Back to bathroom remodel contractors
Mascheroni Construction
- Based in
- Berkeley
- On San Francisco permits
- Apr 2000 to Mar 2025
- Last 24 months
- 1 permit filed
127 permits since 2000: 107 completed, 7 never finaled, 13 expired or cancelled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
42 bathroom remodel permits: 34 completed, 3 never finaled, 5 expired or cancelled. Typically 3 days from filing to permit and 255 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 16, 2024 | Completed final sign-off Jun 2025 | 3433 Sacramento St | unit 2: kitchen remodel with new layout and appliances. bath remodel of fixtures and finishes. installation of new furnace, water heater, and overhead lighting. replacement of (4) windows at rear facade. scope of work is limited to unit 2.Details
unit 2: kitchen remodel with new layout and appliances. bath remodel of fixtures and finishes. installation of new furnace, water heater, and overhead lighting. replacement of (4) windows at rear facade. scope of work is limited to unit 2. | $40,000 |
| Jun 7, 2022 | Completed final sign-off Apr 2024 | 182 Hartford St | basement: new exterior multi-fold doors, rebuild stair, move laundry room, new sauna & remodel (e) patio. 1st/f: remodel kitchen and bathroom. remove fire place, new rear deck. 2nd/f: remodel primary bath & closet.Details
basement: new exterior multi-fold doors, rebuild stair, move laundry room, new sauna & remodel (e) patio. 1st/f: remodel kitchen and bathroom. remove fire place, new rear deck. 2nd/f: remodel primary bath & closet. | $400,000 |
| Dec 4, 2017 | Completed final sign-off Nov 2022 | 1871 Green St | remodel kitchen, add family room at main level, add bath, relocate laundry. remove roof deck, add master bed and bath at upper level.Details
remodel kitchen, add family room at main level, add bath, relocate laundry. remove roof deck, add master bed and bath at upper level. | $300,000 |
| Aug 22, 2017 | Completed final sign-off Sep 2021 | 1430 16th Av | (n)1st fl addtion @ rear. demo of interior walls, plumb/elec.(1)half bath removed.(1)full bath added. 2nd fl(n)deck @ rear. demo interior walls, plumb/elec. remove(2)beds&(1)bath.(1 1/2)bath added. (n)3rd fl addition incl(n)exterior/interior walls, plumb/elec(3)beds,(2)full bath. replace(n)stairsDetails
(n)1st fl addtion @ rear. demo of interior walls, plumb/elec.(1)half bath removed.(1)full bath added. 2nd fl(n)deck @ rear. demo interior walls, plumb/elec. remove(2)beds&(1)bath.(1 1/2)bath added. (n)3rd fl addition incl(n)exterior/interior walls, plumb/elec(3)beds,(2)full bath. replace(n)stairs | $150,000 |
| Jul 28, 2016 | Never finaled issued May 2017, no final | 3545 21st St | rebuild (e) rear enclosed porch, stairs & deck. fill in rear left corner of bldg at 3rd flrs. expand (e) master bath with addition. remodel (e) kitchen & bathroom at 3rd flr. add new roof deck at 4th flr.Details
rebuild (e) rear enclosed porch, stairs & deck. fill in rear left corner of bldg at 3rd flrs. expand (e) master bath with addition. remodel (e) kitchen & bathroom at 3rd flr. add new roof deck at 4th flr. | $145,000 |
| Feb 8, 2016 | Completed final sign-off Jan 2017 | 1259 Stanyan St | renovate (e) kitchen at 2/f master bath at 3rd level & dining rm wall repair water damage @ wall & roofDetails
renovate (e) kitchen at 2/f master bath at 3rd level & dining rm wall repair water damage @ wall & roof | $80,000 |
| Jan 27, 2016 | Completed final sign-off Apr 2016 | 2010 Eddy St | apt #d - renovate existing bathroom, new insert window at existing window @ bathroom.Details
apt #d - renovate existing bathroom, new insert window at existing window @ bathroom. | $20,000 |
| Oct 21, 2015 | Completed final sign-off May 2016 | 1384 Masonic Av | remodel two bathrooms in-kind including new cabinetry, tile floor - no fixtures moving. no new wall and no existing wall relocation. lighting in bathrooms remodel shall comply with cec 150.0(k)5.Details
remodel two bathrooms in-kind including new cabinetry, tile floor - no fixtures moving. no new wall and no existing wall relocation. lighting in bathrooms remodel shall comply with cec 150.0(k)5. | $30,000 |
| Oct 21, 2015 | Completed final sign-off Mar 2016 | 76 Hernandez Av | remodel two existing bathrooms including cabinetry, tile flooring in-kind, no fixtures moving and no structural work. no new wall and no existing wall relocation. lighting in kitchen remodel shall comply with cec 150.0(k)5.Details
remodel two existing bathrooms including cabinetry, tile flooring in-kind, no fixtures moving and no structural work. no new wall and no existing wall relocation. lighting in kitchen remodel shall comply with cec 150.0(k)5. | $30,000 |
| Sep 4, 2015 | Completed final sign-off Oct 2018 | 333 Day St | renovation of single family dwelling including vertical expanding 3rd story into (e) attic to provide (3) (n) bedrooms & 1 (n) bath. interior remodel of (e) 2 story with (n) kitchen, dining & living room. plumbing & electrical work (via separate permit.Details
renovation of single family dwelling including vertical expanding 3rd story into (e) attic to provide (3) (n) bedrooms & 1 (n) bath. interior remodel of (e) 2 story with (n) kitchen, dining & living room. plumbing & electrical work (via separate permit. | $150,000 |
| Dec 16, 2014 | Completed final sign-off Feb 2019 | 3652 22nd St | lightwell infill + street acade windows under p/a#201412184015s renovation of the (e) kitchen and living level and the addition of two new bathrooms and 2 bedrooms on the 1/f. all windows are to be replaced and new electrical, plumbing and heated is to be added. see permit #201401317505 forDetails
lightwell infill + street acade windows under p/a#201412184015s renovation of the (e) kitchen and living level and the addition of two new bathrooms and 2 bedrooms on the 1/f. all windows are to be replaced and new electrical, plumbing and heated is to be added. see permit #201401317505 for | $375,000 |
| Oct 20, 2014 | Completed final sign-off Mar 2015 | 1255 Stanyan St | remodel bathroom, replace fixtures in kind, new electrical led fixtures in living room & dining roomDetails
remodel bathroom, replace fixtures in kind, new electrical led fixtures in living room & dining room | $25,000 |
| Sep 8, 2014 | Completed final sign-off May 2015 | 2010 Eddy St | unit a - remodel master bath incl. tile, cabs, counter, painting, elec, mech, plumnbing work; no structural work; to comply with cec150.0(k)5Details
unit a - remodel master bath incl. tile, cabs, counter, painting, elec, mech, plumnbing work; no structural work; to comply with cec150.0(k)5 | $17,650 |
| Sep 8, 2014 | Completed final sign-off May 2015 | 2010 Eddy St | unit d- remodel kitchen and 2 bathrooms; incl. cabs, counters, tile, flooring, paint, mech, elec, and plumbing; no structural workl; to comply with cec150.0(k) 3 & 5Details
unit d- remodel kitchen and 2 bathrooms; incl. cabs, counters, tile, flooring, paint, mech, elec, and plumbing; no structural workl; to comply with cec150.0(k) 3 & 5 | $65,550 |
| Aug 22, 2014 | Completed final sign-off Feb 2015 | 2984 Washington St | revision to 201407100954) replace deck at rear in kind due to dry rot, replace stairs due to rot. repair/replace in kind front facade due to dry rot, repair moment frame at front due to rot, remodel upstairs bathroomDetails
revision to 201407100954) replace deck at rear in kind due to dry rot, replace stairs due to rot. repair/replace in kind front facade due to dry rot, repair moment frame at front due to rot, remodel upstairs bathroom | $30,000 |
| Mar 4, 2014 | Never finaled issued Apr 2014, no final | 3928 23rd St | interior remodel including (n) bedroom, (n) full bath, (n) laundry on ground floor. remodle of (e) kitchen & (e) bath. plumbing, electrical work (via separate permits).Details
interior remodel including (n) bedroom, (n) full bath, (n) laundry on ground floor. remodle of (e) kitchen & (e) bath. plumbing, electrical work (via separate permits). | $72,783 |
| Jan 14, 2014 | Completed final sign-off Feb 2016 | 3928 23rd St | rear addition to single family dwelling, including (n) living room, (n) master bed & bath, (n) interior stair. plumbing & elect work via separate permit.Details
rear addition to single family dwelling, including (n) living room, (n) master bed & bath, (n) interior stair. plumbing & elect work via separate permit. | $183,408 |
| Nov 27, 2013 | Completed final sign-off Jan 2016 | 750 Castro St | addition of garage reclaim (e) unconditioned 1/f into habitable space. reclaim uncondiioned attic into habitable living. (n) sprinkler system, add dormers @ roof, add 1 bathroom and 1 bedroom on 1st floor, 1 bathroom and 1 bedroom on 4th floorDetails
addition of garage reclaim (e) unconditioned 1/f into habitable space. reclaim uncondiioned attic into habitable living. (n) sprinkler system, add dormers @ roof, add 1 bathroom and 1 bedroom on 1st floor, 1 bathroom and 1 bedroom on 4th floor | $100,000 |
| Mar 22, 2013 | Completed final sign-off Feb 2014 | 2302 Divisadero St | remodel kitchen & 2 baths incl cabinets, flooring, counters, appliances, lighting, painting incl repl doors, no structural work, new kitchen exh fan, bath exh, connect to (e) duct,kitchn ltg will be 50% high efficacy bath lighting controled by sensorDetails
remodel kitchen & 2 baths incl cabinets, flooring, counters, appliances, lighting, painting incl repl doors, no structural work, new kitchen exh fan, bath exh, connect to (e) duct,kitchn ltg will be 50% high efficacy bath lighting controled by sensor | $115,000 |
| Sep 17, 2012 | Completed final sign-off Mar 2014 | 3235 Folsom St | interior remodeling, develop basement and 1st floor area with (n) interior stair, (n) master suite, (n) family room & bath; remodel (e) bath @ 2nd floorDetails
interior remodeling, develop basement and 1st floor area with (n) interior stair, (n) master suite, (n) family room & bath; remodel (e) bath @ 2nd floor | $102,675 |
| Sep 7, 2011 | Completed final sign-off Dec 2011 | 348 Arlington St | remodel existing one bathroom at 2nd floor. light to comply w/ cec 150 (k).Details
remodel existing one bathroom at 2nd floor. light to comply w/ cec 150 (k). | $13,000 |
| Jul 12, 2011 | Completed final sign-off Sep 2011 | 411 Francisco St | #f112- remodel (e) bath incl. new tile, plumbing, shower door, paint, etc. watrproof memnrane at shower floor, install cabinets at hall. new lighting, no structural work.Details
#f112- remodel (e) bath incl. new tile, plumbing, shower door, paint, etc. watrproof memnrane at shower floor, install cabinets at hall. new lighting, no structural work. | $27,500 |
| May 26, 2011 | Expired or cancelled cancelled Aug 2011 | 445 Francisco St | remodel (e) bath including new tile, plumbing, shower door, paint, etc. install cabinets at hall. new lighting. no structural work.Details
remodel (e) bath including new tile, plumbing, shower door, paint, etc. install cabinets at hall. new lighting. no structural work. | $27,500 |
| Feb 15, 2011 | Completed final sign-off May 2011 | 15 Quintara St | remodel bath including new fixtures, ceramic tile, cabinets, lighting, paint. high efficacy lighting or occupancy sensor control. no structural work.Details
remodel bath including new fixtures, ceramic tile, cabinets, lighting, paint. high efficacy lighting or occupancy sensor control. no structural work. | $15,500 |
| Aug 20, 2010 | Completed final sign-off Oct 2010 | 3590 Sacramento St | unit #5 - kitchen & bathroom remodelDetails
unit #5 - kitchen & bathroom remodel | $36,000 |
| Nov 20, 2009 | Completed final sign-off Jun 2011 | 2766 Green St | construction of new media room and master bedroom, bathroom and closet spaces in existing unfinished lower level with interior connection stair. structural work.Details
construction of new media room and master bedroom, bathroom and closet spaces in existing unfinished lower level with interior connection stair. structural work. | $100,000 |
| Jul 2, 2009 | Completed final sign-off Jan 2010 | 3616 Jackson St | this project consists of a interior remodel which includes the addition of a 3-stop elevator, new master bath, mechanical room + the reconfiguration of a stair serving the 1st. + 2nd. floors.Details
this project consists of a interior remodel which includes the addition of a 3-stop elevator, new master bath, mechanical room + the reconfiguration of a stair serving the 1st. + 2nd. floors. | $145,000 |
| May 13, 2009 | Completed final sign-off Apr 2010 | 678 26th Av | horizontal addtion (1 story) at rear at grade level to create bedroom and bathroom suite.Details
horizontal addtion (1 story) at rear at grade level to create bedroom and bathroom suite. | $64,000 |
| Apr 21, 2009 | Expired or cancelled cancelled Feb 2014 | 70 Linda St | new third floor addtition including electrical, mechanical, plumbing, carpet, new bathroom.Details
new third floor addtition including electrical, mechanical, plumbing, carpet, new bathroom. | $120,700 |
| Jan 16, 2009 | Completed final sign-off Nov 2009 | 18 Elsie St | remodel kitchen, new fixtures in bathroom, removal of portion of wall to open into living rm.Details
remodel kitchen, new fixtures in bathroom, removal of portion of wall to open into living rm. | $40,000 |
| Oct 25, 2007 | Completed final sign-off Feb 2008 | 540 Magellan Av | remodel master bath which includes electrical, plumbing, cabinets, tile.Details
remodel master bath which includes electrical, plumbing, cabinets, tile. | $35,000 |
| Mar 20, 2007 | Completed final sign-off Jul 2007 | 66 27th Av | convert pantry into laundry room, remodel master bath, remodel bedroom, replace win.Details
convert pantry into laundry room, remodel master bath, remodel bedroom, replace win. | $55,000 |
| Jan 17, 2007 | Completed final sign-off Jan 2009 | 1782 Sanchez St | basement level-foundation & shear wall. main level-remodel & addition to (e) kitchen and bath. remodel (e) bedroom. upper level-add storage, bedroom and bath. remodel (e) bedroom. total addition 223 s.f. project s.f. 875 s.f.Details
basement level-foundation & shear wall. main level-remodel & addition to (e) kitchen and bath. remodel (e) bedroom. upper level-add storage, bedroom and bath. remodel (e) bedroom. total addition 223 s.f. project s.f. 875 s.f. | $92,375 |
| Nov 20, 2006 | Completed final sign-off Sep 2007 | 155 Marina Bl | extg kchn remodel: repalce all cabinetry and appliances, new flooring, no structural alterations or exterior wrok/extg bath remodel: add sink to pwderroom, add toilet to master bath, remove tub, new cabinetry and vanity, new tile and fixtures in shower, new flooring, no structural or exterior workDetails
extg kchn remodel: repalce all cabinetry and appliances, new flooring, no structural alterations or exterior wrok/extg bath remodel: add sink to pwderroom, add toilet to master bath, remove tub, new cabinetry and vanity, new tile and fixtures in shower, new flooring, no structural or exterior work | $85,000 |
| Oct 4, 2004 | Never finaled issued Oct 2004, no final | 540 Magellan Av | remodel bath in kind incl new fixtures, ceramic tile, paint, no structural workDetails
remodel bath in kind incl new fixtures, ceramic tile, paint, no structural work | $12,000 |
| Aug 27, 2003 | Expired or cancelled expired Jan 2007 | 2171 Bay St | remodel kitchen & bathrooms in kind. new cabs,appliances,paint,ceramic tile,etc.no structural work.Details
remodel kitchen & bathrooms in kind. new cabs,appliances,paint,ceramic tile,etc.no structural work. | $45,000 |
| Nov 12, 2002 | Completed final sign-off Feb 2003 | 3601 Market St | remodel existing bath in kind. new fixtures, ceramic tile, paintDetails
remodel existing bath in kind. new fixtures, ceramic tile, paint | $8,000 |
| Feb 19, 2002 | Completed final sign-off Mar 2002 | 1751 North Point St | revision to pa 200011075039-change layout of bathroom adjacent to garageDetails
revision to pa 200011075039-change layout of bathroom adjacent to garage | |
| Oct 11, 2001 | Expired or cancelled expired Jan 2003 | 23 Robinhood Dr | interior remodel replace(e)bath & kitchen fixtures w/ new new doors/walls,new finishes new insulatioDetails
interior remodel replace(e)bath & kitchen fixtures w/ new new doors/walls,new finishes new insulatio | $135,000 |
| Sep 18, 2001 | Completed final sign-off Dec 2001 | 2261 Jackson St | convert walkin closet in bedroom and remodel master bathDetails
convert walkin closet in bedroom and remodel master bath | $15,000 |
| Nov 7, 2000 | Completed final sign-off Mar 2002 | 1751 North Point St | convert existing garage storage to family room incl. laundry room & bathroomDetails
convert existing garage storage to family room incl. laundry room & bathroom | $70,850 |
| Apr 26, 2000 | Expired or cancelled expired Mar 2002 | 1751 North Point St | bathroom remodel on 2nd and 3rd floorDetails
bathroom remodel on 2nd and 3rd floor | $20,000 |