Nelson Contracting
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Feb 2026
- Last 24 months
- 3 permits filed
58 permits since 2000: 54 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 4 completed. Typically 2 days from filing to permit and 22 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 1207 De Haro St | remove front roof deck and repair fron window per order of abatement 201967331a.Details
remove front roof deck and repair fron window per order of abatement 201967331a. | $3,500 |
| Jan 6, 2014 | Completed final sign-off Dec 2014 | 5151 Diamond Heights Bl | revision to pa# 201311061238. 1st fl: add bathroom, 2nd fl: add frieplace at living room. 3rd fl: extend walking closet, create storage room at back of garage. replace shed roof w/roof deck at master bedroom & replace window w/sliding door.Details
revision to pa# 201311061238. 1st fl: add bathroom, 2nd fl: add frieplace at living room. 3rd fl: extend walking closet, create storage room at back of garage. replace shed roof w/roof deck at master bedroom & replace window w/sliding door. | $34,000 |
| Oct 24, 2013 | Completed final sign-off Dec 2013 | 1111 Carolina St | repair (e) deck with new trex transcend decking, roof deck, less than 50%. comply with fs-01 for allowable material for roof deckDetails
repair (e) deck with new trex transcend decking, roof deck, less than 50%. comply with fs-01 for allowable material for roof deck | $4,500 |
| Apr 8, 2011 | Completed final sign-off Apr 2011 | 2533 Greenwich St | replace 2x6 roof decking with 5/4 ipe wood existing. 365 square feet.Details
replace 2x6 roof decking with 5/4 ipe wood existing. 365 square feet. | $4,200 |