# Martin Paul Duggan Contracting

Contractor license 763148. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/martin-paul-duggan-contracting-763148
- JSON: https://www.permitgraph.org/api/contractor?license=763148
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=763148

81 permits since 2000: 74 completed, 6 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 72 days from permit to final inspection. Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Jun 2004 to Jan 2025
- Last 24 months: 1 permit filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2004 | 1 | 0 | 0 | 0 |
| 2005 | 2 | 0 | 0 | 0 |
| 2006 | 1 | 0 | 0 | 0 |
| 2007 | 1 | 0 | 0 | 0 |
| 2008 | 6 | 0 | 0 | 0 |
| 2009 | 0 | 0 | 1 | 0 |
| 2011 | 5 | 0 | 0 | 0 |
| 2012 | 4 | 0 | 0 | 0 |
| 2013 | 1 | 0 | 1 | 0 |
| 2014 | 32 | 0 | 2 | 1 |
| 2015 | 9 | 0 | 1 | 0 |
| 2016 | 0 | 0 | 1 | 0 |
| 2017 | 2 | 0 | 0 | 0 |
| 2018 | 1 | 0 | 0 | 0 |
| 2019 | 1 | 0 | 0 | 0 |
| 2021 | 3 | 0 | 0 | 0 |
| 2022 | 1 | 0 | 0 | 0 |
| 2023 | 1 | 0 | 0 | 0 |
| 2024 | 2 | 0 | 0 | 0 |
| 2025 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 8 | 8 | 0 | 0 | 0 | 32 | 257 |
| Stairs | 15 | 13 | 0 | 2 | 0 | 0 | 68 |
| Deck | 5 | 4 | 0 | 1 | 0 | 146 | 190 |
| Kitchen remodel | 9 | 9 | 0 | 0 | 0 | 1 | 126 |
| Roof deck | 1 | 1 | 0 | 0 | 0 | 156 | 19 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202501178604](https://www.permitgraph.org/p/202501178604) | Jan 17, 2025 | Completed: final sign-off Apr 2026 | [406 30th St](https://www.permitgraph.org/a/6639/010) | interior renovation of 2nd floor lower unit (406a) with new kitchen, bathroom and powder room/laundry. new deck and stairs in rear yard from ground to floor 3. remove brick chimney from ground floor… | $150,000 |
| [202408158741](https://www.permitgraph.org/p/202408158741) | Aug 15, 2024 | Completed: final sign-off Dec 2024 | [982 Junipero Serra Bl](https://www.permitgraph.org/a/7241/017) | renovation of (e) 2nd fl bathroom & bedroom as drawn. remove (e) skylikght @ bathroom not visible from street | $25,000 |
| [202407307571](https://www.permitgraph.org/p/202407307571) | Jul 30, 2024 | Completed: final sign-off Oct 2024 | [318 Byxbee St](https://www.permitgraph.org/a/6996/027) | otc permit in response to nov# 202423375: construction exceeded scope of work in permit app# 201511051797. ground floor demolition of interior wall at existing staircase as drawn in order to meet cod… | $2,800 |
| [202312202849](https://www.permitgraph.org/p/202312202849) | Dec 20, 2023 | Completed: final sign-off Jun 2024 | [138 Chenery St](https://www.permitgraph.org/a/6663/004) | renovation of kitchen & bathroom: new windows in south elevation & new doors on north elecation, existing windows & door on south elevation to be removed and walls, patched & sided to match existing. | $50,000 |
| [202211216941](https://www.permitgraph.org/p/202211216941) | Nov 21, 2022 | Completed: final sign-off Jan 2024 | [624 Fillmore St](https://www.permitgraph.org/a/0821/044) | interior remodel kitchen and bath | $20,000 |
| [202108055862](https://www.permitgraph.org/p/202108055862) | Aug 5, 2021 | Completed: final sign-off Sep 2021 | [166 Albion St](https://www.permitgraph.org/a/3568/034) | to comply w/ physical inspection report cc. 8507 | $5,000 |
| [202108055864](https://www.permitgraph.org/p/202108055864) | Aug 5, 2021 | Completed: final sign-off Sep 2021 | [166 Albion St](https://www.permitgraph.org/a/3568/034) | legalize wood window that were replaced in kind. at no historic resource. all front windows. to comply with physical inspection report # cc-8507 item 1 | $1,000 |
| [202102114474](https://www.permitgraph.org/p/202102114474) | Feb 11, 2021 | Completed: final sign-off Nov 2021 | [133 Steiner St](https://www.permitgraph.org/a/0866/028) | new floor finishes throughout. new base and trim throughout, new cabinetry troughout. new interior doors and hardwarde throughout. new paint. no work at kitchen and bath | $8,000 |
| [201903266173](https://www.permitgraph.org/p/201903266173) | Mar 26, 2019 | Completed: final sign-off Mar 2019 | [706 11th Av](https://www.permitgraph.org/a/1653/048) | per inspections request - this is a revision to issued permit #201703272391, this permit will correct the language from "bedroom" to the "family r0om" on the scope of work description on dbi & report. |  |
| [201806152070](https://www.permitgraph.org/p/201806152070) | Jun 15, 2018 | Completed: final sign-off Feb 2019 | [504 Liberty St](https://www.permitgraph.org/a/3603/051) | unit 504b- remodel bath in kind, new finishes througout, | $20,000 |
| [201703272391](https://www.permitgraph.org/p/201703272391) | Mar 27, 2017 | Completed: final sign-off Mar 2019 | [706 11th Av](https://www.permitgraph.org/a/1653/048) | horizontally expand residence to the rear @ the ground flr 214 sq. ft for a (n) bdrm & full bathroom. an (e) hall in the garage will be conditioned. a (n) 125 sq. ft deck wil be added above the addit… | $45,000 |
| [201702280275](https://www.permitgraph.org/p/201702280275) | Feb 28, 2017 | Completed: final sign-off Sep 2017 | [706 11th Av](https://www.permitgraph.org/a/1653/048) | to comply with complaint 201578571 .the permit wall create an unconditioned hallway in the existing garage. existing garage foundation to be partially replaced. interior stairs repaired in-kind. 2 wi… | $35,000 |
| [201612195343](https://www.permitgraph.org/p/201612195343) | Dec 19, 2016 | Never finaled: issued Dec 2016, no final | [211 Upper Tr](https://www.permitgraph.org/a/2628/060) | install wood deck over (e) patio at grade. replace (e) fence in-kind.all work rear yeard not visible from street. | $15,000 |
| [201512074354](https://www.permitgraph.org/p/201512074354) | Dec 7, 2015 | Completed: final sign-off Sep 2017 | [706 11th Av](https://www.permitgraph.org/a/1653/048) | replace extg perimeter foundation along north side of house in response to the n.o.v. complaint #201578563 | $10,000 |
| [201512044140](https://www.permitgraph.org/p/201512044140) | Dec 4, 2015 | Never finaled: issued Dec 2015, no final | [211 Upper Tr](https://www.permitgraph.org/a/2628/060) | demo two exterior walls and replace in kind. install property line window pwer ab-009. revision to app#201502279595. |  |
| [201510018620](https://www.permitgraph.org/p/201510018620) | Oct 1, 2015 | Completed: final sign-off Apr 2016 | [429 14th St](https://www.permitgraph.org/a/3546/029) | to comply with physical inspection report cc-7986. | $5,000 |
| [201505216912](https://www.permitgraph.org/p/201505216912) | May 21, 2015 | Completed: final sign-off Oct 2015 | [1464 09th Av](https://www.permitgraph.org/a/1845/029) | selective demolition of existing stucco cladding to reveal original cladding and ascertain condition. applicant provided historic photo showing wood cladding. restoration of facade under separate per… | $500 |
| [201505156473](https://www.permitgraph.org/p/201505156473) | May 15, 2015 | Completed: final sign-off Dec 2015 | [1045 Oak St](https://www.permitgraph.org/a/1217/034) | front bldg: to comply with physical inspection report #cc7690 | $15,000 |
| [201504224322](https://www.permitgraph.org/p/201504224322) | Apr 22, 2015 | Completed: final sign-off Dec 2015 | [1045 Oak St](https://www.permitgraph.org/a/1217/034) | rear bldg: to comply with physical inspection report cc-7691, exit discharge to be fire rated. rear bldg and exit discharge to be sprinklered per nfpa 13 under seperate permit. they will be fire rati… | $4,000 |
| [201502259335](https://www.permitgraph.org/p/201502259335) | Feb 25, 2015 | Completed: final sign-off Jun 2015 | [1155 Broderick St](https://www.permitgraph.org/a/1125/002) | to comply with physical inspection report #cc-7907 | $15,000 |
| [201502027277](https://www.permitgraph.org/p/201502027277) | Feb 2, 2015 | Completed: final sign-off Jun 2015 | [1267 Chestnut St](https://www.permitgraph.org/a/0499/001D) | #4- to obtain final inspection for work approved under pa# 201011165080 all work is complete. n/a ordinance# 155-13 |  |
| [201502027265](https://www.permitgraph.org/p/201502027265) | Feb 2, 2015 | Completed: final sign-off Jun 2015 | [1267 Chestnut St](https://www.permitgraph.org/a/0499/001D) | to comply with physical inspection report #cc-7811. including item #18 of the report with plans. n/a for the maher. | $15,000 |
| [201502027275](https://www.permitgraph.org/p/201502027275) | Feb 2, 2015 | Completed: final sign-off Jun 2015 | [1267 Chestnut St](https://www.permitgraph.org/a/0499/001D) | to obtain final inspection for work approved under pa# 9820698 all work is complete. n/a ordinance# 155-13 |  |
| [201412043022](https://www.permitgraph.org/p/201412043022) | Dec 4, 2014 | Completed: final sign-off Mar 2015 | [504 Liberty St](https://www.permitgraph.org/a/3603/051) | replace footings in basement, 9 total. | $25,000 |
| [201412022809](https://www.permitgraph.org/p/201412022809) | Dec 2, 2014 | Completed: final sign-off Jan 2015 | [670 05th Av](https://www.permitgraph.org/a/1640/033) | administrative correction to bpa#201410229543 to include language required to comply with physical inspection report #cc-7368, all items except item #1, which is included in bpa #201410229543. |  |
| [201411131472](https://www.permitgraph.org/p/201411131472) | Nov 13, 2014 | Never finaled: issued Nov 2014, no final | [135 Buena Vista Tr](https://www.permitgraph.org/a/1258/019) | renew for final pa# 200107204148. |  |
| [201411121317](https://www.permitgraph.org/p/201411121317) | Nov 12, 2014 | Completed: final sign-off Jan 2015 | [407 Miguel St](https://www.permitgraph.org/a/6689/021) | to comply with physical inspection report #cc-7666 | $1,000 |
| [201411050828](https://www.permitgraph.org/p/201411050828) | Nov 5, 2014 | Completed: final sign-off Jan 2015 | [4378 17th St](https://www.permitgraph.org/a/2646/024) | to comply with physical inspection report cc-7649. replacement of all front windows in existing openings with alum. wood clad (12 total). mech and storage room added to the garage level. | $25,000 |
| [201410239767](https://www.permitgraph.org/p/201410239767) | Oct 23, 2014 | Completed: final sign-off Jan 2015 | [407 Miguel St](https://www.permitgraph.org/a/6689/021) | legalize existing skylight in unit #409 and 409a (front building). see pa#2014-0822-4548 for plans. | $5,000 |
| [201410229582](https://www.permitgraph.org/p/201410229582) | Oct 22, 2014 | Completed: final sign-off Jul 2015 | [226 19th Av](https://www.permitgraph.org/a/1415/022B) | to comply with physical inspection report cc-7767 |  |
| [201409196808](https://www.permitgraph.org/p/201409196808) | Sep 19, 2014 | Completed: final sign-off Nov 2014 | [135 Buena Vista East Av](https://www.permitgraph.org/a/1258/019) | to obtain final inspection for work approved under pa#200002141910. all work is complete. |  |
| [201409196806](https://www.permitgraph.org/p/201409196806) | Sep 19, 2014 | Never finaled: issued Sep 2014, no final | [135 Buena Vista East Av](https://www.permitgraph.org/a/1258/019) | to obtain final inspection for work approved under pa#9926555. all work is complete. |  |
| [201409196805](https://www.permitgraph.org/p/201409196805) | Sep 19, 2014 | Completed: final sign-off Nov 2014 | [135 Buena Vista East Av](https://www.permitgraph.org/a/1258/019) | to obtain final inspection for work approved under pa#9910672. all work is complete. |  |
| [201409196807](https://www.permitgraph.org/p/201409196807) | Sep 19, 2014 | Expired or cancelled: cancelled Nov 2014 | [135 Buena Vista East Av](https://www.permitgraph.org/a/1258/019) | to obtain final inspection for work approved under pa#201006144470. all work is complete. |  |
| [201409166463](https://www.permitgraph.org/p/201409166463) | Sep 16, 2014 | Completed: final sign-off Nov 2014 | [135 Buena Vista East Av](https://www.permitgraph.org/a/1258/019) | to comply with physical inspection report cc-7696 | $8,000 |
| [201409105968](https://www.permitgraph.org/p/201409105968) | Sep 10, 2014 | Completed: final sign-off Oct 2014 | [3322 16th St](https://www.permitgraph.org/a/3557/013) | to comply with physical inspection report. cc#7717. | $4,000 |
| [201408264706](https://www.permitgraph.org/p/201408264706) | Aug 26, 2014 | Completed: final sign-off Nov 2014 | [2944 Judah St](https://www.permitgraph.org/a/1789/018G) | remove and replace cracked stucco and replace in kind at the front facade. some dry rotrepair add insulation at the second floor. | $15,000 |
| [201408254615](https://www.permitgraph.org/p/201408254615) | Aug 25, 2014 | Completed: final sign-off Sep 2014 | [2831 Polk St](https://www.permitgraph.org/a/0478/002) | to comply with physical inspection report cc#7761. | $5,000 |
| [201408224548](https://www.permitgraph.org/p/201408224548) | Aug 22, 2014 | Completed: final sign-off Jan 2015 | [409 Miguel St](https://www.permitgraph.org/a/6689/021) | install skylights in detached structure at the rear of the property. install 2 layers of 5/8" type x drywall on the 3 property line walls of the detached structure. | $1,000 |
| [201408133740](https://www.permitgraph.org/p/201408133740) | Aug 13, 2014 | Completed: final sign-off Jan 2015 | [4161 23rd St](https://www.permitgraph.org/a/2804/036) | to obtain final inspection for work approved under pa# 200605010298. all work is complete. |  |
| [201408133739](https://www.permitgraph.org/p/201408133739) | Aug 13, 2014 | Completed: final sign-off Jan 2015 | [4161 23rd St](https://www.permitgraph.org/a/2804/036) | to comply with physical inspection report #cc-7669 | $15,000 |
| [201408063163](https://www.permitgraph.org/p/201408063163) | Aug 6, 2014 | Completed: final sign-off Feb 2016 | [1310 05th Av](https://www.permitgraph.org/a/1759/044) | to comply with physical inspection report #cc-7689 | $8,000 |
| [201407181585](https://www.permitgraph.org/p/201407181585) | Jul 18, 2014 | Completed: final sign-off Aug 2014 | [1278 Church St](https://www.permitgraph.org/a/6536/005) | to comply with physical inspectionr eport #cc-7757; plumbing only | $3,000 |
| [201407010254](https://www.permitgraph.org/p/201407010254) | Jul 1, 2014 | Completed: final sign-off Sep 2014 | [404 45th Av](https://www.permitgraph.org/a/1476/027) | to comply with physical inspection report #cc-7558. | $25,000 |
| [201406269567](https://www.permitgraph.org/p/201406269567) | Jun 26, 2014 | Completed: final sign-off Sep 2014 | [1485 Guerrero St](https://www.permitgraph.org/a/6576/009A) | to comply with physical inspection report cc-7640 | $20,000 |
| [201406168515](https://www.permitgraph.org/p/201406168515) | Jun 16, 2014 | Completed: final sign-off Nov 2014 | [3365 22nd St](https://www.permitgraph.org/a/3633/025) | to comply with physical inspection report #7622; and also to remove un-permitted storage room in b/f & skylights at rear upper unit of 3367 | $18,000 |
| [201406037403](https://www.permitgraph.org/p/201406037403) | Jun 3, 2014 | Completed: final sign-off Oct 2014 | [311 Lake St](https://www.permitgraph.org/a/1364/001) | remove bearing wall and remodel kitchen and dining room | $40,000 |
| [201405307165](https://www.permitgraph.org/p/201405307165) | May 30, 2014 | Completed: final sign-off Apr 2015 | [160 Graystone Tr](https://www.permitgraph.org/a/2719B/008) | kitchen remodel no structural work, remove cabs and replace new flooring in kitchen and living rm | $30,000 |
| [201405276753](https://www.permitgraph.org/p/201405276753) | May 27, 2014 | Completed: final sign-off Jul 2014 | [790 Lyon St](https://www.permitgraph.org/a/1158/029) | to comply with physical inspection report cc 7610 items 9, 10 for 2 interior stairs from gr floor to basement | $10,000 |
| [201405054882](https://www.permitgraph.org/p/201405054882) | May 5, 2014 | Completed: final sign-off Oct 2014 | [623 Dolores St](https://www.permitgraph.org/a/3598/059) | comply with cc-7556 as built roof deck. maher 155-13 not required | $4,000 |
| [201405054912](https://www.permitgraph.org/p/201405054912) | May 5, 2014 | Completed: final sign-off Jun 2014 | [273 29th St](https://www.permitgraph.org/a/6633/025) | to comply with physical inspection report # cc-7479 | $5,000 |
| [201404254220](https://www.permitgraph.org/p/201404254220) | Apr 25, 2014 | Completed: final sign-off May 2014 | [624 Guerrero St](https://www.permitgraph.org/a/3587/005) | to obtain a final inspection for work already approved under pa# 200605192011. all work is complete. |  |
| [201404254223](https://www.permitgraph.org/p/201404254223) | Apr 25, 2014 | Completed: final sign-off May 2014 | [624 Guerrero St](https://www.permitgraph.org/a/3587/005) | to obtain a final inspection for work already approved under pa# 200604249694. all work is complete |  |
| [201404233946](https://www.permitgraph.org/p/201404233946) | Apr 23, 2014 | Completed: final sign-off May 2014 | [624 Guerrero St](https://www.permitgraph.org/a/3587/005) | to comply with physical inspection report #cc - 7495 | $10,000 |
| [201403100309](https://www.permitgraph.org/p/201403100309) | Mar 10, 2014 | Completed: final sign-off Apr 2014 | [180 Haight St](https://www.permitgraph.org/a/0852/010) | to comply with physical inspection report # cc-7518 | $4,000 |
| [201403100303](https://www.permitgraph.org/p/201403100303) | Mar 10, 2014 | Completed: final sign-off Apr 2014 | [188 Noe St](https://www.permitgraph.org/a/3540/013) | to comply with physical inspection report # cc-7552 for 188 1/2 & 194 1/2. | $6,000 |
| [201401247015](https://www.permitgraph.org/p/201401247015) | Jan 24, 2014 | Completed: final sign-off Mar 2014 | [3723 17th St](https://www.permitgraph.org/a/3580/069) | to comply with physical inspection report # 7428 | $10,000 |
| [201401216721](https://www.permitgraph.org/p/201401216721) | Jan 21, 2014 | Completed: final sign-off Apr 2014 | [428 Dewey Bl](https://www.permitgraph.org/a/2864/004) | repair front entry stair, remove and replace brick, new waterproofing under brick, patch and repair stucco. work not to exceed 50% of front entry structure. | $5,000 |
| [201310159248](https://www.permitgraph.org/p/201310159248) | Oct 15, 2013 | Completed: final sign-off Jan 2014 | [1267 17th Av](https://www.permitgraph.org/a/1733/014) | remodel kitchen & bathroom in kind. replace cabinets, counter, backsplash, paint. | $10,000 |
| [201302069588](https://www.permitgraph.org/p/201302069588) | Feb 6, 2013 | Never finaled: issued Feb 2013, no final | [300 Urbano Dr](https://www.permitgraph.org/a/6912/003) | repair and replace dryrot under and around front entry stairs. remove extg brick and replace in kind less than 50% patch and replace stucco. | $10,000 |
| [201211295130](https://www.permitgraph.org/p/201211295130) | Nov 29, 2012 | Completed: final sign-off Dec 2012 | [560 Lyon St](https://www.permitgraph.org/a/1184/026) | comply w/physical inspection cc-7156 - install proper guardrail at bottom landing at rear stairs. | $500 |
| [201211073777](https://www.permitgraph.org/p/201211073777) | Nov 7, 2012 | Completed: final sign-off Dec 2012 | [1597 Fulton St](https://www.permitgraph.org/a/1184/026) | comply with physical inspection application #cc-7156. removal of (e) boiler & water heater under stairs & (e) door infill | $3,000 |
| [201210252829](https://www.permitgraph.org/p/201210252829) | Oct 25, 2012 | Completed: final sign-off Oct 2013 | [534 09th Av](https://www.permitgraph.org/a/1551/041) | revised pa# 2011-0812-2340-framing plan for rear deck |  |
| [201208147347](https://www.permitgraph.org/p/201208147347) | Aug 14, 2012 | Completed: final sign-off Sep 2012 | [34 El Sereno Ct](https://www.permitgraph.org/a/2968A/018) | remove brick and water proofing from front entry, stair, and replaced in kind. less than 50% of builidng entry to be replaced. repair stucco when finished. | $5,000 |
| [201109124335](https://www.permitgraph.org/p/201109124335) | Sep 12, 2011 | Completed: final sign-off Nov 2011 | [423 Teresita Bl](https://www.permitgraph.org/a/2954A/018A) | revision to pa #201108092065. remove only brick and mortor from stair to install new water proofing on top of existing structure and replace brick and mortor after water proofing installation. | $2,000 |
| [201108092065](https://www.permitgraph.org/p/201108092065) | Aug 9, 2011 | Completed: final sign-off Nov 2011 | [423 Teresita Bl](https://www.permitgraph.org/a/2954A/018A) | remove existing facade, replace siding, re-stucco, replace drain pipes, remove overhang above staircase, and column, paint. | $15,000 |
| [201107059482](https://www.permitgraph.org/p/201107059482) | Jul 5, 2011 | Completed: final sign-off Aug 2011 | [562 Lyon St](https://www.permitgraph.org/a/1184/026) | replace kitchen cabinets and countertop, add dishwasher and garbage disposal, plumbing & electrical to support the above. existing lighting retained. | $12,000 |
| [201106027310](https://www.permitgraph.org/p/201106027310) | Jun 2, 2011 | Completed: final sign-off Jun 2011 | [823 Alvarado St](https://www.permitgraph.org/a/2802/042) | revision to 201104053490; new wall under existing beam, delete slab dowels, per plan. | $20,000 |
| [201104053490](https://www.permitgraph.org/p/201104053490) | Apr 5, 2011 | Completed: final sign-off Jun 2011 | [823 Alvarado St](https://www.permitgraph.org/a/2802/042) | replace e brick foundation with new concrete foundation. new slab at garage. add n plywood sheathing at 1st level. remove e post at garge, new beam | $20,000 |
| [200912213576](https://www.permitgraph.org/p/200912213576) | Dec 21, 2009 | Never finaled: issued Dec 2011, no final | [419 Elizabeth St](https://www.permitgraph.org/a/3654/035) | add mudrm, family rm, two bathrms, master bedrm to 1st fl. upgrade (e) stairs to code. clear termite report by #54481. lingruen assoc. foundation upgrade. | $80,000 |
| [200808128990](https://www.permitgraph.org/p/200808128990) | Aug 12, 2008 | Completed: final sign-off Jan 2009 | [706 11th Av](https://www.permitgraph.org/a/1653/048) | rear exterior woor stair north side, no fire wall. infill one (e) window at rear, replace one (e) window at rear. revision to pa# 2008-0125-3279-s1 |  |
| [200808118888](https://www.permitgraph.org/p/200808118888) | Aug 11, 2008 | Completed: final sign-off Aug 2008 | [186 Museum Wy](https://www.permitgraph.org/a/2620/063) | revision to pa 200806255363, walkway post @ exterior no holdowns used. continuous posts are used. no bolts into (e) concrete as new concrete were placed. | $1,000 |
| [200804250652](https://www.permitgraph.org/p/200804250652) | Apr 25, 2008 | Completed: final sign-off Mar 2017 | [706 11th Av](https://www.permitgraph.org/a/1653/048) | remove stucco and replace with wood siding and trim on front of building | $18,000 |
| [200802124551](https://www.permitgraph.org/p/200802124551) | Feb 12, 2008 | Completed: final sign-off Apr 2008 | [21 Rosemont Pl](https://www.permitgraph.org/a/3534/020) | removal of stucco, replaced by new wood siding. repair dryrot replace in kind. the stucco is only on the front of the building. | $20,000 |
| [200801253279](https://www.permitgraph.org/p/200801253279) | Jan 25, 2008 | Completed: final sign-off Jan 2009 | [706 11th Av](https://www.permitgraph.org/a/1653/048) | remove a deteriorated existing rear porch and replace with a new rear porch. (n) porch would extend 3 feet to north side property line. | $40,000 |
| [200801142373](https://www.permitgraph.org/p/200801142373) | Jan 14, 2008 | Completed: final sign-off Feb 2008 | [97 Coleridge St](https://www.permitgraph.org/a/5610A/017) | stairs, repace all dryrot. stair in kind more than 50% of structure | $8,500 |
| [200710226100](https://www.permitgraph.org/p/200710226100) | Oct 22, 2007 | Completed: final sign-off Nov 2007 | [10 Hillway Av](https://www.permitgraph.org/a/1275/040) | const an opening approx 48"x43" in a non-structural wall between the kitchen and the dining room. | $3,000 |
| [200601091726](https://www.permitgraph.org/p/200601091726) | Jan 9, 2006 | Completed: final sign-off Mar 2006 | [44 Newburg St](https://www.permitgraph.org/a/6589/003J) | remove & replace in kind (e) brick @ entry way stairs. minor repair. less than 50% of structure. | $4,000 |
| [200510064925](https://www.permitgraph.org/p/200510064925) | Oct 6, 2005 | Completed: final sign-off Dec 2005 | [353 Noe St](https://www.permitgraph.org/a/3564/070A) | revision to pa# 2005/01/26/4017. beam now to put placed under joists. |  |
| [200509284119](https://www.permitgraph.org/p/200509284119) | Sep 28, 2005 | Completed: final sign-off Mar 2006 | [44 Newburg St](https://www.permitgraph.org/a/6589/003J) | rev. to pa#2005/06/17/5414 | $5,000 |
| [200406297599](https://www.permitgraph.org/p/200406297599) | Jun 29, 2004 | Completed: final sign-off Sep 2004 | [1260 Hampshire St](https://www.permitgraph.org/a/4266/042) | repair & replace flooring for existing 3 decks of above address stucco- tiles & morter & repair deck | $4,500 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/martin-paul-duggan-contracting-763148.
