# P Jordan Builders Llc

Contractor license 1115739. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/p-jordan-builders-llc-1115739
- JSON: https://www.permitgraph.org/api/contractor?license=1115739
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1115739

28 permits since 2000: 14 completed, 13 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 104 days from permit to final inspection.

- Based in: South San Francisco
- On San Francisco permits: Aug 2021 to Oct 2026
- Last 24 months: 24 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2021 | 0 | 0 | 0 | 1 |
| 2024 | 4 | 1 | 0 | 0 |
| 2025 | 9 | 7 | 0 | 0 |
| 2026 | 1 | 5 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Deck | 3 | 1 | 2 | 0 | 0 | 0 | 26 |
| Kitchen remodel | 2 | 1 | 1 | 0 | 0 | 2 | 166 |
| Bathroom remodel | 2 | 2 | 0 | 0 | 0 | 11 | 196 |
| Stairs | 7 | 1 | 6 | 0 | 0 | 0 | 112 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202610269909](https://www.permitgraph.org/p/202610269909) | Oct 26, 2026 | In progress: issued Oct 2026 | [1717 Powell St](https://www.permitgraph.org/a/0101/005) | at the back of the building we are changing out some dryrot. minor demolition and dryrot repair. aprox. 160 sf. | $2,000 |
| [202608267200](https://www.permitgraph.org/p/202608267200) | Aug 26, 2026 | In progress: issued Aug 2026 | [173 Fair Oaks St](https://www.permitgraph.org/a/3632/018) | units #a, #2, #5: removing chimney and patching back walls in 3 units on the inside of the units only, install 1-hour floor/ceiling separation. | $10,000 |
| [202607235447](https://www.permitgraph.org/p/202607235447) | Jul 23, 2026 | In progress: issued Jul 2026 | [1468 Clay St](https://www.permitgraph.org/a/0216/012) | less than 50% repair of back stairs deck, demo and fix part of deck and stairs in kind, same materials. | $22,700 |
| [202607235444](https://www.permitgraph.org/p/202607235444) | Jul 23, 2026 | In progress: issued Jul 2026 | [1468 Clay St](https://www.permitgraph.org/a/0216/012) | repair of dry rot, removal of old dry rot and repair, non street visible, to comply with nov#202654871 wood window sill and associated exterior stucco and interior drywall. | $18,500 |
| [202606294089](https://www.permitgraph.org/p/202606294089) | Jun 29, 2026 | In progress: filed Jun 2026, not yet issued | [261 Dolores St](https://www.permitgraph.org/a/3556/030) | reduce the number of bedrooms to make living areas bigger and remodel the kitchens in all 3 units. | $90,000 |
| [202605070872](https://www.permitgraph.org/p/202605070872) | May 7, 2026 | Completed: final sign-off Oct 2026 | [1618 Mcallister St](https://www.permitgraph.org/a/1156/011) | moving (e) dormers in the same position as plans, comply with planning department nov#2022011112enf to legalize dormers. | $12,500 |
| [202512182120](https://www.permitgraph.org/p/202512182120) | Dec 18, 2025 | Completed: final sign-off Apr 2026 | [96 Mcallister St](https://www.permitgraph.org/a/0349/008) | ground floor commercial space: sheetrock repair on ceiling and wall area. removal of sheetrock and reinstall. | $3,700 |
| [202507312056](https://www.permitgraph.org/p/202507312056) | Jul 31, 2025 | Completed: final sign-off Aug 2025 | [2100 Larkin St](https://www.permitgraph.org/a/0124/028) | repair deck posts outisde back deck. replace some handrails. less than 50% not street visible. | $5,800 |
| [202507312058](https://www.permitgraph.org/p/202507312058) | Jul 31, 2025 | Completed: final sign-off Aug 2025 | [3735 Anza St](https://www.permitgraph.org/a/1571/016A) | fix fence in back of building. replace handrail. less than 50% - back of building. | $6,200 |
| [202507301949](https://www.permitgraph.org/p/202507301949) | Jul 30, 2025 | In progress: issued Jul 2025 | [2332 Fulton St](https://www.permitgraph.org/a/1169/003) | replace exterior stair handrails. replacing spindles on rails. back of home. | $7,500 |
| [202507301955](https://www.permitgraph.org/p/202507301955) | Jul 30, 2025 | In progress: issued Jul 2025 | [1753 Fulton St](https://www.permitgraph.org/a/1186/009D) | changing rails in the back deck area and add spindles with less than 4 inch spacing. adding handrails. | $7,500 |
| [202506189012](https://www.permitgraph.org/p/202506189012) | Jun 18, 2025 | In progress: issued Jun 2025 | [479 14th St](https://www.permitgraph.org/a/3546/020) | replace (e) rear stair tower in same configuration in kind. | $50,000 |
| [202505227037](https://www.permitgraph.org/p/202505227037) | May 22, 2025 | In progress: issued May 2025 | [367 Ivy St](https://www.permitgraph.org/a/0808/032) | dry rot repair back of building. | $25,000 |
| [202505196770](https://www.permitgraph.org/p/202505196770) | May 19, 2025 | Completed: final sign-off Aug 2025 | [479 14th St](https://www.permitgraph.org/a/3546/020) | dryrot repair back of building, southside full back wall from ground to roof repair. wall shtg, 2x studs @ 16 inch o/c, wood siding. all work in-kind | $25,000 |
| [202504305526](https://www.permitgraph.org/p/202504305526) | Apr 30, 2025 | In progress: issued Apr 2025 | [367 Ivy St](https://www.permitgraph.org/a/0808/032) | replacing back stairs hand rails back to same. all in kind. | $8,200 |
| [202504305510](https://www.permitgraph.org/p/202504305510) | Apr 30, 2025 | Completed: final sign-off Jun 2025 | [740 Rhode Island St](https://www.permitgraph.org/a/4073/026) | to obtain final inspection for work approved under pa #201611233503. all work is complete. |  |
| [202504083938](https://www.permitgraph.org/p/202504083938) | Apr 8, 2025 | In progress: issued Apr 2025 | [479 14th St](https://www.permitgraph.org/a/3546/020) | unit a - 25% repair of back stairs. not visible from street. repair in kind less than 50% | $7,500 |
| [202504083940](https://www.permitgraph.org/p/202504083940) | Apr 8, 2025 | In progress: issued Apr 2025 | [30 Abbey St](https://www.permitgraph.org/a/3566/082) | minor repair to front stair, < 20% | $7,500 |
| [202503283279](https://www.permitgraph.org/p/202503283279) | Mar 28, 2025 | Completed: final sign-off Apr 2026 | [6004 California St](https://www.permitgraph.org/a/1382/018A) | barrier removal work at laundrymat: add push putton actuated power door operator at entrance under abe#202503170312. remodel restroom to make accessible. any mep work permited separately. | $10,000 |
| [202502251046](https://www.permitgraph.org/p/202502251046) | Feb 25, 2025 | Completed: final sign-off Aug 2025 | [693 Sutter St](https://www.permitgraph.org/a/0297/009) | revision to 201708235690 & 202412136796 2nd to 6th fl. remove non bearing walls to combine small bedrooms into larger bedrooms; remove 4 full baths & 4 half baths @ 3rd, 4th, 5th & 6th floor; move ki… | $500,000 |
| [202502240939](https://www.permitgraph.org/p/202502240939) | Feb 24, 2025 | Completed: final sign-off Mar 2025 | [740 Rhode Island St](https://www.permitgraph.org/a/4073/026) | to obtain final inspection for work approved under 201611041940,201603311870 and 201601257920. all work is complete |  |
| [202502180523](https://www.permitgraph.org/p/202502180523) | Feb 18, 2025 | Completed: final sign-off Apr 2026 | [60 Leavenworth St](https://www.permitgraph.org/a/0349/008) | to comply with nov #202425689. unit #s: 25, 34, 37, 44 only: repair after water fire damage. repair some framing, front windows replacement, replace sheetrock, floors, tiles, backboard doors and trim… | $70,000 |
| [202412136796](https://www.permitgraph.org/p/202412136796) | Dec 13, 2024 | Completed: final sign-off Aug 2025 | [693 Sutter St](https://www.permitgraph.org/a/0297/009) | revision 201708235690- remove non bearing walls to combine small bedrooms in to larger bedrooms and remove 2.5 bathrooms at mezzanine and 2nd floor. | $250,000 |
| [202412106484](https://www.permitgraph.org/p/202412106484) | Dec 10, 2024 | In progress: issued Dec 2024 | [200 04th Av](https://www.permitgraph.org/a/1430/044) | voluntary adding plywood at existing walls at partial basement, entire first, second and third floor and simpson strong walls at front on 4th avenue, finished with 5/8" type x gyp board at each side… | $30,000 |
| [202408299722](https://www.permitgraph.org/p/202408299722) | Aug 29, 2024 | Completed: final sign-off Apr 2026 | [6000 California St](https://www.permitgraph.org/a/1382/018A) | abe#: 2019-0204-4898. accessiblity upgrade at entrances to deli-cafe. mep permits separtely | $8,000 |
| [202405283128](https://www.permitgraph.org/p/202405283128) | May 28, 2024 | Completed: final sign-off Sep 2024 | [46 Loyola Tr](https://www.permitgraph.org/a/1173/008) | replace front entrance deteriorated stairway w/ new. finish to match existing. brick topping and & stucco finish. | $50,000 |
| [202403147819](https://www.permitgraph.org/p/202403147819) | Mar 14, 2024 | Completed: final sign-off May 2024 | [939 14th St](https://www.permitgraph.org/a/3540/133) | replace 8 windows to back of the building. same operation, openings. u-factor 0.30max | $25,000 |
| [202108176550](https://www.permitgraph.org/p/202108176550) | Aug 17, 2021 | Expired or cancelled: withdrawn Mar 2026 | [1880 Page St](https://www.permitgraph.org/a/1226/017) | reconfigure layout to provide (10) nontransient residential hotel rooms, and (8) apartments to comply with dbi complaints 201835893, 201865031, 201920706, 201957181, 202015291, 202173572. | $700,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.