# Metcon Ti, Inc

Contractor license 974976. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/metcon-ti-inc-974976
- JSON: https://www.permitgraph.org/api/contractor?license=974976
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=974976

52 permits since 2000: 39 completed, 11 in progress, 1 never finaled, 1 expired or cancelled. Typically 17 days from filing to permit and 157 days from permit to final inspection. Of the 1 never-finaled permit, 1 is 3 to 5 years old.

- Based in: Pleasanton
- On San Francisco permits: Jul 2017 to Nov 2026
- Last 24 months: 35 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2017 | 3 | 0 | 0 | 0 |
| 2018 | 5 | 0 | 0 | 0 |
| 2021 | 1 | 0 | 0 | 0 |
| 2022 | 1 | 0 | 1 | 0 |
| 2024 | 5 | 0 | 0 | 1 |
| 2025 | 18 | 1 | 0 | 0 |
| 2026 | 6 | 10 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 1 | 0 | 1 | 0 | 0 | 47 |  |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202611100615](https://www.permitgraph.org/p/202611100615) | Nov 10, 2026 | In progress: filed Nov 2026, not yet issued | [131 Steuart St](https://www.permitgraph.org/a/3715/025) | construction within the interior of an existing office space. limited demo includes: interior non -gearing partiton walls/doors, ceilings, interior finishes, lighting/hvac/plumbing, new construction… | $165,000 |
| [202609188327](https://www.permitgraph.org/p/202609188327) | Sep 18, 2026 | In progress: issued Sep 2026 | [1680 Eddy St](https://www.permitgraph.org/a/0730/044) | expansion of 3 electrical rooms to allow new switch gear. extension of concrete pod at exterior of electrical rooms, portion of concrete walkaway to be extended to allow for complaint walkaway clarea… | $175,871 |
| [202609047741](https://www.permitgraph.org/p/202609047741) | Sep 4, 2026 | In progress: issued Sep 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | mechanical-install new low pressure duct & air distribution to meet new layout. install (3) new terminal units to meet new zoing plan. electrical_ new power & signal devices throughout, new 2025 titl… | $150,000 |
| [202609047756](https://www.permitgraph.org/p/202609047756) | Sep 4, 2026 | Completed: final sign-off Nov 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | mechanical: install (n) low-pressure duct and air distribution to meet new ti layout. install (3) new terminal units to meet new zoning plan. electrical: new power & signal devices througout, (n) 202… | $125,000 |
| [202608046040](https://www.permitgraph.org/p/202608046040) | Aug 4, 2026 | In progress: issued Aug 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 9th fl - structural only permit submittal to show structural drawings and calcs for movable partition in the training room. ref pa 202605191531 |  |
| [202607225381](https://www.permitgraph.org/p/202607225381) | Jul 22, 2026 | Completed: final sign-off Nov 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 2nd floor: anchoring of existing one person furniture phone booths. new signage to designated a recessible phone room and restroom upgrade per form c | $10,000 |
| [202606304267](https://www.permitgraph.org/p/202606304267) | Jun 30, 2026 | In progress: issued Jul 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 9th flr: deferred mep drawings. mech-install new low pressure duct & air distribution to meet new tenant improvement layout. install (7) new terminal units to meet new zoning plan. electrical-new pow… | $250,000 |
| [202606052666](https://www.permitgraph.org/p/202606052666) | Jun 5, 2026 | Completed: final sign-off Aug 2026 | [33 New Montgomery St](https://www.permitgraph.org/a/3707/062) | 9/f: mep deferred submittal to support approved architecutral permit. ref 202512040978 and 202606012267. | $190,000 |
| [202606042536](https://www.permitgraph.org/p/202606042536) | Jun 4, 2026 | In progress: issued Jul 2026 | [33 New Montgomery St](https://www.permitgraph.org/a/3707/062) | ste. #350: lounge improvement for building amenity space. new walls, lighting, floor finishes and install of new owner golf and racing simulators. | $175,000 |
| [202606042530](https://www.permitgraph.org/p/202606042530) | Jun 4, 2026 | In progress: issued Jul 2026 | [33 New Montgomery St](https://www.permitgraph.org/a/3707/062) | 18th floor, suites 1810 and 1840: market ready improvement for office suite(4,500 sf)combing suites and constructing new walls,lighting, flooring, drinking fountain & stall accessibility. | $650,000 |
| [202606012267](https://www.permitgraph.org/p/202606012267) | Jun 1, 2026 | Completed: final sign-off Aug 2026 | [33 New Montgomery St](https://www.permitgraph.org/a/3707/062) | 9/f: rev 202512040978 to add illuminated exit signage to t.i. electrical deferred under this permit. | $55,000 |
| [202605191562](https://www.permitgraph.org/p/202605191562) | May 19, 2026 | Completed: final sign-off Nov 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 12/fl ste 1200 - ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit. | $750,000 |
| [202605191531](https://www.permitgraph.org/p/202605191531) | May 19, 2026 | In progress: issued May 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 9th/f: revision to 202512041010: floor will be converted to 1 full-floor suite in lieu of 2 separate suites, selective demo & construction of non-structural partitions, new finishes lighting fixtures… |  |
| [202605151369](https://www.permitgraph.org/p/202605151369) | May 15, 2026 | In progress: issued Jun 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 10/fl- ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit. | $750,000 |
| [202604229896](https://www.permitgraph.org/p/202604229896) | Apr 22, 2026 | In progress: issued Jun 2026 | [560 Battery St](https://www.permitgraph.org/a/0198/008) | combine two commercial suites 560 and 570 to be used as one commercial space. remodel existing b-occupancy spaces into a single b-occupancy gym, add one new accessible bathroom and shower. add shower… | $639,000 |
| [202603107275](https://www.permitgraph.org/p/202603107275) | Mar 10, 2026 | Completed: final sign-off Jul 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 8/fl: mech:replace low pressure ductwork for whole floor, install 6 new terminal units. elec:new power & signal devices throughout. new title 24 compliant lighting & controls. plumbing: replace (e) l… | $150,000 |
| [202512192286](https://www.permitgraph.org/p/202512192286) | Dec 19, 2025 | Completed: final sign-off Jul 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 8th floor tenant improvement, selective demolition and construction of non structural partitions, new finishes, light fixtures, and mill work. mep and fire/life and safety under seperate permit. | $750,000 |
| [202512051089](https://www.permitgraph.org/p/202512051089) | Dec 5, 2025 | Completed: final sign-off Apr 2026 | [2000 Fillmore St](https://www.permitgraph.org/a/0653/017) | install (n) non load bearing walls. (e) restrooms and plumbing fixtures to remain. install (n) lighting fixtures, ti improvmenets for (e) retail space no change of use. | $30,000 |
| [202512041010](https://www.permitgraph.org/p/202512041010) | Dec 4, 2025 | In progress: issued Jan 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 9/f: tenant improvement to include new partitions, offices, and conference rooms. mep deferred. | $750,000 |
| [202512040978](https://www.permitgraph.org/p/202512040978) | Dec 4, 2025 | Completed: final sign-off Aug 2026 | [33 New Montgomery St](https://www.permitgraph.org/a/3707/062) | 9th/f t.i. new partitions, offices, conference rooms, and 14 new phone booths. mep deferred | $750,000 |
| [202512030850](https://www.permitgraph.org/p/202512030850) | Dec 3, 2025 | Completed: final sign-off Feb 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 7/f: deferred mep for ti# 202509044560. replace (e) plumbing fixtures at break froom 7506, according to cpc 2022 and energy code 2022. replace low pressure ductwork for ste 750. install (5) new termi… | $30,000 |
| [202512010621](https://www.permitgraph.org/p/202512010621) | Dec 1, 2025 | Completed: final sign-off Jan 2026 | [1 Lombard St](https://www.permitgraph.org/a/0081/001) | deferred plumbing: replace (e) drinking fountain at 1st fl and (e) drinking fountain at mezz level. replace (e) restroom fixtures at mezz including undermount (4) lavs, (3) urinals, (5) water closets… | $30,000 |
| [202510248110](https://www.permitgraph.org/p/202510248110) | Oct 24, 2025 | Completed: final sign-off Feb 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 7th floor: revision to permit #202509044560; minor revisions to ceilings, light fixtures, millwork, and finishes. |  |
| [202509306431](https://www.permitgraph.org/p/202509306431) | Sep 30, 2025 | Completed: final sign-off Dec 2025 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | suite 700: installation and seismic anchoring of 4 phone booths. | $8,000 |
| [202509195718](https://www.permitgraph.org/p/202509195718) | Sep 19, 2025 | Completed: final sign-off Jan 2026 | [1 Lombard St](https://www.permitgraph.org/a/0081/001) | deferred mep for pa# 202407085966: mechanical- demo (e) ductwork, registers, and fan coils where shown. relocate (e) registers to new location, install (n) registers/t-stats. comfort balance. electri… | $40,000 |
| [202509155304](https://www.permitgraph.org/p/202509155304) | Sep 15, 2025 | Completed: final sign-off Jan 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | lobby floor/electrical (n) title lighting controls and (n) power signal devices throughout space. plumbing install (n) ada complaint water closet, shower and fixtures, water tempering complaint with… | $75,000 |
| [202509125237](https://www.permitgraph.org/p/202509125237) | Sep 12, 2025 | Completed: final sign-off Nov 2025 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | deferred mep for pa# 202505025705: mech-replace low pressure ductwork for ste 700, install 2 new terminal units. all plumbing is replacing (e) fxitures at (e) location. electrical- new power and sign… | $385,000 |
| [202509044560](https://www.permitgraph.org/p/202509044560) | Sep 4, 2025 | Completed: final sign-off Feb 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 7th fl, ste 750 interior ti; construction of non-structural partitions, new finishes, lighting fixtures and millwork. mep and fire/life safety under separate permit | $750,000 |
| [202508203531](https://www.permitgraph.org/p/202508203531) | Aug 20, 2025 | Completed: final sign-off Jan 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 1/f: revision to permit 202501148318.. revise the description of scope of work stating that there is no modification to fire alarm or sprinkler |  |
| [202505216997](https://www.permitgraph.org/p/202505216997) | May 21, 2025 | Completed: final sign-off Mar 2026 | [2750 19th St](https://www.permitgraph.org/a/4023/004A) | ti improvement ref pa #2024-0829-9734 lvl 1: add (n) office 123-126 & 129. mech rm 127 & it/storage 128. (n) partitions, lighting, power, signal & hvac. provide concrete threshold ext to max 8.33% (1… | $100,000 |
| [202505025705](https://www.permitgraph.org/p/202505025705) | May 2, 2025 | Completed: final sign-off Nov 2025 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 7/f: interior tenant improvement. selective demolition and construction of non-structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under separate permit. | $750,000 |
| [202503061735](https://www.permitgraph.org/p/202503061735) | Mar 6, 2025 | Completed: final sign-off Jun 2025 | [33 New Montgomery St](https://www.permitgraph.org/a/3707/062) | 11/f: interior imrpovement to (e) office suite, including demo of (e) walls and ceiling and construction of (n) non load bearing walls, floor finishes, lighting, power, and ceilings. | $250,000 |
| [202501148318](https://www.permitgraph.org/p/202501148318) | Feb 6, 2025 | Completed: final sign-off Jan 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | exterior non-structural building entry mofification,scope includes new finishes & lighting at walkway ceiling,new signage under deferred permit.modifications to fire sprinkler under deferred permit.t… | $100,000 |
| [202501299282](https://www.permitgraph.org/p/202501299282) | Jan 29, 2025 | Completed: final sign-off Feb 2026 | [1887 Union St](https://www.permitgraph.org/a/0543/024) | deferred mechanicial and electrical for pa# 202411195258. no plumbing deferred submittal, fixtures and removal and replaced. t.i within an existing vacant suite on the g/f of a mixed use bldg to inco… | $120,000 |
| [202501238879](https://www.permitgraph.org/p/202501238879) | Jan 23, 2025 | Completed: final sign-off Mar 2026 | [2750 19th St](https://www.permitgraph.org/a/4023/004A) | deferred mep for pa # 2024-0829-9734 (ref pa #2017-1215-665 s & 2020-0715-0223) level 01- add (n) plumbing to restrooms, janitor's closet & breakroom, new hvac equipment for space conditioning & vent… | $750,000 |
| [202411195258](https://www.permitgraph.org/p/202411195258) | Nov 19, 2024 | Completed: final sign-off Feb 2026 | [1887 Union St](https://www.permitgraph.org/a/0543/024) | tenant improvement of existing vacant suite in an exisintg mixted use builing. scope is interior only. minimal demo of existing non-load bearing partitions. new non-bearing partitions and doors. rest… | $120,000 |
| [202410243671](https://www.permitgraph.org/p/202410243671) | Oct 24, 2024 | Completed: final sign-off Jan 2026 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | ground fl: interior ti. selective demo & construction of non-structural partitions. new ceilings, lighting, millwork & finishes. mep & life safety deferred submittal | $500,000 |
| [202408299734](https://www.permitgraph.org/p/202408299734) | Aug 29, 2024 | Completed: final sign-off Mar 2026 | [2750 19th St](https://www.permitgraph.org/a/4023/004A) | t.i. improvements to the (e)bldg. ref#: approved and issued 201712156685 (iii-a, 6 stories, 1 basement) & pa#: 202007150223 (change const type iii-a to i-a) - level 01: add (n) restrooms, janitor & s… | $350,000 |
| [202407085966](https://www.permitgraph.org/p/202407085966) | Jul 8, 2024 | Completed: final sign-off Jan 2026 | [1 Lombard St](https://www.permitgraph.org/a/0081/001) | 1/f & mezz. -new floor finishes, light fixtures, ceiling finishes, conduits, switches, wiring, outlets, typ. in selected areas. restroom accessibility upgrade. interior non load bearing partitions. t… | $250,000 |
| [202406255244](https://www.permitgraph.org/p/202406255244) | Jun 25, 2024 | Expired or cancelled: cancelled Jun 2025 | [1 Lombard St](https://www.permitgraph.org/a/0081/001) | revision to pa#202310178850. mezanine no longer to be removed. no structural work. no exterior work. |  |
| [202404180237](https://www.permitgraph.org/p/202404180237) | Apr 18, 2024 | Completed: final sign-off Nov 2024 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | interior ti selective demo and construction of non structural partitions, new finishes, light fixtures and millwork. mep and fire life safety under separate permit | $750,000 |
| [202203150081](https://www.permitgraph.org/p/202203150081) | Mar 15, 2022 | Completed: final sign-off Nov 2022 | [323 Octavia St](https://www.permitgraph.org/a/0831/023) | space is a vacant shell, all new construction. building out a fitness studio. adding hvac (10 tons), electrical (new service), plumbing, life safety (fire alarms and sprinkler relocations), new floor… | $500,000 |
| [202203150082](https://www.permitgraph.org/p/202203150082) | Mar 15, 2022 | Never finaled: issued Apr 2022, no final | [323 Octavia St](https://www.permitgraph.org/a/0831/023) | building out a fitness studio with new exterior signage. | $15,000 |
| [202112224934](https://www.permitgraph.org/p/202112224934) | Dec 22, 2021 | Completed: final sign-off Mar 2022 | [1551 Tennessee St](https://www.permitgraph.org/a/4295/010) | voluntarily convert existing office to accessible unisex restroom | $56,000 |
| [201805038139](https://www.permitgraph.org/p/201805038139) | May 3, 2018 | Completed: final sign-off Oct 2019 | [6301 03rd St](https://www.permitgraph.org/a/4968/032) | revision to floor layout 201707061129 for dental offie |  |
| [201804136350](https://www.permitgraph.org/p/201804136350) | Apr 13, 2018 | Completed: final sign-off Oct 2019 | [6301 03rd St](https://www.permitgraph.org/a/4968/032) | revision to app#201712015287 for mechanical and electrical plans. |  |
| [201804136352](https://www.permitgraph.org/p/201804136352) | Apr 13, 2018 | Completed: final sign-off Oct 2019 | [6301 03rd St](https://www.permitgraph.org/a/4968/032) | revision to app#201802221989 for plumbing plans. change of pipes locations and sink location |  |
| [201804105977](https://www.permitgraph.org/p/201804105977) | Apr 10, 2018 | Completed: final sign-off Oct 2018 | [6301 03rd St](https://www.permitgraph.org/a/4968/032) | revision to app#201707061129. replacement of exterior windows in kind, keeping in line with the historic charactor of the bldg. no infill of any windows of any sort |  |
| [201802221989](https://www.permitgraph.org/p/201802221989) | Feb 22, 2018 | Completed: final sign-off Oct 2019 | [6301 03rd St](https://www.permitgraph.org/a/4968/032) | provide piping for operating rooms 1,2,3,4,6 and lab sinks - plan check |  |
| [201712015287](https://www.permitgraph.org/p/201712015287) | Dec 1, 2017 | Completed: final sign-off Feb 2020 | [6301 03rd St](https://www.permitgraph.org/a/4968/032) | hvac, electrical, plumbing, paint, flooring, grid work. ref ti pa #201707061129. | $560,000 |
| [201708316585](https://www.permitgraph.org/p/201708316585) | Aug 31, 2017 | Completed: final sign-off Oct 2019 | [6301 03rd St](https://www.permitgraph.org/a/4968/032) | facade improvement work to include (n) exterior paint. | $2,000 |
| [201707061129](https://www.permitgraph.org/p/201707061129) | Jul 6, 2017 | Completed: final sign-off Feb 2020 | [6301 03rd St](https://www.permitgraph.org/a/4968/032) | interior renovation of e 2 story medical office bldg to bring it up to code and modernize it. space is 5700 sf | $750,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/metcon-ti-inc-974976.