Back to bathroom remodel contractors
Pacific Edge Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Dec 2013 to Jul 2026
- Last 24 months
- 7 permits filed
44 permits since 2000: 39 completed, 4 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 13 completed, 2 in progress. Typically 113 days from filing to permit and 624 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2026 | In progress issued Aug 2026 | 826 Haight St | remodel (e) dining room, bathroom, add powder room (toilet+ lav sink) at hall.Details
remodel (e) dining room, bathroom, add powder room (toilet+ lav sink) at hall. | $38,000 |
| Mar 13, 2026 | In progress issued May 2026 | 1304 Valencia St | structural revision to pa# 202204202645-s1, replace an existing unreinforced masonry foundation in poor condition along property line with poured reinforced concrete foundation. add 1-bathroom with 1-sink and 1-toilet within (e) floor plan on 3rd floor.Details
structural revision to pa# 202204202645-s1, replace an existing unreinforced masonry foundation in poor condition along property line with poured reinforced concrete foundation. add 1-bathroom with 1-sink and 1-toilet within (e) floor plan on 3rd floor. | $13,201 |
| Aug 23, 2024 | Completed final sign-off Apr 2026 | 1345 Masonic Av | remodel (e) second bathroom on 3rd story. to include removal of glass block non bearing wall and replace with pony wall with glassDetails
remodel (e) second bathroom on 3rd story. to include removal of glass block non bearing wall and replace with pony wall with glass | $15,000 |
| Sep 13, 2023 | Completed final sign-off Sep 2025 | 160 Hancock St | a partial remodel to include: window replacement, relocating non-bearing interior partions, new interior finishes, kitchen and (3) bath remodel replace (e) roof deck guard rails, replace a portion of the sidingDetails
a partial remodel to include: window replacement, relocating non-bearing interior partions, new interior finishes, kitchen and (3) bath remodel replace (e) roof deck guard rails, replace a portion of the siding | $250,000 |
| Jul 21, 2023 | Completed final sign-off Jul 2024 | 364 17th Av | kitchen remodel-remove wall, voluntary shearwalls @ garage, remodel existing garage level bathroom from half to full bath. legalize existing office at ground floorDetails
kitchen remodel-remove wall, voluntary shearwalls @ garage, remodel existing garage level bathroom from half to full bath. legalize existing office at ground floor | $60,000 |
| Jan 23, 2023 | Completed final sign-off May 2023 | 2030 Union St | cannabis dispensiing, demo/relocate internal nonbaring prtitions/doors, upgrade bathroom to ada, install counters w/ada accessiblity, upgrade fire proofing of ceiling, install new ceiling lighting, internal roll down security gates, new exterior lights. signage under separate permit.Details
cannabis dispensiing, demo/relocate internal nonbaring prtitions/doors, upgrade bathroom to ada, install counters w/ada accessiblity, upgrade fire proofing of ceiling, install new ceiling lighting, internal roll down security gates, new exterior lights. signage under separate permit. | $50,000 |
| Dec 20, 2022 | Completed final sign-off Jan 2025 | 1340 Clay St | unit 801 - new countertops; 2 bathroom remodel, retrofit ceiling; can lights in kitchen; replace window seals, painting and tilingDetails
unit 801 - new countertops; 2 bathroom remodel, retrofit ceiling; can lights in kitchen; replace window seals, painting and tiling | $90,000 |
| Jul 26, 2022 | Completed final sign-off Nov 2024 | 1583 18th Av | interior remodel of 1 kitchen and 3 baths. taking sf from the (e) garage to become conditioned space. infill (1) lightwell facing a blank wall.Details
interior remodel of 1 kitchen and 3 baths. taking sf from the (e) garage to become conditioned space. infill (1) lightwell facing a blank wall. | $130,000 |
| Nov 3, 2021 | Completed final sign-off Feb 2022 | 1432 Guerrero St | bathroom in kind remodelDetails
bathroom in kind remodel | $20,000 |
| Sep 3, 2021 | Completed final sign-off Apr 2025 | 2424 Polk St | change of use authorized per #2020-011603cua & tenant improvements- bring bathroom & 2nd front entrance to ada compliance, add partitions for retail, offices, storage & smoking areas. install reflectv ceiling & exterior lighting. replace glazing on 2nd front exit dr w/ metallic security door.Details
change of use authorized per #2020-011603cua & tenant improvements- bring bathroom & 2nd front entrance to ada compliance, add partitions for retail, offices, storage & smoking areas. install reflectv ceiling & exterior lighting. replace glazing on 2nd front exit dr w/ metallic security door. | $100,000 |
| Jul 28, 2021 | Completed final sign-off Apr 2023 | 8 Miguel St | interior remodel, adding 1 new bathroom and 2 bedrooms and laundry withing existing building.Details
interior remodel, adding 1 new bathroom and 2 bedrooms and laundry withing existing building. | $62,000 |
| Apr 9, 2021 | Completed final sign-off May 2024 | 2909 26th Av | excavation of (e) crawlspace to add 1,080 gross sqft to include 3 bedrooms, 1 bath and an excercise room. condition a portion of an (e) garage for a family room. add a bay window at the rear. no work at front exterior.Details
excavation of (e) crawlspace to add 1,080 gross sqft to include 3 bedrooms, 1 bath and an excercise room. condition a portion of an (e) garage for a family room. add a bay window at the rear. no work at front exterior. | $197,000 |
| Sep 23, 2020 | Completed final sign-off Oct 2023 | 127 12th Av | 3rd level-interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.no new square footage.concurrent work at the ground level and second level at 125 12th avenue will be submitted under separate building permit.Details
3rd level-interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.no new square footage.concurrent work at the ground level and second level at 125 12th avenue will be submitted under separate building permit. | $158,400 |
| Sep 23, 2020 | Completed final sign-off Oct 2023 | 125 12th Av | interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.garage door replaced and widened 1 foot to 8'w. x 7'h. footing & struct work for interior work on 2nd flr above. concurrent work on third level 127 12th ave. is being submitted under separate permit.Details
interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.garage door replaced and widened 1 foot to 8'w. x 7'h. footing & struct work for interior work on 2nd flr above. concurrent work on third level 127 12th ave. is being submitted under separate permit. | $188,400 |
| Aug 12, 2019 | Completed final sign-off Mar 2021 | 2112 18th St | 231 sq ft ground flr addition under an (e) room and remodel to incl 1 bed, 1 bath, fam room and garage. 15 sq ft 2nd flr addition and remodel to incl (e) kitchen and baths.Details
231 sq ft ground flr addition under an (e) room and remodel to incl 1 bed, 1 bath, fam room and garage. 15 sq ft 2nd flr addition and remodel to incl (e) kitchen and baths. | $225,000 |