# Martin Building Co

Contractor license 565010. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/martin-building-co-565010
- JSON: https://www.permitgraph.org/api/contractor?license=565010
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=565010

79 permits since 2000: 49 completed, 24 never finaled, 6 expired or cancelled. Typically 0 days from filing to permit and 82 days from permit to final inspection. Of the 24 never-finaled permits, 5 are 5 to 10 years old, 19 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Jul 2000 to Oct 2025
- Last 24 months: 1 permit filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 0 | 0 | 0 | 1 |
| 2002 | 1 | 0 | 0 | 0 |
| 2005 | 1 | 0 | 0 | 0 |
| 2007 | 0 | 0 | 1 | 0 |
| 2008 | 0 | 0 | 1 | 0 |
| 2009 | 2 | 0 | 0 | 0 |
| 2010 | 0 | 0 | 1 | 0 |
| 2013 | 4 | 0 | 1 | 1 |
| 2014 | 17 | 0 | 14 | 0 |
| 2015 | 6 | 0 | 1 | 2 |
| 2016 | 4 | 0 | 0 | 0 |
| 2017 | 3 | 0 | 1 | 0 |
| 2018 | 4 | 0 | 3 | 0 |
| 2019 | 2 | 0 | 1 | 1 |
| 2020 | 1 | 0 | 0 | 0 |
| 2021 | 2 | 0 | 0 | 1 |
| 2022 | 1 | 0 | 0 | 0 |
| 2025 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 1 | 1 | 0 | 0 | 0 | 42 | 1237 |
| Roof deck | 1 | 1 | 0 | 0 | 0 | 0 | 176 |
| Kitchen remodel | 3 | 3 | 0 | 0 | 0 | 3 | 814 |
| Pergola or trellis | 1 | 0 | 0 | 1 | 0 | 1 |  |
| Stairs | 3 | 3 | 0 | 0 | 0 | 115 | 909 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202510248103](https://www.permitgraph.org/p/202510248103) | Oct 24, 2025 | Completed: final sign-off Jan 2026 | [8 Boardman Pl](https://www.permitgraph.org/a/3779/072) | 1st & 2nd fl: non-structural tenant improvement to e) office, 2 new offices on each fl. no plumbing fixtures. | $8,000 |
| [202207269300](https://www.permitgraph.org/p/202207269300) | Jul 26, 2022 | Completed: final sign-off Aug 2023 | [855 Bryant St](https://www.permitgraph.org/a/3779/072) | g/f: replace/update (e) reamp to full ada compliance. update (e) restrooms. | $15,000 |
| [202106253246](https://www.permitgraph.org/p/202106253246) | Jun 25, 2021 | Completed: final sign-off Aug 2021 | [8 Boardman Pl](https://www.permitgraph.org/a/3779/072) | mep/ t24 for addition of non structural interior office spaces and restroom. ref pa 202106021457 | $10,000 |
| [202106021457](https://www.permitgraph.org/p/202106021457) | Jun 2, 2021 | Completed: final sign-off Aug 2021 | [8 Boardman Pl](https://www.permitgraph.org/a/3779/072) | addition of new non-structural partitions for office, confirm and restroom. rev to permit 201810092631 | $12,000 |
| [202101213022](https://www.permitgraph.org/p/202101213022) | Jan 21, 2021 | Expired or cancelled: cancelled Aug 2021 | [8 Boardman Pl](https://www.permitgraph.org/a/3779/072) | revision and reference pa 2018-1009-2631add 2 conference rooms | $10,000 |
| [202006249066](https://www.permitgraph.org/p/202006249066) | Jun 24, 2020 | Completed: final sign-off Nov 2020 | [8 Boardman Pl](https://www.permitgraph.org/a/3779/072) | new eyebrow over existing door ( per previously approved permit #201810092631) | $5,000 |
| [201912169638](https://www.permitgraph.org/p/201912169638) | Dec 16, 2019 | Never finaled: issued Dec 2019, no final | [1101 Sutter St](https://www.permitgraph.org/a/0692/001) | demo of interior non-structural partitions only | $7,000 |
| [201910316141](https://www.permitgraph.org/p/201910316141) | Oct 31, 2019 | Expired or cancelled: withdrawn May 2020 | [1123 Sutter St](https://www.permitgraph.org/a/0692/019) | temporary field office to be assembled from steel shipping containers, no work to existing building n/a maher | $50,000 |
| [201904228637](https://www.permitgraph.org/p/201904228637) | Apr 22, 2019 | Completed: final sign-off Jul 2021 | [8 Boardman Pl](https://www.permitgraph.org/a/3779/072) | revision to 201902253703: addition of kitchenette | $2,500 |
| [201902253703](https://www.permitgraph.org/p/201902253703) | Feb 25, 2019 | Completed: final sign-off Jul 2021 | [8 Boardman Pl](https://www.permitgraph.org/a/3779/072) | deferred mep associated with pa #201810092631. | $35,000 |
| [201811266617](https://www.permitgraph.org/p/201811266617) | Nov 26, 2018 | Never finaled: issued Nov 2018, no final | [3512 16th St](https://www.permitgraph.org/a/3559/009) | 2 new non-structural interior partitions. no occupancy change under this permit - ti under separate permit | $7,500 |
| [201810092631](https://www.permitgraph.org/p/201810092631) | Oct 9, 2018 | Completed: final sign-off Jul 2021 | [8 Boardman Pl](https://www.permitgraph.org/a/3779/072) | addition of storefront on boardman street. relocation of(e) stair and expansion of (e) second story maher na | $148,000 |
| [201808016161](https://www.permitgraph.org/p/201808016161) | Aug 1, 2018 | Never finaled: issued Aug 2018, no final | [3512 16th St](https://www.permitgraph.org/a/3559/009) | mep for 201806040903. new post and platforms for new hvac units. f/s sep permit | $20,000 |
| [201806040903](https://www.permitgraph.org/p/201806040903) | Jun 4, 2018 | Never finaled: issued Jul 2018, no final | [3512 16th St](https://www.permitgraph.org/a/3559/009) | non-structural topping slab of (e) structural rat slab & new store front doors. waterless urinal only. ti construction plans, mep/fire under separate permit. revised 7/24/18. no change of use - to re… | $35,000 |
| [201802282492](https://www.permitgraph.org/p/201802282492) | Feb 28, 2018 | Completed: final sign-off Apr 2018 | [374 Harriet St](https://www.permitgraph.org/a/3779/132) | new security grille in single thumb turn and interior lock to be installed in extg rough opening. exterior work only. no change of use. n/a for maher | $800 |
| [201801249405](https://www.permitgraph.org/p/201801249405) | Jan 24, 2018 | Completed: final sign-off Jan 2018 | [374 Harriet St](https://www.permitgraph.org/a/3779/132) | to obtain final inspection for work approved under pa #201511031629 & 201409035360. all work is complete maher na |  |
| [201801168673](https://www.permitgraph.org/p/201801168673) | Jan 16, 2018 | Completed: final sign-off Mar 2018 | [3512 16th St](https://www.permitgraph.org/a/3559/009) | modification to pa# 201606210550. to add rebar to rat slab (non-structural). future ti permit will include structural slab. | $5,000 |
| [201712186763](https://www.permitgraph.org/p/201712186763) | Dec 18, 2017 | Completed: final sign-off Mar 2018 | [75 Boardman Pl](https://www.permitgraph.org/a/3779/132) | correct recording of use in sfdbi system to pa#201507101214. n/a for maher. |  |
| [201708185313](https://www.permitgraph.org/p/201708185313) | Aug 18, 2017 | Never finaled: issued Aug 2017, no final | [440 Jessie St](https://www.permitgraph.org/a/3704/035) | revision to app#201501135631 to revise occupant load for assembly permit. n/a for maher |  |
| [201708104534](https://www.permitgraph.org/p/201708104534) | Aug 10, 2017 | Completed: final sign-off Mar 2018 | [3512 16th St](https://www.permitgraph.org/a/3559/009) | remove & replace windows, skylights & remove existing sign. building is unconditioned. | $10,000 |
| [201704063323](https://www.permitgraph.org/p/201704063323) | Apr 6, 2017 | Completed: final sign-off Feb 2018 | [2201 Bay Shore Bl](https://www.permitgraph.org/a/5087/004) | demolish one story for storage. ** maher: n/a ** | $5,000 |
| [201609087136](https://www.permitgraph.org/p/201609087136) | Sep 8, 2016 | Completed: final sign-off May 2018 | [1550 17th St](https://www.permitgraph.org/a/3953/002B) | construction of new non-load bearing wall at property line condition where none exists and accessible upgrades, restroom upgrade. n/a for maher | $22,000 |
| [201606210550](https://www.permitgraph.org/p/201606210550) | Jun 21, 2016 | Completed: final sign-off Mar 2018 | [3512 16th St](https://www.permitgraph.org/a/3559/009) | demolition of damaged non structural slab and replacement with 2"-3" rat slab with .9 ml v.b. over compacted fill. | $3,500 |
| [201606160175](https://www.permitgraph.org/p/201606160175) | Jun 16, 2016 | Completed: final sign-off Jan 2018 | [724 Brannan St](https://www.permitgraph.org/a/3779/132) | intent of permit is to memorialize t-24 revision ref. permit 201501286916; no work on this permit. n/a ordinance #155-13 |  |
| [201603182516](https://www.permitgraph.org/p/201603182516) | Mar 18, 2016 | Completed: final sign-off Mar 2018 | [3512 16th St](https://www.permitgraph.org/a/3559/009) | non structural demo of extg partitions electrical conduit, elect services, gas services etc. per ab-017 | $2,500 |
| [201509227650](https://www.permitgraph.org/p/201509227650) | Sep 22, 2015 | Completed: final sign-off Jan 2018 | [374 Harriet St](https://www.permitgraph.org/a/3779/132) | 6 new roof top ac units are being added on the roof. new air distrubution is being added to serve new space plan. roof structural work per pa#201511031629. n/a for maher. | $120,000 |
| [201507302935](https://www.permitgraph.org/p/201507302935) | Jul 30, 2015 | Completed: final sign-off Oct 2017 | [724 Brannan St](https://www.permitgraph.org/a/3779/132) | modify permit #201501286916 to retain extg exterior window. add furring walls/gypsum wall bd and insulation at roof and walls. n/a for maher. | $1,000 |
| [201507302934](https://www.permitgraph.org/p/201507302934) | Jul 30, 2015 | Completed: final sign-off Oct 2017 | [374 Harriet St](https://www.permitgraph.org/a/3779/132) | modify permit #201501286917 to add conference room and mtg rooms on ground and mezzanine. relocate approved store front add 3 hr rated door at dimising wall. add privacy screen parallel to harriet en… | $6,500 |
| [201507101214](https://www.permitgraph.org/p/201507101214) | Jul 10, 2015 | Completed: final sign-off Oct 2017 | [75 Boardman Pl](https://www.permitgraph.org/a/3779/132) | revision to 201409035360l add conference room and kitchenette to tenant space at 75 boardman. no changes to 374 harriet, per planning code establish goods & equip repair svc. | $15,000 |
| [201502047527](https://www.permitgraph.org/p/201502047527) | Feb 4, 2015 | Expired or cancelled: withdrawn Jul 2015 | [374 Harriet St](https://www.permitgraph.org/a/3779/132) | change of use. convert (e) auto repair & storage into gymnasium with accessory retail & business service. no construction under this permit. ** maher: compliance with ordinance no# 155-13 not require… |  |
| [201502047533](https://www.permitgraph.org/p/201502047533) | Feb 4, 2015 | Expired or cancelled: withdrawn Jul 2015 | [724 Brannan St](https://www.permitgraph.org/a/3779/132) | change of use. convert portionof 724 brannan from auto repair & storage into retail sales & service. no construction under this permit. ** maher: compliance with ordinance no# 155-13 not required ** |  |
| [201501286917](https://www.permitgraph.org/p/201501286917) | Jan 28, 2015 | Completed: final sign-off Oct 2017 | [374 Harriet St](https://www.permitgraph.org/a/3779/132) | revision to 201409035360. rotate stair location. remove non compliant ramp and exterior door. new connection to 724 brannan. revise approved storefront to add landing and step. n/a maher ordinance | $4,000 |
| [201501286916](https://www.permitgraph.org/p/201501286916) | Jan 28, 2015 | Completed: final sign-off Oct 2017 | [724 Brannan St](https://www.permitgraph.org/a/3779/132) | create new connection to 374 harriet st. remove and replace storefront for ada access. new door in existing opening. n/a maher ordinance | $6,000 |
| [201501135631](https://www.permitgraph.org/p/201501135631) | Jan 13, 2015 | Never finaled: issued Jan 2015, no final | [440 Jessie St](https://www.permitgraph.org/a/3704/035) | t.i. remodel entry lobby for ada compliance. remodel exit for accoustic control.maher n/a. | $10,000 |
| [201409035360](https://www.permitgraph.org/p/201409035360) | Sep 3, 2014 | Completed: final sign-off Mar 2018 | [374 Harriet St](https://www.permitgraph.org/a/3779/132) | interior non structural ti. ada upgrade of bathrooms entry, guardrails, stairs. n/a for the maher | $55,000 |
| [201405155823](https://www.permitgraph.org/p/201405155823) | May 15, 2014 | Completed: final sign-off May 2014 | [410 Jessie St](https://www.permitgraph.org/a/3704/999) | to obtain final inspection for work approved under pa 200710034456. all work is complete |  |
| [201405155822](https://www.permitgraph.org/p/201405155822) | May 15, 2014 | Never finaled: issued May 2014, no final | [410 Jessie St](https://www.permitgraph.org/a/3704/999) | to obtainl final inspection for work approved under pa 20806134424. all work is complete |  |
| [201405155821](https://www.permitgraph.org/p/201405155821) | May 15, 2014 | Completed: final sign-off May 2014 | [410 Jessie St](https://www.permitgraph.org/a/3704/999) | to obtain final inspection for work approved under pa 200708291244. all work is complete |  |
| [201405095382](https://www.permitgraph.org/p/201405095382) | May 9, 2014 | Completed: final sign-off May 2014 | [410 Jessie St](https://www.permitgraph.org/a/3704/999) | to obtain final inspection for work approved under pa#200702083723 |  |
| [201405095387](https://www.permitgraph.org/p/201405095387) | May 9, 2014 | Completed: final sign-off May 2014 | [410 Jessie St](https://www.permitgraph.org/a/3704/999) | to obtain final inspection for work approved under pa#200802255493 |  |
| [201405095386](https://www.permitgraph.org/p/201405095386) | May 9, 2014 | Never finaled: issued May 2014, no final | [410 Jessie St](https://www.permitgraph.org/a/3704/088) | to obtain final inspection for work approved under pa#200711218711 |  |
| [201405024799](https://www.permitgraph.org/p/201405024799) | May 2, 2014 | Never finaled: issued May 2014, no final | [2 Mint Pz](https://www.permitgraph.org/a/3704/079) | to obtain final inspection for work approved under pa# 200802054070. all work is complete. |  |
| [201405024797](https://www.permitgraph.org/p/201405024797) | May 2, 2014 | Never finaled: issued May 2014, no final | [2 Mint Pz](https://www.permitgraph.org/a/3704/079) | to obtain final inspection for work approved under pa# 200701121628. all work is complete. |  |
| [201405024798](https://www.permitgraph.org/p/201405024798) | May 2, 2014 | Never finaled: issued May 2014, no final | [2 Mint Pz](https://www.permitgraph.org/a/3704/079) | to obtain final inspection for work approved under pa# 200808229808. all work is complete. |  |
| [201404294465](https://www.permitgraph.org/p/201404294465) | Apr 29, 2014 | Never finaled: issued Apr 2014, no final | [2 Mint Pz](https://www.permitgraph.org/a/3704/079) | to obtain final inspection for work approved under pa# 200604249696. all work is complete. |  |
| [201404294464](https://www.permitgraph.org/p/201404294464) | Apr 29, 2014 | Never finaled: issued Apr 2014, no final | [2 Mint Pz](https://www.permitgraph.org/a/3704/079) | to obtain final inspection for work approved under pa# 200705090812. all work is complete. |  |
| [201404294467](https://www.permitgraph.org/p/201404294467) | Apr 29, 2014 | Completed: final sign-off May 2014 | [2 Mint Pz](https://www.permitgraph.org/a/3704/079) | to obtain final inspection for work approved under pa# 200712100008. all work is complete. |  |
| [201404244072](https://www.permitgraph.org/p/201404244072) | Apr 24, 2014 | Never finaled: issued Apr 2014, no final | [410 Jessie St](https://www.permitgraph.org/a/3704/999) | to obtain final inspection for work approved under pa# 200510145593s and ref to 201203095800 |  |
| [201404244076](https://www.permitgraph.org/p/201404244076) | Apr 24, 2014 | Never finaled: issued Apr 2014, no final | [410 Jessie St](https://www.permitgraph.org/a/3704/088) | to obtain final inspection for work approved under pa 200710024361; all work is complete |  |
| [201404244082](https://www.permitgraph.org/p/201404244082) | Apr 24, 2014 | Completed: final sign-off May 2014 | [410 Jessie St](https://www.permitgraph.org/a/3704/121) | to co0mplete work and obtain final inspection for work approved under pa 200703156354 |  |
| [201404223824](https://www.permitgraph.org/p/201404223824) | Apr 22, 2014 | Completed: final sign-off Apr 2014 | [2 Mint Pz](https://www.permitgraph.org/a/3704/119) | to obtain final inspection for work approved under pa# 200703297619. all work is complete. working in common area. |  |
| [201404223814](https://www.permitgraph.org/p/201404223814) | Apr 22, 2014 | Never finaled: issued Apr 2014, no final | [2 Mint Pz](https://www.permitgraph.org/a/3704/119) | to obtain final inspection for work approved under pa# 200702123966. all work is complete |  |
| [201404223823](https://www.permitgraph.org/p/201404223823) | Apr 22, 2014 | Completed: final sign-off May 2014 | [2 Mint Pz](https://www.permitgraph.org/a/3704/119) | to obtain final inspection for work approved under pa# 200710024364. all work is complete. working in common area. |  |
| [201404163390](https://www.permitgraph.org/p/201404163390) | Apr 16, 2014 | Never finaled: issued May 2014, no final | [440 Jessie St](https://www.permitgraph.org/a/3704/035) | replace extg structural column and reconfiguration of lounge and bar area. mechanical, electrical, & plumbing by deferred submittal. occupant load calculation will be required under separate architec… | $70,000 |
| [201403120574](https://www.permitgraph.org/p/201403120574) | Mar 12, 2014 | Completed: final sign-off Jun 2014 | [2255 03rd St](https://www.permitgraph.org/a/4058/010) | interior commercial tenant improvement. remove non structural partitions and reconfigure with new non structural partitions. add unisex restroom, utility closet and small training room. na ordinance… | $50,000 |
| [201401297363](https://www.permitgraph.org/p/201401297363) | Jan 29, 2014 | Completed: final sign-off Mar 2014 | [2255 03rd St](https://www.permitgraph.org/a/4058/010) | interior non structural t.i. and finishes to ground level and basement of extg brick one story and basement portion. n/ a for maher ordinance #155-13 | $10,000 |
| [201401216683](https://www.permitgraph.org/p/201401216683) | Jan 21, 2014 | Completed: final sign-off Jan 2014 | [6 Mint Pz](https://www.permitgraph.org/a/3704/170) | to obtain final inspection for work approved under pa # 200706133787. all work is complete. (interim control does not apply; maher ordinance 155-13 does not apply) |  |
| [201401216687](https://www.permitgraph.org/p/201401216687) | Jan 21, 2014 | Completed: final sign-off Feb 2014 | [6 Mint Pz](https://www.permitgraph.org/a/3704/170) | to obtain final inspection for work approved under pa # 200507117343. all work is complete. (interim control does not apply; maher ordinance 155-13 does not apply) |  |
| [201401166452](https://www.permitgraph.org/p/201401166452) | Jan 16, 2014 | Never finaled: issued Jan 2014, no final | [8 Mint Pz](https://www.permitgraph.org/a/3704/144) | to obtain final inspection for work approved under pa201003057659. all work is complete |  |
| [201401156357](https://www.permitgraph.org/p/201401156357) | Jan 15, 2014 | Completed: final sign-off Feb 2014 | [6 Mint Pz](https://www.permitgraph.org/a/3704/170) | to obtain final inspection for work approved under pa #200610195494. all work is complete. (interim control does not apply; maher ordinance 155-13 does not apply) |  |
| [201401156348](https://www.permitgraph.org/p/201401156348) | Jan 15, 2014 | Completed: final sign-off Feb 2014 | [6 Mint Pz](https://www.permitgraph.org/a/3704/170) | to obtain final inspection for work approved under pa #200706224887. all work is complete. (interim control does not apply; maher ordinance 155-13 does not apply) |  |
| [201401156356](https://www.permitgraph.org/p/201401156356) | Jan 15, 2014 | Never finaled: issued Jan 2014, no final | [6 Mint Pz](https://www.permitgraph.org/a/3704/145) | to obtain final inspection for work approved under pa #200504140069. all work is complete. (interim control does not apply; maher ordinance 155-13 does not apply) |  |
| [201401146280](https://www.permitgraph.org/p/201401146280) | Jan 14, 2014 | Completed: final sign-off Feb 2014 | [6 Mint Pz](https://www.permitgraph.org/a/3704/170) | work to be done in common area. to obtain final inspection for work approved under 2008.0229.5936. all work complete. compliance with ordinance no. 155-13 not required. |  |
| [201401146285](https://www.permitgraph.org/p/201401146285) | Jan 14, 2014 | Completed: final sign-off Feb 2014 | [6 Mint Pz](https://www.permitgraph.org/a/3704/145) | work to be done in common area. to obtain final inspection for work approved under 2006-0531-2900. all work complete. compliance with ordinance no. 155-13 not required. |  |
| [201401146286](https://www.permitgraph.org/p/201401146286) | Jan 14, 2014 | Never finaled: issued Jan 2014, no final | [6 Mint Pz](https://www.permitgraph.org/a/3704/145) | work to be done in common area. to obtain final inspection for work approved under 2007-0907-2084. all work complete. compliance with ordinance no. 155-13 not required. |  |
| [201311222640](https://www.permitgraph.org/p/201311222640) | Nov 22, 2013 | Completed: final sign-off Feb 2014 | [2225 03rd St](https://www.permitgraph.org/a/4058/010) | interior commercial tenant improvements. new non bearing partitons, millwork, intergrated light system. mech, elec, plumbing for small kitchenette. new security and low voltage system. work on 3-stor… | $15,000 |
| [201309166847](https://www.permitgraph.org/p/201309166847) | Sep 16, 2013 | Completed: final sign-off Jul 2014 | [2 Mint Pz](https://www.permitgraph.org/a/3704/079) | basement- divide existing storage rooms into smaller storage rooms. include installation of interior non load bearing partition walls; sprinkler under separate permit. | $40,000 |
| [201307252756](https://www.permitgraph.org/p/201307252756) | Jul 25, 2013 | Never finaled: issued Aug 2013, no final | [6 Mint Pz](https://www.permitgraph.org/a/3704/170) | revision to pa #2004.07.26.9825 - structural details for fire escape/firefighter access ladder and platforms (aka 416-420 jessie st). | $40,000 |
| [201306189822](https://www.permitgraph.org/p/201306189822) | Jun 18, 2013 | Completed: final sign-off Apr 2014 | [2 Mint Pz](https://www.permitgraph.org/a/3704/079) | to obtain final inspection for work approved under app#200708301435 |  |
| [201306189820](https://www.permitgraph.org/p/201306189820) | Jun 18, 2013 | Completed: final sign-off Jan 2014 | [6 Mint Pz](https://www.permitgraph.org/a/3704/170) | to complete work and obtain final inspection for work approved under app#200407269825 | $5,000 |
| [201301027091](https://www.permitgraph.org/p/201301027091) | Jan 2, 2013 | Expired or cancelled: withdrawn Apr 2014 | [440 Jessie St](https://www.permitgraph.org/a/3704/035) | remove two extg concrete columns and replace with steel posts. | $8,000 |
| [201003057659](https://www.permitgraph.org/p/201003057659) | Mar 5, 2010 | Never finaled: issued Mar 2010, no final | [8 Mint Pz](https://www.permitgraph.org/a/3704/144) | install hard piped heaters on existing arbors for cafe tables and chair area. in front of 8 mint plaza. not physically connected to building. | $5,500 |
| [200909086370](https://www.permitgraph.org/p/200909086370) | Sep 8, 2009 | Completed: final sign-off Mar 2010 | [2225 03rd St](https://www.permitgraph.org/a/4058/010) | remove and dispose of contaminated soil. no building work under this permit. approx 15,000 tons. 9,259 cy of soil excavation. shoring under separate permit. | $45,000 |
| [200905148393](https://www.permitgraph.org/p/200905148393) | May 14, 2009 | Completed: final sign-off Jul 2009 | [16 Mint Pz](https://www.permitgraph.org/a/3704/034) | revise structural drawing to app #200803137043. convert stairwell from switchback to straight as noted on drawings for street only. all work performed on ref. permit. |  |
| [200811136454](https://www.permitgraph.org/p/200811136454) | Nov 13, 2008 | Never finaled: issued Nov 2008, no final | [414 Jessie St](https://www.permitgraph.org/a/3704/002) | install hardpiped heaters on existing arbor for cafe tables & chairs area (permit no. 07tc-0302)nin front of plaza, ref pa #200709132611 | $7,000 |
| [200706133787](https://www.permitgraph.org/p/200706133787) | Jun 13, 2007 | Never finaled: issued Mar 2008, no final | [416 Jessie St](https://www.permitgraph.org/a/3704/006) | install diesel emergency generator on 8th floor roof. refer to appl #200407269825, permit #1101322. | $15,000 |
| [200507147616](https://www.permitgraph.org/p/200507147616) | Jul 14, 2005 | Completed: final sign-off Jan 2006 | [424 Jessie St](https://www.permitgraph.org/a/3704/009) | add 42 " tall guardrail, increase roof deck to 734 sf, roof spa, bbq and sink. add fire place on 8th | $5,000 |
| [200208123697](https://www.permitgraph.org/p/200208123697) | Aug 12, 2002 | Completed: final sign-off Oct 2002 | [85 Natoma St](https://www.permitgraph.org/a/3721/021) | to renew app#9801614s1 |  |
| [200007104633](https://www.permitgraph.org/p/200007104633) | Jul 10, 2000 | Expired or cancelled: expired Nov 2000 | [54 Mint St](https://www.permitgraph.org/a/3704/034) | renewal of applications 9810920, 9813680, 9910829, 9803767 for final inspection |  |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.