# S C Construction Company

Contractor license 859259. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/s-c-construction-company-859259
- JSON: https://www.permitgraph.org/api/contractor?license=859259
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=859259

11 permits since 2000: 11 completed. Typically 1 days from filing to permit and 173 days from permit to final inspection.

- Based in: San Francisco
- On San Francisco permits: Sep 2007 to Jun 2025
- Last 24 months: 2 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2007 | 2 | 0 | 0 | 0 |
| 2010 | 2 | 0 | 0 | 0 |
| 2017 | 3 | 0 | 0 | 0 |
| 2018 | 1 | 0 | 0 | 0 |
| 2022 | 1 | 0 | 0 | 0 |
| 2025 | 2 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 5 | 5 | 0 | 0 | 0 | 7 | 218 |
| Deck | 1 | 1 | 0 | 0 | 0 | 42 | 331 |
| Kitchen remodel | 4 | 4 | 0 | 0 | 0 | 0 | 140 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202506108383](https://www.permitgraph.org/p/202506108383) | Jun 10, 2025 | Completed: final sign-off Jan 2026 | [356 Mount Vernon Av](https://www.permitgraph.org/a/7027B/024) | remove posts, add new beam in the first fl | $15,000 |
| [202501148305](https://www.permitgraph.org/p/202501148305) | Jan 14, 2025 | Completed: final sign-off Jan 2026 | [356 Mount Vernon Av](https://www.permitgraph.org/a/7027B/024) | convert 1st fl to 2 bedrooms, 1 bath, game room, wet bar and 1 car garage. extend the existing deck in the rear. less than 30" height. replace and relocate water heater and furnace. | $50,000 |
| [202207077905](https://www.permitgraph.org/p/202207077905) | Jul 7, 2022 | Completed: final sign-off Jan 2023 | [838 Capitol Av](https://www.permitgraph.org/a/7053/014A) | interior remodel on 1st flr, remodel (e) kitchen and (e) bathroom; add a bedroom and a study room. | $50,000 |
| [201808248302](https://www.permitgraph.org/p/201808248302) | Aug 24, 2018 | Completed: final sign-off Nov 2018 | [3434 Irving St](https://www.permitgraph.org/a/1715/024) | rev to pa# 201711063198; correct habitable space calculate error to exclude halls, & utility areas, reflect reduced rm sizes after voluntary struct strengthening. document const changes to approved p… | $120,000 |
| [201711063198](https://www.permitgraph.org/p/201711063198) | Nov 6, 2017 | Completed: final sign-off Nov 2018 | [3434 Irving St](https://www.permitgraph.org/a/1715/024) | room down addition, expand habitable space on g/f garage area, remodel (e) and new space to include family room, 2 bedrooms, 2 bathroom, laundry room and storage room. voluntary structural strengthei… | $55,000 |
| [201710252199](https://www.permitgraph.org/p/201710252199) | Oct 25, 2017 | Completed: final sign-off Jun 2018 | [3434 Irving St](https://www.permitgraph.org/a/1715/024) | 2nd fl: convert full bath to master beroom en suite bath. expand half bath to include shower. add outlets, network & tv cable, recessed lights to living room, dining room, bedrooms. | $20,000 |
| [201710030165](https://www.permitgraph.org/p/201710030165) | Oct 3, 2017 | Completed: final sign-off Jun 2018 | [3434 Irving St](https://www.permitgraph.org/a/1715/024) | kitchen remodeling. replace cabinets, countertop, tile floor, and light outlet. | $20,000 |
| [201010143050](https://www.permitgraph.org/p/201010143050) | Oct 14, 2010 | Completed: final sign-off Jan 2011 | [638 Niagara Av](https://www.permitgraph.org/a/6974/011B) | kitchen replace cabinet, floor tiles, non structural, lighting to comply with cec 150(k) | $10,000 |
| [201008199165](https://www.permitgraph.org/p/201008199165) | Aug 19, 2010 | Completed: final sign-off Dec 2010 | [319 Pope St](https://www.permitgraph.org/a/6484/036) | kitchen: replace drywall, cabinets, floor tile, replace electrical & plumbing. (min. 50% of kitchen lighting wattage be high efficacy) bathroom: replace wall & floor tile, replace sink & toilet. (pro… | $25,000 |
| [200712211122](https://www.permitgraph.org/p/200712211122) | Dec 21, 2007 | Completed: final sign-off Dec 2007 | [346 Mount Vernon Av](https://www.permitgraph.org/a/7027B/026) | revision to app#200709142729. to delete electrical work from scope of work per insepctor instructions. |  |
| [200709142729](https://www.permitgraph.org/p/200709142729) | Sep 14, 2007 | Completed: final sign-off Dec 2007 | [346 Mount Vernon Av](https://www.permitgraph.org/a/7027B/026) | repair the dryrot wood and stucco at front bay overhang. replace main electrical service | $3,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/s-c-construction-company-859259.
