Red Bridge Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Sep 2012 to Mar 2021
- Last 24 months
- 0 permits filed
62 permits since 2000: 56 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 26 completed, 3 never finaled. Typically 0 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2021 | Completed final sign-off Jul 2021 | 735 Grand View Av | 2 bathroom rmeodel and kitchen update; kitchen will replace counter tops and lighting; no wlals to be move, no change to openingDetails
2 bathroom rmeodel and kitchen update; kitchen will replace counter tops and lighting; no wlals to be move, no change to opening | $60,000 |
| Nov 13, 2020 | Completed final sign-off Mar 2021 | 4125 24th St | unit 2: bathroom remodel. layout of bathroom to remain. kitchen - new washing machine, countertops, tile. no walls to be removed.Details
unit 2: bathroom remodel. layout of bathroom to remain. kitchen - new washing machine, countertops, tile. no walls to be removed. | $20,000 |
| Jul 16, 2020 | Completed final sign-off Sep 2021 | 54 Lower Tr | kitchen & bathroom remodel. no walls to be movedDetails
kitchen & bathroom remodel. no walls to be moved | $50,000 |
| Jul 10, 2020 | Never finaled issued Jul 2020, no final | 747 Santiago St | one kitchen and one bathroom remodel. no walls to be moved.Details
one kitchen and one bathroom remodel. no walls to be moved. | $65,000 |
| Jul 6, 2018 | Completed final sign-off Sep 2018 | 3144 Buchanan St | one bathroom remodel. no walls to be removed/moved. install new fixtures and tile.Details
one bathroom remodel. no walls to be removed/moved. install new fixtures and tile. | $25,000 |
| May 25, 2018 | Completed final sign-off Oct 2018 | 16 Iris Av | revision to app#201404163387. change includes of a layout to master bath, adding half bath to lower apt. and moving washer/dryer into unit.Details
revision to app#201404163387. change includes of a layout to master bath, adding half bath to lower apt. and moving washer/dryer into unit. | $25,000 |
| May 18, 2018 | Completed final sign-off Oct 2019 | 352 Dolores St | interior alteration to an (e) apartment unit. work to inlcude remodel of (e) kitchen & bath. install new bath, closets & stakcing washer & dryer. non-structural parttions. no change in use, all work within existing building envelopeDetails
interior alteration to an (e) apartment unit. work to inlcude remodel of (e) kitchen & bath. install new bath, closets & stakcing washer & dryer. non-structural parttions. no change in use, all work within existing building envelope | $40,000 |
| May 3, 2018 | Completed final sign-off Feb 2021 | 1324 Chestnut St | construct one new dwelling unit (1 bedroom & 1 bath) at (e) storage per density of zoning. soft story work under pa# 2018-0501-7900.Details
construct one new dwelling unit (1 bedroom & 1 bath) at (e) storage per density of zoning. soft story work under pa# 2018-0501-7900. | $150,000 |
| Mar 15, 2018 | Completed final sign-off Oct 2018 | 1361 California St | remodel of 3 kitchens & 3 bathrooms in units 1, 2, and 3, painting, flooring and new (3) new windows will be installed. windows are on side & not bisible to street. no framing will be removed.Details
remodel of 3 kitchens & 3 bathrooms in units 1, 2, and 3, painting, flooring and new (3) new windows will be installed. windows are on side & not bisible to street. no framing will be removed. | $120,000 |
| Mar 14, 2018 | Completed final sign-off Feb 2019 | 417 Marietta Dr | remodel of kitchen & 2 bathrooms / no walls removedDetails
remodel of kitchen & 2 bathrooms / no walls removed | $60,000 |
| Jan 9, 2018 | Never finaled issued Jan 2018, no final | 1322 Chestnut St | first fl (above garage): relocate (e) kitchen, remodel (e) master bathroom & bath, remodel (e) laundry area.Details
first fl (above garage): relocate (e) kitchen, remodel (e) master bathroom & bath, remodel (e) laundry area. | $30,000 |
| Jan 4, 2018 | Completed final sign-off Oct 2018 | 2285 Filbert St | renovation of flat, unit 2285 - kitchen remodel and relocation of bathroom and eliminate 1 bedroom, replace two front windows with wood double-hung in kind, create 1 new den.Details
renovation of flat, unit 2285 - kitchen remodel and relocation of bathroom and eliminate 1 bedroom, replace two front windows with wood double-hung in kind, create 1 new den. | $75,000 |
| Dec 15, 2017 | Completed final sign-off Oct 2018 | 775 Noe St | revision to pa#201710302651. remodel of master suite at 3rd fl, relocate bath, new skylight.Details
revision to pa#201710302651. remodel of master suite at 3rd fl, relocate bath, new skylight. | $55,000 |
| Oct 30, 2017 | Completed final sign-off Oct 2018 | 775 Noe St | bathroom remodel-relocate toilet, shower and sink. new sheet rock and tiles, no walls to be removed. bedrom - new lighting, sheet rock repairs and flooring. no walls moved, removed, added or infilled. all existing layouts to remain, unchanged.Details
bathroom remodel-relocate toilet, shower and sink. new sheet rock and tiles, no walls to be removed. bedrom - new lighting, sheet rock repairs and flooring. no walls moved, removed, added or infilled. all existing layouts to remain, unchanged. | $35,000 |
| Oct 2, 2017 | Completed final sign-off Dec 2017 | 630 Mason St | bathroom remodel - no structural work. n/a maherDetails
bathroom remodel - no structural work. n/a maher | $15,000 |
| Jun 5, 2017 | Completed final sign-off Jun 2018 | 1875 Lombard St | restore residential use to upper 2 units, previously converted from residential to office. add laundry to both units. renovations to 2nd and 3rd floor units; remodel bedroom, bathrooms, kitchen, (e) roof deck removed, construct (n) complying to open space requirementsDetails
restore residential use to upper 2 units, previously converted from residential to office. add laundry to both units. renovations to 2nd and 3rd floor units; remodel bedroom, bathrooms, kitchen, (e) roof deck removed, construct (n) complying to open space requirements | $185,000 |
| Mar 24, 2017 | Completed final sign-off Jul 2017 | 34 Caselli Av | 2nd fl unit reconfiguration, convert living rm to master bedroom, add closet, relocate living rm to bedroom, remodel baths, open wall at kitchen. no work visible at street. interior work remodel - no strucutral work. work to unit 34 onlyDetails
2nd fl unit reconfiguration, convert living rm to master bedroom, add closet, relocate living rm to bedroom, remodel baths, open wall at kitchen. no work visible at street. interior work remodel - no strucutral work. work to unit 34 only | $10,000 |
| Mar 23, 2017 | Completed final sign-off Dec 2017 | 3710 Sacramento St | kitchen and bathroom remodel. like for like, in same location.Details
kitchen and bathroom remodel. like for like, in same location. | $50,000 |
| Mar 13, 2017 | Completed final sign-off Aug 2017 | 239 Brannan St | remodel of (2) bathrooms and replace flooring in kitchen. no structural work.Details
remodel of (2) bathrooms and replace flooring in kitchen. no structural work. | $25,000 |
| Aug 4, 2016 | Completed final sign-off Sep 2016 | 2100 Rivera St | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $40,000 |
| Jun 21, 2016 | Completed final sign-off Apr 2017 | 2162 12th Av | kitchen and bath remodel. new back deck, parapet on roof for skylight and replace downstairs window with new doorDetails
kitchen and bath remodel. new back deck, parapet on roof for skylight and replace downstairs window with new door | $80,000 |
| May 9, 2016 | Completed final sign-off Apr 2017 | 1343 31st Av | remodel 1st level of (e) 2 level home. replace windows on rear elevation with new french doors & add 2 windows. claim some space in garage for habitable use. remodel (e) master bath, relocate powder room & make into 3/4 bath. replace (e) heating system with hydronic one.Details
remodel 1st level of (e) 2 level home. replace windows on rear elevation with new french doors & add 2 windows. claim some space in garage for habitable use. remodel (e) master bath, relocate powder room & make into 3/4 bath. replace (e) heating system with hydronic one. | $130,000 |
| Apr 12, 2016 | Never finaled issued Apr 2016, no final | 3620 Market St | bathroom & kitchen remodel: bathroom: installation of new bathtub, floor tile wall tile and vanity. kitchen: new counter tops and backsplash. refinished hardwood flor and painting of interior.Details
bathroom & kitchen remodel: bathroom: installation of new bathtub, floor tile wall tile and vanity. kitchen: new counter tops and backsplash. refinished hardwood flor and painting of interior. | $20,000 |
| Jan 27, 2016 | Completed final sign-off Sep 2016 | 3017 Irving St | remodel kitchen and bathroom, move plumbing fixtures in kitchen & bathroom. new tile, cabinets, flooring & paint in kitchen and bathroom. structural modifications to remove kitchen wall on 2nd & 3rd floors.Details
remodel kitchen and bathroom, move plumbing fixtures in kitchen & bathroom. new tile, cabinets, flooring & paint in kitchen and bathroom. structural modifications to remove kitchen wall on 2nd & 3rd floors. | $45,000 |
| May 1, 2015 | Completed final sign-off Sep 2015 | 1286 07th Av | remodel kitchen and bath & add one new bath. update cabinetry, tile, elec, plumbing, paint.Details
remodel kitchen and bath & add one new bath. update cabinetry, tile, elec, plumbing, paint. | $65,000 |
| Feb 17, 2015 | Completed final sign-off Apr 2015 | 49 Landers St | bathroom remodel: include updating plumbing, electrical, sheetrock, paint, tile and vanity, replace existing window with new windowDetails
bathroom remodel: include updating plumbing, electrical, sheetrock, paint, tile and vanity, replace existing window with new window | $24,000 |
| Dec 3, 2014 | Completed final sign-off May 2015 | 1407 Noe St | kitchen remodel and bath addition at level 2 (upper unit) modification and addition of two property line windows per plan. windows adjacent to property line to be fire rated (min 45 min)Details
kitchen remodel and bath addition at level 2 (upper unit) modification and addition of two property line windows per plan. windows adjacent to property line to be fire rated (min 45 min) | $40,000 |
| Jul 24, 2014 | Completed final sign-off Sep 2014 | 1305 Sanchez St | update (1) bathroom tile, vanity, plumbing fixtures and electrical.Details
update (1) bathroom tile, vanity, plumbing fixtures and electrical. | $12,000 |
| Apr 16, 2014 | Completed final sign-off Oct 2018 | 16 Iris Av | ground flr horizontal addition @ rear yard (16a iris), remodel 2nd fl kitchen, bathroom & bedrooms, new second flr deck at rear yard (16 iris). 3 dwelling units to remain.Details
ground flr horizontal addition @ rear yard (16a iris), remodel 2nd fl kitchen, bathroom & bedrooms, new second flr deck at rear yard (16 iris). 3 dwelling units to remain. | $120,000 |