# North Coast Electric And Construction In

Contractor license 881659. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/north-coast-electric-and-construction-in-881659
- JSON: https://www.permitgraph.org/api/contractor?license=881659
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=881659

18 permits since 2000: 11 completed, 7 never finaled. Typically 0 days from filing to permit and 201 days from permit to final inspection. Of the 7 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 1 is over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Jun 2009 to Dec 2022
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2009 | 2 | 0 | 0 | 0 |
| 2010 | 3 | 0 | 0 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2015 | 0 | 0 | 1 | 0 |
| 2016 | 1 | 0 | 0 | 0 |
| 2017 | 2 | 0 | 0 | 0 |
| 2018 | 2 | 0 | 0 | 0 |
| 2019 | 0 | 0 | 3 | 0 |
| 2020 | 0 | 0 | 1 | 0 |
| 2022 | 0 | 0 | 2 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 1 | 0 | 0 | 1 | 0 | 297 |  |
| Deck | 1 | 0 | 0 | 1 | 0 | 0 |  |
| Kitchen remodel | 5 | 5 | 0 | 0 | 0 | 0 | 414 |
| Bathroom remodel | 3 | 2 | 0 | 1 | 0 | 0 | 300 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202212067715](https://www.permitgraph.org/p/202212067715) | Dec 6, 2022 | Never finaled: issued Sep 2023, no final | [11 Bright St](https://www.permitgraph.org/a/7135/016) | major renovatio w/new restrooms, stairs, elevator installation. replace some (e) bearing walls w/beams. | $1,200,000 |
| [202202228412](https://www.permitgraph.org/p/202202228412) | Feb 22, 2022 | Never finaled: issued Feb 2022, no final | [1255 Thomas Av](https://www.permitgraph.org/a/4807/013) | recommencment of work previously approved under a 202001172219 (roof replacement composite) & pa202010031220 (siding repair). | $15,000 |
| [202001031220](https://www.permitgraph.org/p/202001031220) | Jan 3, 2020 | Never finaled: issued Jan 2020, no final | [1255 Thomas Av](https://www.permitgraph.org/a/4807/013) | repair flat concrete base fix slope deck (less than 50%) , repair t1-11 siding, replace 10 ton unit hvac. | $20,000 |
| [201911197704](https://www.permitgraph.org/p/201911197704) | Nov 19, 2019 | Never finaled: issued Nov 2019, no final | [1342 Alabama St](https://www.permitgraph.org/a/4271/009) | reroofing | $15,000 |
| [201911197707](https://www.permitgraph.org/p/201911197707) | Nov 19, 2019 | Never finaled: issued Nov 2019, no final | [1342 Alabama St](https://www.permitgraph.org/a/4271/009) | repair 200-300 sf ti-ii siding paint, no visible from street replace like kind.repair portion of roof. | $3,000 |
| [201908279942](https://www.permitgraph.org/p/201908279942) | Aug 27, 2019 | Never finaled: issued Feb 2020, no final | [2500 Fulton St](https://www.permitgraph.org/a/1644/012) | renovation of 2nd floor kingdom hall includes: main auditorium, meeting room, lobby and restroom removedel. new ada platform. new hvac. (e) elevator elvator to be refurbished under sep permit. | $405,000 |
| [201810233898](https://www.permitgraph.org/p/201810233898) | Oct 23, 2018 | Completed: final sign-off Mar 2019 | [4360 Mission St](https://www.permitgraph.org/a/6799/005) | revision to pa 2017-0919-8943 repair to entry roof expanded to removal & constructionof roof trusses and new support beam. maintain existing roof line elevation height. no exterior changes not visibl… | $25,000 |
| [201808318888](https://www.permitgraph.org/p/201808318888) | Aug 31, 2018 | Completed: final sign-off Mar 2019 | [4360 Mission St](https://www.permitgraph.org/a/6799/005) | revision to 201709198943 for additional repair to front wall and foundation and roof framing.framing work not visible from street. interior structural revision only. | $5,500 |
| [201710050551](https://www.permitgraph.org/p/201710050551) | Oct 5, 2017 | Completed: final sign-off Dec 2017 | [228 Warren Dr](https://www.permitgraph.org/a/2677/009) | to obtain final inspection for work approved under pa# 201511253585. all work is complete. |  |
| [201709198943](https://www.permitgraph.org/p/201709198943) | Sep 19, 2017 | Completed: final sign-off Mar 2019 | [4360 Mission St](https://www.permitgraph.org/a/6799/005) | interior remodeling to an existing church building. new exterior facade, structural upgrade, new hvac unit, new accessible restrooms, and electrical work. | $224,000 |
| [201608306381](https://www.permitgraph.org/p/201608306381) | Aug 30, 2016 | Completed: final sign-off Mar 2017 | [2500 Fulton St](https://www.permitgraph.org/a/1644/012) | remove non-bearing wall seperating 2 library. | $2,000 |
| [201511253585](https://www.permitgraph.org/p/201511253585) | Nov 25, 2015 | Never finaled: issued Nov 2015, no final | [228 Warren Dr](https://www.permitgraph.org/a/2677/009) | new rooms down converting garage space into habitable space includes family, bedroom, , laundry, bath, new french doors, new furnace | $30,000 |
| [201210252795](https://www.permitgraph.org/p/201210252795) | Oct 25, 2012 | Completed: final sign-off Apr 2013 | [2251 26th Av](https://www.permitgraph.org/a/2323/006) | bathroom remodel - relocate shower and tub, remove adjoining closet to expand bathroom - no structural. 3 feet by 2 feet | $25,000 |
| [201004281258](https://www.permitgraph.org/p/201004281258) | Apr 28, 2010 | Completed: final sign-off Jun 2011 | [3892 Sacramento St](https://www.permitgraph.org/a/1013/015) | unit #2. open space btn (e) kitchen and (e) living and provide beam at 3rd level. to open space btn (e) kitchen and (e) living and reinforcement to (e) garage level floor joist below area of work | $4,000 |
| [201004230916](https://www.permitgraph.org/p/201004230916) | Apr 23, 2010 | Completed: final sign-off Jun 2011 | [3892 Sacramento St](https://www.permitgraph.org/a/1013/015) | kitchen and bath upgrade in unit 2 | $20,000 |
| [201004200622](https://www.permitgraph.org/p/201004200622) | Apr 20, 2010 | Completed: final sign-off Jun 2011 | [3892 Sacramento St](https://www.permitgraph.org/a/1013/015) | unit# 6 at top floor. revision to pa# 2010.03.31.9363 create opening between kitchen and living rm, install beam. | $5,000 |
| [200909297904](https://www.permitgraph.org/p/200909297904) | Sep 29, 2009 | Completed: final sign-off Feb 2010 | [45 Cleary Ct](https://www.permitgraph.org/a/0711C/009) | kitchen remodel. replace cabinets, new appliances, new hardwood floors. min 50% of kitchen lighting wattage to be he | $40,000 |
| [200906291536](https://www.permitgraph.org/p/200906291536) | Jun 29, 2009 | Completed: final sign-off Mar 2010 | [2251 26th Av](https://www.permitgraph.org/a/2323/006) | kitchen remodel, new cabinets, electrical, plumbing, install 2 pocket doors. no structural work. | $55,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/north-coast-electric-and-construction-in-881659.
