# Meylan Construction

Contractor license 680456. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/meylan-construction-680456
- JSON: https://www.permitgraph.org/api/contractor?license=680456
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=680456

57 permits since 2000: 42 completed, 1 in progress, 12 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 129 days from permit to final inspection. Of the 12 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 7 are over 10 years old. 1 was filed but never issued.

- Based in: San Rafael
- On San Francisco permits: Jun 2004 to Apr 2025
- Last 24 months: 1 permit filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2004 | 1 | 0 | 0 | 1 |
| 2005 | 4 | 0 | 2 | 0 |
| 2006 | 2 | 0 | 1 | 1 |
| 2007 | 4 | 0 | 0 | 0 |
| 2008 | 1 | 0 | 0 | 0 |
| 2009 | 2 | 0 | 0 | 0 |
| 2010 | 2 | 0 | 0 | 0 |
| 2011 | 2 | 0 | 3 | 0 |
| 2012 | 4 | 0 | 0 | 0 |
| 2013 | 2 | 0 | 0 | 0 |
| 2014 | 3 | 0 | 0 | 0 |
| 2015 | 2 | 0 | 0 | 0 |
| 2016 | 5 | 0 | 1 | 0 |
| 2017 | 1 | 0 | 0 | 0 |
| 2018 | 1 | 0 | 1 | 0 |
| 2019 | 3 | 0 | 1 | 0 |
| 2021 | 1 | 0 | 0 | 0 |
| 2022 | 0 | 0 | 2 | 0 |
| 2023 | 1 | 0 | 1 | 0 |
| 2024 | 1 | 0 | 0 | 0 |
| 2025 | 0 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 2 | 1 | 1 | 0 | 0 | 80 | 146 |
| Kitchen remodel | 3 | 2 | 0 | 1 | 0 | 38 | 132 |
| Stairs | 2 | 2 | 0 | 0 | 0 | 12 | 100 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202503132201](https://www.permitgraph.org/p/202503132201) | Apr 23, 2025 | In progress: issued Oct 2025 | [1370 Wallace Av](https://www.permitgraph.org/a/4827/021) | to comply w/ nov# 201845201, 201845202, 201842931, and orders of abatements: demo work done without permit. retroactively permit (e) roof to expand building envelope over (e) retaining walls (permit… | $117,372 |
| [202407096055](https://www.permitgraph.org/p/202407096055) | Jul 9, 2024 | Completed: final sign-off Nov 2024 | [2255 03rd St](https://www.permitgraph.org/a/4058/010) | ceiling and lighting improvements to existing interior lower fl (basement) space. area of work apprx 2395 sf | $50,260 |
| [202311019967](https://www.permitgraph.org/p/202311019967) | Nov 1, 2023 | Completed: final sign-off Jan 2024 | [1166 Geneva Av](https://www.permitgraph.org/a/6413/031) | build canopy outdoors to house walk-in cooler. installtion of walk-in cooler | $5,000 |
| [202309055915](https://www.permitgraph.org/p/202309055915) | Sep 5, 2023 | Never finaled: issued Sep 2023, no final | [1166 Geneva Av](https://www.permitgraph.org/a/6413/031) | adding floor drain. upgrading electrical panel. | $100,000 |
| [202202258768](https://www.permitgraph.org/p/202202258768) | Feb 25, 2022 | Never finaled: filed Feb 2022, never issued | [2255 03rd St](https://www.permitgraph.org/a/4058/010) | change of use type b occ to type e for 2-8 school. new accessible women's restroom @ lower level. remodel (e) restroom, (n) plumbing fixtures, drinking fountain/bottle filler. relocate kitchenette. m… | $150,000 |
| [202201286881](https://www.permitgraph.org/p/202201286881) | Jan 28, 2022 | Never finaled: issued Jan 2022, no final | [200 Green St](https://www.permitgraph.org/a/0113/006) | revision to permit #202106243158. install new ada automatic door opener system at suite 200 main entrance. | $1,500 |
| [202106243158](https://www.permitgraph.org/p/202106243158) | Jun 24, 2021 | Completed: final sign-off Feb 2022 | [200 Green St](https://www.permitgraph.org/a/0113/006) | interior work only, add interior non bearing partitoins on 1st fl and cleaned up finishes | $48,000 |
| [201908279912](https://www.permitgraph.org/p/201908279912) | Aug 27, 2019 | Never finaled: issued Dec 2019, no final | [1830 Polk St](https://www.permitgraph.org/a/0597/029) | ti - new partitions, toilet facilities. ele/lighting. plm. mech modifications; change from retail to fitness exercise studio. | $230,000 |
| [201907115625](https://www.permitgraph.org/p/201907115625) | Jul 11, 2019 | Completed: final sign-off Sep 2019 | [1798 Bryant St](https://www.permitgraph.org/a/3965/010) | revision to app# 201904258938. remove all car parking -remove marking, striping , signage, from scope. n/a for maher |  |
| [201904258938](https://www.permitgraph.org/p/201904258938) | Apr 25, 2019 | Completed: final sign-off Sep 2019 | [1798 Bryant St](https://www.permitgraph.org/a/3965/010) | revision to permit 2018-0814-7261 r2. new concrete landing and ramp at secondary exit. change in parking striping and van accessible parking location. |  |
| [201901099918](https://www.permitgraph.org/p/201901099918) | Jan 9, 2019 | Completed: final sign-off Sep 2019 | [4228 Geary Bl](https://www.permitgraph.org/a/1438/019) | voluntary seismic upgrade. add 3 ada toilets and automatic door opener | $150,000 |
| [201812148412](https://www.permitgraph.org/p/201812148412) | Dec 14, 2018 | Never finaled: issued Dec 2018, no final | [4228 Geary Bl](https://www.permitgraph.org/a/1438/019) | demo of interior walls, suspended ceiling, flooring light fixtures, plumb fixtures, strip inside of exterior walls to base framing | $28,000 |
| [201808147261](https://www.permitgraph.org/p/201808147261) | Aug 14, 2018 | Completed: final sign-off Sep 2019 | [1798 Bryant St](https://www.permitgraph.org/a/3965/010) | demo some walls, plumbing fixtures. demo of non-structural walls to be replaced w/ structural shear walls. ti including, design showroom, customer & design construction rooms, design workspace, offic… | $500,000 |
| [201708255894](https://www.permitgraph.org/p/201708255894) | Aug 25, 2017 | Completed: final sign-off Nov 2017 | [1415 Howard St](https://www.permitgraph.org/a/3517/034) | revision to pa #201608114810 - modification oto two basement restrooms for kindergarden use in lieu of toddler use including deletion of two toilets, deletion of one sink, & addition of two toilet pa… |  |
| [201609127445](https://www.permitgraph.org/p/201609127445) | Sep 12, 2016 | Completed: final sign-off Sep 2017 | [1415 Howard St](https://www.permitgraph.org/a/3517/034) | demo of extg non-load bearing interior partitions. | $25,000 |
| [201609127424](https://www.permitgraph.org/p/201609127424) | Sep 12, 2016 | Completed: final sign-off Sep 2017 | [1415 Howard St](https://www.permitgraph.org/a/3517/034) | retaining wall, lagging wall, soldier piers at west property line | $100,000 |
| [201608114836](https://www.permitgraph.org/p/201608114836) | Aug 11, 2016 | Completed: final sign-off Nov 2017 | [1415 Howard St](https://www.permitgraph.org/a/3517/034) | seismic retrofit only. t.i. app#201608114810. n/a for maher | $125,000 |
| [201608114810](https://www.permitgraph.org/p/201608114810) | Aug 11, 2016 | Completed: final sign-off Jan 2018 | [1415 Howard St](https://www.permitgraph.org/a/3517/034) | change of use from rectory to school and tenant improvements. (seismic retrofit under seperate permit). ** maher: n/a ** | $986,000 |
| [201603232866](https://www.permitgraph.org/p/201603232866) | Mar 23, 2016 | Completed: final sign-off Oct 2016 | [981 Mission St](https://www.permitgraph.org/a/3725/078) | ti- for ground floor, basement, mezzanie work includes new partitions, doors, new enclosed cafe, reception counter, mep. exterior work consists of one (n) window along minna st. | $320,000 |
| [201601126917](https://www.permitgraph.org/p/201601126917) | Jan 12, 2016 | Never finaled: issued Feb 2016, no final | [3150 California St](https://www.permitgraph.org/a/1022/013) | 2nd floor t. i. of an (e) offic ebldg including reconfiguring of interior walls & doors. upgrade accessible path of travel to area of work. | $125,000 |
| [201507080978](https://www.permitgraph.org/p/201507080978) | Jul 8, 2015 | Completed: final sign-off Oct 2015 | [3620 17th St](https://www.permitgraph.org/a/3566/011) | to comply with nov#201527481 - replace facing brick stairway with like kind; new brick stairway and new wood under carriage. n/a maher ordinance | $20,000 |
| [201505126025](https://www.permitgraph.org/p/201505126025) | May 12, 2015 | Completed: final sign-off Sep 2015 | [2222 Broadway](https://www.permitgraph.org/a/0564/070) | barrier removal, install (n) handrail & guardrail at (e) stair. | $208,561 |
| [201407100875](https://www.permitgraph.org/p/201407100875) | Jul 10, 2014 | Completed: final sign-off Nov 2014 | [1715 Octavia St](https://www.permitgraph.org/a/0663/054) | interior renovation of an extg library. | $387,000 |
| [201406128228](https://www.permitgraph.org/p/201406128228) | Jun 12, 2014 | Completed: final sign-off Mar 2015 | [2222 Broadway](https://www.permitgraph.org/a/0564/070) | modification to extg class room including new flooring, lighting and radiant heater. | $74,500 |
| [201404012112](https://www.permitgraph.org/p/201404012112) | Apr 1, 2014 | Completed: final sign-off Jan 2015 | [2222 Broadway](https://www.permitgraph.org/a/0564/070) | barrier removal and elevator modernization. architectural only. fire sprinklers life safety system, extg elevator and equipment modernization engineering under separate permits by design build contra… | $227,400 |
| [201304114350](https://www.permitgraph.org/p/201304114350) | Apr 11, 2013 | Completed: final sign-off Mar 2014 | [1 Daniel Burnham Ct](https://www.permitgraph.org/a/0690/043) | #365 - divide existing reception into 3 exam rooms @ existing medical office. adjust existing mech & elec, alarms & fire sprinklers under separate permits. | $45,000 |
| [201301077405](https://www.permitgraph.org/p/201301077405) | Jan 7, 2013 | Completed: final sign-off Oct 2013 | [1 Daniel Burnham Ct](https://www.permitgraph.org/a/0690/043) | 4th floor-renovations to (e) vacant commercial office space-create 3 new demising spaces. administration offices to medical offices. adjust (e) m.e.p, fire sprinklers & other life safety | $55,000 |
| [201205291343](https://www.permitgraph.org/p/201205291343) | May 29, 2012 | Completed: final sign-off Dec 2012 | [2222 Broadway](https://www.permitgraph.org/a/0564/024) | remodel 1st floor entry for accessibility. project includes ada compliant ramp, hardware modifications to extg door and minor landscaping. | $30,000 |
| [201205180762](https://www.permitgraph.org/p/201205180762) | May 18, 2012 | Completed: final sign-off Sep 2012 | [2222 Broadway](https://www.permitgraph.org/a/0564/024) | mechanical work for kitchen remodel permit approved under pa# 2012-0227-4935 | $38,000 |
| [201205100259](https://www.permitgraph.org/p/201205100259) | May 10, 2012 | Completed: final sign-off Oct 2012 | [2222 Broadway](https://www.permitgraph.org/a/0564/024) | revision 201202274935. new 2 hour rated shaft wall for ventless dishwasher. type ii hood under separate permit | $5,000 |
| [201202274935](https://www.permitgraph.org/p/201202274935) | Feb 27, 2012 | Completed: final sign-off Oct 2012 | [2222 Broadway](https://www.permitgraph.org/a/0564/024) | interior remodel to (e) kitchen, work to includes new kitchen equipment, new servery equipment, food storage & offices on the lower level. mechanical, type-i & type-ii hoods under separate permit.(n)… | $326,771 |
| [201106067457](https://www.permitgraph.org/p/201106067457) | Jun 6, 2011 | Completed: final sign-off Feb 2013 | [1322 16th Av](https://www.permitgraph.org/a/1770/032B) | owner is performing a lot line adjustment, scope of this permit is to perform the agreed upon adjustments per item #4 of the pre=application meeting notes dated 11-6-09. install sprinkler system, rep… | $5,500 |
| [201106067455](https://www.permitgraph.org/p/201106067455) | Jun 6, 2011 | Completed: final sign-off Feb 2013 | [1314 16th Av](https://www.permitgraph.org/a/1770/033) | owner is performing a lot line adjustment, scope of this permit is to perform the agreed upon adjustments per item #4 of the pre=application meeting notes dated 11-6-09. install sprinkler system, rep… | $5,500 |
| [201105166136](https://www.permitgraph.org/p/201105166136) | May 16, 2011 | Never finaled: issued May 2011, no final | [244 California St](https://www.permitgraph.org/a/0237/010) | 6th floor suite 600 - one new interior wall to subdivide existing room into 2 private offices. replace existing interior office doors. lighting under seperate permit. | $9,800 |
| [201102160396](https://www.permitgraph.org/p/201102160396) | Feb 16, 2011 | Never finaled: issued Apr 2011, no final | [244 California St](https://www.permitgraph.org/a/0237/010) | revision to pa# 2011.02.09.9877 to rotate conference room iin suite 204 |  |
| [201102099877](https://www.permitgraph.org/p/201102099877) | Feb 9, 2011 | Never finaled: issued Feb 2011, no final | [244 California St](https://www.permitgraph.org/a/0237/010) | scope of work includes 1 new conference room in suite 204. room is approx 150 sf. also includes new light fixture and repainting exiting ceiling | $9,500 |
| [201011104662](https://www.permitgraph.org/p/201011104662) | Nov 10, 2010 | Completed: final sign-off Mar 2011 | [55 Green St](https://www.permitgraph.org/a/0136/001) | 2nd floor-new partitions, doors, frames & painting. minor changes to lighting & electrical. relocation of hvac diffusers | $21,317 |
| [201001194909](https://www.permitgraph.org/p/201001194909) | Jan 19, 2010 | Completed: final sign-off Feb 2010 | [3654 Sacramento St](https://www.permitgraph.org/a/1011/011) | commercial tenant improvement at ground floor: minor remodel of (e) space, minor demolition of (e) non-load bearing walls. construction of (n) non-load bearing partitions and minor ada upgrades to (e… | $12,000 |
| [200908134772](https://www.permitgraph.org/p/200908134772) | Aug 13, 2009 | Completed: final sign-off Dec 2009 | [625 Brotherhood Wy](https://www.permitgraph.org/a/7380/037) | revision to pa# 2009/03/12/3991 to redesign new ceiling in social hall & relocate ada entry door. field verify if life safety is required under separate permits. |  |
| [200903123991](https://www.permitgraph.org/p/200903123991) | Mar 12, 2009 | Completed: final sign-off Dec 2009 | [625 Brotherhood Wy](https://www.permitgraph.org/a/7380/037) | social hall referbishment. new interior wall (finish only), floor and ceiling finishes only, new lighting, replace five extg doors. must obtain seperate p-142 assembly permit from fire hq's. | $95,700 |
| [200809040748](https://www.permitgraph.org/p/200809040748) | Sep 4, 2008 | Completed: final sign-off Sep 2008 | [753 Davis St](https://www.permitgraph.org/a/0140/001) | renew for final inspection 2003504243016. |  |
| [200705232118](https://www.permitgraph.org/p/200705232118) | May 23, 2007 | Completed: final sign-off Sep 2007 | [1025 Battery St](https://www.permitgraph.org/a/0112/004) | front door permit seperated form 200610054339 and 200605312825. |  |
| [200703226887](https://www.permitgraph.org/p/200703226887) | Mar 22, 2007 | Completed: final sign-off Mar 2007 | [240 Powell St](https://www.permitgraph.org/a/0314/010) | renew 200605232297 for final inspection |  |
| [200702285071](https://www.permitgraph.org/p/200702285071) | Feb 28, 2007 | Completed: final sign-off Aug 2007 | [631 Howard St](https://www.permitgraph.org/a/3735/005) | oti-1 3rd floor el, l/s | $46,000 |
| [200702274980](https://www.permitgraph.org/p/200702274980) | Feb 27, 2007 | Completed: final sign-off Mar 2007 | [240 Powell St](https://www.permitgraph.org/a/0314/010) | renew pa# 2006/02/17/4909 for final inspection. |  |
| [200612089493](https://www.permitgraph.org/p/200612089493) | Dec 8, 2006 | Completed: final sign-off Mar 2007 | [2186 Geary Bl](https://www.permitgraph.org/a/1078/083) | work @ unit# 311 only. reconfigure existing mechanical system. | $12,500 |
| [200610054339](https://www.permitgraph.org/p/200610054339) | Oct 5, 2006 | Completed: final sign-off May 2007 | [1025 Battery St](https://www.permitgraph.org/a/0112/004) | minor rev. to previously approved pa#2006/05/31/2825: demo (e) floor slab on grade & replace w/ new concrete slab. provide second accessible entrance on battery st. side. improvements to (e) mezzanin… | $20,000 |
| [200607136451](https://www.permitgraph.org/p/200607136451) | Jul 13, 2006 | Never finaled: issued Jul 2006, no final | [170 Columbus Av](https://www.permitgraph.org/a/0176/016) | oti-1 3fl el,sp suite 310 | $16,000 |
| [200605232297](https://www.permitgraph.org/p/200605232297) | May 23, 2006 | Expired or cancelled: expired Mar 2007 | [240 Powell St](https://www.permitgraph.org/a/0314/010) | hvac work to support pa#2006/02/17/4909 - new a/c & furnace & ductwork | $15,000 |
| [200511228800](https://www.permitgraph.org/p/200511228800) | Nov 22, 2005 | Never finaled: issued Nov 2005, no final | [753 Davis St](https://www.permitgraph.org/a/0140/001) | renew appl#200304243016 for final inspection |  |
| [200511017022](https://www.permitgraph.org/p/200511017022) | Nov 1, 2005 | Completed: final sign-off Dec 2005 | [170 Columbus Av](https://www.permitgraph.org/a/0176/016) | oti-1 3/f ls, sp | $55,000 |
| [200508160435](https://www.permitgraph.org/p/200508160435) | Aug 16, 2005 | Completed: final sign-off Jan 2006 | [1760 Cesar Chavez St](https://www.permitgraph.org/a/4288/005) | install electrical material storage racks. minor interior modifications for ada compliance-bathroom | $65,000 |
| [200507127361](https://www.permitgraph.org/p/200507127361) | Jul 12, 2005 | Never finaled: issued Jul 2005, no final | [170 Columbus Av](https://www.permitgraph.org/a/0176/016) | oti-1 3rd/fl-el, ls, sp. | $90,000 |
| [200507087144](https://www.permitgraph.org/p/200507087144) | Jul 8, 2005 | Completed: final sign-off Dec 2005 | [55 Hawthorne St](https://www.permitgraph.org/a/3735/046) | oti-1, 6th floor, ls, el, me, sp. | $120,000 |
| [200506286237](https://www.permitgraph.org/p/200506286237) | Jun 28, 2005 | Completed: final sign-off Jul 2005 | [1760 Cesar Chavez St](https://www.permitgraph.org/a/4288/005) | demolation of interior partition walls. | $60,000 |
| [200412221993](https://www.permitgraph.org/p/200412221993) | Dec 22, 2004 | Expired or cancelled: expired Mar 2007 | [367 09th St](https://www.permitgraph.org/a/3756/009) | replace furnace and ductwork - 1st floor, modify gas piping, new exhaust fan | $13,500 |
| [200406045653](https://www.permitgraph.org/p/200406045653) | Jun 4, 2004 | Completed: final sign-off Dec 2005 | [612 Howard St](https://www.permitgraph.org/a/3722/020) | make a 3'o x 7'o opening in existing wall, frame, add header, finish new surfaces with mdf or simila | $1,200 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.