# New Star Construction

Contractor license 812328. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/new-star-construction-812328
- JSON: https://www.permitgraph.org/api/contractor?license=812328
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=812328

39 permits since 2000: 27 completed, 10 never finaled, 2 expired or cancelled. Typically 3 days from filing to permit and 166 days from permit to final inspection. Of the 10 never-finaled permits, 2 are 5 to 10 years old, 8 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Apr 2003 to Aug 2022
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2003 | 0 | 0 | 0 | 1 |
| 2004 | 2 | 0 | 0 | 0 |
| 2005 | 1 | 0 | 0 | 0 |
| 2006 | 2 | 0 | 0 | 0 |
| 2007 | 1 | 0 | 0 | 0 |
| 2008 | 4 | 0 | 1 | 0 |
| 2009 | 0 | 0 | 2 | 0 |
| 2011 | 1 | 0 | 1 | 0 |
| 2012 | 2 | 0 | 0 | 0 |
| 2013 | 0 | 0 | 1 | 0 |
| 2015 | 2 | 0 | 2 | 0 |
| 2016 | 2 | 0 | 2 | 0 |
| 2017 | 2 | 0 | 0 | 0 |
| 2018 | 2 | 0 | 1 | 0 |
| 2019 | 5 | 0 | 0 | 0 |
| 2022 | 1 | 0 | 0 | 1 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 20 | 12 | 0 | 6 | 2 | 0 | 186 |
| Stairs | 3 | 2 | 0 | 1 | 0 | 0 | 70 |
| Deck | 2 | 2 | 0 | 0 | 0 | 98 | 116 |
| Kitchen remodel | 9 | 7 | 0 | 2 | 0 | 8 | 204 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202208170758](https://www.permitgraph.org/p/202208170758) | Aug 17, 2022 | Completed: final sign-off Nov 2022 | [1591 24th Av](https://www.permitgraph.org/a/1870/010) | add 1 hr exit passageway at ground floor no increase in floor area. | $6,000 |
| [202202168074](https://www.permitgraph.org/p/202202168074) | Feb 16, 2022 | Expired or cancelled: cancelled Jan 2025 | [2301 27th Av](https://www.permitgraph.org/a/2356/001) | remodel a bathroom at 2/f, non structural. | $6,000 |
| [201910164670](https://www.permitgraph.org/p/201910164670) | Oct 16, 2019 | Completed: final sign-off May 2020 | [1740 Taraval St](https://www.permitgraph.org/a/2356/013) | replace four casement with center fixed windows at front and repair some stucco. will use milgard aluminum series windows only. all within existing opening. selective repair of stucco in-kind. no oth… | $3,000 |
| [201910043636](https://www.permitgraph.org/p/201910043636) | Oct 4, 2019 | Completed: final sign-off Jan 2020 | [1725 Anza St](https://www.permitgraph.org/a/1551/051) | replace two windows at lightwell and replace fireplace. not visible from street with gas fireplace | $2,500 |
| [201910033454](https://www.permitgraph.org/p/201910033454) | Oct 3, 2019 | Completed: final sign-off May 2021 | [3459 Mission St](https://www.permitgraph.org/a/5673/023) | provide structural reinforcement to exisitng floor and roofframing (2nd fl & roof) | $10,000 |
| [201906102973](https://www.permitgraph.org/p/201906102973) | Jun 10, 2019 | Completed: final sign-off May 2021 | [3459 Mission St](https://www.permitgraph.org/a/5673/023) | comply with n.o.v #201933911. legalize 2 residential units at rear of building. 1st fl, one bedroom, one bath and kitchen. 2nd fl, two bedroom, one bathrm and kitchen. | $120,000 |
| [201905090215](https://www.permitgraph.org/p/201905090215) | May 9, 2019 | Completed: final sign-off Jan 2020 | [2831 Santiago St](https://www.permitgraph.org/a/2368/034) | remove and replace furnace, new ductwork. relocate (e) water heater,replace rear facing windows and door to backyard in basement. | $15,000 |
| [201809059156](https://www.permitgraph.org/p/201809059156) | Sep 5, 2018 | Completed: final sign-off Dec 2018 | [2222 Irving St](https://www.permitgraph.org/a/1727/021) | revision to pa# 201806152045; to reconfigure walk in freeze and restaurant fixtures |  |
| [201806212568](https://www.permitgraph.org/p/201806212568) | Jun 21, 2018 | Completed: final sign-off Dec 2022 | [643 22nd Av](https://www.permitgraph.org/a/1622/008) | legalization of unauthorized dwelling unit per ordinance# 43-14, (2 bedrooms & 1 bath). no exterior changes. | $5,000 |
| [201806152045](https://www.permitgraph.org/p/201806152045) | Jun 15, 2018 | Never finaled: issued Jul 2018, no final | [2222 Irving St](https://www.permitgraph.org/a/1727/021) | remove partial wall between (e) sitting area on 1st fl per plan. remove (e) wall at kitchen, upgrade (e) restroom to new ada all gender restroom. (e) hvac systems to remain, including kitchen hoods &… | $48,000 |
| [201711073364](https://www.permitgraph.org/p/201711073364) | Nov 7, 2017 | Completed: final sign-off May 2018 | [2454 17th Av](https://www.permitgraph.org/a/2409/026) | add one new family, one closet & one new bathroom on 1st floor. relcoate water heater & heating furnace on 1st floor per plan. | $9,000 |
| [201707061063](https://www.permitgraph.org/p/201707061063) | Jul 6, 2017 | Completed: final sign-off Dec 2017 | [837 33rd Av](https://www.permitgraph.org/a/1676/002) | remodel (e) family rm - convert family rm to bedroom & bathroom. add new bedrm, bathrm, and laundry on 1st fl per plan. | $39,000 |
| [201612024081](https://www.permitgraph.org/p/201612024081) | Dec 2, 2016 | Never finaled: issued Dec 2016, no final | [2649 31st Av](https://www.permitgraph.org/a/2464A/008) | repair front stairs steps (treads and risers) of the house, less than 50 %. | $3,000 |
| [201605258302](https://www.permitgraph.org/p/201605258302) | May 25, 2016 | Completed: final sign-off Jan 2017 | [3110 Ocean Av](https://www.permitgraph.org/a/7207/006A) | remodel existing kitchen at 2nd fl. add 1 bath at 2nd fl, remodel e bath 2nd fl. relocate washer and dryer in garage area maher not req | $30,000 |
| [201603212555](https://www.permitgraph.org/p/201603212555) | Mar 21, 2016 | Never finaled: issued Mar 2016, no final | [3010 26th Av](https://www.permitgraph.org/a/7212/008A) | remodeling bathroom on 1/f. tile replacement, change toilet & sinik. | $4,000 |
| [201602109290](https://www.permitgraph.org/p/201602109290) | Feb 10, 2016 | Completed: final sign-off Oct 2016 | [114 Clearfield Dr](https://www.permitgraph.org/a/7262/020) | 1st floor: add 2 bedrooms, 2 bathroom and one family room. | $65,000 |
| [201507060725](https://www.permitgraph.org/p/201507060725) | Jul 6, 2015 | Completed: final sign-off Apr 2016 | [722 39th Av](https://www.permitgraph.org/a/1606/041) | infill extg lightwell and remodel extg bath. | $6,000 |
| [201506048062](https://www.permitgraph.org/p/201506048062) | Jun 4, 2015 | Never finaled: issued Jun 2015, no final | [248 21st Av](https://www.permitgraph.org/a/1413/031) | remodel bathroom, new tile at floor and wall, replace sink and toilet. no wall to be moved. | $3,000 |
| [201504294910](https://www.permitgraph.org/p/201504294910) | Apr 29, 2015 | Completed: final sign-off Mar 2016 | [631 41st Av](https://www.permitgraph.org/a/1584/021) | soft storey retrofit program 2012 eibc a4 | $50,000 |
| [201503110522](https://www.permitgraph.org/p/201503110522) | Mar 11, 2015 | Never finaled: issued Jun 2015, no final | [631 41st Av](https://www.permitgraph.org/a/1584/021) | add 2 fire-rated windows to the south property line per plan and ab-005 (aluminum windows). add glass blocks at side of 2/f & 3/f. | $5,000 |
| [201310038431](https://www.permitgraph.org/p/201310038431) | Oct 3, 2013 | Never finaled: issued Oct 2013, no final | [1870 34th Av](https://www.permitgraph.org/a/2070/035) | just replace walls and floor tiles in bathroom at 2/f. | $1,200 |
| [201211305237](https://www.permitgraph.org/p/201211305237) | Nov 30, 2012 | Completed: final sign-off Apr 2013 | [2606 36th Av](https://www.permitgraph.org/a/2461A/022) | interior remodel. adding one master suite, one bedroom, one bath and storage at ground floor as per plans. | $48,000 |
| [201208107073](https://www.permitgraph.org/p/201208107073) | Aug 10, 2012 | Completed: final sign-off Oct 2012 | [551 45th Av](https://www.permitgraph.org/a/1499/007) | remodel kitchen. rmove non-bearing wall and built in hood. upgrade electrical to code, relocate plumbing to conform to relocated sink, expand exhaust vent to roof. | $10,000 |
| [201112090399](https://www.permitgraph.org/p/201112090399) | Dec 9, 2011 | Completed: final sign-off Mar 2012 | [2748 36th Av](https://www.permitgraph.org/a/2504A/017) | interior remodeling: adding two new bedrooms, two new bathrooms and storage at ground floor. add new exterior stair at rear of existing building as per plan. | $38,000 |
| [201108172642](https://www.permitgraph.org/p/201108172642) | Aug 17, 2011 | Never finaled: issued Aug 2011, no final | [7713 Geary Bl](https://www.permitgraph.org/a/1503/058) | change cabinet, bar sink and bathroom sink at basement. | $1,200 |
| [200906231110](https://www.permitgraph.org/p/200906231110) | Jun 23, 2009 | Never finaled: issued Jun 2009, no final | [246 21st Av](https://www.permitgraph.org/a/1413/031) | remodeling bathroom, new tile at floor & wall. replace bath tub, sink & toilet (1st fl, not garage level) | $3,000 |
| [200906049782](https://www.permitgraph.org/p/200906049782) | Jun 4, 2009 | Never finaled: issued Jun 2009, no final | [2955 19th Av](https://www.permitgraph.org/a/7203/004A) | remodeling kitchen at first floor: new tile and new counter top, new paint. | $5,000 |
| [200810063448](https://www.permitgraph.org/p/200810063448) | Oct 6, 2008 | Completed: final sign-off Jan 2009 | [1491 43rd Av](https://www.permitgraph.org/a/1810/018) | add 2 bedrooms, 2 full bath, 2 storage and laundry rooms on existing ground floor per plan. remodel existing kitchen and 2 baths on 2nd floor. replace 2 rear windows on ground floor | $54,000 |
| [200810013097](https://www.permitgraph.org/p/200810013097) | Oct 1, 2008 | Never finaled: issued Oct 2008, no final | [2649 31st Av](https://www.permitgraph.org/a/2464A/008) | install new tile at the bathroom only. existing lav, wc, tub to remain. | $2,000 |
| [200808189357](https://www.permitgraph.org/p/200808189357) | Aug 18, 2008 | Completed: final sign-off Sep 2008 | [631 41st Av](https://www.permitgraph.org/a/1584/021) | replace metal beam at rear of bldg in kind replace posts at end of beam in kind | $4,000 |
| [200808128955](https://www.permitgraph.org/p/200808128955) | Aug 12, 2008 | Completed: final sign-off Dec 2008 | [2502 Anza St](https://www.permitgraph.org/a/1528/022) | correct mistakes on approved pa# 2008-0805-8431-keep the closet for converting dining room to bedroom, to keep (e) living room and fireplace. (e) washer and dryer in basement utility room. |  |
| [200805071493](https://www.permitgraph.org/p/200805071493) | May 7, 2008 | Completed: final sign-off Jul 2008 | [1715 42nd Av](https://www.permitgraph.org/a/2007/001C) | add one bedroom and 1 full bathroom on existing ground floor per plan. | $20,000 |
| [200711309367](https://www.permitgraph.org/p/200711309367) | Nov 30, 2007 | Completed: final sign-off May 2009 | [2502 Anza St](https://www.permitgraph.org/a/1528/022) | remodel (e) kitchen and bath in units 2502,2504, 2506. replace kitchen cabs., appliances, countentop and flooring. replace bathroom sink,toilet,bathtubs, floor tile, add washer and dryer in above 3 u… | $18,000 |
| [200607186901](https://www.permitgraph.org/p/200607186901) | Jul 18, 2006 | Completed: final sign-off Aug 2006 | [632 10th Av](https://www.permitgraph.org/a/1635/028E) | replace (e) stair for (e) deck at rear and handreail. less than 50% replacement in kind. | $2,000 |
| [200605121490](https://www.permitgraph.org/p/200605121490) | May 12, 2006 | Completed: final sign-off Jul 2008 | [2478 24th Av](https://www.permitgraph.org/a/2402/018) | renew pa#2003/10/30/8971 for horizontal & vertical addition. pa# 2005/05/02/1392 to begin & complete work. | $320,000 |
| [200505273609](https://www.permitgraph.org/p/200505273609) | May 27, 2005 | Completed: final sign-off Jun 2015 | [346 22nd Av](https://www.permitgraph.org/a/1453/033) | 2 family residences addition & remodeling | $150,000 |
| [200408232292](https://www.permitgraph.org/p/200408232292) | Aug 23, 2004 | Completed: final sign-off Sep 2004 | [69 Morningside Dr](https://www.permitgraph.org/a/7259/012) | revised drawing. remove remodel 2nd flr kitchen from permit 1027815 issued 6/15/04-app 200406156475 |  |
| [200407209244](https://www.permitgraph.org/p/200407209244) | Jul 20, 2004 | Completed: final sign-off Aug 2005 | [1430 Holloway Av](https://www.permitgraph.org/a/7240A/014) | remodel kitchen & new wood deck @main fl.replace (e)windows w/stud wall to reconfigurate the master | $25,000 |
| [200304152285](https://www.permitgraph.org/p/200304152285) | Apr 15, 2003 | Expired or cancelled: expired Apr 2004 | [215 Ewing Tr](https://www.permitgraph.org/a/1110/006A) | change bathroom tile and painting | $3,500 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/new-star-construction-812328.