# Lucky Ching Construction

Contractor license 419507. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/lucky-ching-construction-419507
- JSON: https://www.permitgraph.org/api/contractor?license=419507
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=419507

33 permits since 2000: 27 completed, 3 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 121 days from permit to final inspection. Of the 3 never-finaled permits, 3 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Jan 2000 to Nov 2009
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 5 | 0 | 0 | 1 |
| 2001 | 3 | 0 | 0 | 0 |
| 2002 | 1 | 0 | 1 | 1 |
| 2003 | 3 | 0 | 1 | 1 |
| 2004 | 5 | 0 | 0 | 0 |
| 2005 | 3 | 0 | 0 | 0 |
| 2006 | 2 | 0 | 1 | 0 |
| 2008 | 1 | 0 | 0 | 0 |
| 2009 | 4 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 8 | 7 | 0 | 0 | 1 | 0 | 248 |
| Stairs | 7 | 5 | 0 | 1 | 1 | 0 | 94 |
| Kitchen remodel | 5 | 5 | 0 | 0 | 0 | 0 | 248 |
| Deck | 1 | 0 | 0 | 0 | 1 | 0 |  |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [200911161263](https://www.permitgraph.org/p/200911161263) | Nov 16, 2009 | Completed: final sign-off Dec 2009 | [2305 Van Ness Av](https://www.permitgraph.org/a/0551/004A) | repair courtyard floor-patch floor, waterproof | $2,800 |
| [200911161264](https://www.permitgraph.org/p/200911161264) | Nov 16, 2009 | Completed: final sign-off Dec 2009 | [60 Fernwood Dr](https://www.permitgraph.org/a/3042/012) | replace & repair 1 window in front of house | $1,200 |
| [200907132517](https://www.permitgraph.org/p/200907132517) | Jul 13, 2009 | Completed: final sign-off Aug 2009 | [280 Granada Av](https://www.permitgraph.org/a/6942/049) | replace 2 windows 2 front of building. | $1,500 |
| [200906100145](https://www.permitgraph.org/p/200906100145) | Jun 10, 2009 | Completed: final sign-off Jul 2009 | [6841 Geary Bl](https://www.permitgraph.org/a/1512/046) | repair stairs handrail. repair or replace hardware of the windows. to comply with nov#200904670 issued on 05/13/09. | $1,000 |
| [200804028567](https://www.permitgraph.org/p/200804028567) | Apr 2, 2008 | Completed: final sign-off Apr 2008 | [3356 Baker St](https://www.permitgraph.org/a/0923/027) | renew permit application # 200703146257 for final inspection |  |
| [200607146522](https://www.permitgraph.org/p/200607146522) | Jul 14, 2006 | Completed: final sign-off Nov 2006 | [1291 Union St](https://www.permitgraph.org/a/0123/048) | repair exterior wall. rear portion of the house. repair siding due to leakage. | $1,200 |
| [200602144558](https://www.permitgraph.org/p/200602144558) | Feb 14, 2006 | Never finaled: issued Feb 2006, no final | [1361 California St](https://www.permitgraph.org/a/0251/026) | demolish (e) wooden staircase in front of building and reconstruct with reinforced concrete, see attached drawings. | $12,500 |
| [200602063848](https://www.permitgraph.org/p/200602063848) | Feb 6, 2006 | Completed: final sign-off Mar 2007 | [1637 Moraga St](https://www.permitgraph.org/a/2027/031) | remodel kitchen and 2 bathrooms on 1st floor, legalize (e) basement room and bathroom, relocate laundry, furnace and water heater, lightwell infill. | $48,000 |
| [200512301331](https://www.permitgraph.org/p/200512301331) | Dec 30, 2005 | Completed: final sign-off Apr 2006 | [1291 Union St](https://www.permitgraph.org/a/0123/048) | repair & replace steps and floor (tiel) serving all 3 units, landing at (e) stair serving interior g/f in kind with stone finish | $3,500 |
| [200505253409](https://www.permitgraph.org/p/200505253409) | May 25, 2005 | Completed: final sign-off Feb 2006 | [270 San Leandro Wy](https://www.permitgraph.org/a/3252/007A) | ground floor: bathrooms revised drawing. making a exercise room. |  |
| [200504200427](https://www.permitgraph.org/p/200504200427) | Apr 20, 2005 | Completed: final sign-off Aug 2005 | [577 Castro St](https://www.permitgraph.org/a/3583/059) | install new column on the wall, for recessed electrical box relocated nearby in hallway. see app 200 | $2,500 |
| [200411239942](https://www.permitgraph.org/p/200411239942) | Nov 23, 2004 | Completed: final sign-off Apr 2005 | [60 Fernwood Dr](https://www.permitgraph.org/a/3042/012) | proposed a new computer room & bath room @ existing basement. | $12,000 |
| [200408101155](https://www.permitgraph.org/p/200408101155) | Aug 10, 2004 | Completed: final sign-off Apr 2005 | [200 San Fernando Wy](https://www.permitgraph.org/a/3251/001) | remode kitchen & bathroom. adn termite reapir. | $30,000 |
| [200407229518](https://www.permitgraph.org/p/200407229518) | Jul 22, 2004 | Completed: final sign-off Nov 2004 | [6841 Geary Bl](https://www.permitgraph.org/a/1512/046) | proposed remodeling (e) unit#a @ 2/f. change a (e)kitchen to bedroom. | $12,000 |
| [200406025324](https://www.permitgraph.org/p/200406025324) | Jun 2, 2004 | Completed: final sign-off Feb 2006 | [270 San Leandro Wy](https://www.permitgraph.org/a/3252/007A) | add 2nd level- 3 bedrooms, 2 bath. renovate main level- adjust stair, bath, kitchen. renovate | $200,000 |
| [200404020336](https://www.permitgraph.org/p/200404020336) | Apr 2, 2004 | Completed: final sign-off May 2004 | [1452 Rhode Island St](https://www.permitgraph.org/a/4281A/008) | replace south and east perimeterfooting , double-up floor joist, (e) girders & post to remain | $20,000 |
| [200311109774](https://www.permitgraph.org/p/200311109774) | Nov 10, 2003 | Expired or cancelled: expired Sep 2019 | [3394 16th St](https://www.permitgraph.org/a/3557/034B) | replace (e) exterior stairs & deck with new wood construction. replace (e)wood fence | $20,000 |
| [200310167711](https://www.permitgraph.org/p/200310167711) | Oct 16, 2003 | Completed: final sign-off Apr 2004 | [201 San Benito Wy](https://www.permitgraph.org/a/3260/018) | replace window of the house. 20 total | $7,000 |
| [200310036545](https://www.permitgraph.org/p/200310036545) | Oct 3, 2003 | Never finaled: issued Oct 2003, no final | [401 41st Av](https://www.permitgraph.org/a/1473/001) | revision to#9927158s. repair termite damage to (e) bldg exterior at the second story & the upper hal | $5,000 |
| [200307179735](https://www.permitgraph.org/p/200307179735) | Jul 17, 2003 | Completed: final sign-off Jan 2004 | [111 Robinhood Dr](https://www.permitgraph.org/a/2994/020) | remodeling kitchen and bathroom | $15,000 |
| [200303119311](https://www.permitgraph.org/p/200303119311) | Mar 11, 2003 | Completed: final sign-off Jun 2003 | [1656 Filbert St](https://www.permitgraph.org/a/0521/010) | renew pa#9923272, 2002/04/26/5009 for final inspection |  |
| [200209237165](https://www.permitgraph.org/p/200209237165) | Sep 23, 2002 | Expired or cancelled: expired Apr 2003 | [1658 Filbert St](https://www.permitgraph.org/a/0521/010) | remodel existing bathroom @ 2nd flr. | $7,500 |
| [200204265099](https://www.permitgraph.org/p/200204265099) | Apr 26, 2002 | Never finaled: issued May 2002, no final | [1656 Filbert St](https://www.permitgraph.org/a/0521/010) | rev. to approved pa#9923272 - rev. is to structural plan of groundfloor/wall is being removed | $8,000 |
| [200201156993](https://www.permitgraph.org/p/200201156993) | Jan 15, 2002 | Completed: final sign-off Apr 2002 | [1140 Castro St](https://www.permitgraph.org/a/2804/005) | repair all stair all landings of the front. all damage lumber of 7 the rear of the porches | $3,000 |
| [200111012280](https://www.permitgraph.org/p/200111012280) | Nov 1, 2001 | Completed: final sign-off Mar 2002 | [2038 Balboa St](https://www.permitgraph.org/a/1564/023) | repair damage of car accident for store window & door & walls(stucco)about 500 sq ft.(no structural | $15,000 |
| [200109198658](https://www.permitgraph.org/p/200109198658) | Sep 19, 2001 | Completed: final sign-off Feb 2002 | [39 Terrace Dr](https://www.permitgraph.org/a/2989A/014) | revise to 2001/03/23/5064 to add 2 dormer windows. windows visible from street. | $500 |
| [200103235064](https://www.permitgraph.org/p/200103235064) | Mar 23, 2001 | Completed: final sign-off Feb 2002 | [39 Terrace Dr](https://www.permitgraph.org/a/2989A/014) | alteration of (e) basement & 1/floor, add 3 bedrms & 2 baths upstairs @ 2/fl. | $225,000 |
| [200009201029](https://www.permitgraph.org/p/200009201029) | Sep 20, 2000 | Completed: final sign-off Oct 2001 | [3928 Kirkham St](https://www.permitgraph.org/a/1810/021) | horiz. addition | $55,000 |
| [200006233461](https://www.permitgraph.org/p/200006233461) | Jun 23, 2000 | Completed: final sign-off Feb 2002 | [70 Terrace Dr](https://www.permitgraph.org/a/3072A/023) | demolish 1-story type v-n structure (garage) |  |
| [200006233470](https://www.permitgraph.org/p/200006233470) | Jun 23, 2000 | Completed: final sign-off Sep 2002 | [70 Terrace Dr](https://www.permitgraph.org/a/3072A/023) | erect one1-story, garage | $5,000 |
| [200003275513](https://www.permitgraph.org/p/200003275513) | Mar 27, 2000 | Completed: final sign-off May 2000 | [2198 17th Av](https://www.permitgraph.org/a/2201/003A) | repair and replace stucco wall | $2,000 |
| [20000127418](https://www.permitgraph.org/p/20000127418) | Jan 27, 2000 | Expired or cancelled: expired May 2001 | [60 Terrace Dr](https://www.permitgraph.org/a/3072A/026) | adding a second level to one level home-include some demolition-two internal walls and buindg a stai | $75,000 |
| [20000125223](https://www.permitgraph.org/p/20000125223) | Jan 25, 2000 | Completed: final sign-off May 2000 | [228 Denslowe Dr](https://www.permitgraph.org/a/7243/004) | remove & replace termite damaged limber finsih coat stucco & stairway |  |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/lucky-ching-construction-419507.