# Principal Builders Inc.

Contractor license 829808. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/principal-builders-inc-829808
- JSON: https://www.permitgraph.org/api/contractor?license=829808
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=829808

1,422 permits since 2000: 1,125 completed, 89 in progress, 157 never finaled, 51 expired or cancelled. Typically 11 days from filing to permit and 153 days from permit to final inspection. Of the 157 never-finaled permits, 15 are 3 to 5 years old, 60 are 5 to 10 years old, 82 are over 10 years old. 2 were filed but never issued.

- Based in: San Francisco
- On San Francisco permits: Mar 2004 to Nov 2026
- Last 24 months: 163 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2004 | 8 | 0 | 1 | 4 |
| 2005 | 33 | 0 | 1 | 1 |
| 2006 | 31 | 0 | 3 | 11 |
| 2007 | 24 | 0 | 1 | 13 |
| 2008 | 18 | 0 | 0 | 0 |
| 2009 | 20 | 0 | 0 | 1 |
| 2010 | 5 | 0 | 0 | 0 |
| 2011 | 39 | 0 | 3 | 1 |
| 2012 | 33 | 0 | 4 | 0 |
| 2013 | 74 | 0 | 7 | 0 |
| 2014 | 75 | 0 | 23 | 1 |
| 2015 | 81 | 0 | 20 | 4 |
| 2016 | 117 | 0 | 22 | 1 |
| 2017 | 89 | 0 | 23 | 3 |
| 2018 | 97 | 0 | 18 | 2 |
| 2019 | 85 | 0 | 8 | 1 |
| 2020 | 50 | 0 | 4 | 2 |
| 2021 | 35 | 0 | 5 | 0 |
| 2022 | 37 | 0 | 9 | 0 |
| 2023 | 33 | 5 | 5 | 1 |
| 2024 | 52 | 16 | 0 | 1 |
| 2025 | 56 | 17 | 0 | 4 |
| 2026 | 33 | 51 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 20 | 17 | 2 | 1 | 0 | 58 | 273 |
| Bathroom remodel | 3 | 1 | 1 | 1 | 0 | 89 | 149 |
| Pergola or trellis | 1 | 0 | 0 | 1 | 0 | 11 |  |
| Stairs | 63 | 48 | 4 | 10 | 1 | 15 | 170 |
| Roof deck | 2 | 2 | 0 | 0 | 0 | 174 | 322 |

## Most recent permits

The 100 most recent of 1,422.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202611190998](https://www.permitgraph.org/p/202611190998) | Nov 19, 2026 | In progress: issued Nov 2026 | [149 New Montgomery St](https://www.permitgraph.org/a/3722/007) | 5th and 6th: permit revision to issued pa #202604209747. plan check response to revise egress, drinking fountain and accessibility details. |  |
| [202611190993](https://www.permitgraph.org/p/202611190993) | Nov 19, 2026 | In progress: issued Nov 2026 | [149 New Montgomery St](https://www.permitgraph.org/a/3722/007) | revision to pa# 202604209749. reference also previous revision pa# 202608076281. plan check response to revise egress plan, drinking fountains and accessibility details. |  |
| [202611170849](https://www.permitgraph.org/p/202611170849) | Nov 17, 2026 | In progress: issued Nov 2026 | [333 Brannan St](https://www.permitgraph.org/a/3788/042) | 5th flr: t.i. includes the demo of non-structural partitions, blding new non-structural partitions. add phone booth anchoring. all new or revised mep and life safety work will be design. build and su… | $500,000 |
| [202611100573](https://www.permitgraph.org/p/202611100573) | Nov 10, 2026 | In progress: issued Nov 2026 | [333 Brannan St](https://www.permitgraph.org/a/3788/042) | 1st and 3rd floors: t.i. include the demolishing of non-structural partitions. new lighting & finishes throughout. ref pa #201306280744. all new or revised hvac electrical, plumbing & life safety wor… | $725,000 |
| [202611100612](https://www.permitgraph.org/p/202611100612) | Nov 10, 2026 | In progress: issued Nov 2026 | [149 New Montgomery St](https://www.permitgraph.org/a/3722/007) | evacuation maps for levels 1 and 4 and 6 | $3,000 |
| [202611050415](https://www.permitgraph.org/p/202611050415) | Nov 5, 2026 | In progress: filed Nov 2026, not yet issued | [475 Sansome St](https://www.permitgraph.org/a/0228/039) | l14 tenant improvement includes non structural partitions, structural strenthening, new interior acoustic ceilings, mill work and and finishes. | $3,200,000 |
| [202610280040](https://www.permitgraph.org/p/202610280040) | Oct 28, 2026 | In progress: issued Oct 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | demo existing doors and non-load bearing partitions and interior office front glazing system. replaced with new partitions and doors. | $29,442 |
| [202610269913](https://www.permitgraph.org/p/202610269913) | Oct 26, 2026 | In progress: issued Nov 2026 | [840 Battery St](https://www.permitgraph.org/a/0141/002) | deferred submittal of mech roof access catwalk shop drawings. (ref bpa: 202607144985) |  |
| [202610209684](https://www.permitgraph.org/p/202610209684) | Oct 20, 2026 | In progress: issued Oct 2026 | [550 Terry A Francois Bl](https://www.permitgraph.org/a/8721/011) | to obtain final inspection for work approved under pa# 202507020077. all work is complete |  |
| [202610199584](https://www.permitgraph.org/p/202610199584) | Oct 19, 2026 | In progress: issued Oct 2026 | [88 Spear St](https://www.permitgraph.org/a/3712/023) | 9th fl - deferred mep to pa 202610028988 | $766,000 |
| [202610169556](https://www.permitgraph.org/p/202610169556) | Oct 16, 2026 | In progress: issued Oct 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | sector d4 level 6 phone booths | $150,000 |
| [202610159495](https://www.permitgraph.org/p/202610159495) | Oct 15, 2026 | In progress: issued Oct 2026 | [235 02nd St](https://www.permitgraph.org/a/3736/123) | 6th fl - minor tenant improvement includes adding 5 new non-rated doors and side lites, with card readers and panic hardware, around the passenger elevator and lobby areas | $95,000 |
| [202610139331](https://www.permitgraph.org/p/202610139331) | Oct 13, 2026 | In progress: issued Oct 2026 | [650 Townsend St](https://www.permitgraph.org/a/3783/009) | g/f ste# 160 & 180: interior t.i. of concourse (basement level), remove e) corridor walls & doors, construct new partition walls, infill opening where e) interior door is removed, no mep or fire spri… | $4,000 |
| [202610099284](https://www.permitgraph.org/p/202610099284) | Oct 9, 2026 | In progress: issued Nov 2026 | [475 Sansome St](https://www.permitgraph.org/a/0228/039) | l12-tenant improvement includes non-structural partitions, structural strengthening, new interior acoustic ceilings, millwork and finishes. mep included. | $3,336,000 |
| [202610028956](https://www.permitgraph.org/p/202610028956) | Oct 2, 2026 | Completed: final sign-off Oct 2026 | [850 Brannan St](https://www.permitgraph.org/a/3780/072) | barrier removal only. remove existing glass door and fixed glass panel at 2nd floor. | $1,000 |
| [202610028949](https://www.permitgraph.org/p/202610028949) | Oct 2, 2026 | In progress: issued Oct 2026 | [88 Spear St](https://www.permitgraph.org/a/3712/023) | 9th fl - interior soft demo of non-bearing partitions, millwork and finishes. approx 12,100 sq ft. | $50,000 |
| [202610028988](https://www.permitgraph.org/p/202610028988) | Oct 2, 2026 | In progress: issued Oct 2026 | [88 Spear St](https://www.permitgraph.org/a/3712/023) | 9th floor: partial interior ti includes new partitions, doors, ceilings, finishes, and millwork. mep deferred. | $2,170,000 |
| [202610018898](https://www.permitgraph.org/p/202610018898) | Oct 1, 2026 | In progress: issued Oct 2026 | [50 California St](https://www.permitgraph.org/a/0235/022) | 27/fl- new exhaust fan vav's air and water balancing, insulation of ductwork. ref 202608196842 | $15,000 |
| [202609248578](https://www.permitgraph.org/p/202609248578) | Sep 24, 2026 | In progress: issued Sep 2026 | [145 New Montgomery St](https://www.permitgraph.org/a/3722/007) | ground floor: revise pa #202607175229 to show addition of sink and removal of millwork at reception desk. deferred mep for pa 202607175229 is included on this permit. | $842,811 |
| [202609188323](https://www.permitgraph.org/p/202609188323) | Sep 18, 2026 | In progress: issued Sep 2026 | [850 Brannan St](https://www.permitgraph.org/a/3780/072) | revision 202608146613 to modification of (e) stair handrail. removal of double doors @ loading dock from scope of work. |  |
| [202609178279](https://www.permitgraph.org/p/202609178279) | Sep 17, 2026 | In progress: issued Sep 2026 | [475 Sansome St](https://www.permitgraph.org/a/0228/038) | floor 12-15 interior soft demo. ab-017 | $120,000 |
| [202609178277](https://www.permitgraph.org/p/202609178277) | Sep 17, 2026 | In progress: issued Sep 2026 | [475 Sansome St](https://www.permitgraph.org/a/0228/038) | floor 20 +21- interior soft demo. | $80,000 |
| [202609168233](https://www.permitgraph.org/p/202609168233) | Sep 16, 2026 | In progress: issued Oct 2026 | [1 California St](https://www.permitgraph.org/a/0264/004) | 19th floor: t.i. work includes non-structural partitions, ceilings, finishes and associated mech and electrical expansion of existing tenant suite. | $375,000 |
| [202609117988](https://www.permitgraph.org/p/202609117988) | Sep 11, 2026 | In progress: issued Sep 2026 | [840 Battery St](https://www.permitgraph.org/a/0141/002) | revision to pa#: 202607144985. level 2: relocate drinking foundation. jan closet. update wall mounted water closets remove idf room 212. level#: relocate mdf room. demo (e) idf 140. structural drawin… |  |
| [202609107878](https://www.permitgraph.org/p/202609107878) | Sep 10, 2026 | In progress: issued Sep 2026 | [475 Sansome St](https://www.permitgraph.org/a/0228/039) | 6/f: evac map plan. fabricate & install signage, fire only. | $2,000 |
| [202609037634](https://www.permitgraph.org/p/202609037634) | Sep 3, 2026 | In progress: issued Sep 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 43rd fl: soft demo of interior, replacement with new non bearing partitions, new lighting, new millwork and appliances, partial replacement of mech, electrical, plumbing, district | $624,369 |
| [202608317491](https://www.permitgraph.org/p/202608317491) | Aug 31, 2026 | In progress: issued Oct 2026 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | 24/fl- revision 202602115770- includes altered reception layout to accomadate (n) secure vestibule. (n) fire rated wall and door and four additional phone booths. no plumbing fixture changes |  |
| [202608247048](https://www.permitgraph.org/p/202608247048) | Aug 24, 2026 | Completed: final sign-off Sep 2026 | [850 Brannan St](https://www.permitgraph.org/a/3780/072) | interior tenant improvement consisting of new interior partitions. | $57,000 |
| [202608247039](https://www.permitgraph.org/p/202608247039) | Aug 24, 2026 | In progress: issued Sep 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | interior tenant fit out of office space on level 19. non-structural partitions and ceilings, finishes and millwork | $2,800,000 |
| [202608196842](https://www.permitgraph.org/p/202608196842) | Aug 19, 2026 | In progress: issued Sep 2026 | [50 California St](https://www.permitgraph.org/a/0235/022) | level 27; alterations to conference rooms, storage area and employee break room. mep deferred. | $2,862,400 |
| [202608116401](https://www.permitgraph.org/p/202608116401) | Aug 11, 2026 | Completed: final sign-off Oct 2026 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | level 20. install (1) phone booth. | $2,000 |
| [202608106351](https://www.permitgraph.org/p/202608106351) | Aug 10, 2026 | In progress: issued Aug 2026 | [595 Pacific Av](https://www.permitgraph.org/a/0176/016) | fire only: evacuation maps for 2nd and 3rd floors |  |
| [202608076281](https://www.permitgraph.org/p/202608076281) | Aug 7, 2026 | In progress: issued Aug 2026 | [149 New Montgomery St](https://www.permitgraph.org/a/3722/007) | 4th floor. revision to 202604209749. removal of (e) elevator lobby double door and adding new smoke curtain above (e) elevator cab doors. various partition layouts changes, rcp and lighting updates,… |  |
| [202607215336](https://www.permitgraph.org/p/202607215336) | Jul 21, 2026 | Completed: final sign-off Aug 2026 | [595 Pacific Av](https://www.permitgraph.org/a/0176/016) | 2/f: revision to pa#: 202602246389. adding (2) new phone booths with new supporting power. | $8,000 |
| [202607175229](https://www.permitgraph.org/p/202607175229) | Jul 17, 2026 | In progress: issued Aug 2026 | [145 New Montgomery St](https://www.permitgraph.org/a/3722/007) | minor tenant improvements on ground floor, new non-structural partitions, finishes, and millwork. | $750,000 |
| [202604240059](https://www.permitgraph.org/p/202604240059) | Jul 14, 2026 | In progress: filed Jul 2026, not yet issued | [149 New Montgomery St](https://www.permitgraph.org/a/3722/007) | stairs commercial tenant improvement between floors 4.5 &6. scope of work includes partial demolition of existing flooring. new interconnecting spiral staircases & associated structural improvements. | $1,130,000 |
| [202607144985](https://www.permitgraph.org/p/202607144985) | Jul 14, 2026 | In progress: issued Aug 2026 | [840 Battery St](https://www.permitgraph.org/a/0141/002) | ti includes (n) non strutural partitions, finishes, alterations to (e) bathrooms, and mep associated with listed wsork. soft demo under 202606032472 | $2,000,000 |
| [202607084722](https://www.permitgraph.org/p/202607084722) | Jul 8, 2026 | In progress: issued Jul 2026 | [50 California St](https://www.permitgraph.org/a/0235/022) | l27: suite 2750 non-structural demo per ab-017 | $25,000 |
| [202607024511](https://www.permitgraph.org/p/202607024511) | Jul 2, 2026 | In progress: issued Jul 2026 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | assembly permit associated with pa 202508082619 & 202404129924 |  |
| [202606243806](https://www.permitgraph.org/p/202606243806) | Jun 24, 2026 | In progress: issued Jul 2026 | [2545 16th St](https://www.permitgraph.org/a/3966/001) | deferred under pa 202606032472 installation of walk in and reach in audio chambers as wel as handrails and ramps |  |
| [202606183584](https://www.permitgraph.org/p/202606183584) | Jun 18, 2026 | In progress: issued Oct 2026 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | l24 revision to pa# 202602115770: minor mep updates, corrected address in title blocks. | $770 |
| [202606173412](https://www.permitgraph.org/p/202606173412) | Jun 17, 2026 | In progress: issued Jun 2026 | [2545 16th St](https://www.permitgraph.org/a/3966/001) | new power and signal devices. deferred under pa# 202606032472 |  |
| [202606163267](https://www.permitgraph.org/p/202606163267) | Jun 16, 2026 | In progress: issued Jun 2026 | [400 Montgomery St](https://www.permitgraph.org/a/0239/009) | 2nd floor: ti includes light demo, new conference room, new storage alcore, relocation of mens room door, new breakroom for employee use. mep deferred. | $600,000 |
| [202606123171](https://www.permitgraph.org/p/202606123171) | Jun 12, 2026 | Completed: final sign-off Jul 2026 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | revision to pa# 202602115767, level 20. various minor mep updates, corrected address on title blocks of sheets. | $600 |
| [202606032472](https://www.permitgraph.org/p/202606032472) | Jun 3, 2026 | In progress: issued Jun 2026 | [2545 16th St](https://www.permitgraph.org/a/3966/001) | 1st fl. tenant improvement, constructing 2 rooms with non-struct partitions, new equipment slab to support 3 equipment chamber paints and floor finishes | $322,150 |
| [202606012272](https://www.permitgraph.org/p/202606012272) | Jun 1, 2026 | Completed: final sign-off Sep 2026 | [50 Hawthorne St](https://www.permitgraph.org/a/3735/017) | revision to 202603187875 to include: reconfigured 2 hr wall layout on floor 1. structural steel posts for motorized door on floor 01. conference 318 to become shared office 318. |  |
| [202606012262](https://www.permitgraph.org/p/202606012262) | Jun 1, 2026 | Completed: final sign-off Sep 2026 | [475 Sansome St](https://www.permitgraph.org/a/0228/039) | 6th fl: renovation to existing commercial ti. includes non structural partitions, acoustic ceiling tiles and finishes. new power and signal devices throught the space. | $162,000 |
| [202605292199](https://www.permitgraph.org/p/202605292199) | May 29, 2026 | Completed: final sign-off Jun 2026 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | 21st fl - revision to pa 202511189893 correct project address in title blocks |  |
| [202605261919](https://www.permitgraph.org/p/202605261919) | May 26, 2026 | Completed: final sign-off Sep 2026 | [50 Hawthorne St](https://www.permitgraph.org/a/3735/017) | l1-3: deferred mep for pa# 202603187875 | $713,232 |
| [202605211736](https://www.permitgraph.org/p/202605211736) | May 21, 2026 | Completed: final sign-off Oct 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | installation of phone booths in section a floor 2, section b floor 3 and section c on floor 5 & 8. phase 2-3. add new power to existing breakroom, power and new printers. | $150,000 |
| [202605151392](https://www.permitgraph.org/p/202605151392) | May 15, 2026 | In progress: issued Jun 2026 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | 24th fl - revision to pa 202602115770 minor plumbing updates |  |
| [202605060761](https://www.permitgraph.org/p/202605060761) | May 6, 2026 | Completed: final sign-off Aug 2026 | [595 Pacific Av](https://www.permitgraph.org/a/0176/016) | level 2; revision to pa#: 202602246389 and deferred mep. revised existing wall layouts to mof 256 and conference room 257. revised room function 210 with new supporting power and data layout. | $849,601 |
| [202605040579](https://www.permitgraph.org/p/202605040579) | May 4, 2026 | Completed: final sign-off Jun 2026 | [555 California St](https://www.permitgraph.org/a/0259/026) | 38/fl- partial interior demo includes non structural , partitions, ceilings, lighting, finishes, doors, frames, hardware and milwork. | $49,000 |
| [202604300428](https://www.permitgraph.org/p/202604300428) | Apr 30, 2026 | Completed: final sign-off Jul 2026 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | level 20. revision to 202602115767. addition of 11 new phonebooths, minor mep, millwork updates. | $20,000 |
| [202604300433](https://www.permitgraph.org/p/202604300433) | Apr 30, 2026 | In progress: issued May 2026 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | l24: revision to pa# 202602115770. demolish (e) door & minor upgrades to millwork and finishes, updated dimensions for closet & interior window. |  |
| [202604290322](https://www.permitgraph.org/p/202604290322) | Apr 29, 2026 | Completed: final sign-off Jun 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | installation of phone booths in sector 2 fl, 4 & 5 & sector 3 fls, 5,7 | $150,000 |
| [202604270180](https://www.permitgraph.org/p/202604270180) | Apr 27, 2026 | Completed: final sign-off Sep 2026 | [50 Hawthorne St](https://www.permitgraph.org/a/3735/017) | 3rd floor interior tenant improvement to include new barista bar serving coffee, tea and grab & go prepackaged food. new back of house catering area. | $48,000 |
| [202604240031](https://www.permitgraph.org/p/202604240031) | Apr 24, 2026 | Completed: final sign-off Jul 2026 | [45 Fremont St](https://www.permitgraph.org/a/3710/019) | installation of phonebooths on - 4 on level 7 and 4 on level 8 | $95,000 |
| [202604229923](https://www.permitgraph.org/p/202604229923) | Apr 22, 2026 | Completed: final sign-off Aug 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | sector 3/c floor 5, new walk in coolers. | $450,000 |
| [202604229919](https://www.permitgraph.org/p/202604229919) | Apr 22, 2026 | In progress: issued May 2026 | [840 Battery St](https://www.permitgraph.org/a/0141/002) | per ab-017- demo of non structrual partitions ceilings, light fixtures, millwork, finishes | $195,000 |
| [202604209749](https://www.permitgraph.org/p/202604209749) | Apr 20, 2026 | In progress: issued Jun 2026 | [149 New Montgomery St](https://www.permitgraph.org/a/3722/007) | 4/f: commercial ti of (e) 4th floor. scope of work includes partial demo of interior non-bearing walls, ceilings, light fixtures and (e) flooring. new construction of non-bearing walls, finishes, pow… | $3,270,000 |
| [202604209752](https://www.permitgraph.org/p/202604209752) | Apr 20, 2026 | Completed: final sign-off Jun 2026 | [221 Main St](https://www.permitgraph.org/a/3740/034) | 10th & 11th fl - evac maps | $958 |
| [202604209747](https://www.permitgraph.org/p/202604209747) | Apr 20, 2026 | In progress: issued Jul 2026 | [149 New Montgomery St](https://www.permitgraph.org/a/3722/007) | commercial tenant improvement of (e) floors 5 & 6. | $5,670,000 |
| [202604169579](https://www.permitgraph.org/p/202604169579) | Apr 16, 2026 | Completed: final sign-off Jun 2026 | [221 Main St](https://www.permitgraph.org/a/3740/034) | revision to 202512222392 10th/f & 202512151826 11th/f: showing shaft due to unforseen conditions, power & lighting refiguration. lighting & ceiling modification, add emergency release buttom at eleva… |  |
| [202604079054](https://www.permitgraph.org/p/202604079054) | Apr 7, 2026 | In progress: issued May 2026 | [550 Terry A Francois Bl](https://www.permitgraph.org/a/8721/011) | l1-l4, evac maps for level 1-4. |  |
| [202603187875](https://www.permitgraph.org/p/202603187875) | Mar 18, 2026 | Completed: final sign-off Sep 2026 | [50 Hawthorne St](https://www.permitgraph.org/a/3735/017) | all floors: interior tenant improvement to include non-structural partitions, new ceilings, and associated electrical, lighting, plumbing, and new finishes throughout area of work. new millwork eleme… | $940,000 |
| [202603117393](https://www.permitgraph.org/p/202603117393) | Mar 11, 2026 | Completed: final sign-off Jul 2026 | [595 Pacific Av](https://www.permitgraph.org/a/0176/016) | l3: revision to pa #202601284695: revised booth locations and structural attachments of phone booths |  |
| [202602246389](https://www.permitgraph.org/p/202602246389) | Feb 24, 2026 | Completed: final sign-off Aug 2026 | [595 Pacific Av](https://www.permitgraph.org/a/0176/016) | 2nd fl - office ti installation of new non-bearing partitions, ceilings, power/data and finishes. structural & mep deferred | $1,407,813 |
| [202602125905](https://www.permitgraph.org/p/202602125905) | Feb 12, 2026 | Completed: final sign-off Jun 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | lb4: minor modifications to existing open area. l5b: minor modifications to existing pantry. l6c: minor modifications to existing servery soft and islands, walkin cooler in bo#: servery. l7c: new fin… | $150,000 |
| [202602115770](https://www.permitgraph.org/p/202602115770) | Feb 11, 2026 | In progress: issued Apr 2026 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | l24. ti demo of existing non-structural partitions, millwork, finishes, and new non-structural partitions, millwork, finishes, mep. | $1,411,768 |
| [202602115767](https://www.permitgraph.org/p/202602115767) | Feb 11, 2026 | Completed: final sign-off Jul 2026 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | 20/f: ti demo (e) + (n) partitions, break area, meeting rooms, mep finishes. | $500,000 |
| [202602105643](https://www.permitgraph.org/p/202602105643) | Feb 10, 2026 | Completed: final sign-off Jul 2026 | [595 Pacific Av](https://www.permitgraph.org/a/0176/016) | 3/fl- deferred mep associated with 202601284695 | $50,000 |
| [202602065446](https://www.permitgraph.org/p/202602065446) | Feb 6, 2026 | Completed: final sign-off Jun 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 37th floor ti renovation of (e) breakroom: occ load from 23 to 32. | $109,000 |
| [202602045181](https://www.permitgraph.org/p/202602045181) | Feb 4, 2026 | Completed: final sign-off Jun 2026 | [1 Front St](https://www.permitgraph.org/a/0266/009) | floor 31-33- 202507110624 and ref 202601284713 to capture as built details |  |
| [202601284713](https://www.permitgraph.org/p/202601284713) | Jan 28, 2026 | Completed: final sign-off Jun 2026 | [1 Front St](https://www.permitgraph.org/a/0266/009) | structural revision on l32 at interconnecting stairs for pa #202507110624 and removal of special inspection item #4 |  |
| [202601284695](https://www.permitgraph.org/p/202601284695) | Jan 28, 2026 | Completed: final sign-off Jul 2026 | [595 Pacific Av](https://www.permitgraph.org/a/0176/016) | 3rd floor: ti non-structural partitions , ceiling power data and finishes. mep deferred. | $652,080 |
| [202601274588](https://www.permitgraph.org/p/202601274588) | Jan 27, 2026 | Completed: final sign-off Nov 2026 | [555 California St](https://www.permitgraph.org/a/0259/026) | partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas. | $1,170,366 |
| [202601274584](https://www.permitgraph.org/p/202601274584) | Jan 27, 2026 | In progress: issued Sep 2026 | [555 California St](https://www.permitgraph.org/a/0259/026) | partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas. | $588,286 |
| [202601264575](https://www.permitgraph.org/p/202601264575) | Jan 26, 2026 | Completed: final sign-off Feb 2026 | [1515 03rd St](https://www.permitgraph.org/a/8721/029) | to obtain final inspection for work approved under pa# 202410112789. all work is complete. |  |
| [202601204120](https://www.permitgraph.org/p/202601204120) | Jan 20, 2026 | In progress: issued Sep 2026 | [555 California St](https://www.permitgraph.org/a/0259/026) | 40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas | $1,198,400 |
| [202601153979](https://www.permitgraph.org/p/202601153979) | Jan 15, 2026 | Completed: final sign-off Jun 2026 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | 21/fl- revision 202511189893- add 3 (n) phonebooths, fire sprinkler and alarm submittal deferred | $16,500 |
| [202601143871](https://www.permitgraph.org/p/202601143871) | Jan 14, 2026 | In progress: issued Sep 2026 | [555 California St](https://www.permitgraph.org/a/0259/026) | 41/fl- new communicating stair between floors 40 and 41. | $42,600 |
| [202601143868](https://www.permitgraph.org/p/202601143868) | Jan 14, 2026 | In progress: issued Sep 2026 | [555 California St](https://www.permitgraph.org/a/0259/026) | 39/fl- removal of (e) communicating stair between floors 39 and 40 and infill opening in 40th floor | $15,000 |
| [202601073403](https://www.permitgraph.org/p/202601073403) | Jan 7, 2026 | Completed: final sign-off May 2026 | [1 Embarcadero Center](https://www.permitgraph.org/a/0230/028) | 32/fl- defferred submittal from 202510217760 for operable partition |  |
| [202512091338](https://www.permitgraph.org/p/202512091338) | Dec 23, 2025 | In progress: issued Apr 2026 | [550 Terry A Francois Bl](https://www.permitgraph.org/a/8721/011) | l1 - l4. electrical only revision to approved pa# 202503172334. |  |
| [202512222392](https://www.permitgraph.org/p/202512222392) | Dec 22, 2025 | Completed: final sign-off Jun 2026 | [221 Main St](https://www.permitgraph.org/a/3740/034) | 10/f. t.i (n) non structural partitions, ceiling, finishes, fixtures. demo under pa# 202511069080. | $3,900,000 |
| [202512161909](https://www.permitgraph.org/p/202512161909) | Dec 16, 2025 | In progress: issued Sep 2026 | [555 California St](https://www.permitgraph.org/a/0259/026) | l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas. | $5,419,764 |
| [202512151826](https://www.permitgraph.org/p/202512151826) | Dec 15, 2025 | Completed: final sign-off Jun 2026 | [221 Main St](https://www.permitgraph.org/a/3740/034) | 11/fl- ti demo (e) and build (n) partitions (non-structural) accoustical/ceiling, finishes, millwork (n) cafe | $4,000,000 |
| [202512121673](https://www.permitgraph.org/p/202512121673) | Dec 12, 2025 | Completed: final sign-off Apr 2026 | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | suite 2500. revision to 202507160935. clarifying the door's hardware etec for the egress. door number 2512. |  |
| [202512081191](https://www.permitgraph.org/p/202512081191) | Dec 8, 2025 | Completed: final sign-off Aug 2026 | [550 Terry A Francois Bl](https://www.permitgraph.org/a/8721/011) | l5-l6: evav maps for levels 5 & 6 | $3,500 |
| [202511260519](https://www.permitgraph.org/p/202511260519) | Nov 26, 2025 | In progress: issued Dec 2025 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | 11/f: (n) power signal devices for phone booths. ref#2025-0617-8877 | $1,938 |
| [202511260513](https://www.permitgraph.org/p/202511260513) | Nov 26, 2025 | In progress: issued Dec 2025 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | 2/f: (n) power signal devices for phone booths. ref#2025-0617-8874 | $3,774 |
| [202511250431](https://www.permitgraph.org/p/202511250431) | Nov 25, 2025 | Completed: final sign-off Aug 2026 | [550 Terry A Francois Bl](https://www.permitgraph.org/a/8721/011) | revised details to illustrate design changes to exteior security wall. added cdu and thermal chamber both for future installation ref#: 202504043753 | $10,000 |
| [202511240298](https://www.permitgraph.org/p/202511240298) | Nov 24, 2025 | Completed: final sign-off Aug 2026 | [550 Terry A Francois Bl](https://www.permitgraph.org/a/8721/011) | revision to 202510177584. update structural details including cross sections, concrete pavement, handrail details, and rebar placement. |  |
| [202511210211](https://www.permitgraph.org/p/202511210211) | Nov 21, 2025 | Completed: final sign-off Oct 2026 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | revision to bpa: 202506178877. revised phone booth layout on level 11. eliminate scope of work on level 10 |  |
| [202511189920](https://www.permitgraph.org/p/202511189920) | Nov 18, 2025 | In progress: issued Nov 2025 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | revision to pa#: 202506178874. revised phone booth layout on 2nd floor |  |
| [202511189893](https://www.permitgraph.org/p/202511189893) | Nov 18, 2025 | Completed: final sign-off Jun 2026 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | 21/fl- relocating 4 (e) phone booths | $22,000 |
| [202511069080](https://www.permitgraph.org/p/202511069080) | Nov 6, 2025 | Completed: final sign-off Jun 2026 | [221 Main St](https://www.permitgraph.org/a/3740/034) | 10/fl: demo existing non structured partitions, ceilings, lights fixtures, millwork and finishes per ab-017 | $176,364 |
| [202511069077](https://www.permitgraph.org/p/202511069077) | Nov 6, 2025 | Completed: final sign-off Jul 2026 | [221 Main St](https://www.permitgraph.org/a/3740/034) | 11/f: demo at non-structural partitions, ceilings, lights fixtures, millwork and finishes. per ab017 | $179,229 |
| [202511048903](https://www.permitgraph.org/p/202511048903) | Nov 4, 2025 | Completed: final sign-off May 2026 | [1 Embarcadero Center](https://www.permitgraph.org/a/0230/028) | 32nd and 33rd/f - deferred mep submittal per ti. ref pa# 202510217760 | $301,104 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.