# Maxg Construction Inc (Maxwell M Ghobadi

Contractor license 1079580. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/maxg-construction-inc-maxwell-m-ghobadi-1079580
- JSON: https://www.permitgraph.org/api/contractor?license=1079580
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1079580

29 permits since 2000: 18 completed, 9 in progress, 2 never finaled. Typically 58 days from filing to permit and 240 days from permit to final inspection. Of the 2 never-finaled permits, 2 are 5 to 10 years old.

- Based in: San Francisco
- On San Francisco permits: Jul 2020 to Aug 2026
- Last 24 months: 13 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2020 | 0 | 1 | 1 | 0 |
| 2021 | 0 | 0 | 1 | 0 |
| 2022 | 5 | 1 | 0 | 0 |
| 2023 | 4 | 0 | 0 | 0 |
| 2024 | 1 | 3 | 0 | 0 |
| 2025 | 5 | 3 | 0 | 0 |
| 2026 | 3 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Deck | 5 | 5 | 0 | 0 | 0 | 58 | 237 |
| Stairs | 2 | 2 | 0 | 0 | 0 | 215 | 222 |
| Kitchen remodel | 5 | 2 | 2 | 1 | 0 | 15 | 201 |
| Bathroom remodel | 5 | 3 | 1 | 1 | 0 | 16 | 171 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202608257118](https://www.permitgraph.org/p/202608257118) | Aug 25, 2026 | In progress: issued Sep 2026 | [2575 Mission St](https://www.permitgraph.org/a/3615/020) | change double door to single door with sidelight and metal gate, new seperation wall between kitchen and dining area. relocate ada table. | $10,000 |
| [202606263978](https://www.permitgraph.org/p/202606263978) | Jun 26, 2026 | Completed: final sign-off Oct 2026 | [3532 17th St](https://www.permitgraph.org/a/3567/016) | interior remodel, 3532 17th st,2nd floor unit. work include interior alternations w/ adding three new bathrooms & kitchen relocation. | $180,000 |
| [202605141315](https://www.permitgraph.org/p/202605141315) | May 14, 2026 | Completed: final sign-off Sep 2026 | [444 04th Av](https://www.permitgraph.org/a/1541/035) | revision to 202602105675. widen the existing garage door, ceiling joist frame modification per site visit. |  |
| [202602105675](https://www.permitgraph.org/p/202602105675) | Feb 10, 2026 | Completed: final sign-off Sep 2026 | [444 04th Av](https://www.permitgraph.org/a/1541/035) | to comply with nov 202538488- remove sheetrock at the main level as required to expose work for inspection. expose or resume (n) structural members as required for inspection. obtain permits and comp… | $50,000 |
| [202512051122](https://www.permitgraph.org/p/202512051122) | Dec 5, 2025 | Completed: final sign-off Dec 2025 | [584 02nd Av](https://www.permitgraph.org/a/1544/028) | revision to pa's# 202502190633 and 202509089818: adding (2) windows, (2) doors, (3) sliding doors. updating scope to reflect correct number of windows from 18 to 20 per inspector comments in the fiel… | $1,800 |
| [202511260541](https://www.permitgraph.org/p/202511260541) | Nov 26, 2025 | Completed: final sign-off Jun 2026 | [471 Faxon Av](https://www.permitgraph.org/a/6939/004) | proposed expansion of condition space at ground floor to add: bathroom, bedroom, office and tv room. | $75,000 |
| [202511048915](https://www.permitgraph.org/p/202511048915) | Nov 4, 2025 | In progress: issued Nov 2025 | [2536 Ocean Av](https://www.permitgraph.org/a/7225/014) | ref to complaint 202544902, install new power door operator, correct door swing to be inward. change of use from retail to office | $10,000 |
| [202511048857](https://www.permitgraph.org/p/202511048857) | Nov 4, 2025 | In progress: issued Feb 2026 | [2571 Mission St](https://www.permitgraph.org/a/3615/020) | merge 2 vacant commercial spacwe ( 2573 & 2575 mission ) to one commercial space (2575 mission st). proposed ti at first fl & reviving the mezzanine to accomodate new restroom/bar, new kitchen, new r… | $120,000 |
| [202509084818](https://www.permitgraph.org/p/202509084818) | Sep 8, 2025 | Completed: final sign-off Sep 2026 | [584 02nd Av](https://www.permitgraph.org/a/1544/028) | revision 202502190633- revise front windows to vinyl no changes to opening size or operation. replace garage door in kind. |  |
| [202508143027](https://www.permitgraph.org/p/202508143027) | Aug 14, 2025 | Completed: final sign-off Jul 2026 | [1204 Egbert Av](https://www.permitgraph.org/a/4909/002) | interior modification of 1st foor plan. install new window and new metal gate along front elevation. structural strengthening of existing floor framing. revise kitchen, bathroom, laundry room to offi… | $75,000 |
| [202508052321](https://www.permitgraph.org/p/202508052321) | Aug 5, 2025 | In progress: issued Aug 2025 | [2571 Mission St](https://www.permitgraph.org/a/3615/020) | proposed revision to pa # 2022-1104-5905. change electric to gas for dwelling units. |  |
| [202502190633](https://www.permitgraph.org/p/202502190633) | Feb 19, 2025 | Completed: final sign-off Dec 2025 | [584 02nd Av](https://www.permitgraph.org/a/1544/028) | replacement of 18 windows in kind. no changes to opening size or operation. wood aluminum clad for the 6 facade windows, vinyl for remaining windows. 80 sq,ft siding replacement on left (southeast) s… | $21,000 |
| [202412136821](https://www.permitgraph.org/p/202412136821) | Dec 13, 2024 | In progress: issued Mar 2025 | [2573 Mission St](https://www.permitgraph.org/a/3615/020) | revision to pa# 202407237062: add pg&e closet at the front. relocate store entry due to pg&e closet. all works to be performed within (e) boundary of the building. | $10,000 |
| [202408098336](https://www.permitgraph.org/p/202408098336) | Aug 9, 2024 | In progress: issued Oct 2024 | [2575 Mission St](https://www.permitgraph.org/a/3615/020) | new platform lift to mezzanine. ti for a2 occupancy under seperate permit - ada accessability ti work under this permit only | $40,000 |
| [202407237062](https://www.permitgraph.org/p/202407237062) | Jul 23, 2024 | In progress: issued Oct 2024 | [2573 Mission St](https://www.permitgraph.org/a/3615/020) | alterations at ground level commercial space. front door and main bathroom and ground levels. | $15,000 |
| [202402155961](https://www.permitgraph.org/p/202402155961) | Feb 15, 2024 | Completed: final sign-off Dec 2025 | [584 02nd Av](https://www.permitgraph.org/a/1544/028) | deck replacement at rear of the building to comply with nov# 2024200052. elimination of e) stairs, proposed n) spiral stairs | $5,000 |
| [202308214877](https://www.permitgraph.org/p/202308214877) | Aug 21, 2023 | Completed: final sign-off Apr 2024 | [1945 Carroll Av](https://www.permitgraph.org/a/5434B/003) | revision to permit 202206277127. to replace 2 entrances with auto sliding doors as shown on plans | $5,000 |
| [202307192483](https://www.permitgraph.org/p/202307192483) | Jul 19, 2023 | Completed: final sign-off Jun 2026 | [104 Sadowa St](https://www.permitgraph.org/a/7113/008A) | erect a two story type 5v-b adu per state law.goverment code sec.65852.2 at rear. | $200,000 |
| [202306069369](https://www.permitgraph.org/p/202306069369) | Jun 6, 2023 | Completed: final sign-off Jun 2026 | [201 Plymouth Av](https://www.permitgraph.org/a/7113/008A) | adding one new restidential unit at rear of ground fl within the existing boundary of mixed-use building (102 sadowa st). adding a restroom for commercial area at ground fl (201 plymouth st). interio… | $180,000 |
| [202302152073](https://www.permitgraph.org/p/202302152073) | Feb 15, 2023 | Completed: final sign-off Sep 2023 | [1530 Kirkwood Av](https://www.permitgraph.org/a/5278/007) | to comply with nov 202293768 and 202292866. revision to permit 202211156524 to remove and replace dryrotted structural member of the rear projection as per plan. size/shape of deck to remain the same | $2,000 |
| [202211156524](https://www.permitgraph.org/p/202211156524) | Nov 15, 2022 | Completed: final sign-off Sep 2023 | [1530 Kirkwood Av](https://www.permitgraph.org/a/5278/007) | comply with complaint 202292866. remove unwarranted storage/laundry space at ground floor built under 2nd fl rear popout/deck. | $10,000 |
| [202211045905](https://www.permitgraph.org/p/202211045905) | Nov 4, 2022 | In progress: issued Nov 2024 | [2571 Mission St](https://www.permitgraph.org/a/3615/020) | proposed legalization of three un-warranted dwelling units under local adu provisions. adding a second emergency exit for units @ 2nd floor. full seismic retrofit | $800,000 |
| [202210265257](https://www.permitgraph.org/p/202210265257) | Oct 26, 2022 | Completed: final sign-off Feb 2024 | [4619 Lincoln Wy](https://www.permitgraph.org/a/1703/047) | to comply with nov# 202293773 & revision to pa# 9914370s. adding 1 additional (n) dwelling from adu legalization making propose building to a 3 dewlling-unit building. completing all outstanding work… | $70,000 |
| [202206277127](https://www.permitgraph.org/p/202206277127) | Jun 27, 2022 | Completed: final sign-off Apr 2024 | [1945 Carroll Av](https://www.permitgraph.org/a/5434B/003) | to comply with nov# 202175173. as built plans modification of handicap restrooms. entrance accessibility. accessibility to 2nd fl (equipment platform area/ storage), change of office/ storage to reta… | $60,000 |
| [202203180294](https://www.permitgraph.org/p/202203180294) | Mar 18, 2022 | Completed: final sign-off Jul 2026 | [1204 Egbert Av](https://www.permitgraph.org/a/4909/002) | proposed addition of adu (unit #2) at g/f per government code section 65852.2. in conjunction w/ sb9 permit & lot split #202202147891. reduction of 2/f deck to maintain 3' to proposed property line. | $80,000 |
| [202201256577](https://www.permitgraph.org/p/202201256577) | Jan 25, 2022 | Completed: final sign-off Feb 2025 | [213 Capistrano Av](https://www.permitgraph.org/a/3146/002) | addition of one two-story adu unit at the rear of the building under the state adu program. | $230,000 |
| [202106011396](https://www.permitgraph.org/p/202106011396) | Jun 1, 2021 | Never finaled: issued Jun 2021, no final | [2520 Quint St](https://www.permitgraph.org/a/5425/001) | replace dry rotted wood to comply with nob # 201993851. repair of front exterior balcony at 2nd fl. interior remodeling of 2nd fl units. to relocate (e) kitchen, bedrm, & bath. to add 1 master bathro… | $35,000 |
| [202009234848](https://www.permitgraph.org/p/202009234848) | Sep 23, 2020 | In progress: issued Jun 2026 | [2520 Quint St](https://www.permitgraph.org/a/5425/001) | creation of 6 adu units by eliminating of (e) 6 parking spots on g/f. 2x studio units, 3x 1-bedroom, 1x-2 bedroom per oridinance 162-16. | $175,000 |
| [202007270787](https://www.permitgraph.org/p/202007270787) | Jul 27, 2020 | Never finaled: issued Aug 2020, no final | [2575 Mission St](https://www.permitgraph.org/a/3615/020) | foundation repair & replacement in-kind existing deteriorated foundation. | $80,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/maxg-construction-inc-maxwell-m-ghobadi-1079580.
