9 permits since 2000: 4 completed, 1 in progress, 4 never finaled. Typically 6 days from filing to permit and 216 days from permit to final inspection. Of the 4 never-finaled permits, 4 are over 10 years old.

- Based in: Oakland
- On San Francisco permits: Mar 2009 to Mar 2024
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2009 | 0 | 0 | 1 | 0 |
| 2010 | 0 | 0 | 3 | 0 |
| 2011 | 1 | 0 | 0 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2013 | 1 | 0 | 0 | 0 |
| 2020 | 1 | 0 | 0 | 0 |
| 2024 | 0 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 1 | 1 | 0 | 0 | 0 | 0 | 287 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202403218360](https://www.permitgraph.org/p/202403218360) | Mar 21, 2024 | In progress: filed Mar 2024, not yet issued | [3500 Great Hy](https://www.permitgraph.org/a/7281/007) | sfpuc mou proj#j-24-0570: at (e) wastewater facility concrete building 821 - install new standby diesel generator & fuel system. | $320,000 |
| [202011108643](https://www.permitgraph.org/p/202011108643) | Nov 10, 2020 | Completed: final sign-off May 2021 | [1570 Bay St](https://www.permitgraph.org/a/0459/032) | installation of new 8' high steel swing gate for pc&e marina substation. | $65,000 |
| [201306068840](https://www.permitgraph.org/p/201306068840) | Jun 6, 2013 | Completed: final sign-off Jun 2015 | [2445 Golden Gate Av](https://www.permitgraph.org/a/1145/003) | removal of existing 75 kw standby generator in harney scence center mech room. new 230 kw standby diesel generator at the roof of the harney science center with piping and conduits routed to a new fu… | $230,000 |
| [201206152734](https://www.permitgraph.org/p/201206152734) | Jun 15, 2012 | Completed: final sign-off Mar 2013 | [634 Laguna St](https://www.permitgraph.org/a/0807/030) | kitchen remodel, new elecreical fixtures, lighting, and plumbing. no structural wall modification of 50% of the total rated wattage of permanetly installed lighting in kitchen shall be high efficacy. | $3,000 |
| [201101148407](https://www.permitgraph.org/p/201101148407) | Jan 14, 2011 | Completed: final sign-off Jun 2011 | [801 Felton St](https://www.permitgraph.org/a/5973/002) | 80 kw generator installation plan check revision to permit application #20105142477,201006104237,201006245255. detail changes. added secondary containment fill w/95%, audible alarm, leak sensor. |  |
| [201006245255](https://www.permitgraph.org/p/201006245255) | Jun 24, 2010 | Never finaled: issued Jun 2010, no final | [801 Felton St](https://www.permitgraph.org/a/5973/002) | revision to 201005142477 and 201006104237. detail changes for 80 kw generator installation |  |
| [201006104237](https://www.permitgraph.org/p/201006104237) | Jun 10, 2010 | Never finaled: issued Jun 2010, no final | [801 Felton St](https://www.permitgraph.org/a/5973/002) | revision to pa# 2010.05.14.2477. tank, venting and generator type changed |  |
| [201005142477](https://www.permitgraph.org/p/201005142477) | May 14, 2010 | Never finaled: issued May 2010, no final | [801 Felton St](https://www.permitgraph.org/a/5973/002) | installation of 80 kw genset with leak detection | $150,000 |
| [200903103764](https://www.permitgraph.org/p/200903103764) | Mar 10, 2009 | Never finaled: issued May 2009, no final | [801 Felton St](https://www.permitgraph.org/a/5973/002) | installation of 10,000 gal underground diesel fuel storage tank. install 2 day tanks 150 gal each. install double containment flex hose supply, return, & vent lines underground. install double contai… | $250,000 |

---