382 permits since 2000: 289 completed, 25 never finaled, 68 expired or cancelled. Typically 6 days from filing to permit and 99 days from permit to final inspection. Of the 25 never-finaled permits, 1 is 5 to 10 years old, 24 are over 10 years old. 1 was filed but never issued.

- Based in: Richmond
- On San Francisco permits: Jan 2000 to Nov 2024
- Last 24 months: 1 permit filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 41 | 0 | 0 | 6 |
| 2001 | 20 | 0 | 1 | 26 |
| 2002 | 26 | 0 | 2 | 2 |
| 2003 | 14 | 0 | 0 | 9 |
| 2004 | 12 | 0 | 1 | 1 |
| 2005 | 17 | 0 | 1 | 5 |
| 2006 | 8 | 0 | 5 | 9 |
| 2007 | 8 | 0 | 1 | 0 |
| 2008 | 5 | 0 | 4 | 0 |
| 2009 | 22 | 0 | 2 | 0 |
| 2010 | 8 | 0 | 1 | 0 |
| 2011 | 4 | 0 | 0 | 0 |
| 2012 | 6 | 0 | 1 | 2 |
| 2013 | 11 | 0 | 0 | 4 |
| 2014 | 5 | 0 | 2 | 2 |
| 2015 | 10 | 0 | 1 | 0 |
| 2016 | 9 | 0 | 2 | 0 |
| 2017 | 7 | 0 | 0 | 0 |
| 2018 | 12 | 0 | 0 | 1 |
| 2019 | 17 | 0 | 0 | 0 |
| 2020 | 1 | 0 | 1 | 0 |
| 2021 | 5 | 0 | 0 | 0 |
| 2022 | 12 | 0 | 0 | 1 |
| 2023 | 8 | 0 | 0 | 0 |
| 2024 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 1 | 1 | 0 | 0 | 0 | 11 | 274 |
| Deck | 1 | 0 | 0 | 0 | 1 | 0 |  |
| Stairs | 4 | 4 | 0 | 0 | 0 | 14 | 111 |

## Most recent permits

The 100 most recent of 382.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202411265728](https://www.permitgraph.org/p/202411265728) | Nov 26, 2024 | Completed: final sign-off May 2025 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | suite 700/7th fl ti demo of non structural partitions and building non structural partitions. new millwork, new finishes.e full floor suite will be demised into 2 suites. mep included. deferred submi… | $637,537 |
| [202312041902](https://www.permitgraph.org/p/202312041902) | Dec 4, 2023 | Completed: final sign-off May 2024 | [3316 24th St](https://www.permitgraph.org/a/3643/010A) | revision to pa# 202212289285 & 202111011541 non-structural revisions, revise elevator from sec.5.2 to article 15 elevator per oshsb variance. provide hoistway platform for state elevator d.o.s.h appr… |  |
| [202311201091](https://www.permitgraph.org/p/202311201091) | Nov 20, 2023 | Completed: final sign-off Mar 2024 | [2001 Van Ness Av](https://www.permitgraph.org/a/0594/002) | t.i.suite 407: scope of work shall include new interior non-bearing partition walls, acoustic ceilings, built-in casemwork. insterior finishes, lighting, power/data, hvac distribution & associated | $400,000 |
| [202309186757](https://www.permitgraph.org/p/202309186757) | Sep 18, 2023 | Completed: final sign-off Sep 2023 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | 7/f revision to pa# 202303093308, to relocate new ada toilet to opposite side due to existing bldg vertical pipes. no change of use. |  |
| [202306069313](https://www.permitgraph.org/p/202306069313) | Jun 6, 2023 | Completed: final sign-off Jun 2023 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | ground floor. to obtain final inspection for work approved under permit application #2020-02-05-3560. all work is complete. | $12,000 |
| [202304145733](https://www.permitgraph.org/p/202304145733) | Apr 14, 2023 | Completed: final sign-off Jun 2023 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | deferred mechanical for 202205053663 |  |
| [202303093308](https://www.permitgraph.org/p/202303093308) | Mar 9, 2023 | Completed: final sign-off Sep 2023 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | 7/f: internal removations, architectural and meps (1708 sqft) no change of use. fully sprinklered bldg. (suite 700/balconies not occupied, under separate permit for future tenant) | $429,250 |
| [202302081584](https://www.permitgraph.org/p/202302081584) | Feb 8, 2023 | Completed: final sign-off Aug 2023 | [388 Market St](https://www.permitgraph.org/a/0265/003) | 13th fl - upgrade mechanical & electrical. no tenant occupied. ref pa 2023-0106-9757 & 2022-0118-6116 (fire upgrade) | $200,000 |
| [202301069757](https://www.permitgraph.org/p/202301069757) | Jan 6, 2023 | Completed: final sign-off Feb 2023 | [388 Market St](https://www.permitgraph.org/a/0265/003) | 13/flr: demo interior partitions, doors, frames plumbing fixtures, floors | $100,000 |
| [202212289285](https://www.permitgraph.org/p/202212289285) | Dec 28, 2022 | Completed: final sign-off Mar 2023 | [3316 24th St](https://www.permitgraph.org/a/3643/010A) | revision to previously approved pa# 202207138326. non structural revisions. relocate transfer fan outside of control room, revise 60-min hollow metal door and frame to 60-min wood door and frame. wor… |  |
| [202210315551](https://www.permitgraph.org/p/202210315551) | Oct 31, 2022 | Completed: final sign-off Jul 2023 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | floors 7/8: project is proving new stainless steel. "horizontal" cables to the existing non compliant metal guradrails to tighten up picket spacing. | $175,000 |
| [202210063919](https://www.permitgraph.org/p/202210063919) | Oct 6, 2022 | Completed: final sign-off Apr 2023 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | 8th fl interior renovation. approx construction area 6,755 sqft. scope includes architectural and meps. | $1,925,021 |
| [202209162596](https://www.permitgraph.org/p/202209162596) | Sep 16, 2022 | Expired or cancelled: cancelled May 2023 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | 5th fl interior renovation. approx scope area 585 sqft. scope includes architectural, electrical, plumbing & mechanical. bldg is fully sprinklered. | $260,000 |
| [202208251235](https://www.permitgraph.org/p/202208251235) | Aug 25, 2022 | Completed: final sign-off Feb 2023 | [388 Market St](https://www.permitgraph.org/a/0265/003) | revision to pa 202201256575. add to offices add electrical for (e) ev charges . mechanical for 202201256575 and electrical. |  |
| [202207138326](https://www.permitgraph.org/p/202207138326) | Jul 13, 2022 | Completed: final sign-off Mar 2023 | [3316 24th St](https://www.permitgraph.org/a/3643/010A) | revision to 202111011541. non structural revision to gr fl elevator control room and add hoistway vent. | $8,500 |
| [202206166481](https://www.permitgraph.org/p/202206166481) | Jun 16, 2022 | Completed: final sign-off Apr 2023 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | refurbish lobby entrance (n) exterior tile, refnishing (e) exterior doors and some signage (n) lighting and fixtures. mep deferred no change to exiting/egress. | $5,000 |
| [202205053663](https://www.permitgraph.org/p/202205053663) | May 5, 2022 | Completed: final sign-off Jun 2023 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | refurbish (e) lobby. work includes (n) floor, (n) wall & (n) ceiling finishes as well as lighting & fixtures. mep deferred. | $65,000 |
| [202204283192](https://www.permitgraph.org/p/202204283192) | Apr 28, 2022 | Completed: final sign-off Jan 2023 | [2001 Van Ness Av](https://www.permitgraph.org/a/0594/002) | 3/f suite 300: interior t.i includeds new non-load bearing partitions, ceilings, finishes, and mep. to comply with nov 202185634. | $1,200,000 |
| [202203230707](https://www.permitgraph.org/p/202203230707) | Mar 23, 2022 | Completed: final sign-off Sep 2022 | [2100 Chestnut St](https://www.permitgraph.org/a/0486A/014) | revision to pa# 2022-0118-6133 interior t.i: change of use from retail store to bank. (e) retail space connect to wells fargo bank: |  |
| [202201256575](https://www.permitgraph.org/p/202201256575) | Jan 25, 2022 | Completed: final sign-off Feb 2023 | [388 Market St](https://www.permitgraph.org/a/0265/003) | suite 1040: tenant improvement to include office open area, conferance room, breakroom. add new car charging station. | $176,620 |
| [202201186099](https://www.permitgraph.org/p/202201186099) | Jan 18, 2022 | Completed: final sign-off Mar 2023 | [3316 24th St](https://www.permitgraph.org/a/3643/010A) | revision to pa 2021-1101-1541 non structural revisions to include restroom partitions reconfiguration due to (e) structural conditions and raised floor to accommodate existing plumbing. revised door… | $15,000 |
| [202201186133](https://www.permitgraph.org/p/202201186133) | Jan 18, 2022 | Completed: final sign-off Sep 2022 | [2100 Chestnut St](https://www.permitgraph.org/a/0486A/014) | tenant improvement interior ti in (e) shell space, including including interior walk-up atms, for (n) wells fargo bank; the proposal is to establish a formula retail use to dba wells fargo @ 2100 che… | $561,470 |
| [202111011541](https://www.permitgraph.org/p/202111011541) | Nov 1, 2021 | Completed: final sign-off May 2024 | [3316 24th St](https://www.permitgraph.org/a/3643/010A) | install new 2-step article 15 elevator at stairwell, renovate restrooms to be accessible, renovate adjacent offices, circulation spaces and upgrade storage room. | $700,000 |
| [202110291463](https://www.permitgraph.org/p/202110291463) | Oct 29, 2021 | Completed: final sign-off May 2022 | [560 Mission St](https://www.permitgraph.org/a/3708/095) | interior tenant improvements to part of 25th fl office space. new partitions, doors, ceilings | $162,000 |
| [202108267188](https://www.permitgraph.org/p/202108267188) | Aug 26, 2021 | Completed: final sign-off Mar 2022 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | 5/6/7 fl: demo of non-structural partitions, celings, hvac and plumbing.(e) occpy use, egress system, fire rating and constr type unchanged. to comply to ab-017. fire spirnkler heads shall be turned… | $205,000 |
| [202106011380](https://www.permitgraph.org/p/202106011380) | Jun 1, 2021 | Completed: final sign-off Jul 2022 | [30 Hotaling Pl](https://www.permitgraph.org/a/0196/025) | t-24 eltrical deferred submitted. ref pa 202101122511. |  |
| [202101122511](https://www.permitgraph.org/p/202101122511) | Jan 12, 2021 | Completed: final sign-off Jul 2022 | [30 Hotaling Pl](https://www.permitgraph.org/a/0196/025) | t.i. 1st floor lobby, 2nd and 3rd flr tenant improvement. walls, finishes. no mech/ plumbing. electrical dederred. | $120,000 |
| [202012080419](https://www.permitgraph.org/p/202012080419) | Dec 8, 2020 | Completed: final sign-off May 2021 | [30 Hotaling Pl](https://www.permitgraph.org/a/0196/025) | soft demo of existing finishes, non-structural partitions. 2nd, 3rd floor. ab-017 - soft demo only. | $2,000 |
| [202002053560](https://www.permitgraph.org/p/202002053560) | Feb 5, 2020 | Never finaled: issued Feb 2020, no final | [430 Bush St](https://www.permitgraph.org/a/0270/037) | construction of 32'w x 12'h art installation @ existing office at g/f. installation of structural hanging display bridge. | $12,000 |
| [201912139475](https://www.permitgraph.org/p/201912139475) | Dec 13, 2019 | Completed: final sign-off Mar 2021 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | no change use of occupancy. no change in egress or exit no change to structure. no extrerior or envelope changes. construction of (2) display monitors at existing office at ground floor. | $12,000 |
| [201910023276](https://www.permitgraph.org/p/201910023276) | Oct 2, 2019 | Completed: final sign-off Sep 2020 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | 11th floor: office remodel of (n) conference rooms, huddle rooms, focus rooms, & break room, new furniture & finishes, upgrade all fixtures to new led lighting hvac upgrade for new remodel | $950,000 |
| [201907236583](https://www.permitgraph.org/p/201907236583) | Jul 23, 2019 | Completed: final sign-off Sep 2019 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | 4th fl - revision to pa 2019-0416-8103 adding a sink in women's room accessible stall |  |
| [201907196391](https://www.permitgraph.org/p/201907196391) | Jul 19, 2019 | Completed: final sign-off Jan 2020 | [388 Market St](https://www.permitgraph.org/a/0265/003) | suite #820: t.i. combining ste 820 and 850. 3450 sqft. new lighting layout, partition, hvac upgrades, and finishes. | $200,000 |
| [201907196385](https://www.permitgraph.org/p/201907196385) | Jul 19, 2019 | Completed: final sign-off Feb 2020 | [388 Market St](https://www.permitgraph.org/a/0265/003) | suite #860: t.i. lighting, partition walls, finishes, hvac, electrical | $200,000 |
| [201905130407](https://www.permitgraph.org/p/201905130407) | May 13, 2019 | Completed: final sign-off Dec 2019 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | 6th fl - ti of interior office spaces. demo and limited construction of partition walls, upgrades to interior finishes and restroom accessibility. no change to structure, no exterior of building enve… | $1,000,000 |
| [201905130411](https://www.permitgraph.org/p/201905130411) | May 13, 2019 | Completed: final sign-off May 2020 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | 3rd fl l- ti of interior office. select demo and limited construction, partition walls and upgrades to interior finishes; no change to structure. no structure or building envelope changes. | $50,000 |
| [201905080074](https://www.permitgraph.org/p/201905080074) | May 8, 2019 | Completed: final sign-off Feb 2020 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | tenant improvement of interior office spaces at floor 1 to include slelect demolition and limited construction of partition walls, upgrades to interior finishes and restrooms. no exterior work | $1,500,000 |
| [201905069761](https://www.permitgraph.org/p/201905069761) | May 6, 2019 | Completed: final sign-off Jun 2020 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | 4th flr - ti - select demo and limited construction of partition walls, upgrade to interior finishes and restroom accessibility, no change to structure, no exterior or bld envelope changes. maher n/a. | $1,500,000 |
| [201905069758](https://www.permitgraph.org/p/201905069758) | May 6, 2019 | Completed: final sign-off Feb 2020 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | 2nd flr - ti - select demo and limited construction of partition walls, upgrade to interior finishes and restroom accessibility, no change to structure, no exterior or bld envelope changes | $1,500,000 |
| [201904309258](https://www.permitgraph.org/p/201904309258) | Apr 30, 2019 | Completed: final sign-off Oct 2019 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | 4th fl - meps for 2019-0416-8103 | $500,000 |
| [201904168103](https://www.permitgraph.org/p/201904168103) | Apr 16, 2019 | Completed: final sign-off Sep 2019 | [55 Stockton St](https://www.permitgraph.org/a/0327/002) | 4th fl ti demo of on structural partitions and buildin new non str partitions. mep under separate permit, life safety and sprinkler under sep permit. bldg is fully sprinklered | $480,000 |
| [201904047082](https://www.permitgraph.org/p/201904047082) | Apr 4, 2019 | Completed: final sign-off Jun 2019 | [530 Washington St](https://www.permitgraph.org/a/0196/024) | replace 4 existing lights with new/t-24 plans. add drinking fountain. ref ti pa #201902153029. | $1,000 |
| [201904047159](https://www.permitgraph.org/p/201904047159) | Apr 4, 2019 | Completed: final sign-off Apr 2019 | [4648 Mission St](https://www.permitgraph.org/a/3207/001) | revision to app#201802232101. removal of using extg timeclock in the electrical room |  |
| [201902203323](https://www.permitgraph.org/p/201902203323) | Feb 20, 2019 | Completed: final sign-off May 2019 | [560 Mission St](https://www.permitgraph.org/a/3708/095) | revision to pa #201710060628. relocation of the women's accessible toilet fixture and accesories to the opposite side of the stall. | $30,500 |
| [201902153029](https://www.permitgraph.org/p/201902153029) | Feb 15, 2019 | Completed: final sign-off Jun 2019 | [530 Washington St](https://www.permitgraph.org/a/0196/024) | interior t.i. of 2nd fl. construction of new interior non structural partitions | $119,000 |
| [201901301566](https://www.permitgraph.org/p/201901301566) | Jan 30, 2019 | Completed: final sign-off Feb 2019 | [530 Washington St](https://www.permitgraph.org/a/0196/024) | demolition of non-structural walls of e office. per ab-017 | $3,000 |
| [201812198707](https://www.permitgraph.org/p/201812198707) | Dec 19, 2018 | Completed: final sign-off Feb 2020 | [135 04th St](https://www.permitgraph.org/a/3723/001) | 1/f: sharetea: (e) tenant interior remodel, relocating (e) equipment, install glaze above (e) wall, lighting replacement, plumbing. maher n/a. across from amc ticket counter. | $143,000 |
| [201811276791](https://www.permitgraph.org/p/201811276791) | Nov 27, 2018 | Expired or cancelled: cancelled Jan 2026 | [560 Mission St](https://www.permitgraph.org/a/3708/095) | revision to da checklist for pa #201710060625 |  |
| [201811145806](https://www.permitgraph.org/p/201811145806) | Nov 14, 2018 | Completed: final sign-off Feb 2019 | [655 08th St](https://www.permitgraph.org/a/3783/001) | rev to pa# 201806141916 & 201809251302 minor changes to mechanical & electrical per sffd |  |
| [201811024849](https://www.permitgraph.org/p/201811024849) | Nov 2, 2018 | Completed: final sign-off Dec 2018 | [560 Mission St](https://www.permitgraph.org/a/3708/095) | to obtain final inspection for work approved under pa#20161092320 & 201707182208. all work is complete. |  |
| [201809251302](https://www.permitgraph.org/p/201809251302) | Sep 25, 2018 | Completed: final sign-off Feb 2019 | [655 08th St](https://www.permitgraph.org/a/3783/001) | revision to app#201806141916. t.i. interior build out |  |
| [201809210993](https://www.permitgraph.org/p/201809210993) | Sep 21, 2018 | Completed: final sign-off Mar 2019 | [388 Market St](https://www.permitgraph.org/a/0265/003) | suite 1090: t.i. (2) offices, (1) conference, (1) break area new paint and finishes throughout. sprinkler and life safety under seperate submittal. | $58,575 |
| [201808107060](https://www.permitgraph.org/p/201808107060) | Aug 10, 2018 | Completed: final sign-off Oct 2018 | [524 Washington St](https://www.permitgraph.org/a/0196/024) | interior improvement: interior walls, doors, finishes, lighting, mechanical, minor plumbing & ceiling. no exterior work. n/a for maher. | $262,352 |
| [201808036376](https://www.permitgraph.org/p/201808036376) | Aug 3, 2018 | Completed: final sign-off Oct 2018 | [524 Washington St](https://www.permitgraph.org/a/0196/024) | demo of non load bearing walls per-017. tenant improvement. t.i. under seperate permit. | $1,000 |
| [201807104183](https://www.permitgraph.org/p/201807104183) | Jul 10, 2018 | Completed: final sign-off Nov 2018 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | g/f -interior t.i. to an extg business lobby including: select demolition and limited construction of interior storefront doors and adjacent ceilings, flooring and finishes, restroom accessibility up… | $100,000 |
| [201806141916](https://www.permitgraph.org/p/201806141916) | Jun 14, 2018 | Completed: final sign-off Feb 2019 | [655 08th St](https://www.permitgraph.org/a/3783/001) | suite a-1 -interior fit out for branch bank approx 2800 sf condisting of teller line banking and offices as approved by planning under formula retail space within a new development at 855 brannan | $250,000 |
| [201804237034](https://www.permitgraph.org/p/201804237034) | Apr 23, 2018 | Completed: final sign-off Dec 2018 | [560 Mission St](https://www.permitgraph.org/a/3708/095) | revision to 201707182208 to add exit corridor off corridor and pantry | $5,000 |
| [201802232101](https://www.permitgraph.org/p/201802232101) | Feb 23, 2018 | Completed: final sign-off Apr 2019 | [4648 Mission St](https://www.permitgraph.org/a/3207/001) | non structural interior ti. new finishes, doors, paritions, \\ | $220,902 |
| [201801249353](https://www.permitgraph.org/p/201801249353) | Jan 24, 2018 | Completed: final sign-off Apr 2018 | [30 Hotaling Pl](https://www.permitgraph.org/a/0196/025) | new internal stair in existing 2 level office space; revision to permit 201712045369 | $190,000 |
| [201712287530](https://www.permitgraph.org/p/201712287530) | Dec 28, 2017 | Completed: final sign-off Feb 2022 | [388 Market St](https://www.permitgraph.org/a/0265/003) | 8/f: new led lighting, t-24 controls, modify troffer hvac supply to 2x2 duct. ref app#201712227207. n/a for maher | $30,000 |
| [201712227207](https://www.permitgraph.org/p/201712227207) | Dec 22, 2017 | Completed: final sign-off Jan 2018 | [388 Market St](https://www.permitgraph.org/a/0265/003) | suite 850: demo of non-loadbearing ceiling height wall, modified wall at break room, change hvac distribution from light troffer to grilles. electrical, life safety under sep. permit. maher na | $40,000 |
| [201710060625](https://www.permitgraph.org/p/201710060625) | Oct 6, 2017 | Completed: final sign-off May 2019 | [560 Mission St](https://www.permitgraph.org/a/3708/095) | 5th fl: demo & office/conference rm, improvements of pantry & minor ti, inter. drywall & finishes, new sink & mechanical & electrical. maher na | $150,000 |
| [201706199691](https://www.permitgraph.org/p/201706199691) | Jun 19, 2017 | Completed: final sign-off Aug 2017 | [333 Market St](https://www.permitgraph.org/a/3710/020) | add new heat pump to save existing idf room, provide 2 new fire smoke dampers. connect to existing condenser water | $45,000 |
| [201705085959](https://www.permitgraph.org/p/201705085959) | May 8, 2017 | Completed: final sign-off Jul 2017 | [99 Green St](https://www.permitgraph.org/a/0136/005) | title 24 electrical at 1 office and 1 conf room, 2 lights, 2 switches, 2 duplex circuits 201703292737 | $2,000 |
| [201703292737](https://www.permitgraph.org/p/201703292737) | Mar 29, 2017 | Completed: final sign-off Jul 2017 | [99 Green St](https://www.permitgraph.org/a/0136/005) | 1/f- construction of office and conference room. n/a ordinance #155-13 | $40,000 |
| [201702109186](https://www.permitgraph.org/p/201702109186) | Feb 10, 2017 | Completed: final sign-off Aug 2017 | [388 Market St](https://www.permitgraph.org/a/0265/003) | voluntary addition of automatic door opener at 1 pine st entrance. also add push plates, card reader & intercom | $7,500 |
| [201606089401](https://www.permitgraph.org/p/201606089401) | Jun 8, 2016 | Completed: final sign-off Aug 2017 | [333 Market St](https://www.permitgraph.org/a/3710/020) | open collaboration meeting space for existing retail bank. pantry, meeting rooms at gr and existing mezzanine. revise e stair, provide ada upgrades to restrooms and elevator | $500,000 |
| [201605177610](https://www.permitgraph.org/p/201605177610) | May 17, 2016 | Never finaled: issued May 2016, no final | [555 California St](https://www.permitgraph.org/a/0259/026) | t-24 drawings spec suite electrical. ref app#201509288173 and 201602018461. n/a for maher |  |
| [201605056628](https://www.permitgraph.org/p/201605056628) | May 5, 2016 | Completed: final sign-off Nov 2016 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | revision to ref pa 2015 0401 3538/the purpose of this submission is to remove scope , to modify the (e) trench drain, from permit 2013 0401 3538. this work is being performed under bld permit 2015 11… |  |
| [201603313649](https://www.permitgraph.org/p/201603313649) | Mar 31, 2016 | Completed: final sign-off Jun 2016 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | revision to 201507211990 for lever 3 and 5, revision to vestibules, infill perimeter wall opening and remove abandoned electrical panels; n/a maher ord. 155-13 | $10,000 |
| [201603313540](https://www.permitgraph.org/p/201603313540) | Mar 31, 2016 | Never finaled: issued Mar 2016, no final | [555 California St](https://www.permitgraph.org/a/0259/026) | t24 calcs mech common corridor ref 201509167084 | $500 |
| [201603313538](https://www.permitgraph.org/p/201603313538) | Mar 31, 2016 | Completed: final sign-off Jun 2016 | [555 California St](https://www.permitgraph.org/a/0259/026) | t24 calcs electrical, ref 201508315628 | $500 |
| [201603313539](https://www.permitgraph.org/p/201603313539) | Mar 31, 2016 | Completed: final sign-off Jun 2017 | [555 California St](https://www.permitgraph.org/a/0259/026) | t24 mech spec suites ref 201602018461 | $500 |
| [201603283188](https://www.permitgraph.org/p/201603283188) | Mar 28, 2016 | Completed: final sign-off May 2016 | [525 Market St](https://www.permitgraph.org/a/3708/056) | 16/f elevator lobby- revision to pa#201603081441, title 24 & lighting only. | $4,000 |
| [201603081441](https://www.permitgraph.org/p/201603081441) | Mar 8, 2016 | Completed: final sign-off May 2016 | [525 Market St](https://www.permitgraph.org/a/3708/056) | 16/f elevator lobby- non structural t.i. on 16/f elevator lobby, new floor, wall, lighting & ceiling finishes, existing lobby doors to remain. revision to pa# 201510220531, electrical under seperate… | $30,000 |
| [201602169630](https://www.permitgraph.org/p/201602169630) | Feb 16, 2016 | Completed: final sign-off Jun 2016 | [824 Ellis St](https://www.permitgraph.org/a/0718/006) | remodel office area on 2nd floor & ground floor. work is limited to ground floor & 2nd floor. add two break area, add ada ramp at entry. art activity | $85,000 |
| [201602018461](https://www.permitgraph.org/p/201602018461) | Feb 1, 2016 | Completed: final sign-off Jun 2016 | [555 California St](https://www.permitgraph.org/a/0259/026) | 5th fl:selective demo of non-structural partitions,doors,& frames,construction of tenant suites with new non-stuctural partitions. doors/frames ceilings,lighting,millwork & finishes. no change in occ… | $200,000 |
| [201512165221](https://www.permitgraph.org/p/201512165221) | Dec 16, 2015 | Never finaled: issued Dec 2015, no final | [555 California St](https://www.permitgraph.org/a/0259/026) | change light fixtures in corridor with led, provide controls.maher na | $5,000 |
| [201510220531](https://www.permitgraph.org/p/201510220531) | Oct 22, 2015 | Completed: final sign-off Apr 2016 | [525 Market St](https://www.permitgraph.org/a/3708/056) | 16th floor - demo, new drywall, ceilings, arch millwork, mechanical & electrical. sprinklers & life safety separate permit. | $2,924,400 |
| [201509288173](https://www.permitgraph.org/p/201509288173) | Sep 28, 2015 | Completed: final sign-off Jun 2016 | [555 California St](https://www.permitgraph.org/a/0259/026) | 5th flr: minor demo of non-structural partitions construction of tenant suite with on structural partitions. doors, frames, ceiling, lighting, millwork & finishes. no change in area, occupancy or use… | $400,000 |
| [201509288172](https://www.permitgraph.org/p/201509288172) | Sep 28, 2015 | Completed: final sign-off Jun 2016 | [555 California St](https://www.permitgraph.org/a/0259/026) | 16th flr: barrier removal in restrooms, including removal of urinals. no change in occupancy area or use. mep under sep permit. maher na | $35,000 |
| [201509167084](https://www.permitgraph.org/p/201509167084) | Sep 16, 2015 | Completed: final sign-off Jun 2016 | [555 California St](https://www.permitgraph.org/a/0259/026) | 5th flr: no change in occpancy, no change in floor area,demolition of non-structural partitions,doors/frames/millwork,ceiling grid &tile,lighting,power & finishes.construction of new service elevator… | $246,000 |
| [201508315628](https://www.permitgraph.org/p/201508315628) | Aug 31, 2015 | Completed: final sign-off Jun 2016 | [555 California St](https://www.permitgraph.org/a/0259/026) | 20th floor: demo of partitions, finishes, ceiling and lighting, new partitions, toilet fixtures, and accessories for accessiblity, ceiling and lighting finishes. barreir removal only. n/a for maher. | $600,000 |
| [201508315624](https://www.permitgraph.org/p/201508315624) | Aug 31, 2015 | Completed: final sign-off Jun 2016 | [555 California St](https://www.permitgraph.org/a/0259/026) | 19th floor: demo of toilet partitions, fixtures and accessories. new toilet partitions, fixtures, and acessories for accessiblity. barrierr removal only. n/a for maher. | $150,000 |
| [201507211990](https://www.permitgraph.org/p/201507211990) | Jul 21, 2015 | Completed: final sign-off Jun 2016 | [430 Bush St](https://www.permitgraph.org/a/0270/037) | demo(e)non-load bearing partitions,ceilings,ductwork,elec conduit& plumbing fixtures.install new ceiling,interior partitions,lighting,doors, finishes&plumbing fixtures.alter both mech&elec sys.refini… | $3,500,000 |
| [201506128822](https://www.permitgraph.org/p/201506128822) | Jun 12, 2015 | Completed: final sign-off Jul 2015 | [1167 Mission St](https://www.permitgraph.org/a/3727/120) | 2nd & 3rd flrs: select non structural demolition of non load bearing walls; maher n/a | $3,000 |
| [201504103327](https://www.permitgraph.org/p/201504103327) | Apr 10, 2015 | Completed: final sign-off Dec 2015 | [215 Market St](https://www.permitgraph.org/a/3711/019) | mep drawings for pa# 201409176520, hvac and electrical work only. n/a ordinance #155-13 | $80,000 |
| [201504093218](https://www.permitgraph.org/p/201504093218) | Apr 9, 2015 | Completed: final sign-off May 2015 | [388 Market St](https://www.permitgraph.org/a/0265/003) | #1420: demo 4 lowheight (4') patitions and 1 (6') center partition. n/a for maher. | $1,000 |
| [201412234414](https://www.permitgraph.org/p/201412234414) | Dec 23, 2014 | Expired or cancelled: cancelled Aug 2016 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | voluntary barrier removal to facilities accessed by general public - accessible parking, curb ramp in private parking lot, reception counter, toilet rooms on floors 1,2 and 3, and signage. maher n/a. | $30,000 |
| [201411171689](https://www.permitgraph.org/p/201411171689) | Nov 17, 2014 | Completed: final sign-off Dec 2014 | [550 California St](https://www.permitgraph.org/a/0240/020) | reconfigure womens toilet room due to non-compliant ada stall. remove 1 stall & relocate ada stall, reconfigure standard stalls. remove urinal in mens toilet room. plan revision to permit #2014062796… |  |
| [201409176520](https://www.permitgraph.org/p/201409176520) | Sep 17, 2014 | Completed: final sign-off Dec 2015 | [215 Market St](https://www.permitgraph.org/a/3711/019) | grnd floor, t.i. demo existing gyp board partitions as shown. construct new gyp bd partitions for new conference rooms, relocate (e) light fixtures, interior work only - mep separate permit. sprinkle… | $23,000 |
| [201407020369](https://www.permitgraph.org/p/201407020369) | Jul 2, 2014 | Never finaled: issued Apr 2015, no final | [50 Main St](https://www.permitgraph.org/a/3711/019) | remove extenet's existing cell site from penthouse on roof of parking structural. remove antennas and associated equipment for at&t facility. n/a ordinance #155-13. | $1,200 |
| [201406279669](https://www.permitgraph.org/p/201406279669) | Jun 27, 2014 | Completed: final sign-off Dec 2014 | [550 California St](https://www.permitgraph.org/a/0240/020) | remodel of e office space. new offices, huddle rooms, collaboration of space and copy room. new furniture, finishes, lighting in new offices. mech and elec work, remodel toilet rooms, no addition fix… | $250,000 |
| [201406178564](https://www.permitgraph.org/p/201406178564) | Jun 17, 2014 | Completed: final sign-off Jun 2014 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | revision to 201304184830 for changes to wall layout and framing details. maher 155-13 not required |  |
| [201406037319](https://www.permitgraph.org/p/201406037319) | Jun 3, 2014 | Expired or cancelled: cancelled Jul 2016 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 3rd phase of ongoing project to replace the four existing main service switchgear. this phase of the project will replace the 1st fl of 4 switchboard section and bus riser feeding floors 15-34 | $300,000 |
| [201403070131](https://www.permitgraph.org/p/201403070131) | Mar 7, 2014 | Never finaled: issued Mar 2014, no final | [77 Beale St](https://www.permitgraph.org/a/3711/013) | to obtain final inspection for work approved under pa 201204107966. all work is complete |  |
| [201401035521](https://www.permitgraph.org/p/201401035521) | Jan 3, 2014 | Completed: final sign-off Jan 2014 | [245 Market St](https://www.permitgraph.org/a/3711/019) | revision to 201305308242. revised sheet #a1.1 accessible entry/exit for change to ada push button type change to detail 4 on sheet a1.1 |  |
| [201312124039](https://www.permitgraph.org/p/201312124039) | Dec 12, 2013 | Completed: final sign-off May 2016 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | tenant improvement of open office with modular furniture, a new break area, a new large conference room and 2 smaller conference rooms. | $425,000 |
| [201310300670](https://www.permitgraph.org/p/201310300670) | Oct 30, 2013 | Completed: final sign-off Jun 2014 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | plumbing electric scope f/(e) approved architectural, permit arch 201304184830. gr fl cafe | $40,000 |
| [201309308030](https://www.permitgraph.org/p/201309308030) | Sep 30, 2013 | Completed: final sign-off Dec 2013 | [77 Beale St](https://www.permitgraph.org/a/3711/013) | 16th flr: demolition of one (1) non structural partition | $4,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/paradigm-general-contractors-608135.