# Roebbelen Contracting Inc

Contractor license 734124. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124
- JSON: https://www.permitgraph.org/api/contractor?license=734124
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=734124

136 permits since 2000: 117 completed, 7 in progress, 10 never finaled, 2 expired or cancelled. Typically 50 days from filing to permit and 148 days from permit to final inspection. Of the 10 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 6 are over 10 years old. 1 was filed but never issued.

- Based in: El Dorado Hills
- On San Francisco permits: Aug 2003 to Nov 2026
- Last 24 months: 2 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2003 | 4 | 0 | 0 | 1 |
| 2004 | 4 | 0 | 0 | 0 |
| 2005 | 10 | 0 | 0 | 0 |
| 2006 | 10 | 0 | 1 | 1 |
| 2007 | 7 | 0 | 0 | 0 |
| 2008 | 11 | 0 | 0 | 0 |
| 2009 | 11 | 0 | 0 | 0 |
| 2010 | 11 | 0 | 0 | 0 |
| 2011 | 16 | 0 | 1 | 0 |
| 2012 | 6 | 0 | 0 | 0 |
| 2013 | 8 | 0 | 1 | 0 |
| 2014 | 3 | 0 | 0 | 0 |
| 2015 | 2 | 0 | 0 | 0 |
| 2016 | 2 | 0 | 4 | 0 |
| 2017 | 6 | 0 | 2 | 0 |
| 2018 | 3 | 0 | 0 | 0 |
| 2021 | 0 | 0 | 1 | 0 |
| 2022 | 1 | 1 | 0 | 0 |
| 2023 | 2 | 0 | 0 | 0 |
| 2024 | 0 | 4 | 0 | 0 |
| 2025 | 0 | 1 | 0 | 0 |
| 2026 | 0 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 1 | 1 | 0 | 0 | 0 | 117 | 245 |

## Most recent permits

The 100 most recent of 136.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202610099304](https://www.permitgraph.org/p/202610099304) | Nov 2, 2026 | In progress: filed Nov 2026, not yet issued | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | replace an <e> 500 ton nominal water cooled chiller in basement with a <n> 550 ton nominal water cooled chiller in the basement. all misc. piping, electrical, controls, structural anchorage, rigging,… | $250,000 |
| [202503242877](https://www.permitgraph.org/p/202503242877) | Apr 10, 2025 | In progress: issued Aug 2025 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | install (3) clip-lv devices in the basement electrical space. replace (36) existing panel boards and (4) existing motor control center with new. all misc. electrical work. | $1,250,000 |
| [202407196873](https://www.permitgraph.org/p/202407196873) | Aug 8, 2024 | In progress: issued Sep 2024 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | secure vertically oriented/long alumium panels across all elevations of the bldg. this is a preventive measure. a full facade study is also planned in august 2024 to observe and meet with city's faca… | $845,000 |
| [202405142113](https://www.permitgraph.org/p/202405142113) | Jun 18, 2024 | In progress: issued Oct 2024 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | secure the terracotta facing from coming loose and falling that have been impacted by water leaks at mechanical louvers. this phase will address a portion of the front facade/pine st. elevation. | $1,000,000 |
| [202405222684](https://www.permitgraph.org/p/202405222684) | May 22, 2024 | In progress: issued Feb 2025 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | relocate (e) standby elec equip to (n) room. install feeders to tile (e0 loads to new house service equip. provide/install new ducts to service relocate elec equip. anchorage for 2 components up to 9… | $100,000 |
| [202405021307](https://www.permitgraph.org/p/202405021307) | May 2, 2024 | In progress: issued Nov 2025 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | install (1) standby packaged 2mw 4160 volt diesel generator #3 (gen-3) & its associated after treatment system on the roof of 430 bush. provide & install fuel piping which transfer between the two bu… | $400,000 |
| [202302141935](https://www.permitgraph.org/p/202302141935) | Feb 14, 2023 | Completed: final sign-off Nov 2025 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | install mechanical and electrical infrastructure to support telephone equipment | $500,000 |
| [202302141933](https://www.permitgraph.org/p/202302141933) | Feb 14, 2023 | Completed: final sign-off Jun 2024 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | install new security gates | $20,000 |
| [202211106284](https://www.permitgraph.org/p/202211106284) | Nov 10, 2022 | In progress: issued Nov 2025 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | install 540 gal urea tank on the 1st floor of 555 pine. provide & install fuel piping & associated fuel pumps at 555 pine which transfer between the two buildings. provide & install piping for the eq… | $100,000 |
| [202202188342](https://www.permitgraph.org/p/202202188342) | Feb 18, 2022 | Completed: final sign-off Dec 2024 | [1 Mccoppin St](https://www.permitgraph.org/a/3513/001) | replace two (e) air coole chillers on the roof of the building. mech & elec work to support the replacement. | $250,000 |
| [202108136420](https://www.permitgraph.org/p/202108136420) | Aug 13, 2021 | Never finaled: issued Jul 2022, no final | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | replace 1 water cooled ac unit on the 6th floor with 2 new chilled water ac units on 6th floor. remove 2 extg closed circuit cooling towers on the roof. remove all condenser water piping, supports, a… | $250,000 |
| [201805078397](https://www.permitgraph.org/p/201805078397) | May 7, 2018 | Completed: final sign-off Feb 2020 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | upgrade to existing hvac system on 32nd fl adding new vavs, replace control valves, balancing, fsd improvements - adding 5 (n) fsds and 17 (e) fsds intrfaced to icdiacator panel, new bms controls mah… | $670,000 |
| [201801199085](https://www.permitgraph.org/p/201801199085) | Jan 19, 2018 | Completed: final sign-off Aug 2020 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 27th fl - full floor buildout. partitions, mep | $2,300,000 |
| [201801199088](https://www.permitgraph.org/p/201801199088) | Jan 19, 2018 | Completed: final sign-off Aug 2020 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 8th fl - full floor buildout. partitions, mep | $2,300,000 |
| [201712156584](https://www.permitgraph.org/p/201712156584) | Dec 15, 2017 | Completed: final sign-off Aug 2020 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 8th flr: soft demo - partition, ceilings and flooring. maher n/a. | $50,000 |
| [201712156582](https://www.permitgraph.org/p/201712156582) | Dec 15, 2017 | Completed: final sign-off Aug 2020 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 27th flr: soft demo - partition, ceilings and flooring. maher na | $50,000 |
| [201711284942](https://www.permitgraph.org/p/201711284942) | Nov 28, 2017 | Never finaled: issued Nov 2017, no final | [536 Treat Av](https://www.permitgraph.org/a/3592/031) | remove two vehicle lifts, install 1 new lift with associated electrical, air & hydraulic | $107,000 |
| [201711083453](https://www.permitgraph.org/p/201711083453) | Nov 8, 2017 | Completed: final sign-off Nov 2018 | [355 Mcallister St](https://www.permitgraph.org/a/0788/001) | propose project consists of a vertical addition (type v-b) accessory structure of a commercial food service kiosk cafe with a gross area of approxmately 640 sf. this will built on top of (e) below gr… | $850,000 |
| [201711022940](https://www.permitgraph.org/p/201711022940) | Nov 2, 2017 | Completed: final sign-off Mar 2019 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | provide new gaurd shack and parking area approach. all associated mechanical and elec work. coordinate demo of existing gaurd shack | $70,000 |
| [201705257612](https://www.permitgraph.org/p/201705257612) | May 25, 2017 | Never finaled: issued Jun 2017, no final | [77 Beale St](https://www.permitgraph.org/a/3711/013) | ti of existing security office in basement. including celing, finishes, mep & accessible restroom | $275,000 |
| [201705197137](https://www.permitgraph.org/p/201705197137) | May 19, 2017 | Completed: final sign-off Feb 2021 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 10/f- revision to pa#201612195268, modify of exit signage based on site conditions & inspections. n/a ordinance #155-13 | $200,000 |
| [201705197133](https://www.permitgraph.org/p/201705197133) | May 19, 2017 | Completed: final sign-off Feb 2021 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 9/f- revision to pa#2016-1219-5271, revise square footage calculation, removal of fixed cabinetry & furnishings from calculation, modify of exit signage. n/a ordinance #155-13 | $200,000 |
| [201612205425](https://www.permitgraph.org/p/201612205425) | Dec 20, 2016 | Never finaled: filed Dec 2016, never issued | [245 Market St](https://www.permitgraph.org/a/3711/019) | window washing equipment. demolition & installation of push out riggers, rotation of davit bases and installation of davits, install of guard rails. maher n/a ordinance #155-13 | $272,144 |
| [201612195268](https://www.permitgraph.org/p/201612195268) | Dec 19, 2016 | Completed: final sign-off Feb 2021 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 10th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinance | $2,000,000 |
| [201612195271](https://www.permitgraph.org/p/201612195271) | Dec 19, 2016 | Completed: final sign-off Feb 2021 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 9th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinance | $2,000,000 |
| [201608225614](https://www.permitgraph.org/p/201608225614) | Aug 22, 2016 | Never finaled: issued Aug 2016, no final | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 9th floor: demolition only. ab-017 n/a for maher | $50,000 |
| [201608225616](https://www.permitgraph.org/p/201608225616) | Aug 22, 2016 | Never finaled: issued Aug 2016, no final | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 10th floor: demolition only.ab 017 n/a for maher | $50,000 |
| [201606200343](https://www.permitgraph.org/p/201606200343) | Jun 20, 2016 | Never finaled: issued Aug 2016, no final | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 3rd floor: install new electrical outlets and service. install occupancy sensors. n/a for maher. | $50,000 |
| [201512074359](https://www.permitgraph.org/p/201512074359) | Dec 7, 2015 | Completed: final sign-off May 2016 | [245 Market St](https://www.permitgraph.org/a/3711/019) | basement/13th fl: replace 4 ats switches with wire conduit as needed. build concrete housekeeping pads, new door and frames in electriclal rooms. n/a maher ordinance. | $763,685 |
| [201509015778](https://www.permitgraph.org/p/201509015778) | Sep 1, 2015 | Completed: final sign-off Jul 2017 | [215 Market St](https://www.permitgraph.org/a/3711/019) | amending extg permitted project per app#201406198847 with new information. window jamb details, misc. window repairs, stucco and terra cotta repairs, expansion joint repairs, stucco and terra cotta r… | $100,000 |
| [201410219462](https://www.permitgraph.org/p/201410219462) | Oct 21, 2014 | Completed: final sign-off May 2015 | [45 Beale St](https://www.permitgraph.org/a/3711/019) | 3rd flr. t.i. remove existing pair doors, install single door, patch and fill opening as req'd. cut opening in existing partition and install new door. interior work only. maher n/a. | $12,000 |
| [201408254655](https://www.permitgraph.org/p/201408254655) | Aug 25, 2014 | Completed: final sign-off Oct 2017 | [45 Beale St](https://www.permitgraph.org/a/3711/019) | remove seven existing automatic transfer switches, replace with one automatic transfer switch. replace one electrical panel including conduit & cables. n/a maher ordinance | $230,000 |
| [201406198847](https://www.permitgraph.org/p/201406198847) | Jun 19, 2014 | Completed: final sign-off Jul 2017 | [215 Market St](https://www.permitgraph.org/a/3711/019) | replace (e) windows on n,e, & s elevations with (n) wood windows. n/a for the maher ordinance #155-13 | $800,000 |
| [201308154435](https://www.permitgraph.org/p/201308154435) | Aug 15, 2013 | Completed: final sign-off Feb 2014 | [465 Irwin St](https://www.permitgraph.org/a/3821/005) | cardboard baler 82"w x40.5"d x139.5"tall | $10,000 |
| [201308154432](https://www.permitgraph.org/p/201308154432) | Aug 15, 2013 | Completed: final sign-off Oct 2013 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | install new pdsc panels & minor duct work modifications. all work on 7/f | $50,000 |
| [201308063644](https://www.permitgraph.org/p/201308063644) | Aug 6, 2013 | Completed: final sign-off Dec 2013 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | revision to 201303041432. 12 att panel antenna to be mounted on e 3rd fl balconies- structural 3 |  |
| [201307161971](https://www.permitgraph.org/p/201307161971) | Jul 16, 2013 | Completed: final sign-off Nov 2013 | [100 Paul Av](https://www.permitgraph.org/a/5431A/005) | renovate part of extg mens restroom into unisex restroom. proved and install restroom graphics and sinages. core drill extg conc. wall for extg fan saucut door opening for accessible door. relocate e… | $22,000 |
| [201305207366](https://www.permitgraph.org/p/201305207366) | May 20, 2013 | Never finaled: issued Jul 2013, no final | [430 Bush St](https://www.permitgraph.org/a/0270/037) | demolition of extg partition non load bearing, ceiling and finishes. install new non-load bearing partitions, ceiling, finishes. modification of extg mechanical, electrical and plumbing distribution… | $1,023,112 |
| [201303041432](https://www.permitgraph.org/p/201303041432) | Mar 4, 2013 | Completed: final sign-off Dec 2013 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | installation of 16 panel antennas & associated equipment within the (e) bldg. | $130,000 |
| [201302089816](https://www.permitgraph.org/p/201302089816) | Feb 8, 2013 | Completed: final sign-off May 2013 | [30 Onondaga Av](https://www.permitgraph.org/a/6956/023) | install a new canopy, this structure shall be used as a recycle drop off center, not open to the public only for employee use | $50,000 |
| [201301258761](https://www.permitgraph.org/p/201301258761) | Jan 25, 2013 | Completed: final sign-off Oct 2013 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | install new roof top air handler and duct work. | $750,000 |
| [201301258764](https://www.permitgraph.org/p/201301258764) | Jan 25, 2013 | Completed: final sign-off Sep 2013 | [2345 Pine St](https://www.permitgraph.org/a/0659/029) | install new roof top air handler and ductwork | $500,000 |
| [201209048848](https://www.permitgraph.org/p/201209048848) | Sep 4, 2012 | Completed: final sign-off Oct 2013 | [389 09th Av](https://www.permitgraph.org/a/1441/035) | (e) t-mobile facility. replace (6) antennas w/ (6) (n) antennas at same locations. | $19,000 |
| [201208016289](https://www.permitgraph.org/p/201208016289) | Aug 1, 2012 | Completed: final sign-off Dec 2012 | [1515 19th Av](https://www.permitgraph.org/a/1865/004) | relocate a wall to shorten the pioneer storage room includes mechanical- fire/smoke dampers included- fire alarm separate permit. | $100,000 |
| [201206192927](https://www.permitgraph.org/p/201206192927) | Jun 19, 2012 | Completed: final sign-off Oct 2012 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | 6th floor - install 2 new computer room air handler units. fire alarm and smoke detection separate permit. | $100,000 |
| [201205251236](https://www.permitgraph.org/p/201205251236) | May 25, 2012 | Completed: final sign-off Aug 2012 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | 2nd floor - install ductwork for new telephone equipment | $10,000 |
| [201205180726](https://www.permitgraph.org/p/201205180726) | May 18, 2012 | Completed: final sign-off Sep 2012 | [389 09th Av](https://www.permitgraph.org/a/1441/035) | 2nd floor-install a new 1 hour rated room for wi-fi equipment | $20,000 |
| [201204259071](https://www.permitgraph.org/p/201204259071) | Apr 25, 2012 | Completed: final sign-off Apr 2013 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | demolish and remove offices on the 5th and 9th floors and convert to telephone equipment spaces | $100,000 |
| [201112130568](https://www.permitgraph.org/p/201112130568) | Dec 13, 2011 | Completed: final sign-off Mar 2012 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | revision to pa# 2011-0708-9748-changes to antenna supports, added structural attachments | $10,000 |
| [201111219331](https://www.permitgraph.org/p/201111219331) | Nov 21, 2011 | Completed: final sign-off Jan 2013 | [2345 Pine St](https://www.permitgraph.org/a/0659/029) | mechanical work associated with installation of new telecommunication equipment.all electrical & architectural work associated with this work. | $500,000 |
| [201111148776](https://www.permitgraph.org/p/201111148776) | Nov 14, 2011 | Completed: final sign-off Aug 2012 | [1 Mccoppin St](https://www.permitgraph.org/a/3513/001) | install new chiller at rooftop. install structural framing to support new chiller cac. | $300,000 |
| [201111148779](https://www.permitgraph.org/p/201111148779) | Nov 14, 2011 | Completed: final sign-off Jun 2013 | [389 09th Av](https://www.permitgraph.org/a/1441/035) | install new mechanical air handler to chiller and associated ductwork and piping | $500,000 |
| [201111088494](https://www.permitgraph.org/p/201111088494) | Nov 8, 2011 | Never finaled: issued Jul 2012, no final | [389 09th Av](https://www.permitgraph.org/a/1441/035) | unmanned telecommunication facility at an (e) at & t switch with (p) 5 radio cabinets, 2 parcell cabinets on a (p) 18 x 18 x 7" steel platform on & lower roof. apprtenant cable & cable tray. also add… | $125,000 |
| [201110146882](https://www.permitgraph.org/p/201110146882) | Oct 14, 2011 | Completed: final sign-off Jul 2012 | [3333 25th St](https://www.permitgraph.org/a/6527/045) | chiller replacement at roof | $300,000 |
| [201109215166](https://www.permitgraph.org/p/201109215166) | Sep 21, 2011 | Completed: final sign-off Sep 2011 | [3333 25th St](https://www.permitgraph.org/a/6527/045) | basemnt/1st/2nd/3rd/4th/5th/6th/7th & 8th flrs-create/install evacuation maps at elevator lobby. entrnace to stairwells, entrance to elevator lobby & entrance to building. | $6,500 |
| [201109084178](https://www.permitgraph.org/p/201109084178) | Sep 8, 2011 | Completed: final sign-off Sep 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | create, install evacuation maps at elevator lobby, entrance to stairwell, entrance to elevator lobby & entrances to bldg. typical 7th., 12th., 13th., 15th. & 16th. floors. | $2,500 |
| [201108102208](https://www.permitgraph.org/p/201108102208) | Aug 10, 2011 | Completed: final sign-off Sep 2011 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | create, install evacuation maps at elevator lobby, entrance to stairwell, entrance to elevator lobby and entrances to building. typical 1st. floor through 6th. floor. | $4,500 |
| [201107089748](https://www.permitgraph.org/p/201107089748) | Jul 8, 2011 | Completed: final sign-off Mar 2012 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | a (n) unmanned roof top telecom facility adding (1) (n) rba72 lte cabinet, (2) new purcell lte cabinets,(5)(n) 3106 rbs cabinets on a 16'11" x33'4 1/2" lease area located on the roof, (n) 18" cable t… | $158,108 |
| [201107069572](https://www.permitgraph.org/p/201107069572) | Jul 6, 2011 | Completed: final sign-off Sep 2011 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | install evacuation maps at elevator lobby, entrance to lobby, entrance to stairwell, and entrances to bldg. | $1,000 |
| [201107019348](https://www.permitgraph.org/p/201107019348) | Jul 1, 2011 | Completed: final sign-off Jan 2012 | [30 Onondaga Av](https://www.permitgraph.org/a/6956/023) | remove abandoned air handlers & install a new air handler in the penthouse. | $500,000 |
| [201106309242](https://www.permitgraph.org/p/201106309242) | Jun 30, 2011 | Completed: final sign-off Oct 2011 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | install new exhaust fan and new fsd and modify ductwork on 8 and 9 floors. sprinkler work and fire alarm work require seperate permit. | $50,000 |
| [201105246650](https://www.permitgraph.org/p/201105246650) | May 24, 2011 | Completed: final sign-off Jun 2011 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | t-mobile. re attach two panel antennas previously approved under pa# 9520623 | $3,000 |
| [201104214546](https://www.permitgraph.org/p/201104214546) | Apr 21, 2011 | Completed: final sign-off May 2013 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | upgrades (e)standby generator fueling sys:(n)supply&return piping to bush st 555 pine st: replace leaking piping in bsmt,add redundant fuel supply piping,replace(e)pump sys feeding 430 bush st.facili… | $75,000 |
| [201101148446](https://www.permitgraph.org/p/201101148446) | Jan 14, 2011 | Completed: final sign-off Jun 2011 | [1515 19th Av](https://www.permitgraph.org/a/1865/004) | swap 3 antennas. add rba 72 cabinet,2 purcell cabinets, new splice box,3 surge suppressors,6 rru's,new gps antenna and new inner ducts. | $47,000 |
| [201101078086](https://www.permitgraph.org/p/201101078086) | Jan 7, 2011 | Completed: final sign-off Jan 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | 16th floor-removal of wall mounted fall protection eye bolt from ti scope of work, 201006184827. identify fall protection tie off points at columns h4 and j4 |  |
| [201010213489](https://www.permitgraph.org/p/201010213489) | Oct 21, 2010 | Completed: final sign-off Apr 2011 | [951 Howard St](https://www.permitgraph.org/a/3732/110) | replace (e) 350 kw generator w/ new 500 kw gen'r. remove gen'r & enclosure. install new gen'r, stand alone, package. provide new elect'l, monitoring, alarms, controls, fuel piping. at ext'r of bldg &… | $600,000 |
| [201010072473](https://www.permitgraph.org/p/201010072473) | Oct 7, 2010 | Completed: final sign-off Apr 2011 | [1 Mccoppin St](https://www.permitgraph.org/a/3513/001) | repl air handler and duct work, including demolish existing unit and install new; modify ductwork to redistribute air in basement, electrical and piping modifications to install new air handler | $450,000 |
| [201010072474](https://www.permitgraph.org/p/201010072474) | Oct 7, 2010 | Completed: final sign-off Apr 2011 | [1515 19th Av](https://www.permitgraph.org/a/1865/004) | replace existing 70 ton chiller with a new 120 ton chiller, replace the chilled water pumps, replace controllers, electrical work associated with it | $300,000 |
| [201010072530](https://www.permitgraph.org/p/201010072530) | Oct 7, 2010 | Completed: final sign-off May 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | demolish retired i place dhiller and replace with new modular chiller. relocate pumps to facilitate work. modify chilled water pipiing to relocate pumps and connect new chiller | $600,000 |
| [201010072496](https://www.permitgraph.org/p/201010072496) | Oct 7, 2010 | Completed: final sign-off Jan 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | 8th floor - modify ductwork for space including new ducting, demolition and controls. demolish fire sprinklers in space. install new early warning smoke detectors. | $150,000 |
| [201008259515](https://www.permitgraph.org/p/201008259515) | Aug 25, 2010 | Completed: final sign-off Jun 2011 | [1 Bush St](https://www.permitgraph.org/a/0290/011) | install battery stands at basement | $50,000 |
| [201006184827](https://www.permitgraph.org/p/201006184827) | Jun 18, 2010 | Completed: final sign-off Jan 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | at&t. office ti on the 16th floor. addition of office room and storage room. remodel men's restroom for adf compliance. work to include mech, elec, fire alarm, plumbing. | $85,000 |
| [201006084074](https://www.permitgraph.org/p/201006084074) | Jun 8, 2010 | Completed: final sign-off Jan 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | provide new duct distribution. provide new exhaust fan for battery room. install power distribution. remove existing light, power and install new lighting | $1,000,000 |
| [201005172572](https://www.permitgraph.org/p/201005172572) | May 17, 2010 | Completed: final sign-off Feb 2011 | [1515 19th Av](https://www.permitgraph.org/a/1865/004) | modification to e unmanned telecomminications facility consisting of adding a n rbs cabinet and upgrading e subpanel to 200 amps in e equip area, also removing and replacing 6 e antennas with 6 n ant… | $44,000 |
| [201003319352](https://www.permitgraph.org/p/201003319352) | Mar 31, 2010 | Completed: final sign-off Apr 2011 | [951 Howard St](https://www.permitgraph.org/a/3732/110) | replace existing 600a service with new 800a service, including switchgear, automatic transfer switches, generator tap box, and main house service panel. this project will include a housekeeping pad f… | $497,097 |
| [201003319335](https://www.permitgraph.org/p/201003319335) | Mar 31, 2010 | Completed: final sign-off Nov 2010 | [30 Onondaga Av](https://www.permitgraph.org/a/6956/023) | install acoustic screen wall (12ft high) around existing chillers for sound attenuation. includes structural steel and acoustic panels. patch and repair roof. screen wall to be painted to match build… | $75,000 |
| [200912113055](https://www.permitgraph.org/p/200912113055) | Dec 11, 2009 | Completed: final sign-off Jan 2010 | [1930 Steiner St](https://www.permitgraph.org/a/0659/020) | revision to 200904065696: standpipe class ii fire hose rack relocation | $500 |
| [200912032495](https://www.permitgraph.org/p/200912032495) | Dec 3, 2009 | Completed: final sign-off Sep 2010 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | coolong tower replacement on roof. relocation to new area on roof | $440,000 |
| [200912032499](https://www.permitgraph.org/p/200912032499) | Dec 3, 2009 | Completed: final sign-off Sep 2010 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | chiller installation in basement. fa is required under separate permit. | $775,392 |
| [200911252116](https://www.permitgraph.org/p/200911252116) | Nov 25, 2009 | Completed: final sign-off May 2010 | [951 Howard St](https://www.permitgraph.org/a/3732/110) | revision to appl #2009.1125.2116. add sound barriers on roof screen & sound attenuation on (4) condensers. to address correction notice per d. sullivan & to address complaint #200926047 (bid). | $20,000 |
| [200910158984](https://www.permitgraph.org/p/200910158984) | Oct 15, 2009 | Completed: final sign-off May 2010 | [1930 Steiner St](https://www.permitgraph.org/a/0659/020) | replace chiller on roof | $500,000 |
| [200910018107](https://www.permitgraph.org/p/200910018107) | Oct 1, 2009 | Completed: final sign-off May 2010 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | replacement of a supply fan, sf-6, to the ninth. floor air handler. | $182,125 |
| [200907142563](https://www.permitgraph.org/p/200907142563) | Jul 14, 2009 | Completed: final sign-off Oct 2009 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | relocate basement ahu system. modify ducting and electrical to serve relocated ac system. relocate existing fire smoke dampers and provide new. relocated ac unit is less than 400 pounds. | $70,000 |
| [200906039674](https://www.permitgraph.org/p/200906039674) | Jun 3, 2009 | Completed: final sign-off May 2010 | [951 Howard St](https://www.permitgraph.org/a/3732/110) | replace with identical units hvac rtu for telecommunications equipment processes. remove ceiling in power room & leave open. | $600,000 |
| [200905148444](https://www.permitgraph.org/p/200905148444) | May 14, 2009 | Completed: final sign-off Jun 2010 | [951 Howard St](https://www.permitgraph.org/a/3732/110) | reroofing and roof strengthening. ada upgrades. | $300,000 |
| [200904065696](https://www.permitgraph.org/p/200904065696) | Apr 6, 2009 | Completed: final sign-off Jan 2010 | [1930 Steiner St](https://www.permitgraph.org/a/0659/020) | revision to appl #200809232374/r1 - provide alterate disabled accessible entrance to building. |  |
| [200903305167](https://www.permitgraph.org/p/200903305167) | Mar 30, 2009 | Completed: final sign-off Feb 2011 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | modification to (e) t-mobile tele communications facility, including relocation of (1) bts equipment cabinet from inside (e) elevator penthouse to (e) t-mobile equipment area located outside of penth… | $5,000 |
| [200807318160](https://www.permitgraph.org/p/200807318160) | Jul 31, 2008 | Completed: final sign-off Dec 2008 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | 7th-15th floors-fire smoke dampers & 1-hr rated partition & ceiling. partial 7th & 15th floors. fire smoke dampers deletion where not required. delete the toilet room upgrade on 13th floor; 7th floor… | $200,000 |
| [200807116504](https://www.permitgraph.org/p/200807116504) | Jul 11, 2008 | Completed: final sign-off Jul 2008 | [685 Market St](https://www.permitgraph.org/a/3707/051) | for sffd review only, original application 200805142070 was not reviewed by sffd, to verify existing life safety system. |  |
| [200806053692](https://www.permitgraph.org/p/200806053692) | Jun 5, 2008 | Completed: final sign-off Apr 2011 | [1 Mccoppin St](https://www.permitgraph.org/a/3513/001) | modify existing t-mobile wireless telecommunications facility. replace 1 equipment cabinet at roof top. replace 3 existing antennas and add 2 additional antennas. | $20,000 |
| [200805142070](https://www.permitgraph.org/p/200805142070) | May 14, 2008 | Completed: final sign-off Jul 2008 | [685 Market St](https://www.permitgraph.org/a/3707/051) | change of use from retail store to yogurt store on the ground floor unit # 130 including new lighting, plumbing, millwork, cashier, hand sink and pre sink | $50,000 |
| [200804290898](https://www.permitgraph.org/p/200804290898) | Apr 29, 2008 | Completed: final sign-off Oct 2008 | [1515 19th Av](https://www.permitgraph.org/a/1865/004) | 2007-1210-0066 revision-revise duct penetration detail due to unforseen conditions. sawcut new 65"x36" opening at concrete slab & provide new 1 hour partition around opening up to wood frame roof(exi… | $5,000 |
| [200804099237](https://www.permitgraph.org/p/200804099237) | Apr 9, 2008 | Completed: final sign-off Nov 2008 | [611 Folsom St](https://www.permitgraph.org/a/3750/087) | renew for final inspection. misc electrical work to be performed. 200403030542, 200609132213 and 200612059227. |  |
| [200803106698](https://www.permitgraph.org/p/200803106698) | Mar 10, 2008 | Completed: final sign-off Oct 2008 | [389 09th Av](https://www.permitgraph.org/a/1441/035) | replace 2 rooftop packaged chillers with larger models with upgraded wiring and conduits and electrical upgrades. | $360,000 |
| [200802285900](https://www.permitgraph.org/p/200802285900) | Feb 28, 2008 | Completed: final sign-off Jan 2009 | [1930 Steiner St](https://www.permitgraph.org/a/0659/020) | modifications to existing hvac from roof to 2nd floor, modify basement air handler ducting | $194,386 |
| [200802285904](https://www.permitgraph.org/p/200802285904) | Feb 28, 2008 | Completed: final sign-off Aug 2008 | [6150 03rd St](https://www.permitgraph.org/a/5431A/001M) | replace existing 15 ton chiller with a new 60 ton chiller. provide power ( conduit, wire, and breakers) for new chiller and pump. provide new pump for chiller. new controls for chiller and pump. new… | $133,400 |
| [200801313742](https://www.permitgraph.org/p/200801313742) | Jan 31, 2008 | Completed: final sign-off Oct 2008 | [1515 19th Av](https://www.permitgraph.org/a/1865/004) | installation of equipment cabinets on (n) steel platform at roof. installation of panel antennas on (e) building with coax cables from new equipment to panel antennas. telephone and electrical servic… | $225,000 |
| [200801172673](https://www.permitgraph.org/p/200801172673) | Jan 17, 2008 | Completed: final sign-off Feb 2008 | [101 Spear St](https://www.permitgraph.org/a/3716/021) | revision to pa# 2007.1228.1475 (sht a3) on cabinet elevations. per cbc 1122b.4 reinstate original height of order counter to 3 ft. cash/pay portion to remain at 2'-8" |  |
| [200712100066](https://www.permitgraph.org/p/200712100066) | Dec 10, 2007 | Completed: final sign-off Oct 2008 | [1515 19th Av](https://www.permitgraph.org/a/1865/004) | remove and replace basement air handling unit (ahu) with roof top unit. replumb chilled water to unit. integrate to bldg controls and fire alarm. | $700,000 |
| [200712100079](https://www.permitgraph.org/p/200712100079) | Dec 10, 2007 | Completed: final sign-off Jul 2008 | [1515 19th Av](https://www.permitgraph.org/a/1865/004) | remove and replace approx. 95 ton air cooled chiller with new 120 ton unit. upgrade electrical in kind to bring up to code and correct corrosion issues. re-integrate to ex. chilled water system. repl… | $260,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124.