# Rescue Air Systems Inc

Contractor license 679005. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/rescue-air-systems-inc-679005
- JSON: https://www.permitgraph.org/api/contractor?license=679005
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=679005

6 permits since 2000: 1 completed, 3 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 400 days from permit to final inspection. Of the 3 never-finaled permits, 3 are over 10 years old.

- Based in: San Carlos
- On San Francisco permits: Apr 2010 to Nov 2013
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2010 | 1 | 0 | 1 | 1 |
| 2012 | 0 | 0 | 1 | 1 |
| 2013 | 0 | 0 | 1 | 0 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201311262912](https://www.permitgraph.org/p/201311262912) | Nov 26, 2013 | Never finaled: issued Dec 2013, no final | [631 Folsom St](https://www.permitgraph.org/a/3750/600) | to obtain final inspection for work approved under pa#200912233771 all work is complete. |  |
| [201209058996](https://www.permitgraph.org/p/201209058996) | Sep 5, 2012 | Expired or cancelled: withdrawn Jan 2013 | [55 09th St](https://www.permitgraph.org/a/3701/066) | installation of fire fighter breathing air system in entire building. | $327,750 |
| [201209059004](https://www.permitgraph.org/p/201209059004) | Sep 5, 2012 | Never finaled: issued Apr 2013, no final | [1285 Sutter St](https://www.permitgraph.org/a/0691/008) | installation of fire fighter breathing air system on levels: b3,b1,1 through 14. | $364,000 |
| [201009161023](https://www.permitgraph.org/p/201009161023) | Sep 16, 2010 | Expired or cancelled: expired Apr 2012 | [300 Berry St](https://www.permitgraph.org/a/8704/001) | to comply with ab 5.07. reference #200606144078 s 8 1/29068. remove of air cylinders, co/moisture monitoring module and cap pipes. reconfigure piping distribution system and control panel. fire alarm… |  |
| [201008108462](https://www.permitgraph.org/p/201008108462) | Aug 10, 2010 | Never finaled: issued Aug 2010, no final | [301 Main St](https://www.permitgraph.org/a/3745/298) | comply with ab5.07, ref app 200409285413-s6. removal of arir cylinders, co/moisture monitoring module and cap pipes. reconfigure piping distribution system and contrl panel; fire alarm panel shall be… |  |
| [201004069725](https://www.permitgraph.org/p/201004069725) | Apr 6, 2010 | Completed: final sign-off May 2011 | [724 Van Ness Av](https://www.permitgraph.org/a/0742/028) | to comply with ab-5.07; reference pa#200612049062; removal of 2 air cylinders, removal of co/moisture monitoring module & cap pipes. reconfigure piping distribution system and control panel. fire ala… |  |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/rescue-air-systems-inc-679005.
