# Nieto Valle Construction

Contractor license 950730. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/nieto-valle-construction-950730
- JSON: https://www.permitgraph.org/api/contractor?license=950730
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=950730

24 permits since 2000: 24 completed. Typically 7 days from filing to permit and 170 days from permit to final inspection.

- Based in: Hayward
- On San Francisco permits: Mar 2014 to Aug 2025
- Last 24 months: 1 permit filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2014 | 1 | 0 | 0 | 0 |
| 2015 | 2 | 0 | 0 | 0 |
| 2016 | 4 | 0 | 0 | 0 |
| 2017 | 4 | 0 | 0 | 0 |
| 2018 | 3 | 0 | 0 | 0 |
| 2019 | 1 | 0 | 0 | 0 |
| 2021 | 2 | 0 | 0 | 0 |
| 2022 | 4 | 0 | 0 | 0 |
| 2023 | 2 | 0 | 0 | 0 |
| 2025 | 1 | 0 | 0 | 0 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202508203473](https://www.permitgraph.org/p/202508203473) | Aug 20, 2025 | Completed: final sign-off Nov 2025 | [248 Cumberland St](https://www.permitgraph.org/a/3600/086) | install a (n) shear wall between line b&d. install a new 4x4 x20' strut along line b w/ 2x block over strut between joists. add a new shear wall between back end of bay window and line #4. supplement… | $22,801 |
| [202311301698](https://www.permitgraph.org/p/202311301698) | Nov 30, 2023 | Completed: final sign-off Oct 2024 | [195 Portola Dr](https://www.permitgraph.org/a/2848/007C) | to comply w/ nov #202303480. deconstruction to satisfy & conformance w/ the notice of violation (complaint #202303480) for work conducted without permit. remove all work performed on the exterior at… | $11,200 |
| [202308023534](https://www.permitgraph.org/p/202308023534) | Aug 2, 2023 | Completed: final sign-off Jan 2024 | [3739 20th St](https://www.permitgraph.org/a/3607/069) | voluntary strengthening of a portion of e dwelling and is not intened to bring the structure up to current code requirements for new construction. | $25,320 |
| [202210174469](https://www.permitgraph.org/p/202210174469) | Oct 17, 2022 | Completed: final sign-off Jan 2023 | [199 Burnside Av](https://www.permitgraph.org/a/6760/036) | revision to 2022-0602-5431. relocate proposed shear wall on line a from the south end to the north end. no change to shear wall length. |  |
| [202206307507](https://www.permitgraph.org/p/202206307507) | Jun 30, 2022 | Completed: final sign-off Oct 2022 | [459 Potrero Av](https://www.permitgraph.org/a/3974/019) | voluntary seismic retrofit as per plan set (a). sill plate anchorage. work does not represent a complete seismic retrofit of the entire bldg. | $18,480 |
| [202206226801](https://www.permitgraph.org/p/202206226801) | Jun 22, 2022 | Completed: final sign-off Nov 2022 | [723 Guerrero St](https://www.permitgraph.org/a/3597/085) | modification of (e) overhang supports for voluntary seismic retrofit. | $21,411 |
| [202206025431](https://www.permitgraph.org/p/202206025431) | Jun 2, 2022 | Completed: final sign-off Jan 2023 | [199 Burnside Av](https://www.permitgraph.org/a/6760/036) | voluntary engineered seismic retrofit to comply with the brace and bolt program.this permit is for work to be performed in general confromance w/ california existing building code(cebc), appendix ch.… | $94,124 |
| [202110271251](https://www.permitgraph.org/p/202110271251) | Oct 27, 2021 | Completed: final sign-off Jul 2022 | [254 Page St](https://www.permitgraph.org/a/0839/058) | structural work only. voluntary strengthening in the crawlspace. adding ply shear walls with foundation and new posts with concrete pad footings. | $70,000 |
| [202103106259](https://www.permitgraph.org/p/202103106259) | Mar 10, 2021 | Completed: final sign-off Sep 2021 | [1239 22nd Av](https://www.permitgraph.org/a/1728/007) | voluntary strengthening of 1st floor. | $103,750 |
| [201908300300](https://www.permitgraph.org/p/201908300300) | Aug 30, 2019 | Completed: final sign-off Aug 2020 | [1948 Washington St](https://www.permitgraph.org/a/0600/007) | seismic retrofit at the 1st story as triggered by the mandatory soft story ord. designed per 2016 cebc appx a4 (sfebc chapter 4d) | $70,000 |
| [201809180691](https://www.permitgraph.org/p/201809180691) | Sep 18, 2018 | Completed: final sign-off May 2019 | [2 Castro St](https://www.permitgraph.org/a/2611/042) | revision to 201712196846 details 8 & 5 on s5.1 - rebar and holddowns on concrete grade beam. detail 11 on s8.1 - studs welded into (e) i beam column m,aher na |  |
| [201809069310](https://www.permitgraph.org/p/201809069310) | Sep 6, 2018 | Completed: final sign-off May 2019 | [2 Castro St](https://www.permitgraph.org/a/2611/042) | revision to pa 2017-1219-6846, detail 9s8.1 shear clips only. detail 10s8.1 framing field condition different from original detail. cmst straps reduce to 3 locations |  |
| [201806010707](https://www.permitgraph.org/p/201806010707) | Jun 1, 2018 | Completed: final sign-off Sep 2018 | [830 Broderick St](https://www.permitgraph.org/a/1156/021) | revision to 201709158484. new shearwalls, footers, stem walls. maher na | $50,000 |
| [201712196846](https://www.permitgraph.org/p/201712196846) | Dec 19, 2017 | Completed: final sign-off Jul 2019 | [2 Castro St](https://www.permitgraph.org/a/2611/042) | to comply with nov 201719241 seismic retrofit. 2016 cebc appendix a-4 | $40,000 |
| [201709158450](https://www.permitgraph.org/p/201709158450) | Sep 15, 2017 | Completed: final sign-off Feb 2022 | [557 Capp St](https://www.permitgraph.org/a/3610/060) | seismic upgrade in accordance per sfebc chapter 4-d. 2016 cebc appendix a-4. | $150,000 |
| [201709158484](https://www.permitgraph.org/p/201709158484) | Sep 15, 2017 | Completed: final sign-off Sep 2018 | [830 Broderick St](https://www.permitgraph.org/a/1156/021) | soft story seismic retrofit based on 2016 ibc appendix 4a. no exterior work. ** maher: n/a ** | $60,000 |
| [201705106211](https://www.permitgraph.org/p/201705106211) | May 10, 2017 | Completed: final sign-off Sep 2017 | [1920 Jefferson St](https://www.permitgraph.org/a/0911/032) | revision to 201601157276 double the thickness of one shear wall to accomodate utilities |  |
| [201612296191](https://www.permitgraph.org/p/201612296191) | Dec 29, 2016 | Completed: final sign-off Apr 2018 | [295 Buchanan St](https://www.permitgraph.org/a/0858/031) | s.f. soft story retrofit program sfbc ch 34b, install steel moment frame & plywood shear panels. 2012 iebc appendix a-4. | $34,800 |
| [201612296194](https://www.permitgraph.org/p/201612296194) | Dec 29, 2016 | Completed: final sign-off Apr 2018 | [235 Buchanan St](https://www.permitgraph.org/a/0858/032) | s.f.soft story retrofit program per sfbc ch 34b,vinstall steel moment frame & plywood shear panels. 2012 iebc appendix a-4. | $34,800 |
| [201607223053](https://www.permitgraph.org/p/201607223053) | Jul 22, 2016 | Completed: final sign-off Feb 2017 | [1213 York St](https://www.permitgraph.org/a/4266/051) | implement voluntary engineered seismic retrofit to comply with the brace & bolt program | $31,125 |
| [201602220130](https://www.permitgraph.org/p/201602220130) | Feb 22, 2016 | Completed: final sign-off Aug 2016 | [1694 36th Av](https://www.permitgraph.org/a/1908/027) | voluntary strengthening at front of house. install a steel column and concrete grade beam in the garage slab floor as per engineering plans. | $21,000 |
| [201510220502](https://www.permitgraph.org/p/201510220502) | Oct 22, 2015 | Completed: final sign-off Jul 2016 | [648 Waller St](https://www.permitgraph.org/a/0862/012) | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. strengthening of crawl space cripple walls, add new shear walls at crawl space. | $50,000 |
| [201510099312](https://www.permitgraph.org/p/201510099312) | Oct 9, 2015 | Completed: final sign-off Nov 2015 | [4404 17th St](https://www.permitgraph.org/a/2645/006) | repair of failed concrete slab on grade. work is confined to the east half of the garage, within the (e) perimeter footing | $10,250 |
| [201403100272](https://www.permitgraph.org/p/201403100272) | Mar 10, 2014 | Completed: final sign-off Aug 2014 | [4935 17th St](https://www.permitgraph.org/a/1289/062) | compliance with sfbc chapter 34c mandatory soft story seismic retrofit. | $5,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/nieto-valle-construction-950730.