# O S E Horizon Enterprise

Contractor license 991454. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/o-s-e-horizon-enterprise-991454
- JSON: https://www.permitgraph.org/api/contractor?license=991454
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=991454

34 permits since 2000: 30 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 135 days from permit to final inspection. Of the 2 never-finaled permits, 2 are 5 to 10 years old.

- Based in: Alameda
- On San Francisco permits: Oct 2015 to Aug 2024
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2015 | 3 | 0 | 0 | 0 |
| 2016 | 3 | 0 | 0 | 0 |
| 2017 | 3 | 0 | 0 | 0 |
| 2018 | 4 | 0 | 0 | 1 |
| 2019 | 1 | 0 | 0 | 0 |
| 2020 | 1 | 0 | 0 | 1 |
| 2021 | 3 | 0 | 2 | 0 |
| 2022 | 5 | 0 | 0 | 0 |
| 2023 | 4 | 0 | 0 | 0 |
| 2024 | 3 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 22 | 19 | 0 | 2 | 1 | 0 | 105 |
| Kitchen remodel | 8 | 8 | 0 | 0 | 0 | 8 | 166 |
| Stairs | 1 | 1 | 0 | 0 | 0 | 71 | 426 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202408148601](https://www.permitgraph.org/p/202408148601) | Aug 14, 2024 | Completed: final sign-off Jan 2025 | [776 Victoria St](https://www.permitgraph.org/a/6922/021) | revision to pa# 2024-0320-8213 revised structural drawings due to site condition |  |
| [202403208213](https://www.permitgraph.org/p/202403208213) | Apr 16, 2024 | Completed: final sign-off Jan 2025 | [776 Victoria St](https://www.permitgraph.org/a/6922/021) | interior remodel to (e) two story sfr. (e) kitchen remodel, (e) dining remodel. remodel (e) living room, fireplace. (n) lighting and (n) outlet. | $50,000 |
| [202401174099](https://www.permitgraph.org/p/202401174099) | Jan 17, 2024 | Completed: final sign-off Mar 2024 | [872 Lombard St](https://www.permitgraph.org/a/0066/008) | renovate existing kitchen, replace cabinets and counter inkind, 70sf | $12,000 |
| [202311291588](https://www.permitgraph.org/p/202311291588) | Nov 29, 2023 | Completed: final sign-off Oct 2024 | [327 Chestnut St](https://www.permitgraph.org/a/0062/027) | revision to 202307202633. modify 1st fl kitchen layout unit 329. remove wall and sister e joists above kitchen (unit 329). add a full bath. relocate laundry | $10,000 |
| [202311070342](https://www.permitgraph.org/p/202311070342) | Nov 7, 2023 | Completed: final sign-off May 2024 | [199 Burnside Av](https://www.permitgraph.org/a/6760/036) | repair floor framing | $5,000 |
| [202307202633](https://www.permitgraph.org/p/202307202633) | Jul 20, 2023 | Completed: final sign-off Oct 2024 | [327 Chestnut St](https://www.permitgraph.org/a/0062/027) | renovate kitchens on 1st and 2nf fl. remove partition on each floor between kitchens and (e) laundry. add shear walls on a wall line. new garage beam. replace fixtures and finishes in first and secon… | $130,000 |
| [202307202548](https://www.permitgraph.org/p/202307202548) | Jul 20, 2023 | Completed: final sign-off May 2024 | [199 Burnside Av](https://www.permitgraph.org/a/6760/036) | remodel (e) office & bathroom in-kind on 1/f. add (n) mech/laundry room & office on 1/f.add 2 windows at rear on 1/f. remodel (e) 2/f bathroom & kitchen. reolacate (e) bedroom & living room per plan.… | $85,000 |
| [202212128094](https://www.permitgraph.org/p/202212128094) | Dec 12, 2022 | Completed: final sign-off Mar 2023 | [555 06th Av](https://www.permitgraph.org/a/1549/059) | master bath remodel: wall/layout remain with a shower pan. | $11,500 |
| [202208190932](https://www.permitgraph.org/p/202208190932) | Aug 19, 2022 | Completed: final sign-off Dec 2022 | [463 Arlington St](https://www.permitgraph.org/a/6719/006) | bathroom remodel- in kind ground floor walk in shower, toilet vanity fixture replacement | $12,000 |
| [202208190933](https://www.permitgraph.org/p/202208190933) | Aug 19, 2022 | Completed: final sign-off Nov 2022 | [49 Hamilton St](https://www.permitgraph.org/a/5919/006D) | (1) bathroom remodel- in kind- replace vanity toilet & fixtures w/ a walk in shower | $10,000 |
| [202206236946](https://www.permitgraph.org/p/202206236946) | Jun 23, 2022 | Completed: final sign-off Sep 2022 | [479 33rd Av](https://www.permitgraph.org/a/1465/006C) | for unit #481: remodel (1) full bath and (1) half bath on 2nd floor. replace in kind. no wall removal. | $12,000 |
| [202204132131](https://www.permitgraph.org/p/202204132131) | Apr 13, 2022 | Completed: final sign-off Jul 2022 | [479 33rd Av](https://www.permitgraph.org/a/1465/006C) | remodel (1) full bath & (1-1/2) bath with tub, vanity & toilet replacement. work on the top floor only. | $13,500 |
| [202109168571](https://www.permitgraph.org/p/202109168571) | Sep 16, 2021 | Never finaled: issued Sep 2021, no final | [477 Vallejo St](https://www.permitgraph.org/a/0144/027) | bathroom remodel. no moving walls. lights per cenc 150.0(k). | $10,000 |
| [202106182770](https://www.permitgraph.org/p/202106182770) | Jun 18, 2021 | Completed: final sign-off Jan 2022 | [443 Hazelwood Av](https://www.permitgraph.org/a/3038/029) | partition 2nd fl bath into 2 separate baths, add wall bisecting (e) bath. open doorway from adjoined primary bdrm to new bath, remove 1 elec outlet, install toilet,shower,vanity in bath adjoining pri… | $20,000 |
| [202104088162](https://www.permitgraph.org/p/202104088162) | Apr 8, 2021 | Never finaled: issued Apr 2021, no final | [2827 20th St](https://www.permitgraph.org/a/4087/040) | bathroom remodel in kind. | $11,000 |
| [202103226997](https://www.permitgraph.org/p/202103226997) | Mar 22, 2021 | Completed: final sign-off Jun 2021 | [600 Upland Dr](https://www.permitgraph.org/a/3261/012) | hallway bath in kind remodel. replace existing shower with shower pan. replace toilet, install a vanity and exhaust fan. | $15,000 |
| [202102195015](https://www.permitgraph.org/p/202102195015) | Feb 19, 2021 | Completed: final sign-off Jun 2021 | [600 Upland Dr](https://www.permitgraph.org/a/3261/012) | bathroom remodel in-kind, walk-in shower, tub replacement, vanity replacement, toilet replacement | $10,500 |
| [202009043489](https://www.permitgraph.org/p/202009043489) | Sep 4, 2020 | Expired or cancelled: cancelled Nov 2020 | [680 06th Av](https://www.permitgraph.org/a/1639/056) | full bath and 1/2 bath remodel. no wall alteration | $15,000 |
| [202002285725](https://www.permitgraph.org/p/202002285725) | Feb 28, 2020 | Completed: final sign-off Nov 2020 | [1996 Union St](https://www.permitgraph.org/a/0531/014) | relocate front door to combine 2nd & 3rd fl; replace all hardwood floors; repair (mud)/sand/paint walls & doors; replace light fixtures & damaged electrical outlets/switch covers; frame 2 walls betwe… | $55,000 |
| [201908300303](https://www.permitgraph.org/p/201908300303) | Aug 30, 2019 | Completed: final sign-off Feb 2020 | [768 06th Av](https://www.permitgraph.org/a/1648/027) | reroofing | $6,000 |
| [201811014774](https://www.permitgraph.org/p/201811014774) | Nov 1, 2018 | Completed: final sign-off Mar 2020 | [768 06th Av](https://www.permitgraph.org/a/1648/027) | to comply with nov 201855661 item #2 - 1st flr infill pop out at rear to accomodate a bedrm. convert (e) storage into family rm, 1 bedrm, 1 full bathrm and den. add 1 int stairway for connection btw… | $60,000 |
| [201805240056](https://www.permitgraph.org/p/201805240056) | May 24, 2018 | Completed: final sign-off Aug 2018 | [77 Dow Pl](https://www.permitgraph.org/a/3750/518) | master bath remodel. replace floor & wall tiles w/ new floor & wall tiles. n/a for maher. | $10,000 |
| [201805240060](https://www.permitgraph.org/p/201805240060) | May 24, 2018 | Completed: final sign-off Nov 2018 | [300 03rd St](https://www.permitgraph.org/a/3751/317) | hall & master bath remodel. kitchen remodel. replace (e) cabinets & counter top at the same location. n/a for maher. | $31,500 |
| [201805159160](https://www.permitgraph.org/p/201805159160) | May 15, 2018 | Expired or cancelled: cancelled Aug 2020 | [768 06th Av](https://www.permitgraph.org/a/1648/027) | install an ew wall herater. repair for complaints 201855661 / 201860072 /2018659921 | $2,500 |
| [201803083236](https://www.permitgraph.org/p/201803083236) | Mar 8, 2018 | Completed: final sign-off May 2018 | [2343 19th Av](https://www.permitgraph.org/a/2348/006) | siding replacement at the back | $3,500 |
| [201706270462](https://www.permitgraph.org/p/201706270462) | Jun 27, 2017 | Completed: final sign-off Nov 2017 | [1130 Eddy St](https://www.permitgraph.org/a/0735/063) | kitchen and two bathrooms remodel, replace new countertops and cabinets. replace new vanity and toilets. install bathroom and kitchen tiles. | $38,000 |
| [201706270471](https://www.permitgraph.org/p/201706270471) | Jun 27, 2017 | Completed: final sign-off Nov 2017 | [1130 Eddy St](https://www.permitgraph.org/a/0735/063) | replace three windows and and two sliding doors in kind. | $10,000 |
| [201701127096](https://www.permitgraph.org/p/201701127096) | Jan 12, 2017 | Completed: final sign-off Apr 2017 | [2918 Van Ness Av](https://www.permitgraph.org/a/0478/038) | front and rear window replacment. windows at the front will be aluminum in this case fit existing opening. | $7,500 |
| [201612134861](https://www.permitgraph.org/p/201612134861) | Dec 13, 2016 | Completed: final sign-off May 2017 | [699 36th Av](https://www.permitgraph.org/a/1579/020) | apt 201: ktichen remodel: replace countertop and cabinet. bathroom remodels (guest & master): tile bathroom floor and west area. replace fanity, tub, and remodel shower. no change on walls. | $45,000 |
| [201611102458](https://www.permitgraph.org/p/201611102458) | Nov 10, 2016 | Completed: final sign-off Apr 2017 | [2918 Van Ness Av](https://www.permitgraph.org/a/0478/038) | kitchen remodel - replace kitchen countertop and cabinets, guest bath and master bath remodel - tile bathroom floor, replace vanity and toilet, replace bathtub at master bath. | $35,000 |
| [201607273476](https://www.permitgraph.org/p/201607273476) | Jul 27, 2016 | Completed: final sign-off Dec 2016 | [857 Fell St](https://www.permitgraph.org/a/0827/046) | replace 6 street-facing windows with full wood and double panes. windows will be full wood with ogee lugs to match. | $5,600 |
| [201512145076](https://www.permitgraph.org/p/201512145076) | Dec 14, 2015 | Completed: final sign-off Mar 2016 | [857 Fell St](https://www.permitgraph.org/a/0827/046) | window replacement at the back. not visible from the street. | $5,000 |
| [201511233408](https://www.permitgraph.org/p/201511233408) | Nov 23, 2015 | Completed: final sign-off Mar 2016 | [857 Fell St](https://www.permitgraph.org/a/0827/046) | remove (e) tub and reinstall (e) to replace bathroom floor tiles. | $8,000 |
| [201510210401](https://www.permitgraph.org/p/201510210401) | Oct 21, 2015 | Completed: final sign-off Mar 2016 | [553 Clipper St](https://www.permitgraph.org/a/6556/031) | replace bath tub and retile on 553 clipper st. no wall to be tear down or added. no plumbing changes. | $3,200 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/o-s-e-horizon-enterprise-991454.
