# Mayco Commercial Construction Inc

Contractor license 1024529. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/mayco-commercial-construction-inc-1024529
- JSON: https://www.permitgraph.org/api/contractor?license=1024529
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1024529

24 permits since 2000: 21 completed, 1 in progress, 2 never finaled. Typically 14 days from filing to permit and 124 days from permit to final inspection. Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.

- Based in: Oakland
- On San Francisco permits: Aug 2019 to Oct 2026
- Last 24 months: 17 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2019 | 1 | 0 | 0 | 0 |
| 2020 | 0 | 0 | 1 | 0 |
| 2022 | 0 | 0 | 1 | 0 |
| 2024 | 5 | 0 | 0 | 0 |
| 2025 | 7 | 0 | 0 | 0 |
| 2026 | 8 | 1 | 0 | 0 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202610159488](https://www.permitgraph.org/p/202610159488) | Oct 15, 2026 | In progress: filed Oct 2026, not yet issued | [100 Pine St](https://www.permitgraph.org/a/0262/020) | replacement of existing concrete masonry wall around the fire pump room on the 1st subbasement floor of 100 pine st. | $22,480 |
| [202608066165](https://www.permitgraph.org/p/202608066165) | Aug 6, 2026 | Completed: final sign-off Sep 2026 | [150 California St](https://www.permitgraph.org/a/0236/019) | 17th fl - replacement of light fixtures and associated circuiting & controls. add transfer fan. add/relocated diffusers and registers per new layout. relocate thermostats ref pa 202602065382 | $110,000 |
| [202604229872](https://www.permitgraph.org/p/202604229872) | Apr 22, 2026 | Completed: final sign-off Jun 2026 | [150 California St](https://www.permitgraph.org/a/0236/019) | 6th floor: relocate 1 vav box, add diffusor, registers, return grills, with associated duct work, air balancing, relocate (e) thermostat. (ref 202510016451) | $39,186 |
| [202604229880](https://www.permitgraph.org/p/202604229880) | Apr 22, 2026 | Completed: final sign-off Jun 2026 | [150 California St](https://www.permitgraph.org/a/0236/019) | deferred electrical. #650 6th floor: new office ti conference room center: lighting, fixtures, and associated circuiting/controls, power/sigmal, & signal devices w/ associated wiring. (ref 2025100164… | $121,554 |
| [202604229868](https://www.permitgraph.org/p/202604229868) | Apr 22, 2026 | Completed: final sign-off Jun 2026 | [150 California St](https://www.permitgraph.org/a/0236/019) | 9th fl - office tenant retrofit: new and altered lighting layout, circuiting and controls. mechanical ll- add transfer fan. add diffuser and registers with associated duct work. air balance. relocate… | $31,700 |
| [202602175990](https://www.permitgraph.org/p/202602175990) | Feb 17, 2026 | Completed: final sign-off Jun 2026 | [150 California St](https://www.permitgraph.org/a/0236/019) | 9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework including relocated… | $342,500 |
| [202602065382](https://www.permitgraph.org/p/202602065382) | Feb 6, 2026 | Completed: final sign-off Sep 2026 | [150 California St](https://www.permitgraph.org/a/0236/019) | 17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms. | $450,000 |
| [202601234437](https://www.permitgraph.org/p/202601234437) | Jan 23, 2026 | Completed: final sign-off Jun 2026 | [150 California St](https://www.permitgraph.org/a/0236/019) | 6th, 9th, & 16th floors:office building common restroom lighting remodel: lighting fixtures and associated circuiting/controls. ref. arch permit: 202505055757 | $89,000 |
| [202601053209](https://www.permitgraph.org/p/202601053209) | Jan 5, 2026 | Completed: final sign-off Mar 2026 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 25th fl ref pa #2025-0918-5566: deferred mep. lighting fixtures, power & signal devices. add and relocate diffusers and return air grills | $85,000 |
| [202510016451](https://www.permitgraph.org/p/202510016451) | Oct 1, 2025 | Completed: final sign-off Jun 2026 | [150 California St](https://www.permitgraph.org/a/0236/019) | 6/fl- ti of (e) suite 650 to include interior non structural demo , non structural partitions, doors, frames, hardware, sidelights, finishes and millwork, ceiling and lighting | $199,018 |
| [202509185566](https://www.permitgraph.org/p/202509185566) | Sep 18, 2025 | Completed: final sign-off Mar 2026 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 25th/fl: interior tenant improvement scope includes: demolition and construction of non-structural partitions, door frames, floor finishes, millwork, light fixtures, and 5 new phone booths. deferred… | $418,888 |
| [202505075943](https://www.permitgraph.org/p/202505075943) | May 7, 2025 | Completed: final sign-off Jul 2025 | [150 California St](https://www.permitgraph.org/a/0236/019) | 8th fl- office tenant retrofit: lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring. deffered elec for arch #2025-0110-8086 | $87,222 |
| [202505075944](https://www.permitgraph.org/p/202505075944) | May 7, 2025 | Completed: final sign-off Sep 2025 | [150 California St](https://www.permitgraph.org/a/0236/019) | 8th fl- add diffusers, registers and transfer grilles. add 1 vav and 3 transfer fans. modify duct work. air balance deffered mech for arch #2025-0110-8086 | $83,680 |
| [202505055757](https://www.permitgraph.org/p/202505055757) | May 5, 2025 | Completed: final sign-off Jul 2026 | [150 California St](https://www.permitgraph.org/a/0236/019) | 6th, 9th, & 16th floors: remodel of existing restrooms. | $410,400 |
| [202502039536](https://www.permitgraph.org/p/202502039536) | Feb 3, 2025 | Completed: final sign-off Mar 2025 | [150 California St](https://www.permitgraph.org/a/0236/019) | 5/f: remodel common corridor, pel (public elevator lobby) and restroom lighting, circuiting and assicated controls. ref architectural permit 202410293929. | $65,850 |
| [202501108086](https://www.permitgraph.org/p/202501108086) | Jan 10, 2025 | Completed: final sign-off Jul 2025 | [150 California St](https://www.permitgraph.org/a/0236/019) | 8/fl-interior ti altering 2 suites into 3 suites. work includes demo and construct of partitions, doors, ceilings, lighting and finishes. mep deferred. | $1,233,496 |
| [202412106472](https://www.permitgraph.org/p/202412106472) | Dec 10, 2024 | Completed: final sign-off Jan 2025 | [150 California St](https://www.permitgraph.org/a/0236/019) | restroom lighting remodel and open office update control. ref pa #202408309800 and revision to pa #202410163090 | $85,000 |
| [202410293929](https://www.permitgraph.org/p/202410293929) | Oct 29, 2024 | Completed: final sign-off Mar 2025 | [150 California St](https://www.permitgraph.org/a/0236/019) | 5/fl- remodel of (e) common corridor, elevator lobby and restrooms | $211,864 |
| [202410163090](https://www.permitgraph.org/p/202410163090) | Oct 16, 2024 | Completed: final sign-off Jan 2025 | [150 California St](https://www.permitgraph.org/a/0236/019) | work on 22nd flr. permit revisions for 202408309800; relocating detectable warming strips and removal of railing in garage. finish and fixtures changes in restrooms. no mechanical work. electrical de… |  |
| [202409120599](https://www.permitgraph.org/p/202409120599) | Sep 12, 2024 | Completed: final sign-off Aug 2025 | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | various locations along the wood bowstring trusses are to be strengthened or repaired. (all interior work) | $675,000 |
| [202408309800](https://www.permitgraph.org/p/202408309800) | Aug 30, 2024 | Completed: final sign-off Jan 2025 | [150 California St](https://www.permitgraph.org/a/0236/019) | 22/fl-ti to include soft demo of select non structural partitions and patching of finish and ceiling tile restroom. upgrade include relocating plumbing fixtures and accessories mep deferred. | $190,275 |
| [202210114136](https://www.permitgraph.org/p/202210114136) | Oct 11, 2022 | Never finaled: issued Mar 2023, no final | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | building a/b, shoring and jacking five (5) bowstring trusses to repair cracked outer ply wood splice plates at trusses | $70,000 |
| [202002255329](https://www.permitgraph.org/p/202002255329) | Feb 25, 2020 | Never finaled: issued Feb 2020, no final | [2 Bryant St](https://www.permitgraph.org/a/3768/016) | revisions to pa#201908148797, remove interior ramp upgrades from scope of work. |  |
| [201908148797](https://www.permitgraph.org/p/201908148797) | Aug 14, 2019 | Completed: final sign-off Mar 2020 | [2 Bryant St](https://www.permitgraph.org/a/3768/016) | barrier removal entrance modification of a b occupancy located on bryant streets to comply with sf accessible entry program. remove and replace sidewalk, power door operator, and interoir ramp handra… | $30,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/mayco-commercial-construction-inc-1024529.
