# Liang General Construction Inc

Contractor license 928524. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/liang-general-construction-inc-928524
- JSON: https://www.permitgraph.org/api/contractor?license=928524
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=928524

87 permits since 2000: 63 completed, 8 in progress, 11 never finaled, 5 expired or cancelled. Typically 6 days from filing to permit and 126 days from permit to final inspection. Of the 11 never-finaled permits, 2 are 3 to 5 years old, 7 are 5 to 10 years old, 2 are over 10 years old.

- Based in: Millbrae
- On San Francisco permits: Dec 2009 to Aug 2026
- Last 24 months: 17 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2009 | 1 | 0 | 0 | 0 |
| 2010 | 2 | 0 | 0 | 0 |
| 2011 | 2 | 0 | 0 | 0 |
| 2012 | 2 | 0 | 0 | 0 |
| 2013 | 2 | 0 | 0 | 0 |
| 2014 | 2 | 0 | 2 | 0 |
| 2015 | 3 | 0 | 0 | 0 |
| 2016 | 8 | 0 | 1 | 0 |
| 2017 | 6 | 0 | 1 | 0 |
| 2018 | 5 | 0 | 2 | 2 |
| 2019 | 6 | 0 | 1 | 0 |
| 2020 | 1 | 0 | 0 | 0 |
| 2021 | 3 | 0 | 2 | 0 |
| 2022 | 4 | 0 | 2 | 2 |
| 2023 | 4 | 0 | 0 | 1 |
| 2024 | 3 | 1 | 0 | 0 |
| 2025 | 6 | 2 | 0 | 0 |
| 2026 | 3 | 5 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 11 | 8 | 1 | 1 | 1 | 7 | 126 |
| Deck | 5 | 4 | 0 | 1 | 0 | 17 | 186 |
| Bathroom remodel | 40 | 28 | 6 | 4 | 2 | 26 | 247 |
| Kitchen remodel | 38 | 30 | 4 | 2 | 2 | 16 | 222 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202608136524](https://www.permitgraph.org/p/202608136524) | Aug 13, 2026 | In progress: issued Oct 2026 | [2639 Clement St](https://www.permitgraph.org/a/1459/028) | unit 3: to relocate (e) kitchen and bathroom, convert (e) living to a bathroom, and add a new furnace to the unit. | $80,000 |
| [202607215332](https://www.permitgraph.org/p/202607215332) | Jul 21, 2026 | In progress: issued Aug 2026 | [2510 Bryant St](https://www.permitgraph.org/a/4208/003) | fill (e) light well at 2nd floor at the entrance stair not viisble from street. remove full bathroom. revision to permit 202603036865. | $10,000 |
| [202605060816](https://www.permitgraph.org/p/202605060816) | May 6, 2026 | In progress: issued May 2026 | [1378 33rd Av](https://www.permitgraph.org/a/1787/017) | unit 3: remodel (e) kitchen & (1) bathroom in-kind. no removal of walls. | $40,000 |
| [202605050663](https://www.permitgraph.org/p/202605050663) | May 5, 2026 | Completed: final sign-off Oct 2026 | [2516 Taraval St](https://www.permitgraph.org/a/2364/021) | remodel (e) kitchen, bathroom, change living room to bedroom & add 1 new full bath. all work at 2/f. | $85,000 |
| [202603036865](https://www.permitgraph.org/p/202603036865) | Mar 3, 2026 | In progress: issued Mar 2026 | [2510 Bryant St](https://www.permitgraph.org/a/4208/003) | 2nd fl: to add one full bath. remodel one full bath and add a closet to bedroom #2. | $30,000 |
| [202602095566](https://www.permitgraph.org/p/202602095566) | Feb 9, 2026 | Completed: final sign-off Feb 2026 | [874 40th Av](https://www.permitgraph.org/a/1682/015) | revise pa #202602035139. replace existing front side door (added to scope). | $500 |
| [202602035139](https://www.permitgraph.org/p/202602035139) | Feb 3, 2026 | Completed: final sign-off Feb 2026 | [874 40th Av](https://www.permitgraph.org/a/1682/015) | replace (3) front windows in-kind. fiberglass, same operation. u-factor <0.27 | $3,500 |
| [202601204121](https://www.permitgraph.org/p/202601204121) | Jan 20, 2026 | In progress: issued Apr 2026 | [2639 Clement St](https://www.permitgraph.org/a/1459/028) | unit #4: relocate (e) kitchen, living & bathroom. add one bedroom at unit 4 3rd fl | $100,000 |
| [202512182206](https://www.permitgraph.org/p/202512182206) | Dec 18, 2025 | Completed: final sign-off Feb 2026 | [525 42nd Av](https://www.permitgraph.org/a/1502/002A) | to obtain final inspection for work approved under pa # 201608114752, 201803052866, & 201806071301. all work is complete. |  |
| [202512182197](https://www.permitgraph.org/p/202512182197) | Dec 18, 2025 | Completed: final sign-off Mar 2026 | [1430 Judah St](https://www.permitgraph.org/a/1774/022) | to obtain final inspection for work approved under pa # 202205103942. all work is complete. |  |
| [202512161897](https://www.permitgraph.org/p/202512161897) | Dec 16, 2025 | In progress: issued Dec 2025 | [2343 12th Av](https://www.permitgraph.org/a/2341/006K) | replace 6 front windows in kind. street facing | $1,500 |
| [202512081224](https://www.permitgraph.org/p/202512081224) | Dec 8, 2025 | Completed: final sign-off Feb 2026 | [874 40th Av](https://www.permitgraph.org/a/1682/015) | to obtain final inspection for work approved under pa# 202311090580. all work is complete. |  |
| [202509115126](https://www.permitgraph.org/p/202509115126) | Sep 11, 2025 | Completed: final sign-off Dec 2025 | [1378 33rd Av](https://www.permitgraph.org/a/1787/017) | remodel bathroom on 2nd floor unit# 2 | $8,000 |
| [202508112759](https://www.permitgraph.org/p/202508112759) | Aug 11, 2025 | Completed: final sign-off Nov 2025 | [484 Gold Mine Dr](https://www.permitgraph.org/a/7527/022) | 1st & 2nd fl: rear deck dry rot repair less than 50%. replace 9 windows and 4 sliding doors in-kind, same size and location at rear, visible from the street. 0.3 max ufactor. | $15,000 |
| [202507251657](https://www.permitgraph.org/p/202507251657) | Jul 25, 2025 | In progress: issued Jul 2025 | [484 Gold Mine Dr](https://www.permitgraph.org/a/7527/022) | 2/f: to add a kitchenette in the (e) family room. | $10,000 |
| [202506118483](https://www.permitgraph.org/p/202506118483) | Jun 11, 2025 | Completed: final sign-off Apr 2026 | [2625 Moraga St](https://www.permitgraph.org/a/2017/043) | 2nd/fl: kitchen remodel and remove walls at the kitchen and dining area. one full bathroom remodel and cold stackable washer and dryer inside the bathroom. | $40,000 |
| [202412096400](https://www.permitgraph.org/p/202412096400) | Dec 9, 2024 | Completed: final sign-off May 2025 | [1021 Santiago St](https://www.permitgraph.org/a/2350/001B) | ground floor - to add a kitchenette on the existing ground floor. to legalize the full bathroom conversion from (e) half bath on the ground floor. | $20,000 |
| [202410082581](https://www.permitgraph.org/p/202410082581) | Oct 8, 2024 | Completed: final sign-off Jun 2025 | [2244 Vicente St](https://www.permitgraph.org/a/2434/023) | unit #2: kitchen and bathroom remodel | $35,000 |
| [202406144543](https://www.permitgraph.org/p/202406144543) | Jun 14, 2024 | Completed: final sign-off Jun 2025 | [633 07th Av](https://www.permitgraph.org/a/1637/005) | repair and replace dry rot siding on back building, less than 50% replace one exterior door on back building. (approx 60sf) | $1,500 |
| [202405081680](https://www.permitgraph.org/p/202405081680) | May 8, 2024 | In progress: issued May 2024 | [484 Gold Mine Dr](https://www.permitgraph.org/a/7527/022) | 2nd/f: remodel 1 full bathroom, relocate e) closet, add wet bar to e) family rm. 1st fl: convert 1 bathroom to 2 full bath | $45,000 |
| [202311090580](https://www.permitgraph.org/p/202311090580) | Nov 9, 2023 | Expired or cancelled: expired Feb 2026 | [874 40th Av](https://www.permitgraph.org/a/1682/015) | revision to permit 202303153739. g/f: add a wetbar, relocate walkin closet, change window and door locations. 2/f: revised kitchen area layout. relocate half bath and bathroom layout revision. replac… | $5,000 |
| [202305127721](https://www.permitgraph.org/p/202305127721) | May 12, 2023 | Completed: final sign-off Aug 2023 | [148 Cook St](https://www.permitgraph.org/a/1089/038) | unit #3: remodel 1 full bath | $15,000 |
| [202305117598](https://www.permitgraph.org/p/202305117598) | May 11, 2023 | Completed: final sign-off Jul 2023 | [1834 Eddy St](https://www.permitgraph.org/a/1127/014) | to comply with complain # 202304861. dry-rot repair on front stair. | $3,000 |
| [202303153739](https://www.permitgraph.org/p/202303153739) | Mar 15, 2023 | Completed: final sign-off Feb 2026 | [874 40th Av](https://www.permitgraph.org/a/1682/015) | ground fl add a bedroom, full bath. enclose e lightwell. 2nd fl kitchen remodel add a half bath, full bath remodel. enclose e lightwell to match size of adjacent neighbors lightwell | $220,000 |
| [202303133521](https://www.permitgraph.org/p/202303133521) | Mar 13, 2023 | Completed: final sign-off Jul 2024 | [1654 Alabama St](https://www.permitgraph.org/a/5526/009A) | upper level only: demo of some windows, floor partitions, bathroom, kitchen, and portion of (e) deck. new windows, new partition, bathroom remodel, new bathroom, kitchen remodel, legitimize (e) deck… | $100,000 |
| [202209233075](https://www.permitgraph.org/p/202209233075) | Sep 23, 2022 | Completed: final sign-off Dec 2022 | [1425 18th Av](https://www.permitgraph.org/a/1835/003) | 1 kitchen an 1 baathroom remodel and add one subpanel. non structural work. | $30,000 |
| [202207138403](https://www.permitgraph.org/p/202207138403) | Jul 13, 2022 | Expired or cancelled: expired Feb 2025 | [525 42nd Av](https://www.permitgraph.org/a/1502/002A) | to obtain final inspection for work approved under pa#201608114752, 201803052866, and 201806071301. all work is complete. |  |
| [202205103942](https://www.permitgraph.org/p/202205103942) | May 10, 2022 | Expired or cancelled: expired Jan 2026 | [1430 Judah St](https://www.permitgraph.org/a/1774/022) | 2/f: add 1 new bedroom and relocate 1 (e) bedroom. remove wall at living space. remodel and relocate (e) kitchen and (e) dining room. remodel bathroom and bedrooms. add 1 new bath. no exterior work. | $100,000 |
| [202203170268](https://www.permitgraph.org/p/202203170268) | Mar 17, 2022 | Completed: final sign-off Aug 2022 | [167 Beaumont Av](https://www.permitgraph.org/a/1138/005) | enlarge four (e) windows at the 3rd floor facing rear yard. exist roof to remain the same. | $5,000 |
| [202203109708](https://www.permitgraph.org/p/202203109708) | Mar 10, 2022 | Never finaled: issued Mar 2022, no final | [159 Niagara Av](https://www.permitgraph.org/a/7032A/046) | replace two front windows with aluminum clad wood casement windows. | $5,000 |
| [202203109706](https://www.permitgraph.org/p/202203109706) | Mar 10, 2022 | Completed: final sign-off Jun 2022 | [1201 Sloat Bl](https://www.permitgraph.org/a/7247/001) | replace stucco and dry-rot repair on back alley. approx 300sf. | $3,000 |
| [202201316968](https://www.permitgraph.org/p/202201316968) | Jan 31, 2022 | Never finaled: issued Jan 2022, no final | [347 17th Av](https://www.permitgraph.org/a/1449/010) | replace dry rot on back building stair landing and rear roof overhang. all work in kind. | $1,500 |
| [202201216447](https://www.permitgraph.org/p/202201216447) | Jan 21, 2022 | Completed: final sign-off Jun 2022 | [1201 Sloat Bl](https://www.permitgraph.org/a/7247/001) | replacement of 13 windows visible from the street front of the building | $5,000 |
| [202111122315](https://www.permitgraph.org/p/202111122315) | Nov 12, 2021 | Completed: final sign-off Mar 2023 | [19 Riverton Dr](https://www.permitgraph.org/a/7253/005) | 2nd floor remodel (e) laundy & kitchen. remove wall between kitchen & living & intall beam, new light fixtures, remove door @ bathroom & hall. | $29,000 |
| [202109087948](https://www.permitgraph.org/p/202109087948) | Sep 8, 2021 | Completed: final sign-off Dec 2021 | [1958 36th Av](https://www.permitgraph.org/a/2099/062) | 2/f kitchen remodel. remove partition wall between kitchen and dining area. | $15,000 |
| [202103267348](https://www.permitgraph.org/p/202103267348) | Mar 26, 2021 | Completed: final sign-off Apr 2023 | [2130 Rivera St](https://www.permitgraph.org/a/2186/026) | revision to no-plan pa# 201408153940. add (n) bedroom, family room & full bathroom. remodel (e) kitchen & remove (e) wall of kitchen. remove (e) stair to ground floor, add 1 full bath. infill (e) lig… | $80,000 |
| [202102044003](https://www.permitgraph.org/p/202102044003) | Feb 4, 2021 | Never finaled: issued May 2021, no final | [35 Glendale St](https://www.permitgraph.org/a/2746/030) | to re-stucco (e) front facade in kind. (revision to no plan pa 202101253227). to replace (e) windows and patio door at the front facade of the building. | $15,000 |
| [202101253227](https://www.permitgraph.org/p/202101253227) | Jan 25, 2021 | Never finaled: issued Jan 2021, no final | [35 Glendale St](https://www.permitgraph.org/a/2746/030) | stucco repair of front building (less than 50%), replace dry rot if neccessary. match existing. | $10,000 |
| [202011209372](https://www.permitgraph.org/p/202011209372) | Nov 20, 2020 | Completed: final sign-off Sep 2022 | [2343 12th Av](https://www.permitgraph.org/a/2341/006K) | 1/f: remodel (e) floor space to 2 new bedrooms, 1 bath and 1 new media room & laundry. 2/f: remodel / relocate kitchen & bathroom, new master bathroom, new windows, and replce front windows. | $120,000 |
| [201910023374](https://www.permitgraph.org/p/201910023374) | Oct 2, 2019 | Completed: final sign-off Jun 2020 | [2783 41st Av](https://www.permitgraph.org/a/2510/018) | to remodel (e) kitchen, to remove non-structural wall @ kitchen area | $20,000 |
| [201909303107](https://www.permitgraph.org/p/201909303107) | Sep 30, 2019 | Completed: final sign-off Dec 2019 | [1763 39th Av](https://www.permitgraph.org/a/2010/016) | replace front stucco due to water damage. | $15,000 |
| [201907246845](https://www.permitgraph.org/p/201907246845) | Jul 24, 2019 | Completed: final sign-off Aug 2019 | [668 35th Av](https://www.permitgraph.org/a/1577/016) | install siding over (e) siding, on left side of back building, not visible from street, 7 feet x 20 feet | $500 |
| [201904198533](https://www.permitgraph.org/p/201904198533) | Apr 19, 2019 | Completed: final sign-off Nov 2019 | [41 Cuvier St](https://www.permitgraph.org/a/6722/023) | revision to pa #201902263848, rebuild rear building portion due to dry rot. | $5,000 |
| [201903135112](https://www.permitgraph.org/p/201903135112) | Mar 13, 2019 | Completed: final sign-off Apr 2022 | [2246 Vicente St](https://www.permitgraph.org/a/2434/023) | change of use and occupancy to convert existing ground floor retail space to a single residential dwelling unit: 3 bedroom, 1 kitchen, living space and 2 full bath. add nfpa 13r sprinkler system | $50,000 |
| [201903074618](https://www.permitgraph.org/p/201903074618) | Mar 7, 2019 | Never finaled: issued Mar 2019, no final | [2723 39th Av](https://www.permitgraph.org/a/2508/002) | replace front windows, materials wood with exterior aluminum clad. replace garage door with sectional door w/ glazing at top. | $8,000 |
| [201902263848](https://www.permitgraph.org/p/201902263848) | Feb 26, 2019 | Completed: final sign-off Nov 2019 | [41 Cuvier St](https://www.permitgraph.org/a/6722/023) | interior remodel of 2 units incl new kitchens, remodel (e) baths, remove wall between living rooms & new kitchens, new elctr, mech & plumb, new windows at (e) openings. windows not visible from stree… | $165,000 |
| [201810223798](https://www.permitgraph.org/p/201810223798) | Oct 22, 2018 | Never finaled: issued Nov 2018, no final | [3601 Noriega St](https://www.permitgraph.org/a/2080/001) | landscape set back area permeable material and remediate planning violation #2018-012249enf. | $2,000 |
| [201810022050](https://www.permitgraph.org/p/201810022050) | Oct 2, 2018 | Completed: final sign-off Apr 2019 | [876 Haight St](https://www.permitgraph.org/a/1238/018) | revision to permit #201804237117, correction to previous scope of work, relocation of bathroom and kitchen, convert living room space to 2nd bedroom. add direct vent furnace in unit #4, on the 3rd fl… | $2,000 |
| [201809129822](https://www.permitgraph.org/p/201809129822) | Sep 12, 2018 | Completed: final sign-off Apr 2019 | [35 Glendale St](https://www.permitgraph.org/a/2746/030) | rev to pa# 201708296197; revise shearwalls to match field conditions |  |
| [201809119724](https://www.permitgraph.org/p/201809119724) | Sep 11, 2018 | Completed: final sign-off Feb 2019 | [1885 46th Av](https://www.permitgraph.org/a/2083/036) | 2nd fl: remodel (e) kitchen & 1 full bath. | $18,000 |
| [201806071301](https://www.permitgraph.org/p/201806071301) | Jun 7, 2018 | Expired or cancelled: expired Feb 2025 | [525 42nd Av](https://www.permitgraph.org/a/1502/002A) | provide spiral stair detail for 2nd floor to the ground floor rear yard |  |
| [201804277675](https://www.permitgraph.org/p/201804277675) | Apr 27, 2018 | Never finaled: issued May 2018, no final | [706 Sacramento St](https://www.permitgraph.org/a/0226/009) | change of use of current medical acpnuture to spa//correction this is not a change of use it is a change of business operation |  |
| [201804237117](https://www.permitgraph.org/p/201804237117) | Apr 23, 2018 | Completed: final sign-off Apr 2019 | [876 Haight St](https://www.permitgraph.org/a/1238/018) | unit #4 - remodel and relocate (e) kitchen and add one bedroom and 1 full bathroom | $35,000 |
| [201803052866](https://www.permitgraph.org/p/201803052866) | Mar 5, 2018 | Expired or cancelled: expired Feb 2025 | [525 42nd Av](https://www.permitgraph.org/a/1502/002A) | dryrot & foundation repair one north corner exterior wall at bldg rear, not visible from street. | $5,000 |
| [201802161610](https://www.permitgraph.org/p/201802161610) | Feb 16, 2018 | Completed: final sign-off Jun 2019 | [2723 39th Av](https://www.permitgraph.org/a/2508/002) | to comply with complaint 201531031 - add bedroom & 1 full bath on ground floor. relocate (e) furnace & water heater on ground fl. add 1 bathroom & remodel (e) bath and kitchen, add 1 flat skylight @… | $75,000 |
| [201710201865](https://www.permitgraph.org/p/201710201865) | Oct 20, 2017 | Completed: final sign-off Mar 2018 | [2087 42nd Av](https://www.permitgraph.org/a/2162/015A) | to comply with nov #201704521 - to legalize no permitted bedroom and bathroom and supply heat to the bedroom. | $5,000 |
| [201710050547](https://www.permitgraph.org/p/201710050547) | Oct 5, 2017 | Never finaled: issued Oct 2017, no final | [1575 33rd Av](https://www.permitgraph.org/a/1879/001R) | to remodel (e) half & full bathroom at the 2nd floor. | $15,000 |
| [201705186976](https://www.permitgraph.org/p/201705186976) | May 18, 2017 | Completed: final sign-off Dec 2017 | [3907 Balboa St](https://www.permitgraph.org/a/1604/001) | (e) unpermitted stair in rear yard to roof to be removed. guardrail at roof to be removed. new parapet infill. door to roof to be replaced w/window. (to be wood) | $3,000 |
| [201705126496](https://www.permitgraph.org/p/201705126496) | May 12, 2017 | Completed: final sign-off Mar 2018 | [618 Lombard St](https://www.permitgraph.org/a/0064/032) | remodel (e) kitchen & bathroom @ 2nd floor. remove a non structural wall in the kitchen area | $15,000 |
| [201705015310](https://www.permitgraph.org/p/201705015310) | May 1, 2017 | Completed: final sign-off Nov 2017 | [2158 25th Av](https://www.permitgraph.org/a/2193/022A) | revision to pa #201612013931 - to add remodel of (e) kitchen. | $10,000 |
| [201704244745](https://www.permitgraph.org/p/201704244745) | Apr 24, 2017 | Completed: final sign-off Sep 2019 | [1579 42nd Av](https://www.permitgraph.org/a/1888/003J) | add a bedroom, full bathroom, a play room in the existing ground floor, garage door recessed in the house 3 feets. | $40,000 |
| [201703302841](https://www.permitgraph.org/p/201703302841) | Mar 30, 2017 | Completed: final sign-off Jul 2017 | [478 Monterey Bl](https://www.permitgraph.org/a/3092/021) | remodel e kitchen and bath, add 1 sub elec sub panel | $35,000 |
| [201610180550](https://www.permitgraph.org/p/201610180550) | Oct 18, 2016 | Completed: final sign-off Apr 2017 | [1241 18th Av](https://www.permitgraph.org/a/1732/007) | revision to pa #201507161683 - revised 3 steel frames sizes. revised conneciton details, add 15' shear wall @ garage. | $4,000 |
| [201609137604](https://www.permitgraph.org/p/201609137604) | Sep 13, 2016 | Completed: final sign-off Jun 2017 | [668 35th Av](https://www.permitgraph.org/a/1577/016) | to add one unit in the extg ground floor. to add 2 bedrooms and full bath, kitchen, & living area & pme rear window. add furnace and water heater in the extg utility room. | $50,000 |
| [201609076950](https://www.permitgraph.org/p/201609076950) | Sep 7, 2016 | Completed: final sign-off Dec 2016 | [143 Athens St](https://www.permitgraph.org/a/5960/015) | creating a bedroom and full bathroom downstairs & hall to laundry. | $18,000 |
| [201608084418](https://www.permitgraph.org/p/201608084418) | Aug 8, 2016 | Completed: final sign-off Sep 2016 | [1738 34th Av](https://www.permitgraph.org/a/2016/042) | remodel (e) kitchen. | $5,000 |
| [201607223129](https://www.permitgraph.org/p/201607223129) | Jul 22, 2016 | Completed: final sign-off Apr 2018 | [1746 Anza St](https://www.permitgraph.org/a/1536/020) | add a playroom, two bedroom & a full bath in the existing ground floor. relocate (e) furnace & replace (e) water heater to tankless water heater. | $50,000 |
| [201606089422](https://www.permitgraph.org/p/201606089422) | Jun 8, 2016 | Completed: final sign-off Nov 2016 | [1325 30th Av](https://www.permitgraph.org/a/1785/003) | per correction notice dated 5/26/16. revision permit to repair side stairs. install fire rated hats or boxes over cans at top floor with 5' of p/l. estimated cost of $30,000 | $1,000 |
| [201605066858](https://www.permitgraph.org/p/201605066858) | May 6, 2016 | Completed: final sign-off Mar 2017 | [1139 Pacific Av](https://www.permitgraph.org/a/0182/032) | to legalize 1st fl of 1139 pacific per ordinance 43-14. to add living room, kitchen, 2 bedroom & a bathroom | $10,000 |
| [201602189945](https://www.permitgraph.org/p/201602189945) | Feb 18, 2016 | Completed: final sign-off May 2016 | [2348 Polk St](https://www.permitgraph.org/a/0548/018) | convert existing unisex restroom to an unisex ada restroom. barrier removal only. n/a maher ordinance #155-13 | $8,000 |
| [201601217636](https://www.permitgraph.org/p/201601217636) | Jan 21, 2016 | Never finaled: issued Jun 2016, no final | [1921 Moraga St](https://www.permitgraph.org/a/2024/051) | legalize office, add playroom, full bath, laundry room, hallway 1st fl. enclose space under 2nd fl bedroom. construct rear deck off 2nd fl | $70,000 |
| [201512084447](https://www.permitgraph.org/p/201512084447) | Dec 8, 2015 | Completed: final sign-off Dec 2015 | [243 Topaz Wy](https://www.permitgraph.org/a/7532/009) | replace 1 skylight and 2 windows in kitchen. replace in kind, no structural work. | $5,000 |
| [201509217483](https://www.permitgraph.org/p/201509217483) | Sep 21, 2015 | Completed: final sign-off Nov 2016 | [1325 30th Av](https://www.permitgraph.org/a/1785/003) | remodel (e) kitchen at 2nd floor. replace countertop, cabinets, sink & flooring. convert (e) one bathroom into one full and one half bathroom. replace all (e) drywall. upgrade all (e) electrical wire… | $20,000 |
| [201506259943](https://www.permitgraph.org/p/201506259943) | Jun 25, 2015 | Completed: final sign-off Dec 2015 | [136 Locksley Av](https://www.permitgraph.org/a/2634/086) | remodel one kitchen & one bedroom in each 2 & 3 unit only. | $40,000 |
| [201409297577](https://www.permitgraph.org/p/201409297577) | Sep 29, 2014 | Never finaled: issued Oct 2014, no final | [876 Haight St](https://www.permitgraph.org/a/1238/018) | #2- remove non bearing wall at unit 2, relocate existing kitchen, bath, living room and convert to sunroom | $20,000 |
| [201407312605](https://www.permitgraph.org/p/201407312605) | Jul 31, 2014 | Never finaled: issued Jun 2017, no final | [1318 Hampshire St](https://www.permitgraph.org/a/4275/001A) | remodel interior of (e) residential building, including kitchens & baths. add (1) residential unit within (e) envelope at ground level. | $225,000 |
| [201402269369](https://www.permitgraph.org/p/201402269369) | Feb 26, 2014 | Completed: final sign-off Jun 2014 | [1135 Pacific Av](https://www.permitgraph.org/a/0182/032) | revision to pa# 2013-1016-9428. replace (e) mold infested dry rot beam 4x10 with (n) 4x10 beam at kitchen area. |  |
| [201401065623](https://www.permitgraph.org/p/201401065623) | Jan 6, 2014 | Completed: final sign-off Sep 2014 | [876 Haight St](https://www.permitgraph.org/a/1238/018) | repair of siding. (200 sq. ft.) no street facing | $1,000 |
| [201302210703](https://www.permitgraph.org/p/201302210703) | Feb 21, 2013 | Completed: final sign-off May 2013 | [201 San Anselmo Av](https://www.permitgraph.org/a/3105A/001) | replace (e) windows w/ (n) windows in the dwelling w/ wood ultimate. replacement case aluminum. (n) windows are simulated divided-light (sdl) window. total 32 windows. u=0.4 max | $13,000 |
| [201302190454](https://www.permitgraph.org/p/201302190454) | Feb 19, 2013 | Completed: final sign-off May 2013 | [2095 20th Av](https://www.permitgraph.org/a/2140/013C) | repair e front entry stair and apply stucco finish to e brick wall | $7,000 |
| [201211023471](https://www.permitgraph.org/p/201211023471) | Nov 2, 2012 | Completed: final sign-off May 2013 | [201 San Anselmo Av](https://www.permitgraph.org/a/3105A/001) | remodel 1st floor kitchen and connect space of kitchen and dining room | $20,000 |
| [201210011027](https://www.permitgraph.org/p/201210011027) | Oct 1, 2012 | Completed: final sign-off Nov 2012 | [7321 Geary Bl](https://www.permitgraph.org/a/1507/039) | at unit #3. remodeling kitchen, 4th floor. new cabinet, new counter top, new kitchen sink. no changes on walls and openings. | $4,000 |
| [201109164891](https://www.permitgraph.org/p/201109164891) | Sep 16, 2011 | Completed: final sign-off Feb 2012 | [2038 36th Av](https://www.permitgraph.org/a/2155/042) | relocate (e) bathroom in the (e) ground floor, previously approved under pa#9602712 | $6,000 |
| [201104123914](https://www.permitgraph.org/p/201104123914) | Apr 12, 2011 | Completed: final sign-off Aug 2011 | [890 29th Av](https://www.permitgraph.org/a/1671/008C) | add two bedrooms, one living room, one bathroom on existing ground floor.one storage | $30,000 |
| [201010183247](https://www.permitgraph.org/p/201010183247) | Oct 18, 2010 | Completed: final sign-off Jan 2011 | [85 Aptos Av](https://www.permitgraph.org/a/3262/017) | take out and repair of stucco, replace damaged wood. approx 400 sq ft. | $9,000 |
| [201002086076](https://www.permitgraph.org/p/201002086076) | Feb 8, 2010 | Completed: final sign-off May 2010 | [119 Huntington Dr](https://www.permitgraph.org/a/7276/018) | legalize (e) home office & construct (n) family rm. all work at ground floor. construct (n) staircase. connect to (e) deck at rear of house. | $16,000 |
| [200912032565](https://www.permitgraph.org/p/200912032565) | Dec 3, 2009 | Completed: final sign-off Jan 2010 | [1562 41st Av](https://www.permitgraph.org/a/1886/024A) | remove and replace front stucco, replace two vinyl windows in front. | $4,500 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.