# Rei Build Up Construction Corporation

Contractor license 1034261. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/rei-build-up-construction-corporation-1034261
- JSON: https://www.permitgraph.org/api/contractor?license=1034261
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1034261

24 permits since 2000: 14 completed, 9 never finaled, 1 expired or cancelled. Typically 19 days from filing to permit and 314 days from permit to final inspection. Of the 9 never-finaled permits, 3 are 3 to 5 years old, 6 are 5 to 10 years old.

- Based in: Oakland
- On San Francisco permits: Mar 2015 to Mar 2022
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2015 | 1 | 0 | 0 | 0 |
| 2016 | 1 | 0 | 0 | 0 |
| 2017 | 1 | 0 | 2 | 0 |
| 2018 | 1 | 0 | 0 | 1 |
| 2019 | 7 | 0 | 2 | 0 |
| 2020 | 1 | 0 | 3 | 0 |
| 2021 | 2 | 0 | 0 | 0 |
| 2022 | 0 | 0 | 2 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 2 | 2 | 0 | 0 | 0 | 108 | 914 |
| Kitchen remodel | 1 | 1 | 0 | 0 | 0 | 7 | 1079 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202203109747](https://www.permitgraph.org/p/202203109747) | Mar 10, 2022 | Never finaled: issued Apr 2023, no final | [648 Castro St](https://www.permitgraph.org/a/2696/041) | structural revision work only. revision to pa 201709158461 and 201903195709. |  |
| [202203109742](https://www.permitgraph.org/p/202203109742) | Mar 10, 2022 | Never finaled: issued Mar 2022, no final | [648 Castro St](https://www.permitgraph.org/a/2696/041) | to obtain final inspection for work approved under 201709158461 and 201903195709. all work is complete |  |
| [202109098052](https://www.permitgraph.org/p/202109098052) | Sep 9, 2021 | Completed: final sign-off Mar 2022 | [2208 Vallejo St](https://www.permitgraph.org/a/0557/026) | voluntary seismic strengthening | $50,000 |
| [202101273423](https://www.permitgraph.org/p/202101273423) | Apr 12, 2021 | Completed: final sign-off Jul 2022 | [532 Roosevelt Wy](https://www.permitgraph.org/a/2628/095) | structural revision based on field changes. ref app#201911268300 |  |
| [202009275185](https://www.permitgraph.org/p/202009275185) | Sep 27, 2020 | Completed: final sign-off Mar 2021 | [1760 Golden Gate Av](https://www.permitgraph.org/a/1153/008A) | rev 201908088296 to match field conditions. rev n-s shearwalls to mainting sheathing and holddowns installs from pa201412153712. revise holddowns at gride b.4,c.6,c.7 & f to reflect field changes. ma… |  |
| [202007089777](https://www.permitgraph.org/p/202007089777) | Jul 8, 2020 | Never finaled: issued Jul 2020, no final | [642 Castro St](https://www.permitgraph.org/a/2696/040) | infill an abandoned well in grade ref. soft story pa# 201903195708 & 201903195709. | $3,000 |
| [202007089775](https://www.permitgraph.org/p/202007089775) | Jul 8, 2020 | Never finaled: issued Jul 2020, no final | [648 Castro St](https://www.permitgraph.org/a/2696/041) | infill an abandoned well in grade ref. soft story pa# 201903195708 & 201903195709. | $3,000 |
| [202002194869](https://www.permitgraph.org/p/202002194869) | Feb 19, 2020 | Never finaled: issued May 2023, no final | [556 Scott St](https://www.permitgraph.org/a/0824/012) | adu (4) units w/in (e) envelop in accordance w/ ord# 162-16. ref. soft story pa# 2017-0915-8459.**comply w/ maher ord# 155-13, route to dph** | $500,000 |
| [201911268300](https://www.permitgraph.org/p/201911268300) | Nov 26, 2019 | Completed: final sign-off Jul 2022 | [532 Roosevelt Wy](https://www.permitgraph.org/a/2628/095) | revision to 201907226485, extend garage with new retaining wall, lower rear patio, revise 2/f bedrooms and bath layout | $50,000 |
| [201911197672](https://www.permitgraph.org/p/201911197672) | Nov 19, 2019 | Completed: final sign-off Aug 2020 | [3875 18th St](https://www.permitgraph.org/a/3585/088) | soft story retrofit per sfebc chapter 40 engineering criteria 2016 cebc appendix a-4 | $105,000 |
| [201908300311](https://www.permitgraph.org/p/201908300311) | Aug 30, 2019 | Completed: final sign-off Sep 2020 | [390 Liberty St](https://www.permitgraph.org/a/3605/051A) | revision to 201709058363 soft story. per cebc 2016. new concrete grade beam of shear wall location adjustment per site conditions | $15,000 |
| [201908148815](https://www.permitgraph.org/p/201908148815) | Aug 14, 2019 | Completed: final sign-off Jan 2020 | [330 Divisadero St](https://www.permitgraph.org/a/1217/024) | removal & replacement of existing masonry footing in 3-phases. | $45,000 |
| [201908088296](https://www.permitgraph.org/p/201908088296) | Aug 8, 2019 | Completed: final sign-off Mar 2021 | [1760 Golden Gate Av](https://www.permitgraph.org/a/1153/008A) | revision to pa 2015-0317-1054 (soft story) revise plywood shear wall along grid b5 and c5. replace hardy frame with plywood shear wall at grid f |  |
| [201907226485](https://www.permitgraph.org/p/201907226485) | Jul 22, 2019 | Completed: final sign-off Jul 2022 | [532 Roosevelt Wy](https://www.permitgraph.org/a/2628/095) | remodel of (e) 2-level unit include, new kitchen, new half bath on 2nd fl(floor above garage). remodel 2 (e) bedrooms and bathrooms on 3rd fl. replace (e) windows and patio doors at rear & front. no… | $150,000 |
| [201905090260](https://www.permitgraph.org/p/201905090260) | May 9, 2019 | Completed: final sign-off May 2019 | [1531 Hyde St](https://www.permitgraph.org/a/0185/005) | site revision of shear wall at line 8, ref soft story 201609076989 |  |
| [201903195709](https://www.permitgraph.org/p/201903195709) | Mar 19, 2019 | Never finaled: issued May 2019, no final | [648 Castro St](https://www.permitgraph.org/a/2696/041) | add ground level storage, (n) foundation & slab. | $65,000 |
| [201903195708](https://www.permitgraph.org/p/201903195708) | Mar 19, 2019 | Never finaled: issued May 2019, no final | [642 Castro St](https://www.permitgraph.org/a/2696/040) | add ground level storage, (n) foundation & slab. | $65,000 |
| [201811216551](https://www.permitgraph.org/p/201811216551) | Nov 21, 2018 | Expired or cancelled: cancelled Jan 2026 | [1531 Hyde St](https://www.permitgraph.org/a/0185/005) | (n) storefront window & door, (n) lightwell. new retaining wall for egress alleway basement storage addition. no work to dwelling units | $70,000 |
| [201811055014](https://www.permitgraph.org/p/201811055014) | Nov 5, 2018 | Completed: final sign-off Mar 2019 | [615 Linden St](https://www.permitgraph.org/a/0820/003A) | replacement of extg brick foundation with concrete in 3 phases | $25,000 |
| [201709158461](https://www.permitgraph.org/p/201709158461) | Sep 15, 2017 | Never finaled: issued Mar 2019, no final | [648 Castro St](https://www.permitgraph.org/a/2696/041) | soft story upgrade in compliance with mandatory ord per sfbc ch 4d, cebc a4 | $65,000 |
| [201709158363](https://www.permitgraph.org/p/201709158363) | Sep 15, 2017 | Completed: final sign-off Aug 2020 | [390 Liberty St](https://www.permitgraph.org/a/3605/051A) | soft story retrofit per sfebc ch 34b, 2016 cebc a4 | $65,000 |
| [201709158460](https://www.permitgraph.org/p/201709158460) | Sep 15, 2017 | Never finaled: issued Mar 2019, no final | [642 Castro St](https://www.permitgraph.org/a/2696/040) | soft story upgrade in compliance w mandatory ordinance per sfbc ch 4d, 2016 cebc appendex a-4. | $65,000 |
| [201609076989](https://www.permitgraph.org/p/201609076989) | Sep 7, 2016 | Completed: final sign-off May 2019 | [1531 Hyde St](https://www.permitgraph.org/a/0185/005) | soft story upgrade in compliance with mandatory ordinance per sfbc chap ter 4d, 2016 iebc appendix a4 | $70,000 |
| [201503171054](https://www.permitgraph.org/p/201503171054) | Mar 17, 2015 | Completed: final sign-off Mar 2021 | [1760 Golden Gate Av](https://www.permitgraph.org/a/1153/008A) | mandatory retrofit of soft story per sfbc chapter 34b, fema p-807. | $50,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/rei-build-up-construction-corporation-1034261.