# M J Construction

Contractor license 809241. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/m-j-construction-809241
- JSON: https://www.permitgraph.org/api/contractor?license=809241
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=809241

60 permits since 2000: 51 completed, 2 never finaled, 7 expired or cancelled. Typically 53 days from filing to permit and 230 days from permit to final inspection. Of the 2 never-finaled permits, 2 are over 10 years old.

- Based in: El Cerrito
- On San Francisco permits: Mar 2005 to Apr 2022
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2005 | 0 | 0 | 1 | 0 |
| 2006 | 1 | 0 | 0 | 1 |
| 2008 | 1 | 0 | 0 | 0 |
| 2010 | 1 | 0 | 1 | 0 |
| 2013 | 1 | 0 | 0 | 0 |
| 2014 | 0 | 0 | 0 | 2 |
| 2015 | 3 | 0 | 0 | 0 |
| 2016 | 14 | 0 | 0 | 2 |
| 2017 | 14 | 0 | 0 | 2 |
| 2018 | 4 | 0 | 0 | 0 |
| 2019 | 5 | 0 | 0 | 0 |
| 2020 | 3 | 0 | 0 | 0 |
| 2021 | 3 | 0 | 0 | 0 |
| 2022 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 3 | 1 | 0 | 1 | 1 | 218 | 667 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202204222841](https://www.permitgraph.org/p/202204222841) | Apr 22, 2022 | Completed: final sign-off Feb 2023 | [85 Restani Wy](https://www.permitgraph.org/a/7029/001) | revision to pa 202102255325. revise pier depth on site condition and approval of project engineer. |  |
| [202102255325](https://www.permitgraph.org/p/202102255325) | Feb 25, 2021 | Completed: final sign-off Feb 2023 | [85 Restani Wy](https://www.permitgraph.org/a/7029/001) | to comply with nov # 202038871. partial stabilized leaned site & building retaining wall. restore building out of plumb wood frame. to comply with nov 20203871 | $98,500 |
| [202102235182](https://www.permitgraph.org/p/202102235182) | Feb 23, 2021 | Completed: final sign-off Jun 2021 | [245 Shrader St](https://www.permitgraph.org/a/1213/002C) | revision to pa 201709148087. design is revised to match the layout under separate adu permit. replace steel moment frame with plywood shear wall. revise shear walls due to new openings. | $5,000 |
| [202101132617](https://www.permitgraph.org/p/202101132617) | Jan 13, 2021 | Completed: final sign-off Mar 2021 | [1705 Hyde St](https://www.permitgraph.org/a/0153/011) | revision to pa 201709148309. wood framed seismic soft story retrofit. |  |
| [202003096506](https://www.permitgraph.org/p/202003096506) | Mar 9, 2020 | Completed: final sign-off Aug 2022 | [190 08th Av](https://www.permitgraph.org/a/1367/028) | revision to 201804126212 remodel e gr fl unit 7. convert to 2 bedrm. reconfigure unit 8 at gr fl (adu) new window at gr fl bath facing street | $90,000 |
| [202002144534](https://www.permitgraph.org/p/202002144534) | Feb 14, 2020 | Completed: final sign-off Feb 2020 | [14 Isis St](https://www.permitgraph.org/a/3522/004) | to obtain final inspection for work approved under pa#2016-05-03-6394. all work is complete |  |
| [202002063776](https://www.permitgraph.org/p/202002063776) | Feb 6, 2020 | Completed: final sign-off Nov 2020 | [74 Page St](https://www.permitgraph.org/a/0837/010) | revision to app#201709148303 for foundation on soft story retrofit. | $3,500 |
| [201911066555](https://www.permitgraph.org/p/201911066555) | Nov 6, 2019 | Completed: final sign-off Mar 2020 | [952 Haight St](https://www.permitgraph.org/a/1237/015) | lateral upgrade of bassement level to comply w/seismic design standards of administrative bulletin 94 (ab-094). seismic work to consist of plywood shearwalls, holdowns & concrete foundations | $65,000 |
| [201908279987](https://www.permitgraph.org/p/201908279987) | Aug 27, 2019 | Completed: final sign-off May 2021 | [228 Andover St](https://www.permitgraph.org/a/5665/006) | repair extg foundation. add underpining due to excavation of neighbouring addition project. to comply with nov #201957731 | $18,000 |
| [201905291936](https://www.permitgraph.org/p/201905291936) | May 29, 2019 | Completed: final sign-off Dec 2019 | [234 Andover St](https://www.permitgraph.org/a/5665/007) | shoring plan to comply w/ n.o.v 201957481. temp shoring for installation of new foundation and ground flr upgrade. | $5,000 |
| [201905090228](https://www.permitgraph.org/p/201905090228) | May 9, 2019 | Completed: final sign-off Oct 2019 | [701 Capp St](https://www.permitgraph.org/a/3637/063) | structural revision to 201610042231 & 201810042235. memorialize strucutral changes based on discovered (e) structural conditions. new conc. footings, modification to mf beam conn to diaphragm |  |
| [201902273929](https://www.permitgraph.org/p/201902273929) | Feb 27, 2019 | Completed: final sign-off Jun 2019 | [1078 Clay St](https://www.permitgraph.org/a/0212/019) | to comply with vio 201803271 foundation repair & partial replacement | $12,000 |
| [201810042235](https://www.permitgraph.org/p/201810042235) | Oct 4, 2018 | Completed: final sign-off Oct 2019 | [3129 22nd St](https://www.permitgraph.org/a/3637/063) | residential: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $100,000 |
| [201810042231](https://www.permitgraph.org/p/201810042231) | Oct 4, 2018 | Completed: final sign-off Oct 2019 | [3129 22nd St](https://www.permitgraph.org/a/3637/063) | commercial: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $50,000 |
| [201802201701](https://www.permitgraph.org/p/201802201701) | Feb 20, 2018 | Completed: final sign-off Apr 2018 | [461 Chestnut St](https://www.permitgraph.org/a/0063/025) | soft story retrofit revision to pa #20171262372. strong wall locations & back wall detail change shearwall locations. |  |
| [201802090971](https://www.permitgraph.org/p/201802090971) | Feb 9, 2018 | Completed: final sign-off May 2018 | [1652 Dolores St](https://www.permitgraph.org/a/6637/001) | revision to 201509146903 n foudation detail |  |
| [201712065706](https://www.permitgraph.org/p/201712065706) | Dec 6, 2017 | Completed: final sign-off Jan 2020 | [1245 20th Av](https://www.permitgraph.org/a/1730/008) | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. to compny with ces nov#201717851. | $60,000 |
| [201711284981](https://www.permitgraph.org/p/201711284981) | Nov 28, 2017 | Completed: final sign-off Nov 2019 | [325 Franklin St](https://www.permitgraph.org/a/0809/004) | revision to 201606296222, add 20 lin ft of new foundatio to replace e inadequate foundation. part of mandatory work. | $6,000 |
| [201711214601](https://www.permitgraph.org/p/201711214601) | Nov 21, 2017 | Expired or cancelled: withdrawn Dec 2017 | [1234 20th Av](https://www.permitgraph.org/a/1731/038) | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $60,000 |
| [201710171434](https://www.permitgraph.org/p/201710171434) | Oct 17, 2017 | Completed: final sign-off Oct 2018 | [601 Lake St](https://www.permitgraph.org/a/1367/001) | mandatory soft story retrofit per sfebc ch 4d, 2016 cebc appendix a-4, no additional work | $48,000 |
| [201709148309](https://www.permitgraph.org/p/201709148309) | Sep 14, 2017 | Completed: final sign-off Mar 2021 | [1705 Hyde St](https://www.permitgraph.org/a/0153/011) | soft story retrofit for cripple wall as target storm per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $35,000 |
| [201709148303](https://www.permitgraph.org/p/201709148303) | Sep 14, 2017 | Completed: final sign-off Nov 2020 | [74 Page St](https://www.permitgraph.org/a/0837/010) | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. ** maher: n/a ** | $35,000 |
| [201709087380](https://www.permitgraph.org/p/201709087380) | Sep 8, 2017 | Completed: final sign-off Oct 2018 | [967 Haight St](https://www.permitgraph.org/a/1240/027) | comply with san francisco wood frame seismic retrofit soft story programper sfebc chapter 4d, per 2016 cebc appendix 4 | $68,000 |
| [201708215426](https://www.permitgraph.org/p/201708215426) | Aug 21, 2017 | Completed: final sign-off Aug 2018 | [2562 Post St](https://www.permitgraph.org/a/1074/016) | soft story retrofit per sfebc chapter 4d : 2016 cebc appendix a-4. providie (4) steel moment frames 2nd ply shear walls with new foundations. | $100,000 |
| [201708185239](https://www.permitgraph.org/p/201708185239) | Aug 18, 2017 | Completed: final sign-off Jul 2018 | [1234 12th Av](https://www.permitgraph.org/a/1739/038) | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. | $50,000 |
| [201708185237](https://www.permitgraph.org/p/201708185237) | Aug 18, 2017 | Completed: final sign-off Jun 2018 | [52 Sanchez St](https://www.permitgraph.org/a/3538/011) | revision to soft story pa #201610200828. additonal footing & changing handy frame panel to wood frame shearwall. | $5,000 |
| [201706220032](https://www.permitgraph.org/p/201706220032) | Jun 22, 2017 | Completed: final sign-off Feb 2019 | [1060 Noe St](https://www.permitgraph.org/a/3656/002) | soft story retrofit per sfebc chapter 4d in accordance with cebc appendix a-4. | $30,000 |
| [201705187022](https://www.permitgraph.org/p/201705187022) | May 18, 2017 | Completed: final sign-off Jan 2019 | [1688 Green St](https://www.permitgraph.org/a/0545/008) | soft story shear walls 2016 cebc appendix a-4 | $10,000 |
| [201705187018](https://www.permitgraph.org/p/201705187018) | May 18, 2017 | Completed: final sign-off Jun 2018 | [1005 Jones St](https://www.permitgraph.org/a/0252/004) | soft story - steel frame & shear wall. no exterior work | $20,000 |
| [201705187017](https://www.permitgraph.org/p/201705187017) | May 18, 2017 | Completed: final sign-off Jun 2018 | [1005 Jones St](https://www.permitgraph.org/a/0252/004) | soft story retrofit 2016 cebc appendix a-4. no exterior work. | $3,000 |
| [201704144021](https://www.permitgraph.org/p/201704144021) | Apr 14, 2017 | Completed: final sign-off Jun 2018 | [3301 Wawona St](https://www.permitgraph.org/a/2513/022) | mandatory soft story seismic 2016 cebc appendix a-4 upgrade of 3 story apt building | $65,000 |
| [201704144061](https://www.permitgraph.org/p/201704144061) | Apr 14, 2017 | Expired or cancelled: cancelled Aug 2017 | [2562 Post St](https://www.permitgraph.org/a/1074/016) | soft story upgrade per sfbc chapter 34b and engineering criteria per 2016 ibc app a4 | $60,000 |
| [201611142508](https://www.permitgraph.org/p/201611142508) | Nov 14, 2016 | Completed: final sign-off Sep 2018 | [460 Lyon St](https://www.permitgraph.org/a/1199/024) | soft story upgrade iebc 2012 appendix a-4 | $35,000 |
| [201610200828](https://www.permitgraph.org/p/201610200828) | Oct 20, 2016 | Completed: final sign-off Jun 2018 | [52 Sanchez St](https://www.permitgraph.org/a/3538/011) | mandatory soft story seismic upgrade per sfbc chap 34b: iebc appendix a-4 | $50,000 |
| [201610200831](https://www.permitgraph.org/p/201610200831) | Oct 20, 2016 | Completed: final sign-off Feb 2017 | [3059 Pine St](https://www.permitgraph.org/a/1046/024) | revision to (e) seismic upgrade of an apartment bldg, mandatory soft story revision, foundation replacement, appn. 201608245911. |  |
| [201610200825](https://www.permitgraph.org/p/201610200825) | Oct 20, 2016 | Completed: final sign-off Dec 2017 | [2707 44th Av](https://www.permitgraph.org/a/2513/023) | mandatory seismic upgrade, soft story per sfbc chapter 34b: 2012 iebc appendix a-4 | $45,000 |
| [201609238710](https://www.permitgraph.org/p/201609238710) | Sep 23, 2016 | Completed: final sign-off Jul 2017 | [1271 09th Av](https://www.permitgraph.org/a/1741/015) | soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4. | $75,000 |
| [201609066829](https://www.permitgraph.org/p/201609066829) | Sep 6, 2016 | Completed: final sign-off Oct 2016 | [1065 Dolores St](https://www.permitgraph.org/a/3648/023) | revision to 201601076589, soft story seismic strengthening - detail changes. |  |
| [201608296222](https://www.permitgraph.org/p/201608296222) | Aug 29, 2016 | Completed: final sign-off Dec 2019 | [325 Franklin St](https://www.permitgraph.org/a/0809/004) | soft story upgrade (sfbc ch 34b) per iebc appendix chapter a4,add plywood, bolts, and clips | $80,000 |
| [201608245911](https://www.permitgraph.org/p/201608245911) | Aug 24, 2016 | Completed: final sign-off Feb 2017 | [3059 Pine St](https://www.permitgraph.org/a/1046/024) | 201608245911 seismic upgrade of 3 story aprtment bldg per soft story mandated program | $40,000 |
| [201607273507](https://www.permitgraph.org/p/201607273507) | Jul 27, 2016 | Expired or cancelled: expired Apr 2023 | [14 Isis St](https://www.permitgraph.org/a/3522/004) | add unit per ordinance# 30-15. studio with 1 bathroom. soft story retrofit pa# 2016/05/03/6394. new sprinklers under separate permit. ** maher: n/a ** | $35,000 |
| [201605187747](https://www.permitgraph.org/p/201605187747) | May 18, 2016 | Completed: final sign-off Dec 2016 | [875 Dolores St](https://www.permitgraph.org/a/3618/024) | mandatory soft story retrofit done in accordance to iebc chapter a4, work performed to increase the lateral resisting capacity of the (e) bldg and does not affect the (e) gravity load carrying system… | $120,000 |
| [201605036394](https://www.permitgraph.org/p/201605036394) | May 3, 2016 | Expired or cancelled: expired Sep 2020 | [14 Isis St](https://www.permitgraph.org/a/3522/004) | soft story retropfit per sfbc chpater 34b engineering criteria 2012 iebc appendix a-4. maher na | $30,000 |
| [201605026277](https://www.permitgraph.org/p/201605026277) | May 2, 2016 | Completed: final sign-off Dec 2016 | [1273 11th Av](https://www.permitgraph.org/a/1739/016) | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $50,000 |
| [201603091614](https://www.permitgraph.org/p/201603091614) | Mar 9, 2016 | Completed: final sign-off Aug 2016 | [744 Oak St](https://www.permitgraph.org/a/0827/011) | revision to ref pa 2015 0924 8016, detail changes |  |
| [201602190093](https://www.permitgraph.org/p/201602190093) | Feb 19, 2016 | Completed: final sign-off Nov 2019 | [1400 Washington St](https://www.permitgraph.org/a/0187/007) | mandatory soft story retrofit done in conformance with iebc a4, maher not req | $54,000 |
| [201602109235](https://www.permitgraph.org/p/201602109235) | Feb 10, 2016 | Completed: final sign-off Nov 2017 | [52 Day St](https://www.permitgraph.org/a/6634/011) | soft story retrofit per sfbc mandatory soft story program in accordance with iebc appendix a-4 | $75,000 |
| [201601076569](https://www.permitgraph.org/p/201601076569) | Jan 7, 2016 | Completed: final sign-off May 2016 | [3132 Scott St](https://www.permitgraph.org/a/0512/018) | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4: new plywood shear wall, simpson strong wall and concrete foundation. n/a ordinance #155-13 | $60,000 |
| [201509248016](https://www.permitgraph.org/p/201509248016) | Sep 24, 2015 | Completed: final sign-off Aug 2016 | [744 Oak St](https://www.permitgraph.org/a/0827/011) | soft story seismic retrofit 2012 iebc chapter a4 | $90,000 |
| [201509146902](https://www.permitgraph.org/p/201509146902) | Sep 14, 2015 | Completed: final sign-off Jun 2018 | [3726 24th St](https://www.permitgraph.org/a/3649/013) | soft story retrofit including upgrading some of ground floor walls to shear walls & strengthening the foundation and 2nd floor framing per 2012 iebc app. a-4 | $50,000 |
| [201509146903](https://www.permitgraph.org/p/201509146903) | Sep 14, 2015 | Completed: final sign-off May 2018 | [1652 Dolores St](https://www.permitgraph.org/a/6637/001) | soft story retrofit including upgrading some of the ground floor walls to shear walls and strenthening the foundation and 2nd floor framing per 2012 iebc app. a-4 | $60,000 |
| [201410148790](https://www.permitgraph.org/p/201410148790) | Oct 14, 2014 | Expired or cancelled: expired Dec 2019 | [1025 Scott St](https://www.permitgraph.org/a/1154/006) | strengthen walls of garage level, new plywood shearwalls, anchor bolts, holddowns, shear clips, 3 new hardyframe shear panels and associated grade beams | $60,000 |
| [201410148787](https://www.permitgraph.org/p/201410148787) | Oct 14, 2014 | Expired or cancelled: expired Oct 2019 | [1480 15th St](https://www.permitgraph.org/a/3549/026) | strengthening of walls at the storage level of existing building including new plywood shearwalls, anchor bolts, holddowns, grade beams and shear clips. soft story ordinance mitigation. maher not req… | $57,000 |
| [201304295700](https://www.permitgraph.org/p/201304295700) | Apr 29, 2013 | Completed: final sign-off Sep 2014 | [42 Seward St](https://www.permitgraph.org/a/2701/017A) | to complete work and to obtain final inspection for work approved under pa# 201009231462. all work is complete. | $1,000 |
| [201011225440](https://www.permitgraph.org/p/201011225440) | Nov 22, 2010 | Completed: final sign-off Nov 2011 | [1185 Pine St](https://www.permitgraph.org/a/0276/022) | seismic retrofit of existing umb bldg to compliance w/ ordinance 225-92. | $140,000 |
| [201009231462](https://www.permitgraph.org/p/201009231462) | Sep 23, 2010 | Never finaled: issued Feb 2011, no final | [42 Seward St](https://www.permitgraph.org/a/2701/017A) | replace/repair foundation ftgs &wall. excavate dirt, brace struc, install new beam to span approx.14'. extend wall &convert bsmnt sto stor space incl. work rm, storag, full bath, new dr,wdws, new pul… | $85,000 |
| [200811136520](https://www.permitgraph.org/p/200811136520) | Nov 13, 2008 | Completed: final sign-off Dec 2008 | [2698 San Jose Av](https://www.permitgraph.org/a/7103/051) | increase valuation for pa# 2008/05/19/2382 for $6000 per inspector paul rafael, jr. | $6,000 |
| [200608240403](https://www.permitgraph.org/p/200608240403) | Aug 24, 2006 | Expired or cancelled: expired Aug 2007 | [1215 Fell St](https://www.permitgraph.org/a/1215/014) | renew pa# 200203292671. | $114,000 |
| [200607207060](https://www.permitgraph.org/p/200607207060) | Jul 20, 2006 | Completed: final sign-off Oct 2006 | [467 Valencia St](https://www.permitgraph.org/a/3554/019) | renewal pa#200209055759. | $40,000 |
| [200503258424](https://www.permitgraph.org/p/200503258424) | Mar 25, 2005 | Never finaled: issued Mar 2005, no final | [590 05th Av](https://www.permitgraph.org/a/1547/028) | plumbing service upgrade.galv. change to copper from street to garage main valve | $1,500 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.