# Nbay Construction

Contractor license 1008172. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/nbay-construction-1008172
- JSON: https://www.permitgraph.org/api/contractor?license=1008172
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1008172

22 permits since 2000: 21 completed, 1 never finaled. Typically 0 days from filing to permit and 207 days from permit to final inspection. Of the 1 never-finaled permit, 1 is 5 to 10 years old.

- Based in: San Francisco
- On San Francisco permits: Apr 2015 to Apr 2021
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2015 | 3 | 0 | 0 | 0 |
| 2016 | 10 | 0 | 0 | 0 |
| 2017 | 2 | 0 | 0 | 0 |
| 2018 | 2 | 0 | 0 | 0 |
| 2019 | 2 | 0 | 1 | 0 |
| 2020 | 1 | 0 | 0 | 0 |
| 2021 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 7 | 7 | 0 | 0 | 0 | 0 | 150 |
| Stairs | 1 | 1 | 0 | 0 | 0 | 330 | 1412 |
| Bathroom remodel | 11 | 11 | 0 | 0 | 0 | 0 | 150 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202104017707](https://www.permitgraph.org/p/202104017707) | Apr 1, 2021 | Completed: final sign-off Aug 2021 | [441 24th Av](https://www.permitgraph.org/a/1456/006) | unit #7: remodel (e) kitchen ugrade electrical for kitchen | $12,000 |
| [202008031001](https://www.permitgraph.org/p/202008031001) | Aug 3, 2020 | Completed: final sign-off Sep 2022 | [2485 Post St](https://www.permitgraph.org/a/1080/022) | remove the proposed fire sprinkler system installation for the new ground unit. (reference permit app #2017-1221-7187 s1.) |  |
| [201908057850](https://www.permitgraph.org/p/201908057850) | Aug 5, 2019 | Completed: final sign-off Jan 2020 | [1281 Mcallister St](https://www.permitgraph.org/a/0779/021) | unit 1281a: remodel existing (2) bathrooms (5' x 7') & kitchen (10' x 10') | $39,500 |
| [201907105502](https://www.permitgraph.org/p/201907105502) | Jul 10, 2019 | Never finaled: issued Jul 2019, no final | [2760 San Bruno Av](https://www.permitgraph.org/a/6048/036) | approx 1500 sq ft of siding. install cement siding for courtyard walls (not visible to street). and not facing to street. repair dry rot if necessry. replace total 8 windows and 2 patio door (all not… | $40,000 |
| [201904087342](https://www.permitgraph.org/p/201904087342) | Apr 8, 2019 | Completed: final sign-off Sep 2019 | [751 14th Av](https://www.permitgraph.org/a/1657/008) | remodel (e) kitchen & bath | $18,000 |
| [201804136278](https://www.permitgraph.org/p/201804136278) | Apr 13, 2018 | Completed: final sign-off Apr 2019 | [621 Huron Av](https://www.permitgraph.org/a/7097/043I) | construct two bedrooms, family room, laundry area & one full bathroom at ground floor; n/a maher | $52,000 |
| [201802090871](https://www.permitgraph.org/p/201802090871) | Feb 9, 2018 | Completed: final sign-off Apr 2018 | [2525 23rd Av](https://www.permitgraph.org/a/2424/006) | comply w/ compliant #201835721. construct laundry room & half bath room at ground floor. | $12,000 |
| [201712217187](https://www.permitgraph.org/p/201712217187) | Dec 21, 2017 | Completed: final sign-off Sep 2022 | [2485 Post St](https://www.permitgraph.org/a/1080/022) | horizontal addition. conversion of (e) bedroom & part of garage to a new unit. replace rotted wood members in the (e) garage. install new elec & gas meters. horizontal addition & alteration of (e) 2… | $185,000 |
| [201703010368](https://www.permitgraph.org/p/201703010368) | Mar 1, 2017 | Completed: final sign-off May 2017 | [105 Lake St](https://www.permitgraph.org/a/1362/001) | #7. remodel existing kitchen & bathroom, no structural remodel. | $18,000 |
| [201609026749](https://www.permitgraph.org/p/201609026749) | Sep 2, 2016 | Completed: final sign-off May 2017 | [269 Dorland St](https://www.permitgraph.org/a/3580/034) | revision to app#2016-0805-4373 for revising apartment unit number. reconfiguration on unit #269a dorland street. |  |
| [201608306322](https://www.permitgraph.org/p/201608306322) | Aug 30, 2016 | Completed: final sign-off Oct 2016 | [1520 Geneva Av](https://www.permitgraph.org/a/6418/066) | remodel existing bathroom, no sheetrock removed. | $8,000 |
| [201608185327](https://www.permitgraph.org/p/201608185327) | Aug 18, 2016 | Completed: final sign-off Dec 2016 | [62 Rosewood Dr](https://www.permitgraph.org/a/3043/011) | remodel existing master bathroom | $10,000 |
| [201608054373](https://www.permitgraph.org/p/201608054373) | Aug 5, 2016 | Completed: final sign-off May 2017 | [267 Dorland St](https://www.permitgraph.org/a/3580/034) | reconfigure unit #267a: two bedrooms, one bath,one kitchen and living room. | $40,000 |
| [201608054372](https://www.permitgraph.org/p/201608054372) | Aug 5, 2016 | Completed: final sign-off Jul 2017 | [267 Dorland St](https://www.permitgraph.org/a/3580/034) | structural upgrade: install shear wall & moment frames per sfbc chp 34b using 2012 iebc appendix a-4 | $50,000 |
| [201607111983](https://www.permitgraph.org/p/201607111983) | Jul 11, 2016 | Completed: final sign-off Aug 2016 | [1688 Wallace Av](https://www.permitgraph.org/a/5387/033) | #304: remodel two existing, bathrooms & a kitchen. | $25,000 |
| [201606240866](https://www.permitgraph.org/p/201606240866) | Jun 24, 2016 | Completed: final sign-off Jan 2017 | [3150 Mission St](https://www.permitgraph.org/a/6574/005) | unit #1: remove existing plaster and lathe for whole unit. rebuild closets. install insulation and sheetrock drywall for whole unit. | $3,000 |
| [201605318734](https://www.permitgraph.org/p/201605318734) | May 31, 2016 | Completed: final sign-off Jan 2017 | [3150 Mission St](https://www.permitgraph.org/a/6574/005) | work in unit #1: remodel (e) kitchen and bathroom. update electrical to the building code for kitchen and bathroom. | $18,000 |
| [201605187770](https://www.permitgraph.org/p/201605187770) | May 18, 2016 | Completed: final sign-off Sep 2016 | [1509 Golden Gate Av](https://www.permitgraph.org/a/0776/032) | revision to ref pa 2015 1104 1748: structural upgrade |  |
| [201603253123](https://www.permitgraph.org/p/201603253123) | Mar 25, 2016 | Completed: final sign-off Nov 2016 | [1940 Ellis St](https://www.permitgraph.org/a/1100/014) | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $38,000 |
| [201511041748](https://www.permitgraph.org/p/201511041748) | Nov 4, 2015 | Completed: final sign-off Sep 2016 | [1509 Golden Gate Av](https://www.permitgraph.org/a/0776/032) | structural upgrade: install shear walls & moment frames per soft story sfbc chapter 34b; ordinance 2012 iebc appendix a-4. n/a maher ordinance | $60,000 |
| [201510230707](https://www.permitgraph.org/p/201510230707) | Oct 23, 2015 | Completed: final sign-off Sep 2016 | [2345 Post St](https://www.permitgraph.org/a/1079/018) | structural upgrade. install shear walls and moment frames per soft story ordinance, 2012 iebc appendix a-4. mandatory seismic retrofit. | $50,000 |
| [201504294914](https://www.permitgraph.org/p/201504294914) | Apr 29, 2015 | Completed: final sign-off Apr 2017 | [1940 Ellis St](https://www.permitgraph.org/a/1100/014) | replace (e) exxterior wood siding with new redwood/red cedar wood siding. not visible from street. east wall around 4,000 sq. ft. | $40,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/nbay-construction-1008172.
