Back to bathroom remodel contractors
Pacific Green Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Dec 2024
- Last 24 months
- 1 permit filed
58 permits since 2000: 55 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 24 completed. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 19, 2017 | Completed final sign-off Oct 2017 | 1429 Plymouth Av | upper level: bathroom remodel: lumbing, electricalk, tile work, sheetrock, paint. no change in wall & opening layout, h.e. lighting. replace window in bathroom not visible from street at same opening facing rear yark. u factor 0.32 or better.Details
upper level: bathroom remodel: lumbing, electricalk, tile work, sheetrock, paint. no change in wall & opening layout, h.e. lighting. replace window in bathroom not visible from street at same opening facing rear yark. u factor 0.32 or better. | $25,000 |
| Jul 19, 2017 | Completed final sign-off Oct 2017 | 1338 Union St | bathroom remodel: electrical, pluming, tile work, sheetrock, paint. no change in wlal & opening layout, h.e. lighting.Details
bathroom remodel: electrical, pluming, tile work, sheetrock, paint. no change in wlal & opening layout, h.e. lighting. | $25,000 |
| Jul 19, 2017 | Completed final sign-off Oct 2017 | 2372 Bay St | bathroom remodel: plumbing, elecrical, sheetrock, tilework, panting. powder room remodel: tile work, electrical, plumbing, sheetrock, paiting, no change in wall & opening layout. h.e. lighting.Details
bathroom remodel: plumbing, elecrical, sheetrock, tilework, panting. powder room remodel: tile work, electrical, plumbing, sheetrock, paiting, no change in wall & opening layout. h.e. lighting. | $30,000 |
| Jun 1, 2017 | Completed final sign-off Aug 2017 | 3014 California St | remodel master bathroom. electrical, plumbing, sheetrock, tiles, insulationDetails
remodel master bathroom. electrical, plumbing, sheetrock, tiles, insulation | $25,000 |
| Apr 25, 2017 | Completed final sign-off Oct 2017 | 874 Wisconsin St | rear building: remodel kitchen: install recessed lights, new cabinets, counters. remodel bathroom: tiles, recessed lights, sheet rock, insulation, painting. install floors throughout house, new door & trim. repair siding back of the house. replace 2 windws not visible from the street.Details
rear building: remodel kitchen: install recessed lights, new cabinets, counters. remodel bathroom: tiles, recessed lights, sheet rock, insulation, painting. install floors throughout house, new door & trim. repair siding back of the house. replace 2 windws not visible from the street. | $28,000 |
| Feb 28, 2017 | Completed final sign-off Jun 2017 | 3014 California St | remodel (2) bathrooms: tilework, electrical, plumbing, sheetrock, painting,insulation, etc., same level.Details
remodel (2) bathrooms: tilework, electrical, plumbing, sheetrock, painting,insulation, etc., same level. | $35,000 |
| Jan 6, 2016 | Completed final sign-off Jun 2016 | 1363 Greenwich St | remodel kitchen, bathroom, powder room, paint unit, add unit luandry, etc. no walls to be removed or altered.Details
remodel kitchen, bathroom, powder room, paint unit, add unit luandry, etc. no walls to be removed or altered. | $45,000 |
| Aug 13, 2015 | Completed final sign-off Dec 2015 | 1904 Baker St | interior renovation of master bath, powder room, & eat-in area in kitchen.Details
interior renovation of master bath, powder room, & eat-in area in kitchen. | $50,000 |
| May 11, 2015 | Completed final sign-off Mar 2016 | 106 Collins St | bathroom remodel - tile, sheetrock, paint, plumbing, electrical, to comply with cec150.0(k)5Details
bathroom remodel - tile, sheetrock, paint, plumbing, electrical, to comply with cec150.0(k)5 | $8,000 |
| Mar 31, 2015 | Completed final sign-off Aug 2015 | 67 Wilmot St | kitchen and bathroom remodel- install new floor, smooth wall and paint unit interior, improvements only no structural improvements or modificaitoin to building exterior. to comply with cec150.0(k)3 & 5Details
kitchen and bathroom remodel- install new floor, smooth wall and paint unit interior, improvements only no structural improvements or modificaitoin to building exterior. to comply with cec150.0(k)3 & 5 | $38,000 |
| Mar 19, 2015 | Completed final sign-off Dec 2015 | 1550 Page St | unit a lower level - revision & modifications to bathroom layout (bathroom serving each room) per #2014.1010.8618 & provision of anchor bolts @ sill plates where not installed, final work associated with fire repairs to building, interior improvements only.Details
unit a lower level - revision & modifications to bathroom layout (bathroom serving each room) per #2014.1010.8618 & provision of anchor bolts @ sill plates where not installed, final work associated with fire repairs to building, interior improvements only. | $5,000 |
| Nov 25, 2014 | Completed final sign-off Jan 2015 | 119 Albion St | remodel bathroom, electrical, plumbing, tile work, painting, sheetrock repair frame if needed. one (1) and half (1/2) bathroom demolitionDetails
remodel bathroom, electrical, plumbing, tile work, painting, sheetrock repair frame if needed. one (1) and half (1/2) bathroom demolition | $18,000 |
| Oct 10, 2014 | Completed final sign-off Dec 2015 | 1550 Page St | unit a lower level:fire repairs and bathroom remodel. interior improvements only with no structural improvements or modifications to bldg exterior.Details
unit a lower level:fire repairs and bathroom remodel. interior improvements only with no structural improvements or modifications to bldg exterior. | $15,000 |
| Jul 31, 2014 | Completed final sign-off Oct 2014 | 1550 Page St | remodel unit. kitchen cabinet, bath tile, repair frame, electrical, plumbing, insulation, sheetrock, paint, install 2 windowDetails
remodel unit. kitchen cabinet, bath tile, repair frame, electrical, plumbing, insulation, sheetrock, paint, install 2 window | $40,000 |
| May 22, 2014 | Completed final sign-off Nov 2014 | 1550 Page St | remodel bathroom: shower pan, tile, sheetrock, insulation, electrical, plumbing, paint, cabinet, frame.Details
remodel bathroom: shower pan, tile, sheetrock, insulation, electrical, plumbing, paint, cabinet, frame. | $12,000 |
| Feb 7, 2014 | Completed final sign-off Apr 2014 | 69 Wilmot St | remodel bathroom & kitchen including new electricla lighting, plumbing, cabinets, sheetrock, paint.Details
remodel bathroom & kitchen including new electricla lighting, plumbing, cabinets, sheetrock, paint. | $18,300 |
| Sep 18, 2012 | Completed final sign-off Mar 2013 | 1555 Burke Av | extend opening between open studio space. install washer and dryer. instal pony wall for new non commercial stove. comply with complaint 201211961. change of use from med/dental clinic to retail personal services. remodel bathroom to meet adaDetails
extend opening between open studio space. install washer and dryer. instal pony wall for new non commercial stove. comply with complaint 201211961. change of use from med/dental clinic to retail personal services. remodel bathroom to meet ada | $12,500 |
| Jul 10, 2012 | Completed final sign-off Sep 2012 | 109 Prospect Av | replace back fence less than 6', install tile on bathroom floor only, install new tile in balcony approx 5' x 5'.Details
replace back fence less than 6', install tile on bathroom floor only, install new tile in balcony approx 5' x 5'. | $4,500 |
| Sep 26, 2011 | Completed final sign-off Mar 2012 | 124 21st Av | 3rd fl: remodel 1 bath, remove existing chimney flue, relocate existing lights and outlets, relocate existing plumbing. remove a closet and reframe 2 walls. 2nd fl: install (2) new skylight and replace kitchen cabinets.Details
3rd fl: remodel 1 bath, remove existing chimney flue, relocate existing lights and outlets, relocate existing plumbing. remove a closet and reframe 2 walls. 2nd fl: install (2) new skylight and replace kitchen cabinets. | $40,000 |
| Jun 16, 2011 | Completed final sign-off Aug 2011 | 650 03rd Av | remodel bathroom: plumbing and electrical, sheetrock, painting, tiles, remove wall & create new opening (relocate door). install new shower pan. all work on 2nd floor.Details
remodel bathroom: plumbing and electrical, sheetrock, painting, tiles, remove wall & create new opening (relocate door). install new shower pan. all work on 2nd floor. | $12,000 |
| Jan 7, 2011 | Completed final sign-off Jan 2011 | 872 Wisconsin St | bathroom remodel; new bath tub, toilet, sink, tile, replace one window, new fanDetails
bathroom remodel; new bath tub, toilet, sink, tile, replace one window, new fan | $7,000 |
| Oct 14, 2010 | Completed final sign-off Dec 2010 | 167 Caine Av | remodel kitchen, install new sink, stove, dishwasher, garbage disposal, refrigerator, tiles, cabinets in kitchen. replace sheetrock, install new toilet, sink in bathroom, replace floor, work is on 2nd floor.Details
remodel kitchen, install new sink, stove, dishwasher, garbage disposal, refrigerator, tiles, cabinets in kitchen. replace sheetrock, install new toilet, sink in bathroom, replace floor, work is on 2nd floor. | $15,000 |
| Sep 15, 2010 | Completed final sign-off Oct 2010 | 3170 25th St | bathroom remodel, install washer & dryer including plumbing, electrical, tiles & painting. bathroom is on 2nd floorDetails
bathroom remodel, install washer & dryer including plumbing, electrical, tiles & painting. bathroom is on 2nd floor | $15,000 |
| Jul 14, 2009 | Completed final sign-off Oct 2009 | 720 Gough St | remodle kitchen and bathroom: replace cabinets, tiles, repair sheetrock, paint, replace bathtub + sinks. 1 kitchen, 2 bathroom, powder room.Details
remodle kitchen and bathroom: replace cabinets, tiles, repair sheetrock, paint, replace bathtub + sinks. 1 kitchen, 2 bathroom, powder room. | $46,959 |