# Rudolph And Sletten Inc

Contractor license 198069. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069
- JSON: https://www.permitgraph.org/api/contractor?license=198069
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=198069

141 permits since 2000: 116 completed, 17 never finaled, 8 expired or cancelled. Typically 22 days from filing to permit and 172 days from permit to final inspection. Of the 17 never-finaled permits, 6 are 5 to 10 years old, 11 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Apr 2000 to Nov 2024
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 0 | 0 | 0 | 3 |
| 2003 | 0 | 0 | 1 | 3 |
| 2004 | 2 | 0 | 1 | 0 |
| 2005 | 6 | 0 | 0 | 1 |
| 2007 | 1 | 0 | 0 | 0 |
| 2009 | 1 | 0 | 0 | 0 |
| 2012 | 4 | 0 | 1 | 0 |
| 2013 | 0 | 0 | 1 | 0 |
| 2014 | 4 | 0 | 1 | 0 |
| 2015 | 6 | 0 | 3 | 0 |
| 2016 | 20 | 0 | 3 | 0 |
| 2017 | 20 | 0 | 1 | 0 |
| 2018 | 31 | 0 | 0 | 0 |
| 2019 | 15 | 0 | 4 | 0 |
| 2020 | 4 | 0 | 1 | 1 |
| 2023 | 1 | 0 | 0 | 0 |
| 2024 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 1 | 1 | 0 | 0 | 0 | 24 | 34 |
| Stairs | 2 | 2 | 0 | 0 | 0 | 12 | 230 |
| Deck | 1 | 1 | 0 | 0 | 0 | 3 | 172 |

## Most recent permits

The 100 most recent of 141.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202411134952](https://www.permitgraph.org/p/202411134952) | Nov 13, 2024 | Completed: final sign-off Jun 2025 | [555 San Jose Av](https://www.permitgraph.org/a/6575/005) | project scope includes replacement of (e) glazed door/sidelite w/ a (n) gate in existing person/chair lift to make osha compliant. no work visible from street. | $25,000 |
| [202312041880](https://www.permitgraph.org/p/202312041880) | Dec 4, 2023 | Completed: final sign-off Jul 2024 | [2645 Ocean Av](https://www.permitgraph.org/a/7226/023) | 3/f: commercial interior tenant improvement to convert 2 exam rooms into 1 ultrasound room with 1 probe processing room. | $115,209 |
| [202008242523](https://www.permitgraph.org/p/202008242523) | Aug 24, 2020 | Completed: final sign-off Dec 2020 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | modification of existing hardware on levels 4, 5 and 6 | $160,000 |
| [202008222373](https://www.permitgraph.org/p/202008222373) | Aug 22, 2020 | Completed: final sign-off Dec 2020 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | modification of (e) hardware on levels 2 & 3. addition of electrical outlets in conference room on level 3 and addition of curtain and tracks to level 6. n/a maher | $160,000 |
| [202006299287](https://www.permitgraph.org/p/202006299287) | Jun 29, 2020 | Never finaled: issued Jul 2020, no final | [3555 Cesar Chavez St](https://www.permitgraph.org/a/6575/005) | construction of a retaining wall that will act as temporary shoring to facilitate the demolition of the 1957 building to the north while maintaining the driveway to the south. the wall will then be f… | $65,000 |
| [202003036058](https://www.permitgraph.org/p/202003036058) | Mar 3, 2020 | Completed: final sign-off Aug 2020 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | modify electrical outlets, electrical panels, curtains, casework, and equipment in 1415 sq ft on level 4 & 5 of the existing medical office building and add a transformer to the existing mechanical r… | $620,000 |
| [202002275589](https://www.permitgraph.org/p/202002275589) | Feb 27, 2020 | Completed: final sign-off Sep 2020 | [3555 Cesar Chavez St](https://www.permitgraph.org/a/6575/005) | infill opening in west elevation | $37,000 |
| [202001141879](https://www.permitgraph.org/p/202001141879) | Jan 14, 2020 | Expired or cancelled: cancelled Jan 2026 | [555 San Jose Av](https://www.permitgraph.org/a/6575/005) | revision to 201807255526, civil sheet to address connection points between city utilities and new utilities in hartzel building |  |
| [M1165907](https://www.permitgraph.org/p/M1165907) | Nov 13, 2019 | Never finaled: issued Nov 2019, no final | [3555 Cesar Chavez St](https://www.permitgraph.org/a/6575/005) | street space |  |
| [201910255626](https://www.permitgraph.org/p/201910255626) | Oct 25, 2019 | Completed: final sign-off Mar 2020 | [1580 Valencia St](https://www.permitgraph.org/a/6575/005) | upgrade (e) hvac system to suite 103, 1st fl | $55,000 |
| [201908199152](https://www.permitgraph.org/p/201908199152) | Aug 19, 2019 | Completed: final sign-off Dec 2020 | [2645 Ocean Av](https://www.permitgraph.org/a/7226/023) | interior remodel of the 3rd flr accessibility upgrades to the stairwell, handrail, lighting & exit signage and updating a curb ramp at (e) rear exit door. mep/fire/life safety under permit | $165,000 |
| [201908017590](https://www.permitgraph.org/p/201908017590) | Aug 1, 2019 | Completed: final sign-off Oct 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 2/f: water leak repairs-drywall removal/reinstallation in-kind, 1 flush valve replacement, ceiling tile replacement, electrical repairs, flooring removal/reinstall, medical equipment installation, mo… | $2,500,000 |
| [201907226534](https://www.permitgraph.org/p/201907226534) | Jul 22, 2019 | Completed: final sign-off Mar 2021 | [3555 Cesar Chavez St](https://www.permitgraph.org/a/6575/005) | install new packaged heat pump on the roof of (e) 1957 bld stairwell to connect the (e) supply and return duct mains providing air to the ofc spaces in the 1912 bld. these space are currently conditi… | $25,000 |
| [M1099987](https://www.permitgraph.org/p/M1099987) | Jun 24, 2019 | Never finaled: issued Jul 2019, no final | [2645 Ocean Av](https://www.permitgraph.org/a/7226/023) | street space |  |
| [201906133334](https://www.permitgraph.org/p/201906133334) | Jun 13, 2019 | Completed: final sign-off Jan 2021 | [2645 Ocean Av](https://www.permitgraph.org/a/7226/023) | the scope of the project includes accessibility upgrades to the 2nd and 3rd floor public restrooms in an extg b-occupancy medical building | $165,000 |
| [201905211263](https://www.permitgraph.org/p/201905211263) | May 21, 2019 | Completed: final sign-off Nov 2020 | [2645 Ocean Av](https://www.permitgraph.org/a/7226/023) | 3/f: project is limited to interior improvements on 3rd fl: no ext work is proposed. ti includes full demo of walls, caseworks, finishes, ceilings, lighting. new construction includes new partitions,… | $1,878,580 |
| [201905211268](https://www.permitgraph.org/p/201905211268) | May 21, 2019 | Completed: final sign-off Nov 2020 | [2645 Ocean Av](https://www.permitgraph.org/a/7226/023) | ground fl ti: new partitions, finishes, doors, ceilings, casework, and mep. | $442,174 |
| [201904248793](https://www.permitgraph.org/p/201904248793) | Apr 24, 2019 | Completed: final sign-off May 2021 | [3555 Cesar Chavez St](https://www.permitgraph.org/a/6575/005) | major alteration project consist of partial structural removel of a 4 story 31,274 sq foot (e) 1957 building and recladding of the remaining 1859 square foot stairwell | $4,200,000 |
| [201904228613](https://www.permitgraph.org/p/201904228613) | Apr 22, 2019 | Completed: final sign-off Nov 2020 | [2645 Ocean Av](https://www.permitgraph.org/a/7226/023) | 1st fl per ab-017 soft demo of walls, casework finishes, ceilings, lighitng. only partial floor soft demo | $20,000 |
| [201903205781](https://www.permitgraph.org/p/201903205781) | Mar 20, 2019 | Completed: final sign-off Sep 2020 | [2100 Webster St](https://www.permitgraph.org/a/0628/013) | 5th flr selective demo and partial ti. work includes new accessible toilet room, new partitions, ceilings, and finishes and hvac and elec | $1,416,303 |
| [201903195641](https://www.permitgraph.org/p/201903195641) | Mar 19, 2019 | Completed: final sign-off Sep 2020 | [2351 Clay St](https://www.permitgraph.org/a/0628/014) | floors 1, 4 & 5 - selective demo minor ti work on portions of floors. new non-bearing partitions, ceilings, finishes. floors 2 & 3 limited hardware changes. barrier removal under pa #201511182992. ne… | $425,000 |
| [201903195657](https://www.permitgraph.org/p/201903195657) | Mar 19, 2019 | Completed: final sign-off Sep 2022 | [2351 Clay St](https://www.permitgraph.org/a/0628/014) | 5th floor: t.i. of cosmetic srgery/ breast surgery clinic. work included new accessible toilet rooms. idf room, partitions, ceiling and finishes, new power data, lighting and hvac. | $350,000 |
| [201903185495](https://www.permitgraph.org/p/201903185495) | Mar 18, 2019 | Never finaled: issued Mar 2019, no final | [1580 Valencia St](https://www.permitgraph.org/a/6575/005) | temp water heater installation level 1 of 1912 bld 1580 valencia | $20,000 |
| [201902132842](https://www.permitgraph.org/p/201902132842) | Feb 13, 2019 | Never finaled: issued Jul 2019, no final | [1375 Sutter St](https://www.permitgraph.org/a/0690/016) | 2nd fl - selective demo and partial ti work. work includes new accessible toilet, new accessible toilet, new partitions, ceilings and finishes and associated mep | $200,000 |
| [201902062176](https://www.permitgraph.org/p/201902062176) | Feb 6, 2019 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 2nd & 3rd floor - revision to pa 2017-1020-1778 add card readers and exit signs and metal stud details |  |
| [201902062178](https://www.permitgraph.org/p/201902062178) | Feb 6, 2019 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 5th floor - revision to pa 2017-0927-9716 and 2018-0517-9347 add card readers and exit signs and metal stud details |  |
| [201901170599](https://www.permitgraph.org/p/201901170599) | Jan 17, 2019 | Completed: final sign-off Dec 2020 | [1580 Valencia St](https://www.permitgraph.org/a/6575/005) | mission bernal campus decant & demo project & utilities trence acress the court yard between the 1912 building and the hartzell building to tie the bldg utilities and fire alarm together |  |
| [201812128100](https://www.permitgraph.org/p/201812128100) | Dec 12, 2018 | Completed: final sign-off Dec 2020 | [555 San Jose Av](https://www.permitgraph.org/a/6575/005) | basement: demo of all existing tanks, feed water system, demestic hot water tanks., fulton thermal fluid, how water boiler, piping, ductwork, conduits and plumbing in mezzanime level and basement lev… | $31,500 |
| [201812107902](https://www.permitgraph.org/p/201812107902) | Dec 10, 2018 | Completed: final sign-off Apr 2021 | [3555 Cesar Chavez St](https://www.permitgraph.org/a/6575/005) | to demolish a type 1-b, 12-story hospital with one basement. | $4,000,000 |
| [201811155965](https://www.permitgraph.org/p/201811155965) | Nov 15, 2018 | Completed: final sign-off May 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 7th flr - revisiont o 201710131168 adding card readers. removing and adding exit signs. adding recalimed wood panels approx 250sf |  |
| [201811145783](https://www.permitgraph.org/p/201811145783) | Nov 14, 2018 | Completed: final sign-off Apr 2019 | [1580 Valencia St](https://www.permitgraph.org/a/6575/005) | level 3, 3208 & 3209. new demising wall and door at rooms | $10,000 |
| [201810294454](https://www.permitgraph.org/p/201810294454) | Oct 29, 2018 | Completed: final sign-off Feb 2019 | [640 Sacramento St](https://www.permitgraph.org/a/0227/011) | 1st fl: rev to pa# 201806131753 revision to restroom background to current design. maher n/a. |  |
| [201810264220](https://www.permitgraph.org/p/201810264220) | Oct 26, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 2nd/3rd fl: revision to pa #201710201778. original drawings called out oshpd 1 level anchorage is being changed to oshpd 3 level standards; corine "stud" details added for areas where kickers can't r… |  |
| [201810243977](https://www.permitgraph.org/p/201810243977) | Oct 24, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 6th fl: revision to #201709279722 add card readers, revised exit signs and add metal stud details |  |
| [201810243985](https://www.permitgraph.org/p/201810243985) | Oct 24, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 4th fl: revision to #201708175144 add card readers, adding and removing exit signs, adding metal stud framing details |  |
| [201810163255](https://www.permitgraph.org/p/201810163255) | Oct 16, 2018 | Completed: final sign-off May 2020 | [555 San Jose Av](https://www.permitgraph.org/a/6575/005) | basement selective demo of e abandoned domestic water tank and associated piping in the hartzell cup. install new distribution board and pull box for utilize tie in. | $240,000 |
| [201810163250](https://www.permitgraph.org/p/201810163250) | Oct 16, 2018 | Completed: final sign-off Dec 2020 | [555 San Jose Av](https://www.permitgraph.org/a/6575/005) | new concrete pads for pge transformer to tie into untilities and new switchboard. utilities trench up san jose ave for future tie in to hartzell distribution panel |  |
| [201810112956](https://www.permitgraph.org/p/201810112956) | Oct 11, 2018 | Completed: final sign-off Nov 2020 | [3555 Cesar Chavez St](https://www.permitgraph.org/a/6575/005) | upturn sprinkler heads to prepare space for soft demo under 201810032115 maher not req | $100,000 |
| [201810112883](https://www.permitgraph.org/p/201810112883) | Oct 11, 2018 | Completed: final sign-off Oct 2018 | [240 Stockton St](https://www.permitgraph.org/a/0309/020) | 4th fl, ste 400 revision to 2018-0320-4096 plumbing inspector wanted note on page a6.1 detail 3 in record |  |
| [201810032092](https://www.permitgraph.org/p/201810032092) | Oct 3, 2018 | Completed: final sign-off Nov 2020 | [555 San Jose Av](https://www.permitgraph.org/a/6575/005) | 1st, 2nd and roof - interior and exterior selective demo for hartzell ti project ti under separate permit. | $600,000 |
| [201810032115](https://www.permitgraph.org/p/201810032115) | Oct 3, 2018 | Completed: final sign-off Jan 2021 | [3555 Cesar Chavez St](https://www.permitgraph.org/a/6575/005) | the project consists of a non-structural interior demo of 2 vacant buildings on sutter mission bernal campus. the 1957 building scope includes interior demo of a 31,724 sf, 4 story bldg. the 1970 bld… | $750,000 |
| [201809241127](https://www.permitgraph.org/p/201809241127) | Sep 24, 2018 | Completed: final sign-off Feb 2019 | [640 Sacramento St](https://www.permitgraph.org/a/0227/011) | 1/f: mep ti for ref pa# 201806131753. maher n/a. | $380,000 |
| [201808318917](https://www.permitgraph.org/p/201808318917) | Aug 31, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 2nd/3rd fl: a/mep revision & adding work to #201710201778. revision are minor, new mri adding sq ft to the whole scope (project is oshpd 3), cryovent for liquid helium, inert | $35,000 |
| [201807255521](https://www.permitgraph.org/p/201807255521) | Jul 25, 2018 | Completed: final sign-off Dec 2020 | [555 San Jose Av](https://www.permitgraph.org/a/6575/005) | (1st floor-central courtyard): (n) disable access ramps and entry enclosure to parking garage. enclose garage entry with glass vestibule, (n) hardware to elevator lobbies. maher n/a. |  |
| [201807255526](https://www.permitgraph.org/p/201807255526) | Jul 25, 2018 | Completed: final sign-off Jan 2021 | [555 San Jose Av](https://www.permitgraph.org/a/6575/005) | 1st and 2nd floor. interior demo on 1st & 2nd level. build back outpaitent medical offices on both levels. mep included & structural. | $8,000,000 |
| [201806293339](https://www.permitgraph.org/p/201806293339) | Jun 29, 2018 | Completed: final sign-off Sep 2018 | [640 Sacramento St](https://www.permitgraph.org/a/0227/011) | 1st fl.- demo only associated with project 2018-0613-1753. |  |
| [201806111500](https://www.permitgraph.org/p/201806111500) | Jun 11, 2018 | Completed: final sign-off Oct 2018 | [240 Stockton St](https://www.permitgraph.org/a/0309/020) | 4th, suite 400 - mechanical and electrical for 201803204096 | $76,000 |
| [201805179347](https://www.permitgraph.org/p/201805179347) | May 17, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 5th fl - revision to pa 2017-0927-9716 and 2018-0416-6404 adding gamma rey machine to scope and additional correction to building & engineering pages |  |
| [201804307750](https://www.permitgraph.org/p/201804307750) | Apr 30, 2018 | Completed: final sign-off Sep 2018 | [1580 Valencia St](https://www.permitgraph.org/a/6575/005) | convert existing blood draw room into a fluid processing room, adding a pass thru cabinet in an (e) accessible toilet and adding a wall mount for an (e) monitor in an (e) soiled utility room | $32,000 |
| [201804176546](https://www.permitgraph.org/p/201804176546) | Apr 17, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 6th fl - meps and structural for project pa 2017-0927-9722 | $4,000,000 |
| [201804166404](https://www.permitgraph.org/p/201804166404) | Apr 16, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 5th floor, meps and structural for project pa# 201709279716. maher na | $4,000,000 |
| [201804166398](https://www.permitgraph.org/p/201804166398) | Apr 16, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 4th floor mep's and structural for project pa# 201708175144. n/a for maher | $4,000,000 |
| [201804105909](https://www.permitgraph.org/p/201804105909) | Apr 10, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 1st floor: meps and structural for ti 20171013164. | $254,744 |
| [201803204096](https://www.permitgraph.org/p/201803204096) | Mar 20, 2018 | Completed: final sign-off Oct 2018 | [240 Stockton St](https://www.permitgraph.org/a/0309/020) | full floor arch ti 4th floor -demo of non-bearing walls, millwork. finishes & portion of corridor. also, new interior partitions, glazing, door/frames, lighting, power, millwork & new finishes. there… | $500,000 |
| [201803153714](https://www.permitgraph.org/p/201803153714) | Mar 15, 2018 | Completed: final sign-off May 2018 | [901 Van Ness Av](https://www.permitgraph.org/a/0719/002) | to erect electrical sign at the interior wall on 2nd floor. n/a for maher | $3,000 |
| [201803123379](https://www.permitgraph.org/p/201803123379) | Mar 12, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 7th fl - mechanical, electrical & plumbing & structural for pa 2017-1013-1168. maher na | $3,000,000 |
| [201802272318](https://www.permitgraph.org/p/201802272318) | Feb 27, 2018 | Completed: final sign-off Sep 2018 | [1580 Valencia St](https://www.permitgraph.org/a/6575/005) | 1st and basement floors: fire review was missed on 201711174274. fire dept/ requested a full arch. set. re-review for the same project to put it in record. revision to 2017-1117-4274. |  |
| [201801249358](https://www.permitgraph.org/p/201801249358) | Jan 24, 2018 | Completed: final sign-off Sep 2018 | [1580 Valencia St](https://www.permitgraph.org/a/6575/005) | basement/1st floor: mep for 201711174274 |  |
| [201712126173](https://www.permitgraph.org/p/201712126173) | Dec 12, 2017 | Completed: final sign-off Jan 2018 | [201 Spear St](https://www.permitgraph.org/a/3741/032) | 9th flr: revision to 201710302554 changing some exit sign placement, move card reader to inside vestible and adjusting exit egress pathway. maher na |  |
| [201711174273](https://www.permitgraph.org/p/201711174273) | Nov 17, 2017 | Completed: final sign-off Dec 2020 | [3555 Cesar Chavez St](https://www.permitgraph.org/a/6575/005) | 1st floor: install new emergency generator and related equipment on new concrete pads within extg outdoor uncovered service yard. install new green wall/plant screen fence and gate at entrance to the… | $1,129,102 |
| [201711174274](https://www.permitgraph.org/p/201711174274) | Nov 17, 2017 | Completed: final sign-off Sep 2018 | [1580 Valencia St](https://www.permitgraph.org/a/6575/005) | basement-1st floor: partial interior remodel of monteagle. basement &1st floor: (initial demo pender 201707182106)mechanical & electrical under separate permit. n/a for maher | $462,202 |
| [201711174209](https://www.permitgraph.org/p/201711174209) | Nov 17, 2017 | Completed: final sign-off May 2018 | [901 Van Ness Av](https://www.permitgraph.org/a/0719/002) | 2nd fl - mechanical and electrical for arch pa #2017-0816-5042. maher n/a | $100,000 |
| [201711083515](https://www.permitgraph.org/p/201711083515) | Nov 8, 2017 | Completed: final sign-off Feb 2018 | [525 Market St](https://www.permitgraph.org/a/3708/056) | 36th fl. minor ti non structural demo of storage and pantry. new construction to include partitions etc. meps sprinkler and life safety under sep permit | $207,162 |
| [201710302554](https://www.permitgraph.org/p/201710302554) | Oct 30, 2017 | Completed: final sign-off Jan 2018 | [201 Spear St](https://www.permitgraph.org/a/3741/032) | 9/f- add 1 door & side light to new wall & soffit above, add exit signs & card reader. n/a ordinance #155-13 | $15,000 |
| [201710201778](https://www.permitgraph.org/p/201710201778) | Oct 20, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | (2nd & 3rd flrs) medical office building (clinic, outpatient) t.i. mechanical, electrical, plumbing & structural included. 1st time build out. (oshpd 3 permit) | $7,285,102 |
| [201710131164](https://www.permitgraph.org/p/201710131164) | Oct 13, 2017 | Never finaled: issued Feb 2018, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 1st floor: t.i medical office building (clinic outpatient)first time build out. meps, life safety and sprinkler submitted separately | $237,337 |
| [201710131168](https://www.permitgraph.org/p/201710131168) | Oct 13, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 7th floor: full floor medical office building (clinical outpatient) t.i. 1st time build out, single floor. mep, lifesafety and sprinklers under separate permits. | $4,954,864 |
| [201709279722](https://www.permitgraph.org/p/201709279722) | Sep 27, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | (6th flr) medical office bldg (clinic, outpatient) is a t.i. project, 1st time build out, single floor t.i.; meps, life safety & sprinklers under separate permit. maher n/a. | $4,393,775 |
| [201709279716](https://www.permitgraph.org/p/201709279716) | Sep 27, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | (5th fl): medical office bldg (clinic outpatient) is a t.i. project. 1st time buildout, single fl t.i. (mep, life safety and sprinklers under separate permit) | $4,641,551 |
| [201709087343](https://www.permitgraph.org/p/201709087343) | Sep 8, 2017 | Completed: final sign-off Feb 2018 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | suite 560: t.i. demo of (e) walls and construction of new walls & glazing configuration, minor ceiling and powe/data work, finishes. (e) fire life saftey & sprinkler mods under sep permit. maher n/a. | $200,000 |
| [201709087352](https://www.permitgraph.org/p/201709087352) | Sep 8, 2017 | Completed: final sign-off Feb 2018 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | suite 1450: a/mep t.i. demo of (e) walls and glazing and ceiling, construction of new walls & glazing configuration, (n) ceiling and power/data work, finishes. fire life safety & sprinkler mod is und… | $650,000 |
| [201708175144](https://www.permitgraph.org/p/201708175144) | Aug 17, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 4/f- t. i. to a medical office building for clinic outpatient, 1st time build out, single floor t.i., meps. life safety and sprinklers under seperate permit. n/a maher ordinance #155-13 | $4,854,717 |
| [201708165042](https://www.permitgraph.org/p/201708165042) | Aug 16, 2017 | Completed: final sign-off May 2018 | [901 Van Ness Av](https://www.permitgraph.org/a/0719/002) | revision to app#201706068547:interior remodel of extg boutiqes & extg restroom on 2nd fl. no change of use. nw fixtures & finishes to restroom for continued use as auto sales facility & arch features… | $140,000 |
| [201708104426](https://www.permitgraph.org/p/201708104426) | Aug 10, 2017 | Completed: final sign-off May 2018 | [901 Van Ness Av](https://www.permitgraph.org/a/0719/002) | 2/f: mechanical and electrical for architectual permit #201706068547. maher na | $115,000 |
| [201707182106](https://www.permitgraph.org/p/201707182106) | Jul 18, 2017 | Completed: final sign-off Aug 2017 | [3555 Cesar Chavez St](https://www.permitgraph.org/a/6575/005) | basement & ground floor - demolition of tenant improvement spaces in preparation of future tenant improvement under separate permit. n/a maher ordinance | $74,000 |
| [201706220129](https://www.permitgraph.org/p/201706220129) | Jun 22, 2017 | Completed: final sign-off Feb 2018 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | suite 510: t.i. on multi-tenant floor: build-=out consist of demo of (e) walls & construction of (n) wall and glazing configuration, celing and minor power/data work and finishes. life safety and spi… | $200,000 |
| [201706068547](https://www.permitgraph.org/p/201706068547) | Jun 6, 2017 | Completed: final sign-off May 2018 | [901 Van Ness Av](https://www.permitgraph.org/a/0719/002) | re 1/a.001 project entails t.i. int. remodel for extg auto sales facility. work is limited to the 2nd floor only and does not entail any change of use. 1)scope includes but not limited to constructio… | $149,000 |
| [201705176804](https://www.permitgraph.org/p/201705176804) | May 17, 2017 | Completed: final sign-off Nov 2017 | [901 Van Ness Av](https://www.permitgraph.org/a/0719/002) | 1st floor: mechanical and electrical for app#201611031922 |  |
| [201701046456](https://www.permitgraph.org/p/201701046456) | Jan 4, 2017 | Completed: final sign-off Mar 2017 | [333 Bush St](https://www.permitgraph.org/a/0288/032) | 29th floor: mechanical and electrical for ref app#201611011636. | $130,000 |
| [201611152678](https://www.permitgraph.org/p/201611152678) | Nov 15, 2016 | Never finaled: issued Nov 2016, no final | [180 Sansome St](https://www.permitgraph.org/a/0267/016) | (aka 160 sansome st.) 3rd fl mechanical and electrical for 201610170683 maher not req. n/a maher | $20,000 |
| [201611031922](https://www.permitgraph.org/p/201611031922) | Nov 3, 2016 | Completed: final sign-off May 2018 | [901 Van Ness Av](https://www.permitgraph.org/a/0719/002) | 1st flr: ti- remodel (e) auto sales facility. no change of use. scope includes b.n.l.t: demo of (e) conf & sales offices, constr of new offices, customer areas and accessory storage rms, partitions,… | $534,000 |
| [201611031925](https://www.permitgraph.org/p/201611031925) | Nov 3, 2016 | Completed: final sign-off Nov 2017 | [901 Van Ness Av](https://www.permitgraph.org/a/0719/002) | revision to pa 2016-0525-8349. expansion of pagani showroom (rm 214) with (n) finishes, partition types & lighting fixtures. maher ord 155-13 na | $125,000 |
| [201611011636](https://www.permitgraph.org/p/201611011636) | Nov 1, 2016 | Completed: final sign-off Mar 2017 | [333 Bush St](https://www.permitgraph.org/a/0288/032) | flrs: 27,29,30 & 31: interior tenant improvement to add card readers on an (e)communicating stair door. construction of new offices on floor 29. no structural work. | $330,000 |
| [201610190683](https://www.permitgraph.org/p/201610190683) | Oct 19, 2016 | Completed: final sign-off Dec 2016 | [180 Sansome St](https://www.permitgraph.org/a/0267/016) | 3rd floor tenant improvement limited to non-structural interior walls & floor finishes. meps, life safety etc will be design build & submitted separately, n/a ordinance #155-13 | $342,244 |
| [201610119971](https://www.permitgraph.org/p/201610119971) | Oct 11, 2016 | Completed: final sign-off Nov 2017 | [901 Van Ness Av](https://www.permitgraph.org/a/0719/002) | mechanical and electrical for 201605258349 | $397,474 |
| [201609016630](https://www.permitgraph.org/p/201609016630) | Sep 1, 2016 | Completed: final sign-off Mar 2017 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | 13th floor: revision to ref pa 201604144810. new scope: ti to suite 1300 - demo of (e) wall partitions & new finishes. maher na | $60,000 |
| [201608054288](https://www.permitgraph.org/p/201608054288) | Aug 5, 2016 | Never finaled: issued Aug 2016, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | a/mep no new fsd's 11/f- demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new non structural partitions, doors, frames, millwork & finishes. no structural w… | $123,960 |
| [201608054284](https://www.permitgraph.org/p/201608054284) | Aug 5, 2016 | Completed: final sign-off Sep 2016 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | a/mep no new fsd's 9/f - demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new construct of non structural partitions, doors, frames, millwork & finishes. no… | $1,215,000 |
| [201606069209](https://www.permitgraph.org/p/201606069209) | Jun 6, 2016 | Never finaled: issued Jun 2016, no final | [180 Sansome St](https://www.permitgraph.org/a/0267/016) | suite 200 -electrical permit for pa #201604124595 - additoinal outlets & power distribution. n/a maher ordinance | $12,464 |
| [201605278601](https://www.permitgraph.org/p/201605278601) | May 27, 2016 | Completed: final sign-off Jun 2016 | [180 Sansome St](https://www.permitgraph.org/a/0267/016) | 2nd fl: revision to ref pa 2016-0412-4595: ti to include minor removal of non structural partitions, new millwork in pantry and restrooms, paint & carpet; maher n/a | $250 |
| [201605258349](https://www.permitgraph.org/p/201605258349) | May 25, 2016 | Completed: final sign-off Nov 2017 | [901 Van Ness Av](https://www.permitgraph.org/a/0719/002) | ti remodel (e)auto sales facility. work at 2/f only. no change of use. includes but not limited to demo (e)storage & customer service areas on 2/f, new offices, customer services areas & accessory st… | $140,000 |
| [201605167537](https://www.permitgraph.org/p/201605167537) | May 16, 2016 | Completed: final sign-off Jun 2016 | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | lobby level: minor construction clarifications (permit amendment) inlcuding sink location - layout clarifications. ref pa 2016-0315-2018, mechanical pa 2016-0422-5477 and electrical pa 2016-0509-6931 |  |
| [201605096931](https://www.permitgraph.org/p/201605096931) | May 9, 2016 | Completed: final sign-off Jun 2016 | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | lobby level: electrical lighting for ref pa 2016 0422 5477 (mech) and 2016 0315 2018 (arch) |  |
| [201605026335](https://www.permitgraph.org/p/201605026335) | May 2, 2016 | Completed: final sign-off Jul 2017 | [901 Van Ness Av](https://www.permitgraph.org/a/0719/002) | deferred electrical permit for 201603172342 | $34,000 |
| [201604225477](https://www.permitgraph.org/p/201604225477) | Apr 22, 2016 | Completed: final sign-off Jun 2016 | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | lobby level: mechanical permit for pa 2016-0315-2018. minor modification to (e) system distribution for new roomss, x-ray rooms physicist letter and details. | $37,001 |
| [201604144810](https://www.permitgraph.org/p/201604144810) | Apr 14, 2016 | Completed: final sign-off Mar 2017 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | 13th floor, ste 1300: ti at suite 1300 in a 22 story bldg build out consisting of demo to existing partitions, construction of new wall, glazing, ceiling, and power/data, finishes. n/a maher ord. # 1… | $60,000 |
| [201604124595](https://www.permitgraph.org/p/201604124595) | Apr 12, 2016 | Completed: final sign-off Jun 2016 | [180 Sansome St](https://www.permitgraph.org/a/0267/016) | ste #200: scope of modifications for tenant improvements are minimal:removal of non-structural partitions,floor finishes,kitchen cabinetry. minor modifications to 9e) ada restroom to bring room into… | $100,000 |
| [201604043868](https://www.permitgraph.org/p/201604043868) | Apr 4, 2016 | Completed: final sign-off May 2016 | [999 Van Ness Av](https://www.permitgraph.org/a/0719/001) | mechanical and electrical deferred ap 201601076565 | $16,000 |
| [201603172342](https://www.permitgraph.org/p/201603172342) | Mar 17, 2016 | Completed: final sign-off Jul 2016 | [901 Van Ness Av](https://www.permitgraph.org/a/0719/002) | 4th fl:tenant improvement interior remodel for (e) auto sales customer facility. does not entail any change of use. demo (e) to parts store area offices, finishes customer service areas, accessory st… | $115,000 |
| [201603152018](https://www.permitgraph.org/p/201603152018) | Mar 15, 2016 | Completed: final sign-off Jun 2016 | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | 2/f lobby level- non structural demo, (n) non structural partitions, doors, millwork, finishes. no change in area, occupancy or use. mep under separate permit. n/a ordinance #155-13 | $384,461 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069.