Back to bathroom remodel contractors
Mrcc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Aug 2026
- Last 24 months
- 13 permits filed
103 permits since 2000: 73 completed, 7 in progress, 15 never finaled, 8 expired or cancelled.
Of the 15 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 29 completed, 2 in progress, 3 never finaled. Typically 10 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2026 | Completed final sign-off Sep 2026 | 4118 20th St | patch sheetrock from electrical upgrade. new vanity and medicine cabinet on the 3rd floor bathDetails
patch sheetrock from electrical upgrade. new vanity and medicine cabinet on the 3rd floor bath | $15,000 |
| Oct 24, 2025 | Completed final sign-off Feb 2026 | 1952 21st Av | one bathroom remodel remove all finishes (tile, vanity, lighting fixtures, plumbing fixtures) replace with newDetails
one bathroom remodel remove all finishes (tile, vanity, lighting fixtures, plumbing fixtures) replace with new | $50,000 |
| Sep 22, 2025 | In progress issued Aug 2026 | 54 Sussex St | new two story horizontal addition at rear yard, new media room and bathroom at basement level, new second story vertical addition: primary bedroom and bathroom, new exterior finishes at existing front facade, new main entry front door system at existing location, new interior renovationsDetails
new two story horizontal addition at rear yard, new media room and bathroom at basement level, new second story vertical addition: primary bedroom and bathroom, new exterior finishes at existing front facade, new main entry front door system at existing location, new interior renovations | $750,000 |
| Nov 8, 2024 | In progress issued Dec 2024 | 1410 Monterey Bl | remodel of (e) bathroom, replacement of plumbing fixtures. enlarged shower, removal of (e) bathtub. new vanity, new electrical & plumbing, all new tile.Details
remodel of (e) bathroom, replacement of plumbing fixtures. enlarged shower, removal of (e) bathtub. new vanity, new electrical & plumbing, all new tile. | $37,500 |
| Jul 16, 2024 | Completed final sign-off Dec 2024 | 743 Filbert St | remodel existing kitchen and bathroom. add new bathroom - new plumbing req'd and electrical. no exterior work.Details
remodel existing kitchen and bathroom. add new bathroom - new plumbing req'd and electrical. no exterior work. | $80,000 |
| Feb 21, 2024 | Completed final sign-off Dec 2024 | 410 30th St | remodel of (e) kitchen, new window and door, new electrical. remodel (2) bathrooms with new electrical and plumbing.Details
remodel of (e) kitchen, new window and door, new electrical. remodel (2) bathrooms with new electrical and plumbing. | $110,000 |
| Jun 29, 2023 | Completed final sign-off Sep 2024 | 73 Dellbrook Av | 1st fl. remodel garage to include additon of bedroom and bathroom, replace sliding door 2nd fl. remodel (e) kitchen and bathrooms new elce ad plumbing in area of remodels structural upgrades as required for remodelDetails
1st fl. remodel garage to include additon of bedroom and bathroom, replace sliding door 2nd fl. remodel (e) kitchen and bathrooms new elce ad plumbing in area of remodels structural upgrades as required for remodel | $250,000 |
| May 1, 2023 | Completed final sign-off Dec 2023 | 51 Farnum St | remodel 1 (e) bathroom, new plumbing fixtures, new finishes, one new lavatory sink. replace 1 (e) skylight on flat roof. no changes. u-factor = 0.30. new electrical and plumbing in area of work. in kind replacement of light fixtures.Details
remodel 1 (e) bathroom, new plumbing fixtures, new finishes, one new lavatory sink. replace 1 (e) skylight on flat roof. no changes. u-factor = 0.30. new electrical and plumbing in area of work. in kind replacement of light fixtures. | $22,000 |
| Mar 17, 2023 | Completed final sign-off Mar 2026 | 56 Hartford St | (n) horizontal building addition @ rear yard. basement level only, under (e) deck & under (e) building envelope. (n) bedroom & bathroom. (n) roof deck to match (e)g (first floor level).Details
(n) horizontal building addition @ rear yard. basement level only, under (e) deck & under (e) building envelope. (n) bedroom & bathroom. (n) roof deck to match (e)g (first floor level). | $125,000 |
| Oct 8, 2020 | Completed final sign-off Dec 2021 | 112 Montcalm St | revision to pa 201908300285. reconfiguration of master bath, office and master closet on 1st flr window shift along 2nd flr.Details
revision to pa 201908300285. reconfiguration of master bath, office and master closet on 1st flr window shift along 2nd flr. | $25,000 |
| Jul 6, 2020 | Completed final sign-off Dec 2020 | 426 Eureka St | upper level bathroom remodel. plumbing fixture locations to remain. (n) electrical, sheetrack, tile, fixtures, insulation, paintDetails
upper level bathroom remodel. plumbing fixture locations to remain. (n) electrical, sheetrack, tile, fixtures, insulation, paint | $20,000 |
| Jul 6, 2020 | Completed final sign-off Dec 2020 | 2040 Laguna St | (n) bathroom remodel (to the studs). kitchen remodel, plumbing fixture locations to remain. (n) sheetrock, insulation, cabinets, tile, counter tops, paintDetails
(n) bathroom remodel (to the studs). kitchen remodel, plumbing fixture locations to remain. (n) sheetrock, insulation, cabinets, tile, counter tops, paint | $45,000 |
| Jan 9, 2020 | Completed final sign-off Aug 2020 | 426 Eureka St | 2/f: remodel (e) bathroom. fixture locations reamin in the same location. new vanity, new medicine cabinet, rough-in of eletrical & plumbing, new sheetrock & new tile. 1 bathroom remodel in-kind.Details
2/f: remodel (e) bathroom. fixture locations reamin in the same location. new vanity, new medicine cabinet, rough-in of eletrical & plumbing, new sheetrock & new tile. 1 bathroom remodel in-kind. | $20,000 |
| May 6, 2019 | Completed final sign-off Oct 2019 | 2214 Pine St | replace kitchen cabinets/finishes; demo/replace bath #1 and finishes; demo/replace bath #2 and finises/ add laundry where closet is currently. no structural work, no framing/modification.Details
replace kitchen cabinets/finishes; demo/replace bath #1 and finishes; demo/replace bath #2 and finises/ add laundry where closet is currently. no structural work, no framing/modification. | $100,000 |
| Apr 26, 2019 | Completed final sign-off Feb 2020 | 1220 18th St | unit 1220, 1st flr. relocate kitchen, install (n) laundry and pantry, (n) sink at (e) powder room. units 1220 & 1222: renovation of (e) baths at 1st and 2nd flr.Details
unit 1220, 1st flr. relocate kitchen, install (n) laundry and pantry, (n) sink at (e) powder room. units 1220 & 1222: renovation of (e) baths at 1st and 2nd flr. | $45,000 |
| Apr 18, 2019 | Completed final sign-off Oct 2019 | 136 Randall St | kitchen remodel. relocate (e) half bath. remodel of (e) shed to sunroom with new door & windows. sunroom is uncondititioned space.Details
kitchen remodel. relocate (e) half bath. remodel of (e) shed to sunroom with new door & windows. sunroom is uncondititioned space. | $36,837 |
| Jan 18, 2019 | Completed final sign-off Jul 2019 | 2040 Laguna St | kitchen and bathroom remodel. bathroom-new cabinets, countertops, appliances, 6'x5'. bathroom-demo to the studs, new tiles, fixtures, electrical., 5'x5'. misc: new flooring and paint. maher n/aDetails
kitchen and bathroom remodel. bathroom-new cabinets, countertops, appliances, 6'x5'. bathroom-demo to the studs, new tiles, fixtures, electrical., 5'x5'. misc: new flooring and paint. maher n/a | $50,000 |
| Aug 9, 2018 | Completed final sign-off Dec 2018 | 60 Hartford St | bathroom remodel: existing 6'x10' bath demoed down to the studs. new electrical wiring, plumbing fixtures remain in the same spot. (toilet,tub, sink)Details
bathroom remodel: existing 6'x10' bath demoed down to the studs. new electrical wiring, plumbing fixtures remain in the same spot. (toilet,tub, sink) | $20,000 |
| Jul 20, 2018 | Completed final sign-off Apr 2019 | 523 17th Av | new 3rd fl master bath/closet. new exterior window at front, wood double hung, no added square footage, no increase to exterior envelopeDetails
new 3rd fl master bath/closet. new exterior window at front, wood double hung, no added square footage, no increase to exterior envelope | $50,000 |
| Mar 6, 2018 | Completed final sign-off Aug 2018 | 2212 Pine St | lighting per cenc 150.0(k) unit demolished to the studs. there are 2 bedrooms, one kitchen, one bath. all finishes to be replace in kind. lower unit, behind entrance stairs. all (e) walls to remainDetails
lighting per cenc 150.0(k) unit demolished to the studs. there are 2 bedrooms, one kitchen, one bath. all finishes to be replace in kind. lower unit, behind entrance stairs. all (e) walls to remain | $225,000 |
| Oct 17, 2017 | Completed final sign-off May 2018 | 666 10th Av | remodel (e) bathroom, new plumbing, electrical, insulation, sheetrock, tile, cabinet, paint.Details
remodel (e) bathroom, new plumbing, electrical, insulation, sheetrock, tile, cabinet, paint. | $25,000 |
| Jun 14, 2017 | Completed final sign-off Jan 2018 | 40 Collingwood St | interior remodel of kitchen and bath with new powder room. new electrical and plumbing in remodeled area. removal of extg brick flue and raising extg beam up into attic space. new awning window at back of house. replace in kind exterior door at rear. maher ord 155-13 naDetails
interior remodel of kitchen and bath with new powder room. new electrical and plumbing in remodeled area. removal of extg brick flue and raising extg beam up into attic space. new awning window at back of house. replace in kind exterior door at rear. maher ord 155-13 na | $85,000 |
| May 3, 2016 | Completed final sign-off Jul 2016 | 2032 14th Av | residential remodel: replace fixtures and finishes in powder room and bathrooms. upgrade main electricla panel.Details
residential remodel: replace fixtures and finishes in powder room and bathrooms. upgrade main electricla panel. | $45,000 |
| Mar 9, 2015 | Completed final sign-off Aug 2015 | 4268 26th St | revision to approved permit # 2013 0321 2723 - convert 1st flr bathroom into living space. convert closet to bathroom. replace in kind windows (3) at rear facade. remove approved dormers from scope of work from approved permitDetails
revision to approved permit # 2013 0321 2723 - convert 1st flr bathroom into living space. convert closet to bathroom. replace in kind windows (3) at rear facade. remove approved dormers from scope of work from approved permit | $24,433 |
| Aug 8, 2014 | Completed final sign-off Jan 2015 | 936 Chenery St | bathroom remodel 6' x 6' - plumbing fixtures locations to remain, new electrical fixtures installed, insulation, sheetrocks. to comply with cec 150.0(k)5Details
bathroom remodel 6' x 6' - plumbing fixtures locations to remain, new electrical fixtures installed, insulation, sheetrocks. to comply with cec 150.0(k)5 | $30,000 |
| Jan 23, 2014 | Completed final sign-off May 2014 | 359 San Benito Wy | remodel to kitchen & two bathrooms, no expansion of (e) envelope. several windows to be replaced at sides & rear of house in-kind wood windows. new heating system to be installed & some new electrical updates. general dryrot repair.Details
remodel to kitchen & two bathrooms, no expansion of (e) envelope. several windows to be replaced at sides & rear of house in-kind wood windows. new heating system to be installed & some new electrical updates. general dryrot repair. | $135,000 |
| Jun 28, 2013 | Completed final sign-off Sep 2015 | 4271 26th St | lower floor addition including bedroom & bathroom & new interior stair. legalize (e) family room @ 2nd floor (garden room).Details
lower floor addition including bedroom & bathroom & new interior stair. legalize (e) family room @ 2nd floor (garden room). | $75,000 |
| Mar 21, 2013 | Never finaled issued Mar 2014, no final | 4268 26th St | convert closet and attic space to bathroomDetails
convert closet and attic space to bathroom | $25,000 |
| Jan 29, 2013 | Never finaled issued Feb 2013, no final | 2744 Fulton St | interior renovation: extg ground level renovation to legalize laundry, bath, family. extg 2nd level renovated bath.Details
interior renovation: extg ground level renovation to legalize laundry, bath, family. extg 2nd level renovated bath. | $50,000 |
| Nov 8, 2012 | Completed final sign-off Jan 2013 | 52 07th Av | kitchen remodel, remodel of (2) bathrooms, relocate laundry, minor electrical (interior work only).Details
kitchen remodel, remodel of (2) bathrooms, relocate laundry, minor electrical (interior work only). | $70,000 |
| Oct 30, 2012 | Completed final sign-off Sep 2013 | 2047 10th Av | partial excavation at first floor to create new laundry room. new interior renovations throughout existing first floor level including new bathroom & new bedroom, new exterior window systems & new exterior door at first floor level.Details
partial excavation at first floor to create new laundry room. new interior renovations throughout existing first floor level including new bathroom & new bedroom, new exterior window systems & new exterior door at first floor level. | $45,000 |
| Sep 8, 2010 | Never finaled issued Aug 2011, no final | 60 Hartford St | remodel 1st floor bedroom & bathroom.remove art studio at 1st floor.add garage @ 1st floor.Details
remodel 1st floor bedroom & bathroom.remove art studio at 1st floor.add garage @ 1st floor. | $50,000 |
| Jul 30, 2010 | Completed final sign-off Oct 2010 | 1315 Diamond St | add full bathroom and legalize bedroom at existing first/garage floorDetails
add full bathroom and legalize bedroom at existing first/garage floor | $24,000 |
| Jan 26, 2010 | Completed final sign-off Jun 2010 | 2445 Ulloa St | downstairs (e) bathroom remodel, upstairs (e) kitchen remodel. no added sqft. no increase to bldg enevelope. window replacement under separate permitDetails
downstairs (e) bathroom remodel, upstairs (e) kitchen remodel. no added sqft. no increase to bldg enevelope. window replacement under separate permit | $40,000 |