Mike Cahalan
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2021
- Last 24 months
- 0 permits filed
106 permits since 2000: 90 completed, 9 never finaled, 7 expired or cancelled.
Of the 9 never-finaled permits, 2 are 5 to 10 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
14 deck permits: 14 completed. Typically 0 days from filing to permit and 42 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2019 | Completed final sign-off Apr 2019 | 591 44th Av | repair deck at south west corner of building (rear) in partial compliance with nov 201919451. work is less than 50%. ref pa201903054454 for penalty of nov201919451.Details
repair deck at south west corner of building (rear) in partial compliance with nov 201919451. work is less than 50%. ref pa201903054454 for penalty of nov201919451. | $1,000 |
| Feb 22, 2017 | Completed final sign-off Apr 2017 | 816 Pacheco St | complete work as outlined in notice of violation complaint #201643391. remove deck.Details
complete work as outlined in notice of violation complaint #201643391. remove deck. | $7,500 |
| Oct 16, 2014 | Completed final sign-off Oct 2014 | 40 Meadowbrook Dr | repair dry rot damage to front decorative balcony, right side, remove 3-feet stucco, replace 1 4x4 joist; repair two deck boards.Details
repair dry rot damage to front decorative balcony, right side, remove 3-feet stucco, replace 1 4x4 joist; repair two deck boards. | $2,000 |
| Mar 21, 2014 | Completed final sign-off Apr 2014 | 44 Meadowbrook Dr | repair dryrot at front. remove stucco and repair wood repair only. change balcony deck boards (2) repair only. restucco in kind.Details
repair dryrot at front. remove stucco and repair wood repair only. change balcony deck boards (2) repair only. restucco in kind. | $5,000 |
| Sep 1, 2011 | Completed final sign-off Nov 2012 | 3887 17th St | to comply w/ nov# 201152003 dated 8/2/11. upper rear deck has rot damaged struc framing. demo upper rear deck, lower rear deck & 2-story enclosed porch. not to rebuild lower rear deck, build (n)2-sty enclosed porch w/ 3rd story deck & ext.stairs 2ndfl to grade.enclosed porch is unconditioned spaceDetails
to comply w/ nov# 201152003 dated 8/2/11. upper rear deck has rot damaged struc framing. demo upper rear deck, lower rear deck & 2-story enclosed porch. not to rebuild lower rear deck, build (n)2-sty enclosed porch w/ 3rd story deck & ext.stairs 2ndfl to grade.enclosed porch is unconditioned space | $35,000 |
| May 23, 2008 | Completed final sign-off Aug 2008 | 184 Gold Mine Dr | repair/replace deck boards, railings boards, joists as necessary with new redwood or pressure treated material. new material to be same as before, less than 50% repair/replace.Details
repair/replace deck boards, railings boards, joists as necessary with new redwood or pressure treated material. new material to be same as before, less than 50% repair/replace. | $21,000 |
| Apr 19, 2007 | Completed final sign-off Apr 2007 | 123 Beulah St | repair dry rotted material at rear wood decks and stairs. new material to be pressure treated or redwood. less then 50%Details
repair dry rotted material at rear wood decks and stairs. new material to be pressure treated or redwood. less then 50% | $7,000 |
| Feb 20, 2007 | Completed final sign-off Mar 2007 | 134 Galewood Cr | repair rear 1st floor deck. remove stucco as necessary. repair dry rotted material. re-stucco to reasonable match existing. (existing, in kind repair)Details
repair rear 1st floor deck. remove stucco as necessary. repair dry rotted material. re-stucco to reasonable match existing. (existing, in kind repair) | $6,400 |
| Sep 30, 2005 | Completed final sign-off May 2008 | 2022 12th Av | construct a new 3rd story vertical addition & deck on top of (e) 2 story house. build exterior stairs from new 3rd story deck to grade at southeast corner of house.Details
construct a new 3rd story vertical addition & deck on top of (e) 2 story house. build exterior stairs from new 3rd story deck to grade at southeast corner of house. | $87,000 |
| Aug 24, 2005 | Completed final sign-off Oct 2005 | 671 Douglass St | work to be done as outlined in n.o.v#200559666. dated 05/11/05. repair/replace section of back deckDetails
work to be done as outlined in n.o.v#200559666. dated 05/11/05. repair/replace section of back deck | $3,000 |
| Oct 7, 2002 | Completed final sign-off Apr 2003 | 631 San Bruno Av | deck replaced and made largerDetails
deck replaced and made larger | $7,000 |
| Jul 24, 2002 | Completed final sign-off Aug 2002 | 1147 Dolores St | repairs to deck stairs at back of bldg. replace stringer. replace deckboards. install hand rail wherDetails
repairs to deck stairs at back of bldg. replace stringer. replace deckboards. install hand rail wher | $8,000 |
| Apr 27, 2001 | Completed final sign-off Jun 2001 | 1355 Bay St | repair concrete deck at rear, repair dry rotted wood, install roof membrame cit 200114034Details
repair concrete deck at rear, repair dry rotted wood, install roof membrame cit 200114034 | $10,000 |
| Jan 31, 2001 | Completed final sign-off Apr 2001 | 245 Anderson St | repair fire damage repair deck w/like material -redwood -remove treated joistsDetails
repair fire damage repair deck w/like material -redwood -remove treated joists | $14,550 |