# Performance Systems Co

Contractor license 661143. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/performance-systems-co-661143
- JSON: https://www.permitgraph.org/api/contractor?license=661143
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=661143

8 permits since 2000: 3 completed, 5 never finaled. Typically 2 days from filing to permit and 65 days from permit to final inspection. Of the 5 never-finaled permits, 5 are over 10 years old.

- Based in: Paramount
- On San Francisco permits: Aug 2005 to Mar 2012
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2005 | 1 | 0 | 0 | 0 |
| 2009 | 0 | 0 | 1 | 0 |
| 2011 | 1 | 0 | 2 | 0 |
| 2012 | 1 | 0 | 2 | 0 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201203276996](https://www.permitgraph.org/p/201203276996) | Mar 27, 2012 | Never finaled: issued Mar 2012, no final | [2445 16th St](https://www.permitgraph.org/a/3965/021) | proposed (1) 400,000 btu air make up unit for 1 existing paint spray booth. revison to 201202033468 |  |
| [201202033468](https://www.permitgraph.org/p/201202033468) | Feb 3, 2012 | Never finaled: issued Feb 2012, no final | [2445 16th St](https://www.permitgraph.org/a/3965/021) | proposed gasline permit for a heater unit (1,000,000 btu) within a existing bldg, heater on spray booth.legalize existing sparay booth for planning purposes. | $15,000 |
| [201202013303](https://www.permitgraph.org/p/201202013303) | Feb 1, 2012 | Completed: final sign-off Jun 2012 | [265 Eddy St](https://www.permitgraph.org/a/0339/015) | install paint spray booth for auto repair within (e) building. | $15,000 |
| [201109154774](https://www.permitgraph.org/p/201109154774) | Sep 15, 2011 | Never finaled: issued Oct 2011, no final | [1240 17th St](https://www.permitgraph.org/a/3950/002) | proposed to replace (e) spray booth with new within (e) building. fire permit required for flammable combustibles. | $50,000 |
| [201102250956](https://www.permitgraph.org/p/201102250956) | Feb 25, 2011 | Completed: final sign-off May 2011 | [1850 Cesar Chavez St](https://www.permitgraph.org/a/4287/004) | replacing an (e) permitted spray booth with a new spray booth, same type of spray booth. | $20,000 |
| [201102230830](https://www.permitgraph.org/p/201102230830) | Feb 23, 2011 | Never finaled: issued Feb 2011, no final | [340 Fell St](https://www.permitgraph.org/a/0817/011) | install new gas line and motor for existing spray booth. (heater unit on existing booth). | $3,500 |
| [200909177062](https://www.permitgraph.org/p/200909177062) | Sep 17, 2009 | Never finaled: issued Sep 2009, no final | [450 Potrero Av](https://www.permitgraph.org/a/3973/002A) | proposed fire suppression system for one pre-fab spray booth & paint mixing room. | $4,500 |
| [200508029179](https://www.permitgraph.org/p/200508029179) | Aug 2, 2005 | Completed: final sign-off Dec 2005 | [948 Folsom St](https://www.permitgraph.org/a/3732/023) | remove (e) crossdraft auto spraybooth & install new-listed accudraft down draft with 1.5 mbtu heater | $100,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/performance-systems-co-661143.
