Saarman Construction,Ltd.
- Based in
- Alameda
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 42 permits filed
544 permits since 2000: 415 completed, 24 in progress, 53 never finaled, 52 expired or cancelled.
Of the 53 never-finaled permits, 4 are 3 to 5 years old, 24 are 5 to 10 years old, 25 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
22 stairs permits: 20 completed, 2 expired or cancelled. Typically 15 days from filing to permit and 290 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2024 | Completed final sign-off Jul 2025 | 1218 Pierce St | repainting of building exterior, trim railings, stairs (less than 50% repair), and patio. repair of stucco for minor cracks where needed.Details
repainting of building exterior, trim railings, stairs (less than 50% repair), and patio. repair of stucco for minor cracks where needed. | $133,537 |
| Aug 27, 2024 | Completed final sign-off Mar 2026 | 1817 California St | to comply w/ nov# 202200515, items #4 & #3, replacement of an (e) common egress stair, located in an open-air lobby/ courtyard.Details
to comply w/ nov# 202200515, items #4 & #3, replacement of an (e) common egress stair, located in an open-air lobby/ courtyard. | $380,000 |
| Aug 26, 2024 | Completed final sign-off Jul 2025 | 1250 Pierce St | repainting of building exterior, trim , railing , stairs and patio fences, repair tucco for minor cracks when needed (building#4 common area)Details
repainting of building exterior, trim , railing , stairs and patio fences, repair tucco for minor cracks when needed (building#4 common area) | $66,255 |
| Aug 26, 2024 | Completed final sign-off Jul 2025 | 1680 Eddy St | #458 -repainting of building exterior, trim , railing , stairs and patio fences, repair tucco for minor cracks when needed (building 5 common area)Details
#458 -repainting of building exterior, trim , railing , stairs and patio fences, repair tucco for minor cracks when needed (building 5 common area) | $277,884 |
| Aug 26, 2024 | Expired or cancelled cancelled Oct 2024 | 1652 Eddy St | repainting of building exterior, trim , railing , stairs and patio fences, repair stucco for minor cracks when needed (building#1 common area)Details
repainting of building exterior, trim , railing , stairs and patio fences, repair stucco for minor cracks when needed (building#1 common area) | $107,782 |
| Aug 26, 2024 | Completed final sign-off Jul 2025 | 1303 Steiner St | repainting of building exterior, trim , railing , stairs and patio fences, repair tucco for minor cracks when needed (building#2 common area) laundry roomDetails
repainting of building exterior, trim , railing , stairs and patio fences, repair tucco for minor cracks when needed (building#2 common area) laundry room | $37,505 |
| Aug 26, 2024 | Completed final sign-off Jul 2025 | 1729 Ellis St | repainting of building exterior, trim , railing , stairs and patio fences, repair tucco for minor cracks when needed (building 5 common area)Details
repainting of building exterior, trim , railing , stairs and patio fences, repair tucco for minor cracks when needed (building 5 common area) | $277,884 |
| Jun 29, 2023 | Completed final sign-off Sep 2023 | 701 China Basin St | demo approx 35 ln ft of stucco at the base of wall, remove and save drain rock, demo drywall at stair well, core concrete for installation of (n) drain, install new drain and connect to (e) storm drain line, install cim 1000 with sloping around drain, install new stainless steel "l" flashing at..Details
demo approx 35 ln ft of stucco at the base of wall, remove and save drain rock, demo drywall at stair well, core concrete for installation of (n) drain, install new drain and connect to (e) storm drain line, install cim 1000 with sloping around drain, install new stainless steel "l" flashing at.. | $47,700 |
| Dec 30, 2022 | Completed final sign-off Feb 2024 | 1 Burnett Ave North Av | retrofitting existing common area exterior wood stair structures btw 1,3,5 and 7 burnett ave north, replacing in-kind selective damaged framing membranes, patching adjacent stucco, waterproofing the repaired stairs/walkways and restoring the finishes. no architectural changes. common areaDetails
retrofitting existing common area exterior wood stair structures btw 1,3,5 and 7 burnett ave north, replacing in-kind selective damaged framing membranes, patching adjacent stucco, waterproofing the repaired stairs/walkways and restoring the finishes. no architectural changes. common area | $570,000 |
| Aug 13, 2021 | Expired or cancelled cancelled Jan 2026 | 69 Cragmont Av | install 1 (n) staircase w/ concrete pad & rebar, stand-off base for stringers. staircase to be 10 ft from lower side walkway to upper gardening area in backyardDetails
install 1 (n) staircase w/ concrete pad & rebar, stand-off base for stringers. staircase to be 10 ft from lower side walkway to upper gardening area in backyard | $11,921 |
| Dec 18, 2019 | Completed final sign-off Sep 2023 | 106 South Park | mayors office 13-01.rehab/renovation improvement for sing room occupancy, new interiors, new mep,new stairs, interior walls.exterior replacements. doors, paint windows in kindDetails
mayors office 13-01.rehab/renovation improvement for sing room occupancy, new interiors, new mep,new stairs, interior walls.exterior replacements. doors, paint windows in kind | $3,100,000 |
| Nov 25, 2019 | Completed final sign-off Mar 2020 | 1463 Powell St | revision to pa# 2018-0913-0110: add strap and blocking to underside of stair landing. soft story retrofit per sfebc chapter 4d, engineering criteria: 2016 cebc appendix a-4Details
revision to pa# 2018-0913-0110: add strap and blocking to underside of stair landing. soft story retrofit per sfebc chapter 4d, engineering criteria: 2016 cebc appendix a-4 | $20,000 |
| Jun 21, 2018 | Completed final sign-off Jul 2019 | 150 Francisco St | replace extg waterproofing at courtyard walkway's. remediate extg walkway railing. replace extg railing at roof parapet, repair extg concrete walkway. spalls & cracks, & new elastomeric coating at stair tower enclosures per drawing water proofing repairs- meet sffc section 1103.7.6.1Details
replace extg waterproofing at courtyard walkway's. remediate extg walkway railing. replace extg railing at roof parapet, repair extg concrete walkway. spalls & cracks, & new elastomeric coating at stair tower enclosures per drawing water proofing repairs- meet sffc section 1103.7.6.1 | $1,179,082 |
| Feb 15, 2013 | Completed final sign-off Oct 2013 | 1555 Beach St | ground floor remodel of laundry area to include 2 baths, playroom/bedroom, and storage room. repair/replace parts of existing stairs in kind as needed. no change on other floors. no exterior workDetails
ground floor remodel of laundry area to include 2 baths, playroom/bedroom, and storage room. repair/replace parts of existing stairs in kind as needed. no change on other floors. no exterior work | $70,000 |
| Mar 6, 2012 | Completed final sign-off Mar 2013 | 45 Scenic Wy | new deck and stair addition.Details
new deck and stair addition. | $45,000 |
| Sep 30, 2011 | Completed final sign-off Oct 2011 | 627 Corbett Av | install deck surfacing over (e) roof deck area using 2'x2' ipe panels on pedestals, less than 50% of structure. add step @ bottom of stairs.Details
install deck surfacing over (e) roof deck area using 2'x2' ipe panels on pedestals, less than 50% of structure. add step @ bottom of stairs. | $15,566 |
| Feb 2, 2011 | Completed final sign-off Oct 2012 | 1407 Montgomery St | in unit #3:remove extg stair/replace with new stair/demo ceiling partial for new structure support/new footing at post. new demising wall at stair/new window and sliding glass door at extg opening at back.Details
in unit #3:remove extg stair/replace with new stair/demo ceiling partial for new structure support/new footing at post. new demising wall at stair/new window and sliding glass door at extg opening at back. | $40,000 |
| Sep 9, 2009 | Completed final sign-off Jul 2010 | 101 Lombard St | rooftop stair remediation at 23 locations (unit 401e thru 405)(unit 414e thru 420)(unit 901w thru 915w)revision to pa# 2008-0402-8644Details
rooftop stair remediation at 23 locations (unit 401e thru 405)(unit 414e thru 420)(unit 901w thru 915w)revision to pa# 2008-0402-8644 | $400,000 |
| Mar 27, 2009 | Completed final sign-off Oct 2009 | 101 Lombard St | private roof landing remediation: demo (e) concrete roof landing, patch roofing membrane, install treads metal edge to adjust stair riser heights, apply new traffic coating at stairs, to comply with nov# 200994035, revision to pa# 2008-0402-8644Details
private roof landing remediation: demo (e) concrete roof landing, patch roofing membrane, install treads metal edge to adjust stair riser heights, apply new traffic coating at stairs, to comply with nov# 200994035, revision to pa# 2008-0402-8644 | $9,554 |
| Sep 2, 2008 | Completed final sign-off Oct 2008 | 1225 Washington St | #401- remove existing sliding glass door & install new sgd & flashing, 1 loc. demo existing tile & plywood sheathing on private deck, re-install new plywood, water proofing membrane system, metal flashing & deck tile (40sq.ft.) install new metal flashing along stairs from garage to rear deck (20 lf)Details
#401- remove existing sliding glass door & install new sgd & flashing, 1 loc. demo existing tile & plywood sheathing on private deck, re-install new plywood, water proofing membrane system, metal flashing & deck tile (40sq.ft.) install new metal flashing along stairs from garage to rear deck (20 lf) | $20,000 |
| Jan 28, 2004 | Completed final sign-off Jun 2004 | 440 Grove St | upgrade exterior stair access to the 2 units in rear of bldg. install new sheet metal,membrane &Details
upgrade exterior stair access to the 2 units in rear of bldg. install new sheet metal,membrane & | $12,500 |
| Nov 16, 2000 | Completed final sign-off Nov 2000 | 320 Rutledge St | add on spiral staircase at rear of house only permit for final inspection onlyDetails
add on spiral staircase at rear of house only permit for final inspection only |