Mulhall Construction Inc.
- Based in
- Novato
- On San Francisco permits
- Apr 2009 to May 2026
- Last 24 months
- 4 permits filed
238 permits since 2000: 216 completed, 2 in progress, 15 never finaled, 5 expired or cancelled.
Of the 15 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
14 deck permits: 14 completed. Typically 152 days from filing to permit and 312 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2017 | Completed final sign-off Nov 2020 | 3255 Sacramento St | deck replacement. not visible from street. like for likeDetails
deck replacement. not visible from street. like for like | $2,000 |
| Feb 22, 2017 | Completed final sign-off Sep 2017 | 412 Gold Mine Dr | replace rear decking and joists damaged by dry rot. repair shingles, all work in kind.Details
replace rear decking and joists damaged by dry rot. repair shingles, all work in kind. | $20,000 |
| Apr 14, 2016 | Completed final sign-off Jun 2017 | 569 Duboce Av | new deck in rear with new stair to replace (e) landing and stair.Details
new deck in rear with new stair to replace (e) landing and stair. | $9,000 |
| May 4, 2015 | Completed final sign-off Sep 2015 | 1378 Portola Dr | conversion of extg basement "rooms down" conversion to include new bedroom and bathroom. french doors from extg bedroom to new landing to extg deck. remove extg wood beam and post and replace with new steel beam and post with new foundation; no building expansionDetails
conversion of extg basement "rooms down" conversion to include new bedroom and bathroom. french doors from extg bedroom to new landing to extg deck. remove extg wood beam and post and replace with new steel beam and post with new foundation; no building expansion | $70,000 |
| Mar 14, 2014 | Completed final sign-off Mar 2016 | 70 Martha Av | a 3 story rear deck.Details
a 3 story rear deck. | $19,000 |
| Mar 5, 2014 | Completed final sign-off Apr 2016 | 823 Alvarado St | remodel of existing kitchen & family rm. addition of bay window off of family rm. rebuild deck and exterior stair at back of house. expand basement level art studio under family rm. adding approx 325 sf useable.Details
remodel of existing kitchen & family rm. addition of bay window off of family rm. rebuild deck and exterior stair at back of house. expand basement level art studio under family rm. adding approx 325 sf useable. | $125,000 |
| Dec 13, 2013 | Completed final sign-off Feb 2017 | 178 Los Palmos Dr | a 820 sq ft 3rd story addition atop an existing 2 story house interior remodel of (e) 2nd story. rear decks.Details
a 820 sq ft 3rd story addition atop an existing 2 story house interior remodel of (e) 2nd story. rear decks. | $350,000 |
| Oct 18, 2013 | Completed final sign-off Jun 2015 | 1327 35th Av | interior remodel of an (e) 2 unit residence including kitchens & bathrooms. demolish 210sq ft of ground level. re-build deck & egress stairsDetails
interior remodel of an (e) 2 unit residence including kitchens & bathrooms. demolish 210sq ft of ground level. re-build deck & egress stairs | $100,000 |
| Feb 8, 2013 | Completed final sign-off Oct 2015 | 2335 15th Av | interior remodel of existing kitchen, master bedroom add 1 interior bath. enclose an existing rear deck, enclose an existing lightwell.Details
interior remodel of existing kitchen, master bedroom add 1 interior bath. enclose an existing rear deck, enclose an existing lightwell. | $99,000 |
| Aug 2, 2012 | Completed final sign-off Nov 2012 | 640 Ortega St | replace rear deck in kind, less than 10ftDetails
replace rear deck in kind, less than 10ft | $10,000 |
| May 10, 2012 | Completed final sign-off Feb 2014 | 95 Coleridge St | replace retaiing walls & exterior deck, deck less than 30".Details
replace retaiing walls & exterior deck, deck less than 30". | $10,000 |
| Mar 13, 2012 | Completed final sign-off Jul 2012 | 1460 Alabama St | a new deck at the back of houseDetails
a new deck at the back of house | $4,500 |
| May 13, 2011 | Completed final sign-off Oct 2011 | 447 Fair Oaks St | replace existing deck and stairs in kind. exiting decking, framing, rails are delapiated and structurally undsound. deck is on 2nd floor, there are 2 sets of stairs. grade to deck and deck to 3rd flDetails
replace existing deck and stairs in kind. exiting decking, framing, rails are delapiated and structurally undsound. deck is on 2nd floor, there are 2 sets of stairs. grade to deck and deck to 3rd fl | $10,000 |
| Mar 11, 2011 | Completed final sign-off Nov 2011 | 2141 Filbert St | horizontial extension of rear of building existing deck to be cut back to accept addition.Details
horizontial extension of rear of building existing deck to be cut back to accept addition. | $100,000 |