Back to kitchen remodel contractors
Saturn Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Aug 2026
- Last 24 months
- 23 permits filed
309 permits since 2000: 245 completed, 18 in progress, 32 never finaled, 14 expired or cancelled.
Of the 32 never-finaled permits, 17 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
66 kitchen remodel permits: 61 completed, 3 in progress, 2 never finaled. Typically 3 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2026 | In progress filed Jun 2026, not yet issued | 1348 South Van Ness Av | rear carport/cottage detached structure. addition of 1 story type vb over existing carport. kitchenette with 2 burnerDetails
rear carport/cottage detached structure. addition of 1 story type vb over existing carport. kitchenette with 2 burner | $350,000 |
| Jan 9, 2026 | In progress issued Jan 2026 | 145 Ulloa St | interior remodel 1st fl. remove (e) concrete slab and portions of ext. wall footings add new concrete slab and footings at removed locations remodel (e) bath, bedroom, family room, hall and int stair. add new laundry bedroom and bath. remodel (e) 2nd fl. living, dining, kitchen, hall bath,Details
interior remodel 1st fl. remove (e) concrete slab and portions of ext. wall footings add new concrete slab and footings at removed locations remodel (e) bath, bedroom, family room, hall and int stair. add new laundry bedroom and bath. remodel (e) 2nd fl. living, dining, kitchen, hall bath, | $425,000 |
| Aug 9, 2024 | Completed final sign-off Sep 2025 | 55 Ulloa St | interior remodel: 1st flr remove existing concrete slab & interior walls. new concrete slab, remodel existing bathrooms, 2 bdrms,family room, hall. replace interior stair, new side + rear window/door (not visible from puplic way) 2nd fl: remodel kitchen, reframe openings to living & dining rooms,Details
interior remodel: 1st flr remove existing concrete slab & interior walls. new concrete slab, remodel existing bathrooms, 2 bdrms,family room, hall. replace interior stair, new side + rear window/door (not visible from puplic way) 2nd fl: remodel kitchen, reframe openings to living & dining rooms, | $185,000 |
| Oct 31, 2023 | Completed final sign-off Jan 2024 | 109 Amber Dr | in kind- kitchen remodel: 8x12=96Details
in kind- kitchen remodel: 8x12=96 | $40,000 |
| May 26, 2023 | Completed final sign-off Nov 2024 | 172 25th Av | replacing fixtures & finishes. in-kind. in kitchen and 3 bathroom.Details
replacing fixtures & finishes. in-kind. in kitchen and 3 bathroom. | $250,000 |
| Dec 27, 2022 | In progress issued Jul 2025 | 1518 07th Av | horizontal rear addition on 2/f & 3/f. new windows and doors at addition. new half-bath/laundy and kitchen expansion on 2/f. new primarty suite at 3/f with new skylight at (e) roof. add new adu on 1st floor.Details
horizontal rear addition on 2/f & 3/f. new windows and doors at addition. new half-bath/laundy and kitchen expansion on 2/f. new primarty suite at 3/f with new skylight at (e) roof. add new adu on 1st floor. | $300,000 |
| Dec 27, 2022 | Completed final sign-off Sep 2026 | 580 Banks St | demo & relocate interior partitions.replace all siding & wdws.raised partial area of roof to add clerestory.add powder rm, relocate (e) bathrms & replace all fixtures.replace kitchen fixtures,int stair & floor finish,ext backyard stair & fence, add on grade wood deck.replace a portion of retainingDetails
demo & relocate interior partitions.replace all siding & wdws.raised partial area of roof to add clerestory.add powder rm, relocate (e) bathrms & replace all fixtures.replace kitchen fixtures,int stair & floor finish,ext backyard stair & fence, add on grade wood deck.replace a portion of retaining | $471,270 |
| Oct 28, 2022 | Completed final sign-off Aug 2026 | 4245 23rd St | interior renovation of(e)garage level laundry room & storage room,1st level kitchen & living room,2nd level hall bath & bedrooms.exterior rear addition to add a bedroom on the garage level,enlarge the 2nd level.scope of work also includes(n)interior stair to(n)roof deck.Details
interior renovation of(e)garage level laundry room & storage room,1st level kitchen & living room,2nd level hall bath & bedrooms.exterior rear addition to add a bedroom on the garage level,enlarge the 2nd level.scope of work also includes(n)interior stair to(n)roof deck. | $1,200,000 |
| Jan 28, 2022 | Completed final sign-off Nov 2024 | 3030 Pacific Av | interior renovation inlcuding removal of smaller staircase and extending main staircase to basement and 3rd floor. minor kitchen reconfiguration ofdr pantry and closet space. reconfiguration of bathroom and closet space. 2nd & 3rd floor master bedroom and master bathroom. add a full bath at 2nd fl.Details
interior renovation inlcuding removal of smaller staircase and extending main staircase to basement and 3rd floor. minor kitchen reconfiguration ofdr pantry and closet space. reconfiguration of bathroom and closet space. 2nd & 3rd floor master bedroom and master bathroom. add a full bath at 2nd fl. | $1,000,000 |
| Nov 22, 2021 | Completed final sign-off Aug 2022 | 68 Mars St | addition of replacing finishes (in kind) only to one kitchen and one bathroom, no structural work or walls to be moved.Details
addition of replacing finishes (in kind) only to one kitchen and one bathroom, no structural work or walls to be moved. | |
| Apr 22, 2021 | Completed final sign-off Feb 2024 | 1580 Masonic Av | horizontal addition and roof dormer at rear yard. replace kitchen appliances and plumbing at main house, first floor. new lighting and electrical at kitchenDetails
horizontal addition and roof dormer at rear yard. replace kitchen appliances and plumbing at main house, first floor. new lighting and electrical at kitchen | $250,000 |
| Apr 12, 2021 | Completed final sign-off Dec 2021 | 2158 Larkin St | remodel kitchen and bath in kind. replace existing wooden flooring.Details
remodel kitchen and bath in kind. replace existing wooden flooring. | $45,000 |
| Mar 23, 2021 | Completed final sign-off Jan 2024 | 2152 Larkin St | renovation of existing residence ground floor: replace existing windows of front facade, new windows, remodel entry, kitchen, and powder room to create better connection to existing courtyard. 2nd floor horizontal addition at rear on north and east facade for larger bedroom. courtyard fence.Details
renovation of existing residence ground floor: replace existing windows of front facade, new windows, remodel entry, kitchen, and powder room to create better connection to existing courtyard. 2nd floor horizontal addition at rear on north and east facade for larger bedroom. courtyard fence. | $400,000 |
| Feb 2, 2021 | Completed final sign-off Feb 2022 | 526 Connecticut St | bathroom & kitchen remodel on 1st floor. no change of use. no structural work.Details
bathroom & kitchen remodel on 1st floor. no change of use. no structural work. | $35,000 |
| Oct 2, 2020 | Completed final sign-off Jun 2021 | 507 Rhode Island St | amend to pa202008312940: 1/f: new concrete footing and post at house centerline. 2/f:remove walls between kitchen & living room & sunroom.3/f expand master bedroom into nw eavespace, add master bath and closet. expand 2 bedroom into se eavespace. new closet.(n) attic pull down stair.Details
amend to pa202008312940: 1/f: new concrete footing and post at house centerline. 2/f:remove walls between kitchen & living room & sunroom.3/f expand master bedroom into nw eavespace, add master bath and closet. expand 2 bedroom into se eavespace. new closet.(n) attic pull down stair. | $60,000 |
| Aug 31, 2020 | Completed final sign-off Jun 2021 | 507 Rhode Island St | interior remodel of existing kitchen including new cabinets, appliances, plumbing fixtures, (add 1 vegetable sink), electrical outlets, lighting and room finishes. no wall removal.Details
interior remodel of existing kitchen including new cabinets, appliances, plumbing fixtures, (add 1 vegetable sink), electrical outlets, lighting and room finishes. no wall removal. | $35,000 |
| Jul 22, 2020 | Completed final sign-off Mar 2021 | 713 Rhode Island St | kitchen interior remodel and new skylight.Details
kitchen interior remodel and new skylight. | $25,000 |
| Jul 8, 2020 | Completed final sign-off Nov 2020 | 209 Arkansas St | kitchen remodel w/ in kind replacements of finishes only. no structuralwork, work to be performed on 2nd flr.Details
kitchen remodel w/ in kind replacements of finishes only. no structuralwork, work to be performed on 2nd flr. | $20,000 |
| Jun 10, 2020 | Never finaled issued Jun 2020, no final | 97 Amber Dr | replace in-kind finishes such as flooring, fixtures in 2 small bathrooms and fixtures in one kitchen.Details
replace in-kind finishes such as flooring, fixtures in 2 small bathrooms and fixtures in one kitchen. | $30,000 |
| Dec 31, 2019 | Completed final sign-off May 2021 | 251 Hartford St | interior remooel of (e) 1st fl. unit relocate kitchen and add closet, replace front windowsDetails
interior remooel of (e) 1st fl. unit relocate kitchen and add closet, replace front windows | $30,000 |
| Sep 11, 2019 | Completed final sign-off Jan 2021 | 468 Pennsylvania Av | 2nd floor kitchen and bathroom remodel, replace extg door with bi-fold. 3rd floor bathroom remodel, replace rear bedroom door/window with new window and remove bridge to rear yardDetails
2nd floor kitchen and bathroom remodel, replace extg door with bi-fold. 3rd floor bathroom remodel, replace rear bedroom door/window with new window and remove bridge to rear yard | $160,000 |
| Jul 11, 2019 | Completed final sign-off Jul 2020 | 333 Texas St | remove garage stair & rear patio stair. remodel (e) kitchen & bathroom, add 1 (n) bathroom, replace rear window/door with/bi-fold door. remove (e) fireplace.Details
remove garage stair & rear patio stair. remodel (e) kitchen & bathroom, add 1 (n) bathroom, replace rear window/door with/bi-fold door. remove (e) fireplace. | $180,000 |
| Jun 5, 2019 | Completed final sign-off Feb 2020 | 1636 Diamond St | rewaterproof (e) deck, remove penthouse window and infill, update guardrails deck to have same foot print and square footage. replace kitchen window w/bi-fold door. all windows not street visible. max 0.32 u-factor or better.Details
rewaterproof (e) deck, remove penthouse window and infill, update guardrails deck to have same foot print and square footage. replace kitchen window w/bi-fold door. all windows not street visible. max 0.32 u-factor or better. | $60,000 |
| Jan 10, 2019 | Completed final sign-off Jun 2019 | 430 College Av | remodel 1 kitchen, 2 bathrooms (same fixture count) now wall moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remodel 1 kitchen, 2 bathrooms (same fixture count) now wall moved, removed, added or infilled. all existing layouts to remain unchanged. | $40,000 |
| Jan 4, 2018 | Completed final sign-off Sep 2018 | 250 Elsie St | remodel kitchen. relocate bathroom. remove 1 window, replace extg slider, extg window, extg door, extg skylight update all electrical.Details
remodel kitchen. relocate bathroom. remove 1 window, replace extg slider, extg window, extg door, extg skylight update all electrical. | $80,000 |
| Oct 5, 2017 | Completed final sign-off Jul 2019 | 384 Fair Oaks St | interior and exterior alterations to a 3-story, 2 unit residence. kitchen, bath & powder rm remodel at 1st fl. kitchen & bath remodel @ 2nd fl. bath & laundry remodel, new water heaters, hvac equip. repair garage roofDetails
interior and exterior alterations to a 3-story, 2 unit residence. kitchen, bath & powder rm remodel at 1st fl. kitchen & bath remodel @ 2nd fl. bath & laundry remodel, new water heaters, hvac equip. repair garage roof | $215,350 |
| Sep 1, 2017 | Completed final sign-off Sep 2018 | 1051 Powhattan Av | replace 4 existing aluminum windows and 1 door in-kind with the same materials. remodel existing kitchen on the second floor; no structural work. no other work.Details
replace 4 existing aluminum windows and 1 door in-kind with the same materials. remodel existing kitchen on the second floor; no structural work. no other work. | $30,000 |
| May 4, 2017 | Completed final sign-off Nov 2017 | 51 Nebraska St | remodel kitchen. no structural work.Details
remodel kitchen. no structural work. | $21,000 |
| Apr 21, 2017 | Completed final sign-off Oct 2019 | 765 Market St | grand penthouse a- interior renovation of grand penthouse a in four seasons residences. work to include renovation of master bedroom, bath, closets & guest bedrooms, baths, closets; front entry foyer/hall; powder room, kitchen; dining room; family/living rooms; new media roomDetails
grand penthouse a- interior renovation of grand penthouse a in four seasons residences. work to include renovation of master bedroom, bath, closets & guest bedrooms, baths, closets; front entry foyer/hall; powder room, kitchen; dining room; family/living rooms; new media room | $500,000 |
| Mar 8, 2017 | Completed final sign-off Jul 2017 | 597 Connecticut St | kitchen remodel to new location, new opening in interior wallDetails
kitchen remodel to new location, new opening in interior wall | $15,000 |
| Feb 10, 2017 | Completed final sign-off Jun 2018 | 169 Amber Dr | remodel 2 bathrooms & 1 half bathroom; add (n) bathroom to 2nd floor. remodel kitchen & bedrooms. update electrical & plumbingDetails
remodel 2 bathrooms & 1 half bathroom; add (n) bathroom to 2nd floor. remodel kitchen & bedrooms. update electrical & plumbing | $120,000 |
| Sep 15, 2016 | Completed final sign-off Sep 2016 | 317 Missouri St | add valuation to pa# 201604296202 per inspector's note"add valuation $35,000 for kitchen/bathroom remodel at 2nd floor"Details
add valuation to pa# 201604296202 per inspector's note"add valuation $35,000 for kitchen/bathroom remodel at 2nd floor" | $35,000 |
| Jul 7, 2016 | Completed final sign-off Sep 2016 | 2219 12th Av | kitchen remodel - replace cabinets and counter top in kind, install tile back splash. install 7 recessed lights in ceilings.Details
kitchen remodel - replace cabinets and counter top in kind, install tile back splash. install 7 recessed lights in ceilings. | $15,000 |
| Jun 7, 2016 | Completed final sign-off Apr 2017 | 70 Lopez Av | partial 1st fl interior remodel including kitchen, bath, laundry. new breakfast rm, new side door, rear door, window. partial 2nd flr interior remodel including master bath, wic, kids bathDetails
partial 1st fl interior remodel including kitchen, bath, laundry. new breakfast rm, new side door, rear door, window. partial 2nd flr interior remodel including master bath, wic, kids bath | $125,000 |
| Apr 28, 2016 | Completed final sign-off Jan 2017 | 549 Connecticut St | per ordinance 43-14. legalization of new kitchen in basement and legalization of (e) in law unit.Details
per ordinance 43-14. legalization of new kitchen in basement and legalization of (e) in law unit. | $17,000 |
| Mar 31, 2016 | Completed final sign-off Feb 2017 | 1124 De Haro St | renovation & full seismic retrofit, infill @ (e) 2nd floor lightwell(18 sq ft),new foundation per plan,new shear walls,relocate/remodel bath @ 2nd floor,remodeled kitchen @ 2nd floor,new window & door @rear facade,new skylight,new partition walls @ 2nd floor,new furnace & water heaterDetails
renovation & full seismic retrofit, infill @ (e) 2nd floor lightwell(18 sq ft),new foundation per plan,new shear walls,relocate/remodel bath @ 2nd floor,remodeled kitchen @ 2nd floor,new window & door @rear facade,new skylight,new partition walls @ 2nd floor,new furnace & water heater | $162,000 |
| Mar 22, 2016 | Completed final sign-off Sep 2016 | 270 States St | kitchen remodel. update electrical switches & lighting. remove (e) gas fireplace.Details
kitchen remodel. update electrical switches & lighting. remove (e) gas fireplace. | $40,000 |
| Dec 10, 2015 | Completed final sign-off Sep 2016 | 317 Missouri St | foundation bolting, new kitchen counter tops & tile floor, disconnect old gas lights, rewire all electrical (remove knob& tube), suspend a new ceiling and maintain minimum 7'6" ceiling height. 3/4 phase bolts, min embed 7", 48" oc and within 6" end of every mudsill, 3x3 bp washer.Details
foundation bolting, new kitchen counter tops & tile floor, disconnect old gas lights, rewire all electrical (remove knob& tube), suspend a new ceiling and maintain minimum 7'6" ceiling height. 3/4 phase bolts, min embed 7", 48" oc and within 6" end of every mudsill, 3x3 bp washer. | $20,000 |
| Jul 17, 2015 | Completed final sign-off Dec 2016 | 2101 Scott St | revision to app#201506048045. revise location of kitchen. revise windows on d line between 3 and 5. revise location of bath, 1st floor between c and d line, to east of 3 line.Details
revision to app#201506048045. revise location of kitchen. revise windows on d line between 3 and 5. revise location of bath, 1st floor between c and d line, to east of 3 line. | |
| Apr 16, 2015 | Completed final sign-off Nov 2015 | 955 Green St | replace in-kind kitchen remodel. all locations remain for all services.Details
replace in-kind kitchen remodel. all locations remain for all services. | $40,000 |
| Mar 13, 2015 | Completed final sign-off Jul 2016 | 748 Church St | removal of a non-conforming rear decks. int renovation of (e) two unit w/expansion of the lower unit into unconditioned space on the 1st flr (n) full bathroom, (n) laundry rm, (n) bedroom. (n) kitchen in (e) location, (n) full bath on 2nd flr. 3rd flr remains. add roof deck. new interior stair.Details
removal of a non-conforming rear decks. int renovation of (e) two unit w/expansion of the lower unit into unconditioned space on the 1st flr (n) full bathroom, (n) laundry rm, (n) bedroom. (n) kitchen in (e) location, (n) full bath on 2nd flr. 3rd flr remains. add roof deck. new interior stair. | $489,000 |
| Feb 6, 2015 | Completed final sign-off Dec 2015 | 1108 Page St | ground fl: remove (e) fireplace base, add moment frame, remodel bathroom. 2nd fl: remove fireplace, add moment frame, remodel kitchen, relocate bathroom.Details
ground fl: remove (e) fireplace base, add moment frame, remodel bathroom. 2nd fl: remove fireplace, add moment frame, remodel kitchen, relocate bathroom. | $120,000 |
| Jul 2, 2014 | Completed final sign-off Nov 2014 | 948 Wisconsin St | bathroom tile, floor tile, glass shower door, new sink, new toilet. replace kitchen counter top and back splash.Details
bathroom tile, floor tile, glass shower door, new sink, new toilet. replace kitchen counter top and back splash. | $16,000 |
| Jun 27, 2014 | Completed final sign-off Feb 2015 | 315 Missouri St | #315: interior remodel to include new kitchen & bath, ew forced air heater, exterior work limited to 3 new skylights & and 3 window replacement in kind; voluntary seismic upgrade, grnd flr dry rot repair & voluntary shear wall upgradesDetails
#315: interior remodel to include new kitchen & bath, ew forced air heater, exterior work limited to 3 new skylights & and 3 window replacement in kind; voluntary seismic upgrade, grnd flr dry rot repair & voluntary shear wall upgrades | $85,000 |
| Apr 22, 2014 | Completed final sign-off Sep 2014 | 1958 Vallejo St | refinish flooring, reface cabinets, in kitchen, repaint house, retile master bathroom, new bathroom fixtures at master bathroom, new fixtures in kitchenDetails
refinish flooring, reface cabinets, in kitchen, repaint house, retile master bathroom, new bathroom fixtures at master bathroom, new fixtures in kitchen | $50,000 |
| Mar 14, 2014 | Completed final sign-off Jun 2014 | 2025 Hayes St | remodel kitchen: (n) cabinets, appliances, plumbing fixtures, countertops, remov e(e) cabinets & door to dining room.Details
remodel kitchen: (n) cabinets, appliances, plumbing fixtures, countertops, remov e(e) cabinets & door to dining room. | $30,000 |
| Feb 5, 2014 | Completed final sign-off Jun 2014 | 432 Fair Oaks St | remove/replace finishes in kitchen, replace fixtures, complete interior paint. no changes in walls & opening layout, kitchen lighting shall be higih efficacy or controlled by manual-on sensors.Details
remove/replace finishes in kitchen, replace fixtures, complete interior paint. no changes in walls & opening layout, kitchen lighting shall be higih efficacy or controlled by manual-on sensors. | $40,000 |
| Sep 24, 2013 | Completed final sign-off Feb 2014 | 4031 21st St | addendem to application #20138144320. kitchen remodel:remove replace appliances and finishes. new lighting & reconnect hood.Details
addendem to application #20138144320. kitchen remodel:remove replace appliances and finishes. new lighting & reconnect hood. | $40,000 |
| Sep 18, 2013 | Completed final sign-off Mar 2016 | 4338 Cesar Chavez St | square (e) rear bay windows. install 7 new windows, 1 skylite, 4 n ext doors not visible to street. new flat roof@rear & new side dormer. replace &enlarge 2 e rear decks.kitchen removation.convert 1/2 bath to full bath. renovate mst bath & bath 3.remove garage post.Details
square (e) rear bay windows. install 7 new windows, 1 skylite, 4 n ext doors not visible to street. new flat roof@rear & new side dormer. replace &enlarge 2 e rear decks.kitchen removation.convert 1/2 bath to full bath. renovate mst bath & bath 3.remove garage post. | $150,000 |
| Aug 23, 2013 | Completed final sign-off Mar 2015 | 2331 Lake St | kitchen remodel - replace cabinets, lightings, countertop ,plumbing with copper pipes. no change to (e) layout. to comply cec150(k) 8Details
kitchen remodel - replace cabinets, lightings, countertop ,plumbing with copper pipes. no change to (e) layout. to comply cec150(k) 8 | $30,000 |
| Jul 25, 2013 | Completed final sign-off Nov 2013 | 1733 20th St | full kitchen remodel. no structural work.Details
full kitchen remodel. no structural work. | $30,000 |
| Feb 8, 2013 | Completed final sign-off Jul 2013 | 251 Hartford St | relocate kitchen and remodel bath at ground floor level.Details
relocate kitchen and remodel bath at ground floor level. | $50,000 |
| Jan 23, 2013 | Completed final sign-off Aug 2013 | 681 Duncan St | remodel kitchen, bathroom, replace (3) existing skylights in kind replacement, replace (e) wood floors.Details
remodel kitchen, bathroom, replace (3) existing skylights in kind replacement, replace (e) wood floors. | $50,000 |
| Dec 19, 2012 | Completed final sign-off Mar 2013 | 1835 Franklin St | new hardwood floors throughout, new kitchen cabients & appliances, new light fixture in dining room, replace shower door, shower head & toilet.Details
new hardwood floors throughout, new kitchen cabients & appliances, new light fixture in dining room, replace shower door, shower head & toilet. | $20,000 |
| Sep 26, 2012 | Completed final sign-off Oct 2013 | 1050 North Point St | revision to 201109295794. delete approved opening between units to expand this unit.no structural work. no area changes. remodel existing kitchen and baths.Details
revision to 201109295794. delete approved opening between units to expand this unit.no structural work. no area changes. remodel existing kitchen and baths. | |
| Sep 13, 2012 | Completed final sign-off Dec 2012 | 195 Santa Ana Av | kitchen remodel interior work only, replacement of windows in kind at kitchenDetails
kitchen remodel interior work only, replacement of windows in kind at kitchen | $45,000 |
| May 16, 2012 | Completed final sign-off Sep 2012 | 245 Castro St | kitchen remodel: replacing cabinets, relocate appliances, new hardwood floor, replacement in-kind, no structural work.Details
kitchen remodel: replacing cabinets, relocate appliances, new hardwood floor, replacement in-kind, no structural work. | $80,000 |
| Jan 20, 2012 | Completed final sign-off Aug 2012 | 251 Hartford St | minor interior remodel - no change to bldg envelope, renovate kitchen & bath, (n) skylights, voluntary plywood stiffening in ground floor unit modified. retaining wall in backyard.Details
minor interior remodel - no change to bldg envelope, renovate kitchen & bath, (n) skylights, voluntary plywood stiffening in ground floor unit modified. retaining wall in backyard. | $150,000 |
| Oct 21, 2011 | Completed final sign-off Jul 2013 | 1278 Clayton St | convert (e) 1st fl storage area @ rear to habitable space (bedroom, bathroom & laundry room). create addition along south side to enclosed stair from 1st to 2nd fl. renovate kitchen, add master bathroom @ rear on the 3rd fl.Details
convert (e) 1st fl storage area @ rear to habitable space (bedroom, bathroom & laundry room). create addition along south side to enclosed stair from 1st to 2nd fl. renovate kitchen, add master bathroom @ rear on the 3rd fl. | $75,000 |
| Jul 29, 2011 | Completed final sign-off Mar 2012 | 1200 California St | cosmetic remodeling to a residential apartment work includes remodeling of a coat closet, (n) wood paneling addition of recessed light fixtures to (e) new kitchen countertops. no other work to kitchen and/or bathrooms. no exterior work.Details
cosmetic remodeling to a residential apartment work includes remodeling of a coat closet, (n) wood paneling addition of recessed light fixtures to (e) new kitchen countertops. no other work to kitchen and/or bathrooms. no exterior work. | $100,000 |
| Jul 27, 2010 | Never finaled issued May 2011, no final | 3733 21st St | new horizontal 2 story rear addition that is to contain an expanded kitchen & renovated sitting room on the ground floor & a new bedroom, bathroom, & roof deck on the 2nd floor. (e) attic convert to 2nd floor.Details
new horizontal 2 story rear addition that is to contain an expanded kitchen & renovated sitting room on the ground floor & a new bedroom, bathroom, & roof deck on the 2nd floor. (e) attic convert to 2nd floor. | $255,000 |
| Jul 14, 2010 | Completed final sign-off Jan 2011 | 3947 23rd St | remodel (e) kitchen and dining area on 2nd fl. remodel (e) bathroom on 3rd fl. redo deck floor of (e) deck at rear on 2nd fl adjacent to dining rm. remove door/wall and replace with new wall at ground flDetails
remodel (e) kitchen and dining area on 2nd fl. remodel (e) bathroom on 3rd fl. redo deck floor of (e) deck at rear on 2nd fl adjacent to dining rm. remove door/wall and replace with new wall at ground fl | $37,000 |
| May 14, 2010 | Completed final sign-off Oct 2010 | 61 Sharon St | compose of a renovation of the (e) kitchen in the upper unit of a two unit bldg. the scope is to include (n) fixtures & finishes throughout & (n) windows on the rear facade. (e) bldg. is comprised of 3-stories: garage level, 63 sharon st. & 61 sharon st. (work @ 61 sharon st only).Details
compose of a renovation of the (e) kitchen in the upper unit of a two unit bldg. the scope is to include (n) fixtures & finishes throughout & (n) windows on the rear facade. (e) bldg. is comprised of 3-stories: garage level, 63 sharon st. & 61 sharon st. (work @ 61 sharon st only). | $49,000 |
| Jun 11, 2009 | Completed final sign-off Nov 2009 | 84 South Park | replace waterprof membrane on roof deck. new kitchen cabinets.Details
replace waterprof membrane on roof deck. new kitchen cabinets. | $30,000 |
| May 12, 2009 | Completed final sign-off Oct 2009 | 73 Pleasant St | interior remodel of existing kitchen, bath, closets, fixtures & finishes. construction of new non-load bearing partitions & 1-hr. separation.Details
interior remodel of existing kitchen, bath, closets, fixtures & finishes. construction of new non-load bearing partitions & 1-hr. separation. | $96,000 |
| Mar 7, 2008 | Completed final sign-off Jul 2008 | 4522 20th St | on 2nd floor: remodel existing kitchen. remodel existing closet into 1/2 bath. replacement of existing kitchen door and additoin of transom window above new finishes, new plumbing trim, elec outlets and lightingDetails
on 2nd floor: remodel existing kitchen. remodel existing closet into 1/2 bath. replacement of existing kitchen door and additoin of transom window above new finishes, new plumbing trim, elec outlets and lighting | $42,000 |