Back to bathroom remodel contractors
Mutual Seiko Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Aug 2023
- Last 24 months
- 0 permits filed
248 permits since 2000: 214 completed, 20 never finaled, 14 expired or cancelled.
Of the 20 never-finaled permits, 6 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
68 bathroom remodel permits: 61 completed, 6 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 21, 2022 | Completed final sign-off Apr 2023 | 551 Holyoke St | revison under pa #202209273198: add 1 full bathroom at g/f.Details
revison under pa #202209273198: add 1 full bathroom at g/f. | $10,000 |
| Sep 27, 2022 | Completed final sign-off Apr 2023 | 551 Holyoke St | remove interior staircase & infill opening. re-arrange (e) bathroom. construct fire wall between garage & install (n) kitchenette. all work at ground floor.Details
remove interior staircase & infill opening. re-arrange (e) bathroom. construct fire wall between garage & install (n) kitchenette. all work at ground floor. | $15,000 |
| Mar 5, 2021 | Completed final sign-off Mar 2021 | 295 Monterey Bl | remodel kitchen and 1 bath in kind. walls and opening stay the same.Details
remodel kitchen and 1 bath in kind. walls and opening stay the same. | $20,000 |
| Jan 22, 2021 | Never finaled issued Jan 2021, no final | 1020 Pacific Av | del bathroom, replace bath tub and floor and wall tile.Details
del bathroom, replace bath tub and floor and wall tile. | $15,000 |
| Oct 28, 2020 | Completed final sign-off Sep 2022 | 133 Lake St | remodel existing garage and install new garage door. repair dry-rot in eisting stairs at rear. unit #135: remodel bathroom, kitchen, and repair dry rot. replace west & south windows.Details
remodel existing garage and install new garage door. repair dry-rot in eisting stairs at rear. unit #135: remodel bathroom, kitchen, and repair dry rot. replace west & south windows. | $150,000 |
| Nov 12, 2019 | Completed final sign-off Feb 2020 | 539 Ortega St | comply with complaint #20199732 & 201999741. interior rmeodel existing kitchen & two bathrooms. conert existing unoccupy space to new bedroom & full bath room at first floor. construct new roof deck.Details
comply with complaint #20199732 & 201999741. interior rmeodel existing kitchen & two bathrooms. conert existing unoccupy space to new bedroom & full bath room at first floor. construct new roof deck. | $89,000 |
| Nov 12, 2019 | Completed final sign-off Dec 2020 | 1358 46th Av | reface kitchen cabinet, replace flooring. replace bath wall & floor tiles.Details
reface kitchen cabinet, replace flooring. replace bath wall & floor tiles. | $4,000 |
| Sep 13, 2019 | Completed final sign-off Feb 2020 | 539 Ortega St | removal kitchen & bathroom. remove fire place in living room.Details
removal kitchen & bathroom. remove fire place in living room. | $30,000 |
| Apr 29, 2019 | Completed final sign-off May 2019 | 348 Harvard St | replace tile and sheetrock around tub enclosure. retile bathroom floorDetails
replace tile and sheetrock around tub enclosure. retile bathroom floor | $3,000 |
| Sep 7, 2018 | Completed final sign-off May 2019 | 2110 21st Av | remodel (e) kitchen, bathroom and add 1 new nath at 2nd flr. add skylights per plan.Details
remodel (e) kitchen, bathroom and add 1 new nath at 2nd flr. add skylights per plan. | $35,000 |
| Jan 4, 2018 | Completed final sign-off Jul 2019 | 842 48th Av | reface kitchen cabinet & replace bathroom floor tileDetails
reface kitchen cabinet & replace bathroom floor tile | $3,000 |
| Nov 16, 2017 | Completed final sign-off Aug 2018 | 1205 San Bruno Av | interior remodel on 2/f, relocate kitchen & bath. add new bath, relocate interior stairs to connect to 1/f, convert area behind garage to 2 bedrooms & 2 baths, built new deck 5'x19' at rear with stairs, replace brick foundation.Details
interior remodel on 2/f, relocate kitchen & bath. add new bath, relocate interior stairs to connect to 1/f, convert area behind garage to 2 bedrooms & 2 baths, built new deck 5'x19' at rear with stairs, replace brick foundation. | $80,000 |
| Aug 24, 2017 | Completed final sign-off Oct 2017 | 1537 Ocean Av | replace floor tile in bathroom. install tile on bathroom walls on ground floor.Details
replace floor tile in bathroom. install tile on bathroom walls on ground floor. | $3,000 |
| Apr 18, 2017 | Completed final sign-off Aug 2017 | 1523 28th Av | remove & replace bathroom wall & tile.Details
remove & replace bathroom wall & tile. | $2,000 |
| Feb 7, 2017 | Completed final sign-off Dec 2017 | 2430 Castro St | revision to permit 201503191345. interior layout changes. second flr no floor opening at living rm. third flr relocate bath 3. no exterior changes.Details
revision to permit 201503191345. interior layout changes. second flr no floor opening at living rm. third flr relocate bath 3. no exterior changes. | $10,000 |
| Dec 9, 2016 | Completed final sign-off Oct 2017 | 1340 Washington St | #7- remodel kitchen & bath in kind, replace counter & fixtures. n/a for maher ordinance no.155-13.Details
#7- remodel kitchen & bath in kind, replace counter & fixtures. n/a for maher ordinance no.155-13. | $20,000 |
| Dec 2, 2016 | Completed final sign-off Jun 2017 | 1679 Newcomb Av | convert part of garage/storage to one bedroom, living room and one 1/2 bath.Details
convert part of garage/storage to one bedroom, living room and one 1/2 bath. | $60,000 |
| Nov 10, 2016 | Completed final sign-off Nov 2016 | 1221 05th Av | rear cottage- reduce scope of work on pa#201605167483, reduce from full bath to 1/2 bath.Details
rear cottage- reduce scope of work on pa#201605167483, reduce from full bath to 1/2 bath. | |
| Oct 27, 2016 | Completed final sign-off Oct 2019 | 333 Diamond St | remodel of interior of (e) 2 unit bldg and (e) garage. development of (e) ground flr storage space as (n) bdrm & living room. rear addition for (n) family rm and master bdrm. (n) 4th flr for rec room study & bathroom.Details
remodel of interior of (e) 2 unit bldg and (e) garage. development of (e) ground flr storage space as (n) bdrm & living room. rear addition for (n) family rm and master bdrm. (n) 4th flr for rec room study & bathroom. | $650,000 |
| Oct 13, 2016 | Completed final sign-off Feb 2019 | 1273 10th Av | adu per ord #162-16 including (1) bedrooms, (2) full baths, kitchen, living room, media room, office & laundry on ground floor. grd fl sprinklered to nfpa-13 on deferred submittal.Details
adu per ord #162-16 including (1) bedrooms, (2) full baths, kitchen, living room, media room, office & laundry on ground floor. grd fl sprinklered to nfpa-13 on deferred submittal. | $50,000 |
| Apr 18, 2016 | Completed final sign-off May 2016 | 1938 30th Av | to comply with complaint # 201609051, remodel bathroom repalce toilet in kind, remodel kitchen, replace cabinetsDetails
to comply with complaint # 201609051, remodel bathroom repalce toilet in kind, remodel kitchen, replace cabinets | $10,000 |
| Feb 8, 2016 | Completed final sign-off Jul 2016 | 814 Detroit St | add 2 bedrooms & bath & laundry on lower level & remodel bath on upper level, partial remodel kitchen, seismic upgrade lower level.Details
add 2 bedrooms & bath & laundry on lower level & remodel bath on upper level, partial remodel kitchen, seismic upgrade lower level. | $150,000 |
| Jan 15, 2016 | Completed final sign-off Jul 2016 | 621 Greenwich St | remove and replace wall tiles in hallway bathroomDetails
remove and replace wall tiles in hallway bathroom | $1,000 |
| Nov 19, 2015 | Completed final sign-off Apr 2016 | 132 Encline Ct | remodel (e) 2nd floor kitchen and bath. add one bathroom. remove center patio walls. structural support at ceiling. new skylights.Details
remodel (e) 2nd floor kitchen and bath. add one bathroom. remove center patio walls. structural support at ceiling. new skylights. | $50,000 |
| May 12, 2015 | Completed final sign-off Sep 2015 | 2349 27th Av | unit #2 - remodel kitchen & bathroom.Details
unit #2 - remodel kitchen & bathroom. | $15,000 |
| Apr 21, 2015 | Completed final sign-off Sep 2015 | 2349 27th Av | comply w/complaint #201540481, 201540501, 201540482 & 201540483 - convert storage area to exercise room w/1/2 bath bathroom of no more than 25 square feet & laundry area. sprinkler on separate permit.Details
comply w/complaint #201540481, 201540501, 201540482 & 201540483 - convert storage area to exercise room w/1/2 bath bathroom of no more than 25 square feet & laundry area. sprinkler on separate permit. | $18,000 |
| Mar 28, 2014 | Never finaled issued Mar 2014, no final | 619 Greenwich St | remove and install tile in the bathroom and entrance foyer - ground floor unitDetails
remove and install tile in the bathroom and entrance foyer - ground floor unit | $5,000 |
| Dec 31, 2013 | Completed final sign-off Nov 2014 | 28 Paramount Tr | modify ground floor layout to provide an "accessible friendly" entry, bathroom and bedroom areas. relocate (e) bathroom and hvac/mech power plant (within the envelope of the exiting ground floor plan). provide a plant platform on the 2nd flr & replace (e) windows w/ gl. doors.Details
modify ground floor layout to provide an "accessible friendly" entry, bathroom and bedroom areas. relocate (e) bathroom and hvac/mech power plant (within the envelope of the exiting ground floor plan). provide a plant platform on the 2nd flr & replace (e) windows w/ gl. doors. | $50,000 |
| Nov 22, 2013 | Completed final sign-off Apr 2015 | 1894 Donner Av | interior remodel to add 2 bedrooms, 2 baths, and one family room on first floor. remodel (e) kitchen & bathroom on 2nd floor.Details
interior remodel to add 2 bedrooms, 2 baths, and one family room on first floor. remodel (e) kitchen & bathroom on 2nd floor. | $60,000 |
| Sep 16, 2013 | Completed final sign-off Nov 2015 | 177 19th Av | remodeling kitchens & bathrooms in two unitDetails
remodeling kitchens & bathrooms in two unit | $25,000 |
| Jul 23, 2013 | Completed final sign-off Oct 2013 | 1635 Bush St | replace kitchen cabinets and replace bathroom floor and wall tile unit #7Details
replace kitchen cabinets and replace bathroom floor and wall tile unit #7 | $8,000 |
| Jun 4, 2013 | Completed final sign-off Oct 2013 | 492 45th Av | replace kitchen cabinets. replace wall and floor tiles in bathroomDetails
replace kitchen cabinets. replace wall and floor tiles in bathroom | $5,000 |
| May 30, 2013 | Never finaled issued May 2013, no final | 710 Grant Av | install grab bars in public hallway bathrooms on all floors per ordinance da-01. to comply with ordinance 029-13 only. installation of grab bars in sro at 710 grant ave.Details
install grab bars in public hallway bathrooms on all floors per ordinance da-01. to comply with ordinance 029-13 only. installation of grab bars in sro at 710 grant ave. | $100 |
| May 9, 2013 | Completed final sign-off Sep 2013 | 2065 Oakdale Av | comply with nov# 201384082- ti to (e) space-add new partition walls for offices & conference room, relocate bathroom wall to comply with ada access. add 3 new pull-up doors & re-size entry door to meet ada access from parking lot. demo 1 roll down door, fill in with 1 hour rated wall.Details
comply with nov# 201384082- ti to (e) space-add new partition walls for offices & conference room, relocate bathroom wall to comply with ada access. add 3 new pull-up doors & re-size entry door to meet ada access from parking lot. demo 1 roll down door, fill in with 1 hour rated wall. | $68,000 |
| Apr 9, 2013 | Completed final sign-off Jul 2013 | 619 Greenwich St | remodel kitchen and bathroom in unit 619Details
remodel kitchen and bathroom in unit 619 | $25,000 |
| Apr 1, 2013 | Completed final sign-off Jul 2013 | 116 Lenox Wy | convert closet space to 1/2 bathroom on 2nd floor, keep 20% landscape at front.Details
convert closet space to 1/2 bathroom on 2nd floor, keep 20% landscape at front. | $3,000 |
| Mar 28, 2013 | Completed final sign-off Aug 2013 | 15 Phoenix Tr | replace kitchen cabinet & countertop, remodel existing hallway bathroom.Details
replace kitchen cabinet & countertop, remodel existing hallway bathroom. | $20,000 |
| Feb 26, 2013 | Completed final sign-off Mar 2013 | 1220 Stockton St | retile bathroom floor and walls. no electrical or plumbing work being performed.Details
retile bathroom floor and walls. no electrical or plumbing work being performed. | $3,000 |
| Nov 15, 2012 | Completed final sign-off May 2013 | 1435 Clement St | replace kitchen cabinets, countertops, remodel existing bathroom, replace rear window like for like window, not visible from streetDetails
replace kitchen cabinets, countertops, remodel existing bathroom, replace rear window like for like window, not visible from street | $20,000 |
| Aug 13, 2012 | Completed final sign-off Jul 2013 | 121 Westgate Dr | remove 2 posts in basement level. legalize family room and bath. add one full bath on 2nd floor.Details
remove 2 posts in basement level. legalize family room and bath. add one full bath on 2nd floor. | $30,000 |
| Jul 19, 2012 | Completed final sign-off Sep 2012 | 121 Westgate Dr | remove & replace wall tile & floor tile in second floor hallway bathroom.Details
remove & replace wall tile & floor tile in second floor hallway bathroom. | $1,500 |
| Jun 12, 2012 | Never finaled issued Jun 2012, no final | 1355 California St | remodel one kitchen and one bathroom in unit #5, no wall relocation. change four rear windows like for like same size openings. u-factor for windows not to exceed 0.40Details
remodel one kitchen and one bathroom in unit #5, no wall relocation. change four rear windows like for like same size openings. u-factor for windows not to exceed 0.40 | $20,000 |
| Jun 12, 2012 | Completed final sign-off Jul 2012 | 1037 Clay St | remodel one kitchen & one bathroom in unit #3, no wall relocation. a min. of 50% of total rated wattage of installed lighting in kitchen shall be high efficacy. permanently installed lights in bathroom shall be high efficacy unless controlled by manual on occupancy sensors.Details
remodel one kitchen & one bathroom in unit #3, no wall relocation. a min. of 50% of total rated wattage of installed lighting in kitchen shall be high efficacy. permanently installed lights in bathroom shall be high efficacy unless controlled by manual on occupancy sensors. | $15,000 |
| Mar 19, 2012 | Completed final sign-off Apr 2012 | 617 Moscow St | ground floor remodel to convert garage/storage to 2 bedroom and one fullbath. add one full bath on 2nd floor. replace existing roof membrane, b.u.r.Details
ground floor remodel to convert garage/storage to 2 bedroom and one fullbath. add one full bath on 2nd floor. replace existing roof membrane, b.u.r. | $45,000 |
| Feb 27, 2012 | Completed final sign-off Apr 2012 | 617 Moscow St | remodel kitchen and bathroom on upper floor level, no structural work, new lighting comply with cec150(k)Details
remodel kitchen and bathroom on upper floor level, no structural work, new lighting comply with cec150(k) | $15,000 |
| Aug 11, 2011 | Completed final sign-off Dec 2011 | 1547 Powell St | replace all existing windows due to fire damage with same size double pane glass windows. no other exterior work. remodel basement by adding 2 bedrooms, a half bath & a wet bar as an extension of the unit above (1547 powell), partial bldg seismic strengthening for basement level.Details
replace all existing windows due to fire damage with same size double pane glass windows. no other exterior work. remodel basement by adding 2 bedrooms, a half bath & a wet bar as an extension of the unit above (1547 powell), partial bldg seismic strengthening for basement level. | $15,000 |
| Aug 5, 2011 | Completed final sign-off Mar 2012 | 185 Parnassus Av | ground floor storage rooms, and add half bath, use a sprial stair to connect upper floor to ground floor, doing all related work.Details
ground floor storage rooms, and add half bath, use a sprial stair to connect upper floor to ground floor, doing all related work. | $25,000 |
| Jul 28, 2011 | Completed final sign-off Jan 2012 | 1547 Powell St | repair all fire damaged wall and celing with 5/8 type x gb. replace all damaged bathrooms and kitchen. add 1/2 bath on 1st and 2nd fl. replace fireplace,furnaces and hot water heaters. replace portion of e foundation in basement. existing plaster wall and ceiling removal under apprv app 201107261095Details
repair all fire damaged wall and celing with 5/8 type x gb. replace all damaged bathrooms and kitchen. add 1/2 bath on 1st and 2nd fl. replace fireplace,furnaces and hot water heaters. replace portion of e foundation in basement. existing plaster wall and ceiling removal under apprv app 201107261095 | $50,000 |
| Jun 10, 2011 | Completed final sign-off Mar 2016 | 445 Liberty St | revision to #2010-1109-4600 and 2009-0924-7595. add (n) bathroom at storage area and add bathtub at ground floor. no structural workDetails
revision to #2010-1109-4600 and 2009-0924-7595. add (n) bathroom at storage area and add bathtub at ground floor. no structural work | $15,000 |
| Mar 9, 2011 | Completed final sign-off Jun 2011 | 132 Encline Ct | add 2 bedrooms, 1 bathroom on 1st floor (garage). remodel (e) bathroom & add 1 skylight on the 2nd floor. mechanical, electrical, plumbing under seperate permitDetails
add 2 bedrooms, 1 bathroom on 1st floor (garage). remodel (e) bathroom & add 1 skylight on the 2nd floor. mechanical, electrical, plumbing under seperate permit | $19,000 |
| Feb 25, 2011 | Completed final sign-off May 2011 | 633 Huron Av | interior remodel on 2nd floor. create 1 master bathroomDetails
interior remodel on 2nd floor. create 1 master bathroom | $20,000 |
| Feb 10, 2011 | Completed final sign-off May 2011 | 633 Huron Av | remodel existing kitchen and bathroomDetails
remodel existing kitchen and bathroom | $20,000 |
| Jul 8, 2010 | Completed final sign-off Sep 2010 | 2200 Pacific Av | unit #8a: repair and replace kitchen cabinets. install ceramic tile floor on bathroom. no lighting work. no change in exhaust system.Details
unit #8a: repair and replace kitchen cabinets. install ceramic tile floor on bathroom. no lighting work. no change in exhaust system. | $10,000 |
| Jun 9, 2010 | Never finaled issued Dec 2012, no final | 28 Cotter St | comply with compt 200670250. legalize 1 story horizontal addition at rear of exist bldg. for 1 bedroom, play area & 1 full bath room at grd fl.Details
comply with compt 200670250. legalize 1 story horizontal addition at rear of exist bldg. for 1 bedroom, play area & 1 full bath room at grd fl. | $33,000 |
| Apr 27, 2010 | Completed final sign-off Dec 2010 | 1019 Mission St | tenant improvement for (e) office space. no structural work. remove (e) non-bearing partitions. install (n) partitions and ada bathroom. mep & sprinkler under separate permit. no exterior changes.Details
tenant improvement for (e) office space. no structural work. remove (e) non-bearing partitions. install (n) partitions and ada bathroom. mep & sprinkler under separate permit. no exterior changes. | $110,000 |
| Oct 30, 2009 | Completed final sign-off Jan 2010 | 779 14th Av | revision to 200909146722. add storage in garage. arrange bathroom on 2nd fl. total 2 & 1/2 bathsDetails
revision to 200909146722. add storage in garage. arrange bathroom on 2nd fl. total 2 & 1/2 baths | $15,000 |
| Oct 29, 2009 | Completed final sign-off Apr 2010 | 1635 Bush St | replace bathroom tile on wall and floor. no adding or moving walls.Details
replace bathroom tile on wall and floor. no adding or moving walls. | $2,500 |
| Oct 14, 2009 | Completed final sign-off Feb 2010 | 71 Waller St | replace bathroom tile on wall and floor.Details
replace bathroom tile on wall and floor. | $2,500 |
| Dec 23, 2008 | Completed final sign-off Nov 2009 | 405 Saint Francis Bl | remove & replace kitchen cabinets & counter top. replace bathrooms cabinets & floor. no lighting change.Details
remove & replace kitchen cabinets & counter top. replace bathrooms cabinets & floor. no lighting change. | $18,000 |
| Aug 5, 2008 | Completed final sign-off Jan 2009 | 3037 Laguna St | replace bathroom wall tiles and paint.Details
replace bathroom wall tiles and paint. | $3,000 |
| Mar 4, 2008 | Completed final sign-off Oct 2008 | 190 Bridgeview Dr | develope basement level for new 2 bedrooms and 1 bath.Details
develope basement level for new 2 bedrooms and 1 bath. | $38,000 |
| Nov 28, 2007 | Completed final sign-off Mar 2008 | 939 Jones St | replace bathroom floor tile and kitchen floor tile. comply with his nov#200798895, & #200701541.Details
replace bathroom floor tile and kitchen floor tile. comply with his nov#200798895, & #200701541. | $5,000 |
| Nov 27, 2007 | Completed final sign-off Apr 2008 | 779 14th Av | work on unit#2. remodel kitchen and bathroom.Details
work on unit#2. remodel kitchen and bathroom. | $30,000 |
| Sep 28, 2007 | Completed final sign-off Jan 2008 | 6012 California St | replace creamic tile around the bath top. no structural change.Details
replace creamic tile around the bath top. no structural change. | $2,000 |
| May 10, 2007 | Completed final sign-off Aug 2008 | 93 Monterey Bl | extend deck, remodel master bath (bath -1), replace kitchen cabinets and bath-3 cabinetsDetails
extend deck, remodel master bath (bath -1), replace kitchen cabinets and bath-3 cabinets | $43,000 |
| Jan 28, 2005 | Never finaled issued Jan 2005, no final | 75 Liberty St | remodel kitchen and bath per plan. replace lath and plaster w/ sheetrock in the area.......Details
remodel kitchen and bath per plan. replace lath and plaster w/ sheetrock in the area....... | $15,000 |
| Nov 23, 2004 | Completed final sign-off Apr 2005 | 176 Cora St | legalize rooms behind garage, one storage, living room, bedroom & bath.Details
legalize rooms behind garage, one storage, living room, bedroom & bath. | $15,000 |
| Oct 30, 2003 | Expired or cancelled cancelled Jul 2007 | 1060 Jackson St | replace 20 dry rot windows,d.h.windows, repair cracked stucco, remodel kitchen/bathDetails
replace 20 dry rot windows,d.h.windows, repair cracked stucco, remodel kitchen/bath | $48,000 |