |
| [202005047290](https://www.permitgraph.org/p/202005047290) | May 4, 2020 | Never finaled: issued Jun 2020, no final | [1056 Potrero Av](https://www.permitgraph.org/a/4153/008) | voluntary seismic upgrade of (e) soft story bldg per ab-094 to qualify for unlimited adu for property. | $30,000 |
| [201912179706](https://www.permitgraph.org/p/201912179706) | Dec 17, 2019 | Completed: final sign-off Feb 2023 | [716 41st Av](https://www.permitgraph.org/a/1604/021) | comply w/ nov #201995372: leglaize bedroom & bathroom on ground floor and rear deck. check plumbing & electrical work are to current code. restore gargage door opening to a min. 7'-6" width. | $8,500 |
| [201812219020](https://www.permitgraph.org/p/201812219020) | Dec 21, 2018 | Completed: final sign-off Apr 2022 | [64 Potomac St](https://www.permitgraph.org/a/0866/014) | interior renovation of kitchen and e bath 2nd fl add new bath at 2nd fl. new structural posts and bems to accomomodate partition changes. remove e chimney, install 4 new windows rear. replace 8 windo… | $125,000 |
| [201811297001](https://www.permitgraph.org/p/201811297001) | Nov 29, 2018 | Completed: final sign-off Jul 2022 | [2062 Pine St](https://www.permitgraph.org/a/0651/065) | revision to app#201603232872. alter window number at front facade at floor 1 to accommodate seismic upgrade requirements. | $2,500 |
| [201811075248](https://www.permitgraph.org/p/201811075248) | Nov 7, 2018 | Completed: final sign-off Jul 2022 | [2062 Pine St](https://www.permitgraph.org/a/0651/065) | rev to pa# 201603232872; delete 2nd stair at rear of house (75'path of travel) unit 2062 |  |
| [201809059187](https://www.permitgraph.org/p/201809059187) | Sep 5, 2018 | Completed: final sign-off Oct 2018 | [219 Lake St](https://www.permitgraph.org/a/1363/051) | bathroom remodel. change out shower fixturs, add 2x lights, new insulation and sheetrock, tiles, and paint. no change of existing floor plan. | $3,500 |
| [201808137202](https://www.permitgraph.org/p/201808137202) | Aug 13, 2018 | Never finaled: issued Aug 2018, no final | [219 Lake St](https://www.permitgraph.org/a/1363/051) | voluntary structure strengthen of extg broken joist at 219 lake st (interior work only) | $2,000 |
| [201804196759](https://www.permitgraph.org/p/201804196759) | Apr 19, 2018 | Completed: final sign-off Apr 2023 | [59 Potomac St](https://www.permitgraph.org/a/0865/008) | 3-story rear addition, includes a new family rm on 1st (ground) flr, a new kitchen on the 2nd flr, enlarged bedroom & new bath @ the 3rd flr. also includes interior remodel of misc spaces, replacemen… | $671,500 |
| [201802201696](https://www.permitgraph.org/p/201802201696) | Feb 20, 2018 | Never finaled: issued Feb 2018, no final | [3433 Fillmore St](https://www.permitgraph.org/a/0467A/020) | partial bathroom remodeling: replace tile in guest bathroom shower area and floor. | $7,500 |
| [201711164197](https://www.permitgraph.org/p/201711164197) | Nov 16, 2017 | Never finaled: issued Nov 2017, no final | [3433 Fillmore St](https://www.permitgraph.org/a/0467A/020) | remodel kitchen, replace in kind. new lighting in kitchen, living room and 2 bedrooms. | $40,000 |
| [201705237465](https://www.permitgraph.org/p/201705237465) | May 23, 2017 | Completed: final sign-off Jul 2022 | [2062 Pine St](https://www.permitgraph.org/a/0651/065) | new 8' fence along east and west property line in the rear yard. | $15,000 |
| [201703222100](https://www.permitgraph.org/p/201703222100) | Mar 22, 2017 | Completed: final sign-off Jun 2019 | [2617 Sutter St](https://www.permitgraph.org/a/1074/029) | replacement o f windows and door at rear elevation with new aluminum venting windows & sliding doors | $20,000 |
| [201612165168](https://www.permitgraph.org/p/201612165168) | Dec 16, 2016 | Never finaled: issued Feb 2019, no final | [1056 Potrero Av](https://www.permitgraph.org/a/4153/008) | renovation & addition to existing single family structure over abandoned commecial by vertical/horiz addition. create 5 apts new bike parking. new exterior materials windows & doors, new landscaping… | $825,000 |
| [201608256025](https://www.permitgraph.org/p/201608256025) | Aug 25, 2016 | Completed: final sign-off Dec 2017 | [1441 Jones St](https://www.permitgraph.org/a/0188/043) | compliance with mandatory soft story retrofit program, iebc 2012 sec a4 | $15,000 |
| [201606079323](https://www.permitgraph.org/p/201606079323) | Jun 7, 2016 | Never finaled: issued Jun 2016, no final | [412 Hearst Av](https://www.permitgraph.org/a/3116/007) | provide temporary shoring to facilitate excavation and construction of proposed basement addition | $25,000 |
| [201602028555](https://www.permitgraph.org/p/201602028555) | Feb 2, 2016 | Never finaled: issued Dec 2017, no final | [68 Pierce St](https://www.permitgraph.org/a/0865/016) | rear addition and house renovation including adding living space in attic with 2 bedrooms & 1 bath. | $260,000 |
| [201411040616](https://www.permitgraph.org/p/201411040616) | Nov 4, 2014 | Expired or cancelled: expired Jul 2025 | [831 Chenery St](https://www.permitgraph.org/a/6738/020) | construct (n) 3-story single family residence. | $725,000 |
| [201204138248](https://www.permitgraph.org/p/201204138248) | Apr 13, 2012 | Never finaled: issued Nov 2015, no final | [412 Hearst Av](https://www.permitgraph.org/a/3116/007) | to erect 2 stories, 1 basement, single family dwelling. | $537,120 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/seapoint-construction-896999.
