# Richlen Construction

Contractor license 570031. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/richlen-construction-570031
- JSON: https://www.permitgraph.org/api/contractor?license=570031
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=570031

1,291 permits since 2000: 1,110 completed, 31 in progress, 66 never finaled, 84 expired or cancelled. Typically 11 days from filing to permit and 148 days from permit to final inspection. Of the 66 never-finaled permits, 5 are 3 to 5 years old, 20 are 5 to 10 years old, 41 are over 10 years old.

- Based in: Pacheco
- On San Francisco permits: Jan 2000 to Nov 2026
- Last 24 months: 65 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 56 | 0 | 0 | 16 |
| 2001 | 29 | 0 | 0 | 6 |
| 2002 | 33 | 0 | 0 | 4 |
| 2003 | 71 | 0 | 1 | 10 |
| 2004 | 59 | 0 | 2 | 7 |
| 2005 | 49 | 0 | 2 | 11 |
| 2006 | 75 | 0 | 2 | 6 |
| 2007 | 82 | 0 | 3 | 6 |
| 2008 | 60 | 0 | 4 | 4 |
| 2009 | 46 | 0 | 2 | 1 |
| 2010 | 38 | 0 | 2 | 4 |
| 2011 | 25 | 0 | 0 | 0 |
| 2012 | 28 | 0 | 3 | 2 |
| 2013 | 34 | 0 | 2 | 0 |
| 2014 | 32 | 0 | 3 | 0 |
| 2015 | 45 | 0 | 4 | 3 |
| 2016 | 36 | 0 | 12 | 0 |
| 2017 | 32 | 0 | 9 | 2 |
| 2018 | 47 | 0 | 3 | 0 |
| 2019 | 28 | 0 | 4 | 0 |
| 2020 | 34 | 0 | 1 | 0 |
| 2021 | 42 | 0 | 2 | 0 |
| 2022 | 40 | 1 | 5 | 2 |
| 2023 | 25 | 0 | 0 | 0 |
| 2024 | 23 | 7 | 0 | 0 |
| 2025 | 18 | 5 | 0 | 0 |
| 2026 | 23 | 18 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 32 | 30 | 1 | 0 | 1 | 21 | 231 |
| Bathroom remodel | 3 | 3 | 0 | 0 | 0 | 89 | 198 |
| Kitchen remodel | 7 | 7 | 0 | 0 | 0 | 5 | 154 |
| Deck | 3 | 1 | 0 | 0 | 2 | 0 | 478 |
| Roof deck | 1 | 1 | 0 | 0 | 0 | 144 | 463 |
| Pergola or trellis | 3 | 1 | 2 | 0 | 0 | 15 | 361 |

## Most recent permits

The 100 most recent of 1,291.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202611160798](https://www.permitgraph.org/p/202611160798) | Nov 16, 2026 | In progress: filed Nov 2026, not yet issued | [201 California St](https://www.permitgraph.org/a/0262/021) | convert all (e) fan powered and vav box pneumatic controls to direct digital controls. install new occupancy sensors where shown. install new c02 sensors where shown. reconfigure low pressure ductwor… | $100,000 |
| [202610290086](https://www.permitgraph.org/p/202610290086) | Oct 29, 2026 | In progress: issued Nov 2026 | [201 California St](https://www.permitgraph.org/a/0262/021) | 2nd fl patio constructioin of trellis system with integrated lighting and heaters. interior construction of cabinetry, sink, wall finish. plumbing & electrical defered. | $95,471 |
| [202610290097](https://www.permitgraph.org/p/202610290097) | Oct 29, 2026 | In progress: issued Nov 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 27th floor: ref pa#202610018880 instulation new sink and faucets at breakroom areas. replacing existing electric tank water heater serving core restroom fixtures for the associates level. replacing e… | $20,000 |
| [202610169548](https://www.permitgraph.org/p/202610169548) | Oct 16, 2026 | In progress: issued Oct 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | new power and signal devices throughout the space. new 2025 tiltle 24 compliant lighting and controls | $752,879 |
| [202610169529](https://www.permitgraph.org/p/202610169529) | Oct 16, 2026 | In progress: issued Oct 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | demo exist ductwork, diffusers, grilles and 4 wshps with associated ductwork and condenser water piping to bldg mains cap piping;retain vav boxes and health water piping.new work inst new hp/lp ductw… | $350,465 |
| [202610069085](https://www.permitgraph.org/p/202610069085) | Oct 6, 2026 | In progress: issued Oct 2026 | [201 California St](https://www.permitgraph.org/a/0262/021) | 2/f suite 200: new construction of conference rooms, huddle, phone and breakarea of non-structural elements. doors, finishes, ceilings, lighting, mechanical, electrical outlets, switches. existing sp… | $900,000 |
| [202610018880](https://www.permitgraph.org/p/202610018880) | Oct 1, 2026 | In progress: issued Oct 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | suites 2700 & 2750 interior demo & construction of elements including but not limited to interior partitions, doors finishes, acoustic ceiings, open ceiilngs & light fixtures. alteration work to rr's… | $715,000 |
| [202609248586](https://www.permitgraph.org/p/202609248586) | Sep 24, 2026 | In progress: issued Oct 2026 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | 9/fl- mechanical scope ti ductwork and air outlet modifications. (n) vav box , cooling only vav box. (n) lighting fixture and associated circuiting/controls. power and signal devices and associated w… | $195,000 |
| [202609178254](https://www.permitgraph.org/p/202609178254) | Sep 17, 2026 | In progress: issued Sep 2026 | [50 California St](https://www.permitgraph.org/a/0235/022) | existing interior office remodel. scope includes demo and construction of non structural partitions, ceilings, glazing, finishes, electrical, mechanical and plumbing fixtures, new drinking foundation… | $3,942,870 |
| [202609168214](https://www.permitgraph.org/p/202609168214) | Sep 16, 2026 | In progress: issued Nov 2026 | [525 Market St](https://www.permitgraph.org/a/3708/056) | 15th flr: office t.i. of an existing space includes new partitions, mechanical, electrical upgrade. demo under separate permit. restroom upgrade. seperate deferred submission for health review in reg… | $6,000,000 |
| [202609118019](https://www.permitgraph.org/p/202609118019) | Sep 11, 2026 | In progress: issued Sep 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | mech: replace duct work, transfer fan relocation, supply air diffusers, rework flexible inlet duct connectors, install new balancing dampers where required. check all hvac equip. elec: new lighting f… | $337,875 |
| [202609117968](https://www.permitgraph.org/p/202609117968) | Sep 11, 2026 | In progress: issued Sep 2026 | [221 Main St](https://www.permitgraph.org/a/3740/034) | new lobby level security improvements-installing turnstiles | $250,000 |
| [202608257109](https://www.permitgraph.org/p/202608257109) | Aug 25, 2026 | In progress: issued Sep 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical. | $322,135 |
| [202608206891](https://www.permitgraph.org/p/202608206891) | Aug 20, 2026 | In progress: issued Sep 2026 | [50 California St](https://www.permitgraph.org/a/0235/022) | suit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures. | $859,574 |
| [202608206959](https://www.permitgraph.org/p/202608206959) | Aug 20, 2026 | In progress: issued Sep 2026 | [525 Market St](https://www.permitgraph.org/a/3708/056) | 15th fl - demo only permit (interior) accessibility per ab-017 | $30,000 |
| [202607144996](https://www.permitgraph.org/p/202607144996) | Jul 14, 2026 | In progress: issued Jul 2026 | [201 California St](https://www.permitgraph.org/a/0262/021) | ste 1100 11/f: includes new construction of conf rooms, huddle, phone & break area. mep will be submitted as a separate permit. scope does not alter fixture quantities, occ load, calcs or path of tra… | $1,335,500 |
| [202607074622](https://www.permitgraph.org/p/202607074622) | Jul 7, 2026 | Completed: final sign-off Jul 2026 | [201 California St](https://www.permitgraph.org/a/0262/021) | ste 1500 15/f revised coversheet in ref to pa# 202510026577: clarifying no deferred submittals required for mechanical and plumbing. |  |
| [202606253903](https://www.permitgraph.org/p/202606253903) | Jun 25, 2026 | Completed: final sign-off Nov 2026 | [221 Main St](https://www.permitgraph.org/a/3740/034) | deferred electrical for 4th floor suite 400 office ti under permit 202604028757. | $175,000 |
| [202606253891](https://www.permitgraph.org/p/202606253891) | Jun 25, 2026 | Completed: final sign-off Nov 2026 | [221 Main St](https://www.permitgraph.org/a/3740/034) | suite 400: reconfigure existing ductwork, ceiling diffusers, and grilles. provided vav boxes and suspended transfer air fan. | $75,000 |
| [202606243869](https://www.permitgraph.org/p/202606243869) | Jun 24, 2026 | In progress: issued Aug 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life sa… | $285,000 |
| [202606233738](https://www.permitgraph.org/p/202606233738) | Jun 23, 2026 | In progress: issued Jul 2026 | [650 California St](https://www.permitgraph.org/a/0241/025) | 27th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire sprinkler and alarm are deffered submittals. | $1,184,490 |
| [202606173393](https://www.permitgraph.org/p/202606173393) | Jun 17, 2026 | Completed: final sign-off Jul 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location. | $56,543 |
| [202606052625](https://www.permitgraph.org/p/202606052625) | Jun 5, 2026 | Completed: final sign-off Aug 2026 | [650 California St](https://www.permitgraph.org/a/0241/025) | 20th floor: mechanical and electrical work install 2 new cooling vav vox and ductwork air distribution. provide new lighting. ref 202602246378 | $100,000 |
| [202606042522](https://www.permitgraph.org/p/202606042522) | Jun 4, 2026 | Completed: final sign-off Aug 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles. | $190,288 |
| [202606042534](https://www.permitgraph.org/p/202606042534) | Jun 4, 2026 | Completed: final sign-off Sep 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 21 fl - ste: 2150 - hvac relocate (e) difusers, air grills, modify heat pump add thermostats. mech deferred for 202605201639 | $60,000 |
| [202606042529](https://www.permitgraph.org/p/202606042529) | Jun 4, 2026 | Completed: final sign-off Oct 2026 | [575 Market St](https://www.permitgraph.org/a/3708/175) | 3rd floor. ref: 202605070841. new lighting fixtures, controls in 2 new enclosed office. new power/teledata feeds for new work stations, new receptacles and associated wiring in existing conference ro… | $20,125 |
| [202606042547](https://www.permitgraph.org/p/202606042547) | Jun 4, 2026 | Completed: final sign-off Sep 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 21fl - ste 2150: def electrical for 202605201639 : new light fixtures and ciruits/ controls new power signal devices. | $127,465 |
| [202605201639](https://www.permitgraph.org/p/202605201639) | May 20, 2026 | Completed: final sign-off Sep 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawing… | $218,435 |
| [202605070841](https://www.permitgraph.org/p/202605070841) | May 7, 2026 | Completed: final sign-off Oct 2026 | [575 Market St](https://www.permitgraph.org/a/3708/175) | 3rd floor: this project involves modification of (e) ti to include construction of new non-load bearing partitions, new door, frames and hardware modification of (e) ceiing tile & grd system, new lig… | $200,000 |
| [202604239932](https://www.permitgraph.org/p/202604239932) | Apr 23, 2026 | Completed: final sign-off Aug 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | floor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications… | $341,000 |
| [202604079027](https://www.permitgraph.org/p/202604079027) | Apr 7, 2026 | Completed: final sign-off Jul 2026 | [201 California St](https://www.permitgraph.org/a/0262/021) | 15th fl - provide new lighting @ ste 1500 ref pa 202510026577 | $190,000 |
| [202604028762](https://www.permitgraph.org/p/202604028762) | Apr 2, 2026 | Completed: final sign-off Aug 2026 | [631 Howard St](https://www.permitgraph.org/a/3735/005) | basement and 2nd flr - new power and signal devices in space. ref#: 202512222436 and 202512192339. (electrical sheets) | $197,607 |
| [202604028757](https://www.permitgraph.org/p/202604028757) | Apr 2, 2026 | Completed: final sign-off Nov 2026 | [221 Main St](https://www.permitgraph.org/a/3740/034) | 4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades. scope does not aff… | $238,237 |
| [202603197947](https://www.permitgraph.org/p/202603197947) | Mar 19, 2026 | Completed: final sign-off Jul 2026 | [575 Market St](https://www.permitgraph.org/a/3708/175) | 30/f: mechanical and electrical permit to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref pa# 202601274610. | $30,000 |
| [202603127468](https://www.permitgraph.org/p/202603127468) | Mar 12, 2026 | Completed: final sign-off Oct 2026 | [631 Howard St](https://www.permitgraph.org/a/3735/005) | basement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this permit, opening is ex… | $155,000 |
| [202603097157](https://www.permitgraph.org/p/202603097157) | Mar 9, 2026 | Completed: final sign-off Jun 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | suite 2350: deferred mep for pa # 2026-0121-4223. new ducts & air distribution. new lighting, power & plumbing. | $25,000 |
| [202602246378](https://www.permitgraph.org/p/202602246378) | Feb 24, 2026 | Completed: final sign-off Aug 2026 | [650 California St](https://www.permitgraph.org/a/0241/025) | ste# 2000/ 20th/f: selective demo & new const of interior partitions, doors, finishes, ceilings, lighting, electrical. scope of work included restroom accessibility upgrades. no exterior, site, lands… | $707,557 |
| [202602055297](https://www.permitgraph.org/p/202602055297) | Feb 5, 2026 | Completed: final sign-off Mar 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | patio demo. remove exisitng planting beds & security fencing | $46,484 |
| [202601274610](https://www.permitgraph.org/p/202601274610) | Jan 27, 2026 | Completed: final sign-off Jul 2026 | [575 Market St](https://www.permitgraph.org/a/3708/175) | 30th fl. partial floor demo and construction of interior partitons, doors, finishes and ceilings. mep deferred. | $194,288 |
| [202601224304](https://www.permitgraph.org/p/202601224304) | Jan 22, 2026 | Completed: final sign-off Jul 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 23rd flr. mep permit for approved architectual scope. new fsd and supply diffusers. new lighting and power. ref pa#: 202510308608. | $249,348 |
| [202601214223](https://www.permitgraph.org/p/202601214223) | Jan 21, 2026 | Completed: final sign-off Jun 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | ste 2350 - selective demo & new construction of elements including but not limited to interior partitions, doors, finishes ceilins, mep & life safety under separate permits | $255,000 |
| [202512222436](https://www.permitgraph.org/p/202512222436) | Dec 22, 2025 | Completed: final sign-off Aug 2026 | [631 Howard St](https://www.permitgraph.org/a/3735/005) | 2nd floor: interior ti - removal of non-structural partitions and finishes. new partitions, finishes, and accessibility upgrades to restrooms. | $112,400 |
| [202512192339](https://www.permitgraph.org/p/202512192339) | Dec 19, 2025 | Completed: final sign-off Oct 2026 | [631 Howard St](https://www.permitgraph.org/a/3735/005) | basement level: interior ti removal of non structrual partitions, finishes and millwork. new non structrual partitions, finishes, break room millwork and upgrade to restrooms for accessibility | $275,900 |
| [202512182148](https://www.permitgraph.org/p/202512182148) | Dec 18, 2025 | In progress: issued Jul 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 1st floor: convert 2449 sqft of retail space to office to provide tenant amenities. | $550,000 |
| [202512151745](https://www.permitgraph.org/p/202512151745) | Dec 15, 2025 | In progress: issued Jul 2026 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | #950: new t.i. on 9th floor:includes demolition of existing office space: non structural partitions, doors, glazing, ceiling, lighting, millwork and finishes. mechanical, electrical, & plumbing submi… | $840,000 |
| [202512111590](https://www.permitgraph.org/p/202512111590) | Dec 11, 2025 | Completed: final sign-off Aug 2026 | [901 Battery St](https://www.permitgraph.org/a/0135/003) | 1 floor - suite 100: interior ti. including new non-structural partitions, millwork, light fixtures and plumbing fixtures and finishes. | $1,000,000 |
| [202511190015](https://www.permitgraph.org/p/202511190015) | Nov 19, 2025 | Completed: final sign-off Jan 2026 | [575 Market St](https://www.permitgraph.org/a/3708/175) | 39/f suite 3950: reduce size of an existing suite, creating 2 smaller suites. modification of (e) tenant improvements to include demolition of door and glazing system, minor ceiling, tile modificatio… | $10,000 |
| [202511079208](https://www.permitgraph.org/p/202511079208) | Nov 7, 2025 | Completed: final sign-off Jan 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 5/f: administrative permit to revise scope of work per building inspector. verbiage change from mep deferred to no mep required. ref pa# 202510066828. |  |
| [202511048875](https://www.permitgraph.org/p/202511048875) | Nov 4, 2025 | Completed: final sign-off Jan 2026 | [50 California St](https://www.permitgraph.org/a/0235/022) | 35th floor: to obtain final inspection for work approved under pa# 202406245061. all work is complete. |  |
| [202510308608](https://www.permitgraph.org/p/202510308608) | Oct 30, 2025 | Completed: final sign-off Jul 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 23 floor: interior alteration work to restrooms, elev. lobby & common corridor. scope does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting to remain as… | $657,000 |
| [202510227905](https://www.permitgraph.org/p/202510227905) | Oct 22, 2025 | Completed: final sign-off Apr 2026 | [217 Montgomery St](https://www.permitgraph.org/a/0269/001) | ebiko sushi- 217 montgomery st, small take out food establishment, tenant improvement, new fixtures, finshes, equipment, lighting, plimbing and electrical work. no exterior changes. | $125,000 |
| [202510167555](https://www.permitgraph.org/p/202510167555) | Oct 16, 2025 | Completed: final sign-off May 2026 | [125 03rd St](https://www.permitgraph.org/a/3722/257) | revision 202503273212 for (n) storage room | $5,000 |
| [202510157452](https://www.permitgraph.org/p/202510157452) | Oct 15, 2025 | Completed: final sign-off Mar 2026 | [575 Market St](https://www.permitgraph.org/a/3708/175) | suite 2550: t.i.: demo and construction of new non-load bearing partitions, (n) doors, frames and hardware. modification of (e) ceiling and grid system. (n) relocazted light fixtures and switches. (n… | $426,300 |
| [202510066828](https://www.permitgraph.org/p/202510066828) | Oct 6, 2025 | Completed: final sign-off Jan 2026 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | suite 510. new partitions, offices and conference rooms. mep deferred. no plumbing fixtures. | $220,000 |
| [202510026577](https://www.permitgraph.org/p/202510026577) | Oct 2, 2025 | Completed: final sign-off Jul 2026 | [201 California St](https://www.permitgraph.org/a/0262/021) | 15/f suite 1500: architectural only. interior only office t.i. new partitions, offices, and finishes. mep deferred. | $601,994 |
| [202508072569](https://www.permitgraph.org/p/202508072569) | Aug 7, 2025 | Completed: final sign-off Sep 2025 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | 5/fl- ti 202507160889-lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring | $20,000 |
| [202507171031](https://www.permitgraph.org/p/202507171031) | Jul 17, 2025 | Completed: final sign-off Sep 2025 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | suite 1900. interior tenant improvement. removal of non structural partition, new non structural partitions, door assembly, sidelight and electrical outlets. no plumbing fixtures. | $120,000 |
| [202507160889](https://www.permitgraph.org/p/202507160889) | Jul 16, 2025 | Completed: final sign-off Sep 2025 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | suite #550: demolition of non-structural partitions, reception desk, casework, light fixtures, and finishes. construction of non-structural partitions, doors, interior glazing system, casework, light… | $144,000 |
| [202504164515](https://www.permitgraph.org/p/202504164515) | Apr 16, 2025 | Completed: final sign-off Aug 2025 | [101 California St](https://www.permitgraph.org/a/0263/011) | suite 4225,42nd fl: interior demo of non structural partitions, millwork, ceilings, lighting & finishes. construction includes new partitions, doors, ceilings, lighting and millwork/finishes. mep & f… | $422,171 |
| [202503273212](https://www.permitgraph.org/p/202503273212) | Mar 27, 2025 | Completed: final sign-off May 2026 | [125 03rd St](https://www.permitgraph.org/a/3722/257) | interior renovation of (e) spa @ 5th & 6th floors. | $652,844 |
| [202502079855](https://www.permitgraph.org/p/202502079855) | Feb 7, 2025 | In progress: issued Feb 2025 | [50 California St](https://www.permitgraph.org/a/0235/022) | 2 new freestanding phonebooths located in tenant suite 2525. all other elements are existing to remain with no changes. | $14,000 |
| [202501299327](https://www.permitgraph.org/p/202501299327) | Jan 29, 2025 | In progress: issued Mar 2025 | [55 Erie St](https://www.permitgraph.org/a/3530/032) | revision to 202210194666 included: replace 2 abb 184 chargers w/ 2 abba 400 chargers, added utility trench detail. update erosion control notes, added fence & gate detail |  |
| [202501299316](https://www.permitgraph.org/p/202501299316) | Jan 29, 2025 | In progress: issued Mar 2025 | [73 Erie St](https://www.permitgraph.org/a/3530/042) | revision to permit# 202210194663: added utility trench detail, updated erovsion control notes, added fence and gate detail. |  |
| [202501168465](https://www.permitgraph.org/p/202501168465) | Jan 16, 2025 | Completed: final sign-off Jul 2025 | [1 California St](https://www.permitgraph.org/a/0264/004) | hvac: add 2 heat pumps, w transfer fans, new duct, 2 hp thermostats and relate thermostats. lighting: install new fixtures, controls, power and signal devices. arch 202410253783 | $871,153 |
| [202412126681](https://www.permitgraph.org/p/202412126681) | Dec 12, 2024 | Completed: final sign-off Sep 2025 | [201 California St](https://www.permitgraph.org/a/0262/021) | 2nd flr. project scope on 2nd flr. consists of interior demo and new construction of non-structural elements; interior partitions, doors, finishes, ceilings, lighting, mechanical and plumbing (includ… | $400,000 |
| [202411064499](https://www.permitgraph.org/p/202411064499) | Nov 6, 2024 | Completed: final sign-off Jun 2025 | [45 Fremont St](https://www.permitgraph.org/a/3710/019) | 34th flr. tenant suite demising and corridor construction at the 34th flr. new non-structural partitions, mechanical, electrical, light, and finishes. minor plumbing modifications to mens restroom. | $350,000 |
| [202410253783](https://www.permitgraph.org/p/202410253783) | Oct 25, 2024 | Completed: final sign-off Jul 2025 | [1 California St](https://www.permitgraph.org/a/0264/004) | 2nd flr. demolition and construction of non-structural walls, door, glazing, ceilings, lighting fixtures, millwork and finishes, new movebable wall and structural beam support, restroom finish upgrad… | $1,816,064 |
| [202410243686](https://www.permitgraph.org/p/202410243686) | Oct 24, 2024 | Completed: final sign-off Dec 2024 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 13/fl- ti (n) cased opening to combine suite 1300 and 1310 and (n) undercounter low-temp dishwasher (ada). no mech work | $40,000 |
| [202410032219](https://www.permitgraph.org/p/202410032219) | Oct 3, 2024 | Completed: final sign-off Dec 2024 | [225 Bush St](https://www.permitgraph.org/a/0289/001) | ste 1800: revision to pa # 2024-0724-7143 removal of mech & plumbing work. electrical will be trade permit only |  |
| [202410032275](https://www.permitgraph.org/p/202410032275) | Oct 3, 2024 | Completed: final sign-off Mar 2025 | [221 Main St](https://www.permitgraph.org/a/3740/034) | 5th flr, ste 520: shall consist of limited interior demolition and const. of non-struc elements including but not necessary lmted to partitions, finishes, electrical outlets and switches. work does n… | $291,009 |
| [202410022144](https://www.permitgraph.org/p/202410022144) | Oct 2, 2024 | Completed: final sign-off Dec 2024 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 13th fl, ste 1380 - interior ti removal of select existing non-structural partition and addition of new office and millwork at existing break area | $139,748 |
| [202409261653](https://www.permitgraph.org/p/202409261653) | Sep 26, 2024 | Completed: final sign-off Apr 2025 | [201 California St](https://www.permitgraph.org/a/0262/021) | interior demoltion of 16/17 floor at 201 california. includes demo of non-structural interior partitions, doors, mechanical/electrical outlets, switches, millwork, lighting, dropped ceiling, and floo… | $533,583 |
| [202408158726](https://www.permitgraph.org/p/202408158726) | Aug 15, 2024 | Completed: final sign-off Mar 2025 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 6th fl. w/(e) single occupancy, shall consist of selective interior demo and (n) const of non-structural elements including but not limited to interior partitions doors finishes ceiling no structural… | $139,924 |
| [202408128412](https://www.permitgraph.org/p/202408128412) | Aug 12, 2024 | In progress: issued Jan 2025 | [998 Sansome St](https://www.permitgraph.org/a/0142/006) | abe upgrade including providing level landing at top and bottom of existing stair, new level accessible van loading zone and modified curb cuts at existing sidewalk. abe 202306157591 | $126,000 |
| [202408088219](https://www.permitgraph.org/p/202408088219) | Aug 8, 2024 | In progress: issued Dec 2024 | [901 Battery St](https://www.permitgraph.org/a/0135/003) | abe ord 51-16 accessible building entry upgrades, relocate door actuator to front facade, exterior sidewalk upgrades. abe 20200492108 | $147,000 |
| [202408078122](https://www.permitgraph.org/p/202408078122) | Aug 7, 2024 | Completed: final sign-off May 2025 | [50 California St](https://www.permitgraph.org/a/0235/022) | 24th fl - restroom remodel including demo and construction of lighting, finishes, fixtures, accessories and millwork. mep deferred | $195,721 |
| [202408057985](https://www.permitgraph.org/p/202408057985) | Aug 5, 2024 | Completed: final sign-off Dec 2024 | [1 California St](https://www.permitgraph.org/a/0264/004) | 12th/f ste 1200: t.i. select demo & contruction of non-structural partitions, doors, glazing, millwork, finishes & lighting. mep deferred no final inspection until completeion of pa#:2024-0129-4863 (… | $115,538 |
| [202407307560](https://www.permitgraph.org/p/202407307560) | Jul 30, 2024 | Completed: final sign-off Nov 2024 | [201 California St](https://www.permitgraph.org/a/0262/021) | 3/f: ti, adding 1-large office, 1-small wellness room and vestible, installign new ceiling, lighting, finshes and power. mep and life safety plans will be submitted as a separate permit. suite 325 | $266,000 |
| [202407247143](https://www.permitgraph.org/p/202407247143) | Jul 24, 2024 | In progress: issued Aug 2024 | [225 Bush St](https://www.permitgraph.org/a/0289/001) | suite 1800: t.i. -combine 2 suites into one single tenant. demo select walls and doors throughout. includes new finishes. no structural work performed. refer to approved path of travel set #202202248… | $322,998 |
| [202406245061](https://www.permitgraph.org/p/202406245061) | Jun 24, 2024 | In progress: issued Jul 2024 | [50 California St](https://www.permitgraph.org/a/0235/022) | 35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17. | $192,560 |
| [202405021241](https://www.permitgraph.org/p/202405021241) | Jun 11, 2024 | In progress: issued Mar 2025 | [650 California St](https://www.permitgraph.org/a/0241/025) | retire (e) 450kw generator/fuel tank on roof. in garage, install (n) 500kw tier 2 generator w/ diesel particulate filter, free-standing fuel tank, automatic transfer switch, manual transfer switch, &… | $1,786,903 |
| [202406104025](https://www.permitgraph.org/p/202406104025) | Jun 10, 2024 | Completed: final sign-off Nov 2024 | [275 Battery St](https://www.permitgraph.org/a/0238/001) | existing suite 900 will be subdivided into 2 suites, suite 900 and suite 910, scope includes construction of a new structural demising wall and related ceiling flooring and finish repair, relocation… | $98,103 |
| [202406053743](https://www.permitgraph.org/p/202406053743) | Jun 5, 2024 | Completed: final sign-off Dec 2024 | [345 California St](https://www.permitgraph.org/a/0261/020) | 29th floor: t.i. in existing tenant space. demolition includes some walls, millwork, and finishes. new construction to include walls, doors, millwork, power, finishes, etc. no structural work is requ… | $200,000 |
| [202405293214](https://www.permitgraph.org/p/202405293214) | May 29, 2024 | Completed: final sign-off Nov 2024 | [345 California St](https://www.permitgraph.org/a/0261/017) | 11th floor: demo and construction of toilet partitions, new plumbing, and new finishes salvage and reuse of existing selected materials. core restrooms 11th floor | $300,000 |
| [202403268633](https://www.permitgraph.org/p/202403268633) | Mar 26, 2024 | In progress: issued Mar 2024 | [401 Mason St](https://www.permitgraph.org/a/0306/004) | new lighting in restrooms and lounge. pa #2021-0305-5990 | $30,000 |
| [202403208233](https://www.permitgraph.org/p/202403208233) | Mar 20, 2024 | Completed: final sign-off Sep 2024 | [100 01st St](https://www.permitgraph.org/a/3721/001) | restaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changes | $75,000 |
| [202403147792](https://www.permitgraph.org/p/202403147792) | Mar 14, 2024 | Completed: final sign-off May 2024 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | revision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of br… |  |
| [202402286715](https://www.permitgraph.org/p/202402286715) | Feb 28, 2024 | Completed: final sign-off Jun 2024 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | interior alteration work to (2) elevator lobby ceilings on the 18th fl. (n) ceiling & lighting. scope does not affect (e) tenant suites, exit access, paths of egress or exit stairs. (e) exiting is to… | $158,000 |
| [202402286712](https://www.permitgraph.org/p/202402286712) | Feb 28, 2024 | Completed: final sign-off Jun 2024 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | interior alteration work to elevator lobby ceiling on the 5th fl. new ceiling and lighting scope does not affect e tenant suites, exit access, paths of egress or exit stairs. e exiting remains as is.… | $60,000 |
| [202402286726](https://www.permitgraph.org/p/202402286726) | Feb 28, 2024 | Completed: final sign-off Jul 2024 | [201 California St](https://www.permitgraph.org/a/0262/021) | 6th floor suite 600 - tenant improvement to include additon of small conference room by reconfiguring (e) conference room partitions, ceiling, millwork. mep work is deferred | $214,819 |
| [202402145870](https://www.permitgraph.org/p/202402145870) | Feb 14, 2024 | Completed: final sign-off May 2024 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele… | $216,353 |
| [202402085559](https://www.permitgraph.org/p/202402085559) | Feb 8, 2024 | In progress: issued Feb 2024 | [221 Main St](https://www.permitgraph.org/a/3740/034) | 1st fl suite 102 replacement of existing hood with a new hood at existing current location within suite | $5,000 |
| [202402015053](https://www.permitgraph.org/p/202402015053) | Feb 1, 2024 | Completed: final sign-off May 2024 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 22/f-ste 2230: revison to pa# 202311090499, men's restroom scope has been revised to show no push buttons at entry door as 18" pull side clearance is achiered. |  |
| [202401043425](https://www.permitgraph.org/p/202401043425) | Jan 4, 2024 | Completed: final sign-off Apr 2024 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | adding ada passenger drop-off/ loading zone in parking lot. | $500 |
| [202311090512](https://www.permitgraph.org/p/202311090512) | Nov 9, 2023 | Completed: final sign-off Apr 2024 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | suite #510:limited interior demolition of non-structural elements including interior partitions,doors,ceiling and lighting and finishes contruction of newglass fronts,frames,power & teldate,act ceili… | $486,433 |
| [202311090493](https://www.permitgraph.org/p/202311090493) | Nov 9, 2023 | Completed: final sign-off May 2024 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finish… | $504,622 |
| [202311090499](https://www.permitgraph.org/p/202311090499) | Nov 9, 2023 | Completed: final sign-off May 2024 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | 22/f - #2230: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & fini… | $442,270 |
| [202310259410](https://www.permitgraph.org/p/202310259410) | Oct 25, 2023 | Completed: final sign-off Apr 2024 | [650 California St](https://www.permitgraph.org/a/0241/025) | 27th fl:interior demolition of select partitions, finishes, and ceilings. relocation of some (e) light fixtures to accomodate new layout. new construction includes new private offices and dropped cei… | $284,292 |
| [202308083954](https://www.permitgraph.org/p/202308083954) | Aug 8, 2023 | Completed: final sign-off Feb 2024 | [188 Spear St](https://www.permitgraph.org/a/3717/019) | selective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017. | $225,000 |
| [202307283217](https://www.permitgraph.org/p/202307283217) | Jul 28, 2023 | Completed: final sign-off Aug 2023 | [45 Fremont St](https://www.permitgraph.org/a/3710/019) | 28th flr: recommencement and completion of work approved under pa #201507222162. |  |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/richlen-construction-570031.
