# Mc Gibbon Construction

Contractor license 968064. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/mc-gibbon-construction-968064
- JSON: https://www.permitgraph.org/api/contractor?license=968064
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=968064

29 permits since 2000: 27 completed, 2 never finaled. Typically 0 days from filing to permit and 45 days from permit to final inspection. Of the 2 never-finaled permits, 2 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Nov 2012 to Dec 2018
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2012 | 1 | 0 | 0 | 0 |
| 2013 | 3 | 0 | 0 | 0 |
| 2014 | 7 | 0 | 0 | 0 |
| 2015 | 8 | 0 | 2 | 0 |
| 2016 | 3 | 0 | 0 | 0 |
| 2017 | 1 | 0 | 0 | 0 |
| 2018 | 4 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Roof deck | 3 | 3 | 0 | 0 | 0 | 224 | 51 |
| Deck | 10 | 10 | 0 | 0 | 0 | 0 | 26 |
| Stairs | 9 | 9 | 0 | 0 | 0 | 0 | 36 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201812178496](https://www.permitgraph.org/p/201812178496) | Dec 17, 2018 | Completed: final sign-off Mar 2019 | [805 Marina Bl](https://www.permitgraph.org/a/0909/001B) | under 50% deck repair for dryrot, front deck repair in kind | $4,500 |
| [201806081366](https://www.permitgraph.org/p/201806081366) | Jun 8, 2018 | Completed: final sign-off Jun 2019 | [76 Museum Wy](https://www.permitgraph.org/a/2620/134) | roof deck on (e) roof. steel guard to be compliant with bird safe steel. | $20,000 |
| [201805108775](https://www.permitgraph.org/p/201805108775) | May 10, 2018 | Completed: final sign-off Aug 2018 | [836 Page St](https://www.permitgraph.org/a/0845/010) | revision to 2018-0221-1845. replace stucco at front of building, in kind, 100%. | $16,700 |
| [201802211845](https://www.permitgraph.org/p/201802211845) | Feb 21, 2018 | Completed: final sign-off Aug 2018 | [836 Page St](https://www.permitgraph.org/a/0845/010) | small stucco patch on facade to repair cracks on a 10-15 sq ft section of lower bay | $1,300 |
| [201701036407](https://www.permitgraph.org/p/201701036407) | Jan 3, 2017 | Completed: final sign-off Feb 2017 | [271 Eureka St](https://www.permitgraph.org/a/2698/051) | under 50% repair of an existing rear deck. redwood tread replacement, replace infected joists, new handrails at stairs. | $5,000 |
| [201609016544](https://www.permitgraph.org/p/201609016544) | Sep 1, 2016 | Completed: final sign-off Oct 2016 | [54 Allen St](https://www.permitgraph.org/a/0096/054) | repair of existing rear roof deck in-kind under 50%. | $5,000 |
| [201606291202](https://www.permitgraph.org/p/201606291202) | Jun 29, 2016 | Completed: final sign-off Aug 2016 | [255 Waller St](https://www.permitgraph.org/a/0869/041) | partial replacement in-kind of approx 2,000 sq ft of siding with cedar wood siding. partial visible to street. siding only. no framing work - no structural work. | $42,000 |
| [201601268009](https://www.permitgraph.org/p/201601268009) | Jan 26, 2016 | Completed: final sign-off Sep 2017 | [1821 Grant Av](https://www.permitgraph.org/a/0062/043) | replace existing roof deck reroofing and guardrails | $50,000 |
| [201507292846](https://www.permitgraph.org/p/201507292846) | Jul 29, 2015 | Completed: final sign-off Jun 2017 | [3978 Cesar Chavez St](https://www.permitgraph.org/a/6565/021) | proposed reconstgruction of rear stairs & horizontl extension of rear deck. | $12,000 |
| [201506260073](https://www.permitgraph.org/p/201506260073) | Jun 26, 2015 | Completed: final sign-off Aug 2015 | [1667 Fulton St](https://www.permitgraph.org/a/1185/028A) | revision to pa# 201505287443, structural changes only per plan. to comply with his nove #201549321 dated 5/21/2015. |  |
| [201505287443](https://www.permitgraph.org/p/201505287443) | May 28, 2015 | Completed: final sign-off Aug 2015 | [1667 Fulton St](https://www.permitgraph.org/a/1185/028A) | repair and replace deck in kind | $3,000 |
| [201504244582](https://www.permitgraph.org/p/201504244582) | Apr 24, 2015 | Never finaled: issued May 2015, no final | [2601 Mission St](https://www.permitgraph.org/a/3637/069) | 7th flr: minor demo of partition walls (non-structural) at (e) office space | $2,000 |
| [201504244583](https://www.permitgraph.org/p/201504244583) | Apr 24, 2015 | Never finaled: issued May 2015, no final | [2601 Mission St](https://www.permitgraph.org/a/3637/069) | 8th flr: minor demo of partition wall (non-structural) at (e) office space | $2,000 |
| [201504133421](https://www.permitgraph.org/p/201504133421) | Apr 13, 2015 | Completed: final sign-off Oct 2015 | [185 Graystone Tr](https://www.permitgraph.org/a/2719/019) | to obtain final inspection for work approved under pa#9800173 all work is complete. |  |
| [201504133448](https://www.permitgraph.org/p/201504133448) | Apr 13, 2015 | Completed: final sign-off Oct 2015 | [185 Graystone Tr](https://www.permitgraph.org/a/2719/019) | to comply w/physical inspection report #cc-7881 | $1,000 |
| [201504133439](https://www.permitgraph.org/p/201504133439) | Apr 13, 2015 | Completed: final sign-off Apr 2015 | [185 Graystone Tr](https://www.permitgraph.org/a/2719/019) | to leagalize the installation of the windows at the front of the building. three (3) windows total. windows are wood inserts no changes to size or location. this permit will comply with item 1 on the… | $1,000 |
| [201503191261](https://www.permitgraph.org/p/201503191261) | Mar 19, 2015 | Completed: final sign-off Apr 2015 | [2601 Mission St](https://www.permitgraph.org/a/3637/069) | suite 501: minor ti to consist of (2) offices within open office. work consists of 2 partition walls & (4) new doors i | $6,000 |
| [201503110462](https://www.permitgraph.org/p/201503110462) | Mar 11, 2015 | Completed: final sign-off Apr 2015 | [442 Sanchez St](https://www.permitgraph.org/a/3581/102) | under 50% deck reapir. replace 4x4 structural post, 10ft, replace 4x6 platform beam 10ft. replace (2) 2x6 treads & 4x4 railing post. | $1,200 |
| [201410239676](https://www.permitgraph.org/p/201410239676) | Oct 23, 2014 | Completed: final sign-off Nov 2014 | [3511 16th St](https://www.permitgraph.org/a/3564/147) | under 50 % stair repair. rear stairs. replace 3 bullnose treads on stairs. 3' platforms 3ft x 6ft with 1/2 treads replaced | $800 |
| [201410148753](https://www.permitgraph.org/p/201410148753) | Oct 14, 2014 | Completed: final sign-off Oct 2014 | [1358 Utah St](https://www.permitgraph.org/a/4264/036) | under 50% deck repair, individual unit deck approx 13x10. replace 1 side of railing surface redwood. no structural | $1,500 |
| [201407231922](https://www.permitgraph.org/p/201407231922) | Jul 23, 2014 | Completed: final sign-off Aug 2014 | [1029 Munich St](https://www.permitgraph.org/a/6442/021) | replacement in-kind of a platform deck 8ft x 3 ft, picket railing | $2,350 |
| [201405206275](https://www.permitgraph.org/p/201405206275) | May 20, 2014 | Completed: final sign-off Jul 2014 | [124 Pierce St](https://www.permitgraph.org/a/0861/036) | to comply with physical inspection report #cc-7548 | $10,000 |
| [201404153229](https://www.permitgraph.org/p/201404153229) | Apr 15, 2014 | Completed: final sign-off May 2014 | [1129 Church St](https://www.permitgraph.org/a/3650/055) | 4 6"x6" post replacement. amending stair railings with more pickets & handrail. replacement in kind. less than 50% repair. | $2,000 |
| [201404153230](https://www.permitgraph.org/p/201404153230) | Apr 15, 2014 | Completed: final sign-off May 2014 | [124 Pierce St](https://www.permitgraph.org/a/0861/036) | replacement of stair stringers & railings horizontal to remove dryrot. replacement in kind. less than 50% repair. | $1,500 |
| [201401176604](https://www.permitgraph.org/p/201401176604) | Jan 17, 2014 | Completed: final sign-off May 2014 | [130 Pierce St](https://www.permitgraph.org/a/0861/036) | demo existing non code eompliant egress stair. erect new code compliant egress stair in kind. | $5,000 |
| [201307293012](https://www.permitgraph.org/p/201307293012) | Jul 29, 2013 | Completed: final sign-off Aug 2013 | [1514 Waller St](https://www.permitgraph.org/a/1246/012) | repiar deck stringer and treads on rear stairs, less than 50% replacement. 18' of 4x6 structural post. | $4,500 |
| [201307111549](https://www.permitgraph.org/p/201307111549) | Jul 11, 2013 | Completed: final sign-off Jul 2013 | [2131 Divisadero St](https://www.permitgraph.org/a/1004/004) | less than 50% deck replacement. replace 8 4ft 2 x 10 joists. replace outer rim joint. replace trim of outer rim joist | $2,500 |
| [201306078943](https://www.permitgraph.org/p/201306078943) | Jun 7, 2013 | Completed: final sign-off Aug 2013 | [253 Waller St](https://www.permitgraph.org/a/0869/040) | repair of existing wood stair- dryrot, less than 50% of structure, locate to rear at side, not visable from street. | $5,000 |
| [201211053482](https://www.permitgraph.org/p/201211053482) | Nov 5, 2012 | Completed: final sign-off Nov 2012 | [116 Downey St](https://www.permitgraph.org/a/1269/192) | replace a stairs form a deck to a midway platform with pressure treated lumber aisd replace a 10th section of guardrail at the bottom right hand side of stairs. guardrail is (e) + is of a 2x4 horizon… | $1,800 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/mc-gibbon-construction-968064.
