# Level 10 Construction Lp

Contractor license 967797. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/level-10-construction-lp-967797
- JSON: https://www.permitgraph.org/api/contractor?license=967797
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=967797

248 permits since 2000: 206 completed, 7 in progress, 13 never finaled, 22 expired or cancelled. Typically 18 days from filing to permit and 822 days from permit to final inspection. Of the 13 never-finaled permits, 1 is 3 to 5 years old, 11 are 5 to 10 years old, 1 is over 10 years old.

- Based in: Sunnyvale
- On San Francisco permits: Apr 2012 to Sep 2026
- Last 24 months: 7 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2012 | 2 | 0 | 0 | 0 |
| 2013 | 7 | 0 | 0 | 7 |
| 2014 | 6 | 0 | 1 | 1 |
| 2015 | 2 | 0 | 0 | 3 |
| 2016 | 1 | 0 | 0 | 1 |
| 2017 | 17 | 0 | 2 | 1 |
| 2018 | 84 | 0 | 0 | 4 |
| 2019 | 21 | 0 | 1 | 1 |
| 2020 | 14 | 0 | 1 | 3 |
| 2021 | 32 | 0 | 7 | 0 |
| 2022 | 13 | 0 | 1 | 1 |
| 2024 | 6 | 3 | 0 | 0 |
| 2025 | 1 | 1 | 0 | 0 |
| 2026 | 0 | 3 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 14 | 11 | 1 | 1 | 1 | 122 | 566 |
| Stairs | 26 | 25 | 0 | 0 | 1 | 45 | 1087 |
| Bathroom remodel | 35 | 30 | 1 | 2 | 2 | 0 | 194 |
| Roof deck | 3 | 3 | 0 | 0 | 0 | 155 | 552 |

## Most recent permits

The 100 most recent of 248.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202609168204](https://www.permitgraph.org/p/202609168204) | Sep 16, 2026 | In progress: issued Nov 2026 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | 18th fl - installation of door hardware release of electronically locked egress doors. reference pa# 202412187109 | $2,500 |
| [202609158135](https://www.permitgraph.org/p/202609158135) | Sep 15, 2026 | In progress: issued Nov 2026 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | 16th and 18th fl: installation of pre manufactured phone booths | $30,000 |
| [202609158149](https://www.permitgraph.org/p/202609158149) | Sep 15, 2026 | In progress: issued Nov 2026 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | level 16: egress path revision and installation of door hardware release of electronic door lockers. (ref bpa: 2024.1218.7109 and 2024.0730.7534) | $2,500 |
| [202512262798](https://www.permitgraph.org/p/202512262798) | Dec 26, 2025 | In progress: issued Dec 2025 | [1317 Kansas St](https://www.permitgraph.org/a/4260/025) | 2nd/f unit: remodel kitchen, demo cabinetry, intall new. new code compliant plumbing & electrical fixtures. remodel bathroom, demo e) bathrooom fixtures & install new, new code compliant plumbing & e… | $10,000 |
| [202507030191](https://www.permitgraph.org/p/202507030191) | Jul 3, 2025 | Completed: final sign-off Oct 2025 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | 17th floor: board room revisions including grid and title ceilings, light fixtures, millwork and finishes. no plumbing fixtures. | $250,000 |
| [202412187109](https://www.permitgraph.org/p/202412187109) | Dec 18, 2024 | In progress: issued Jan 2025 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | 16/fl- revision 202407307534- work includes relocation of exit sign and path of travel on level 16 (e) security card readers to remain |  |
| [202412187111](https://www.permitgraph.org/p/202412187111) | Dec 18, 2024 | In progress: issued Jan 2025 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | 18/fl- revision 202407307548- work includes relocation of exit sign and path of travel on level 18 (e) security card readers to remain |  |
| [202409090372](https://www.permitgraph.org/p/202409090372) | Sep 9, 2024 | In progress: issued Sep 2024 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | 17/f: admin permit - obtain fire assembly permit correction to pa# 202408209070 to denote it was a revision to pa# 202406104047 and not pa#202406104048. |  |
| [202408209070](https://www.permitgraph.org/p/202408209070) | Aug 20, 2024 | Completed: final sign-off Oct 2024 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | revision to 202406104048, work includes the addition of new card readers and ceiling addition |  |
| [202407307548](https://www.permitgraph.org/p/202407307548) | Jul 30, 2024 | Completed: final sign-off Oct 2024 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | 18th fl revision to pa # 2024-0610-4048 addition of new card readers |  |
| [202407307534](https://www.permitgraph.org/p/202407307534) | Jul 30, 2024 | Completed: final sign-off Oct 2024 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | revision to 202406104044, work includes the addition of new card readers. |  |
| [202406104047](https://www.permitgraph.org/p/202406104047) | Jun 10, 2024 | Completed: final sign-off Oct 2024 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | construction of new non-structural partitions, acoustical grid and tiles and gyp board ceilings, light fixtures, millwork, and finishes 17th fl. | $232,309 |
| [202406104048](https://www.permitgraph.org/p/202406104048) | Jun 10, 2024 | Completed: final sign-off Oct 2024 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes 18th fl. | $331,360 |
| [202406104044](https://www.permitgraph.org/p/202406104044) | Jun 10, 2024 | Completed: final sign-off Oct 2024 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | construction of new non-structural partitions, acoustical grid and tiles and gyp board ceilings, light fixtures, millwork, and finishes 16th fl. | $224,577 |
| [202212168569](https://www.permitgraph.org/p/202212168569) | Dec 16, 2022 | Completed: final sign-off Mar 2023 | [1 Beach St](https://www.permitgraph.org/a/0018/001) | revision to pa 2019 0923 2380: addition of handrail and wheelchair gaurd @ ramp @ roof |  |
| [202212168566](https://www.permitgraph.org/p/202212168566) | Dec 16, 2022 | Completed: final sign-off Mar 2023 | [1 Beach St](https://www.permitgraph.org/a/0018/001) | revision to pa 202012171243: partial slab flushing & construction stripe |  |
| [202211045896](https://www.permitgraph.org/p/202211045896) | Nov 4, 2022 | Never finaled: issued Nov 2022, no final | [1 Beach St](https://www.permitgraph.org/a/0018/001) | sffd review only. revision to pa# 201909232380 s1 for clarification of elevator access hatch location and detail. |  |
| [202209021806](https://www.permitgraph.org/p/202209021806) | Sep 2, 2022 | Completed: final sign-off Oct 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/467) | unit #55-d: remove and replace tiled walls in unit bathroom. maintain accessibility requirements at time of original construction. | $12,000 |
| [202209021802](https://www.permitgraph.org/p/202209021802) | Sep 2, 2022 | Completed: final sign-off Oct 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/486) | unit # 60-c: r & r existing tiled walls in unit bathroom. maintain accessibility requirement at time of original construction. | $12,000 |
| [202207158563](https://www.permitgraph.org/p/202207158563) | Jul 15, 2022 | Completed: final sign-off Sep 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/457) | remove and replace existing existing tiled walls in bathroom. maintain accessibility requirements at time of original construction. | $12,000 |
| [202207158560](https://www.permitgraph.org/p/202207158560) | Jul 15, 2022 | Completed: final sign-off Sep 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/479) | remove and restore existing tiled walls in bathroom. maintain accessibility requirements at time or original construction. | $12,000 |
| [202207088078](https://www.permitgraph.org/p/202207088078) | Jul 8, 2022 | Completed: final sign-off Mar 2023 | [1 Beach St](https://www.permitgraph.org/a/0018/001) | revision to pa# 202011128788. incorporate structural field changes including expansion of ground floor slab replacement in stairway between lines 3 to 4 and removal of structural styrofoam in topping… |  |
| [202206085841](https://www.permitgraph.org/p/202206085841) | Jun 8, 2022 | Completed: final sign-off Aug 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/497) | unit 63b: refurbish and restore existing tiled walls in bathroom #2. maintain accessibility requirements at time of original construction. | $12,000 |
| [202206085844](https://www.permitgraph.org/p/202206085844) | Jun 8, 2022 | Completed: final sign-off Sep 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/465) | unit 55b: refurbish and restore existing tiled walls in the unit bathroom # 2. maintain accessibility requirements at time of original construction. | $12,000 |
| [202206085842](https://www.permitgraph.org/p/202206085842) | Jun 8, 2022 | Completed: final sign-off Aug 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/478) | unit 58c: refurbish and restore existing tile walls in the unit bathroom #2. maintain accessibility requirements at time of original construction. | $12,000 |
| [202204212671](https://www.permitgraph.org/p/202204212671) | Apr 21, 2022 | Expired or cancelled: cancelled Mar 2026 | [181 Fremont St](https://www.permitgraph.org/a/3719/505) | unit #65-b: r & r tile walls in unit bathroom #2. maintain accessibility requirements at original time of construction. | $12,000 |
| [202204212673](https://www.permitgraph.org/p/202204212673) | Apr 21, 2022 | Completed: final sign-off Aug 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/501) | unit #64-b: r & r existing tile walls in unit #2 bathroom. maintain accessibility requirements at time of original construction. | $12,000 |
| [202204212669](https://www.permitgraph.org/p/202204212669) | Apr 21, 2022 | Completed: final sign-off Jul 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/512) | unit # 67-b: r and r existing tiled walls in unit bathroom #2. #3. maintain accessibility requirements at time of original construction. | $12,000 |
| [202204011378](https://www.permitgraph.org/p/202204011378) | Apr 1, 2022 | Completed: final sign-off Mar 2023 | [1 Beach St](https://www.permitgraph.org/a/0018/001) | evacuation map submittal associated with pa 201909232380 and pa 202110140520 | $1,000 |
| [202111041821](https://www.permitgraph.org/p/202111041821) | Nov 4, 2021 | Completed: final sign-off Jan 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/451) | 1st fl fan relocation and ceiling drop | $35,000 |
| [202110140520](https://www.permitgraph.org/p/202110140520) | Oct 14, 2021 | Completed: final sign-off Mar 2023 | [1 Beach St](https://www.permitgraph.org/a/0018/001) | revision to 2020 1217 1243 including abandannont of previously proposed infull new stair and accociated mep |  |
| [202110120304](https://www.permitgraph.org/p/202110120304) | Oct 12, 2021 | Completed: final sign-off Nov 2022 | [1200 Mississippi St](https://www.permitgraph.org/a/4288/003) | repairing and restriping for existing private bus parking lot. | $3,500,000 |
| [202109148404](https://www.permitgraph.org/p/202109148404) | Sep 14, 2021 | Completed: final sign-off Jun 2022 | [1 Beach St](https://www.permitgraph.org/a/0018/001) | 3rd fl - interior non-structural demo of tenant suit per ab-017 | $60,000 |
| [202109037770](https://www.permitgraph.org/p/202109037770) | Sep 3, 2021 | Completed: final sign-off Nov 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/451) | 40th fl - relocation of supply fan 40-2. addition of rated fan enclosure. | $50,000 |
| [202108166475](https://www.permitgraph.org/p/202108166475) | Aug 16, 2021 | Completed: final sign-off Sep 2021 | [1 Market St](https://www.permitgraph.org/a/3713/006) | 11/f: revision to pa 201909262834. amendment to occupancy load of exterior roof decks to 49 occupancy each. clarifying hardware on doors es101 and es1103 as existing. identifying an existing curb in… |  |
| [202107164512](https://www.permitgraph.org/p/202107164512) | Jul 16, 2021 | Completed: final sign-off Jan 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/506) | r&r existing tiled walls in the unit bathroom. maintain accessiblities at shower. ste 65c | $12,000 |
| [202107164521](https://www.permitgraph.org/p/202107164521) | Jul 16, 2021 | Completed: final sign-off Oct 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/489) | unit 61b: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| [202107164517](https://www.permitgraph.org/p/202107164517) | Jul 16, 2021 | Completed: final sign-off Jul 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/513) | unit 67c: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| [202107164520](https://www.permitgraph.org/p/202107164520) | Jul 16, 2021 | Completed: final sign-off Jan 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/499) | unit 63d: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| [202107164513](https://www.permitgraph.org/p/202107164513) | Jul 16, 2021 | Completed: final sign-off Jan 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/498) | r&r existing tiled walls in the unit bathroom. maintain accessiblities at shower. ste 63c | $12,000 |
| [202107164523](https://www.permitgraph.org/p/202107164523) | Jul 16, 2021 | Completed: final sign-off Nov 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/500) | unit 64a: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| [202107164519](https://www.permitgraph.org/p/202107164519) | Jul 16, 2021 | Completed: final sign-off Jul 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/515) | unit 68b: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| [202107164516](https://www.permitgraph.org/p/202107164516) | Jul 16, 2021 | Completed: final sign-off Aug 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/493) | unit 62b: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| [202107164518](https://www.permitgraph.org/p/202107164518) | Jul 16, 2021 | Never finaled: issued Jul 2021, no final | [181 Fremont St](https://www.permitgraph.org/a/3719/514) | unit 68a: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| [202107164522](https://www.permitgraph.org/p/202107164522) | Jul 16, 2021 | Completed: final sign-off Nov 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/507) | unit 65d: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| [202107164515](https://www.permitgraph.org/p/202107164515) | Jul 16, 2021 | Completed: final sign-off Sep 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/469) | remove and replace tiled walls in the unit bathroom | $12,000 |
| [202107164514](https://www.permitgraph.org/p/202107164514) | Jul 16, 2021 | Completed: final sign-off Jan 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/480) | remove and replace existing tiled walls in the unit bathrooms, maintain accessibility required at thime of construction. | $12,000 |
| [202107124191](https://www.permitgraph.org/p/202107124191) | Jul 12, 2021 | Completed: final sign-off Oct 2022 | [1 Market St](https://www.permitgraph.org/a/3713/006) | revise occupancy class of teaching kitchen, from assembly to classroom. no alteration or construction under this permit application. reference #201909262834 & 2021-0204-4100 (ansul) |  |
| [202106162555](https://www.permitgraph.org/p/202106162555) | Jun 16, 2021 | Never finaled: issued Jun 2021, no final | [1 Market St](https://www.permitgraph.org/a/3713/006) | fire only permit for place of assembly occupant load refer 2019-0904-0591 |  |
| [202106162546](https://www.permitgraph.org/p/202106162546) | Jun 16, 2021 | Never finaled: issued Jun 2021, no final | [1 Market St](https://www.permitgraph.org/a/3713/006) | fire only permit for place of assembly occupant load refer 2019-0611-3075 r1 |  |
| [202106162549](https://www.permitgraph.org/p/202106162549) | Jun 16, 2021 | Never finaled: issued Jun 2021, no final | [1 Market St](https://www.permitgraph.org/a/3713/006) | fire only permit for place of assembly occupant load refer 2019-0611-3065 |  |
| [202106152482](https://www.permitgraph.org/p/202106152482) | Jun 15, 2021 | Never finaled: issued Jun 2021, no final | [1 Market St](https://www.permitgraph.org/a/3713/006) | fire only permit for place of assembly occupant load refer 2019-0904-0607 |  |
| [202105100033](https://www.permitgraph.org/p/202105100033) | May 10, 2021 | Completed: final sign-off May 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | to obtain final inspection for work approved under permit application #'s 201804166436, 201804166442, 201804166440. all work is completed. |  |
| [202105100086](https://www.permitgraph.org/p/202105100086) | May 10, 2021 | Completed: final sign-off May 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | to obtain final inspection for work approved under permit# 201804166439, 201804277573, and 201804277574. all work is completed. |  |
| [202105069887](https://www.permitgraph.org/p/202105069887) | May 6, 2021 | Completed: final sign-off Nov 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/462) | unit 54l -r&r existing tiled walls in the unit bathroom | $12,000 |
| [202105069898](https://www.permitgraph.org/p/202105069898) | May 6, 2021 | Completed: final sign-off Jan 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/464) | unit 55a: r & r existing tiled walls in the unit bathroom | $12,000 |
| [202105069891](https://www.permitgraph.org/p/202105069891) | May 6, 2021 | Completed: final sign-off Jan 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/496) | unit 63a: r & r existing tiled walls in the unit bathroom | $12,000 |
| [202105069890](https://www.permitgraph.org/p/202105069890) | May 6, 2021 | Completed: final sign-off Nov 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/503) | unit 64d: r & r existing tiled walls in the unit bathroom | $12,000 |
| [202105069886](https://www.permitgraph.org/p/202105069886) | May 6, 2021 | Never finaled: issued May 2021, no final | [181 Fremont St](https://www.permitgraph.org/a/3719/452) | unit 54a -r & r existing tiled walls in the unit bathroom | $12,000 |
| [202105069899](https://www.permitgraph.org/p/202105069899) | May 6, 2021 | Completed: final sign-off Jan 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/458) | unit 54g: r & r existing tiled walls in the unit bathroom | $12,000 |
| [202105059822](https://www.permitgraph.org/p/202105059822) | May 5, 2021 | Completed: final sign-off Jan 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/468) | r & r existing tiled walls in the unit bathroom. unit 56a | $12,000 |
| [202105059810](https://www.permitgraph.org/p/202105059810) | May 5, 2021 | Completed: final sign-off Nov 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/517) | remove and replace e tiled walls in unit bathroom | $12,000 |
| [202105059813](https://www.permitgraph.org/p/202105059813) | May 5, 2021 | Completed: final sign-off Jan 2022 | [181 Fremont St](https://www.permitgraph.org/a/3719/511) | remove and replace tiled walls in unit bathroom | $12,000 |
| [202105059821](https://www.permitgraph.org/p/202105059821) | May 5, 2021 | Completed: final sign-off Nov 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/470) | r & r existing tiled walls in the unit bathroom. unit 56c | $12,000 |
| [202103237117](https://www.permitgraph.org/p/202103237117) | Mar 23, 2021 | Completed: final sign-off Sep 2021 | [1 Market St](https://www.permitgraph.org/a/3713/006) | 11th floor: revision to pa# 201909262834: addition of a dph compliant ceiling in "kitchen sync" over the student and teacher cooking stations, revised lighting in accordance to the (n) ceiling additi… |  |
| [202103196942](https://www.permitgraph.org/p/202103196942) | Mar 19, 2021 | Never finaled: issued Apr 2021, no final | [1 Market St](https://www.permitgraph.org/a/3713/007) | for dph review only. ref pa# 201909040607. smooth ceiling soffits over micro kitchen in response to dph comments. | $45,000 |
| [202103116365](https://www.permitgraph.org/p/202103116365) | Mar 11, 2021 | Completed: final sign-off Sep 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/451) | level 40: installation of three steel-framed access platforms at level 40 mechanical floor to provide inspection/maintenance access to valves and detectors. | $100,000 |
| [202103045909](https://www.permitgraph.org/p/202103045909) | Mar 4, 2021 | Completed: final sign-off Jun 2021 | [1 Market St](https://www.permitgraph.org/a/3713/006) | level 7 & level 10: revision to 201906113076 for as built scope to replace cafe banquet seating to alcove to accommodate 2 new handwash sinks given covid 19. level 10: revision to pa 201906113065 for… | $20,000 |
| [202012171243](https://www.permitgraph.org/p/202012171243) | Dec 17, 2020 | Completed: final sign-off Mar 2023 | [1 Beach St](https://www.permitgraph.org/a/0018/001) | interior core & shell improvements. remodel grnd flr main lobby, (n) cut-out. infill of 2nd flr openings. cosmetic upgrade of (e) egress stairs, (n) restrooms on level 01-03. no change of use; no new… | $300,000 |
| [202012090573](https://www.permitgraph.org/p/202012090573) | Dec 9, 2020 | Expired or cancelled: withdrawn Jun 2022 | [1 Beach St](https://www.permitgraph.org/a/0018/001) | adding ramp, canopy & construction of rooftop appurtenance for future use. no sprinkler & plumbing work. no elevator is included. | $40,000 |
| [202012019912](https://www.permitgraph.org/p/202012019912) | Dec 1, 2020 | Completed: final sign-off Apr 2022 | [1 Market St](https://www.permitgraph.org/a/3713/007) | level 6: rev to pa201910033474: change relate to restroom revisions. a single gender neutral restroom has been added; a raised floor is added to manage restroom plumbing connections; misc plumbing re… | $100,000 |
| [202011108607](https://www.permitgraph.org/p/202011108607) | Nov 10, 2020 | Completed: final sign-off Jan 2021 | [2901 Broadway](https://www.permitgraph.org/a/0964/001) | to obtain final inspection for work approved under pa# 201312103808, 201311202397, 201603162186. |  |
| [202011108605](https://www.permitgraph.org/p/202011108605) | Nov 10, 2020 | Completed: final sign-off Jan 2021 | [2901 Broadway](https://www.permitgraph.org/a/0964/001) | to obtain final inspection for work approved under pa# 201306109080. |  |
| [202011108610](https://www.permitgraph.org/p/202011108610) | Nov 10, 2020 | Completed: final sign-off Jan 2021 | [2901 Broadway](https://www.permitgraph.org/a/0964/001) | to obtain final inspection for work approved under pa# 201309257731, 201307172071, 201705166682. |  |
| [202011108609](https://www.permitgraph.org/p/202011108609) | Nov 10, 2020 | Completed: final sign-off Jan 2021 | [2901 Broadway](https://www.permitgraph.org/a/0964/001) | to obtain final inspection for work approved under pa# 201504274716, 201511122395, 201407010243. |  |
| [202011048194](https://www.permitgraph.org/p/202011048194) | Nov 4, 2020 | Completed: final sign-off Jul 2022 | [1 Beach St](https://www.permitgraph.org/a/0018/001) | interior demo of non-structural partitions, ceilings and finishes on levels 01, 02 and 03. no exterior work per ab-017. no change of use under this permit. | $120,000 |
| [202010176775](https://www.permitgraph.org/p/202010176775) | Oct 17, 2020 | Expired or cancelled: cancelled Jan 2026 | [1 Market St](https://www.permitgraph.org/a/3713/006) | annex. convert (e) opening on l3 into communicating opeing plus minor cosmetic work, new communicating opening to comply w/ ab10; note: l3 landmark annex & l3 spear tower both are occupied by google. | $90,500 |
| [202010086139](https://www.permitgraph.org/p/202010086139) | Oct 8, 2020 | Completed: final sign-off Apr 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/451) | remove & replace hardlid gypsum ceilings in 34 locations commercial space | $95,000 |
| [202010086170](https://www.permitgraph.org/p/202010086170) | Oct 8, 2020 | Completed: final sign-off Jan 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/451) | modify t-bar ceiling to incl new gypsum soffit w/ access panel | $15,000 |
| [202009164259](https://www.permitgraph.org/p/202009164259) | Sep 16, 2020 | Completed: final sign-off Sep 2021 | [1 Market St](https://www.permitgraph.org/a/3713/006) | 10th fl cafe. mep only permit; grease exhaust, makeup air, new grease interuptor and water heating, new pwoer distrib and lighting/controls, deferred mep for issued pa #201906113065. | $2,500,000 |
| [202007220693](https://www.permitgraph.org/p/202007220693) | Jul 22, 2020 | Completed: final sign-off Apr 2021 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | 4th floor: revision to app#202002033333 create new large office, new interior partitions door, finishes etc . this location org, new lighting/mechanical/electrical outlets. | $20,000 |
| [202003116714](https://www.permitgraph.org/p/202003116714) | Mar 11, 2020 | Expired or cancelled: cancelled Jan 2026 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | install new trash chute exhaust fan at roof level | $20,000 |
| [202002205012](https://www.permitgraph.org/p/202002205012) | Feb 20, 2020 | Completed: final sign-off Jul 2020 | [181 Fremont St](https://www.permitgraph.org/a/3719/451) | to obtain final inspection for work approved under pa 201305015894. all work is complete | $78,462,315 |
| [202002204896](https://www.permitgraph.org/p/202002204896) | Feb 20, 2020 | Completed: final sign-off Sep 2021 | [1 Market St](https://www.permitgraph.org/a/3713/006) | ref pa# 201906113076; tenant remodel to add sandwich cafe to office building new hvac, exhaust, lighting, controls and power outlets, this is the deferred submittal for mep |  |
| [202002033333](https://www.permitgraph.org/p/202002033333) | Feb 3, 2020 | Never finaled: issued Mar 2020, no final | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | 4th floor: new office space, meeting rooms, lounge spaces, and break room. new interior partitions, doors, finishes, ceiling, lighting, mechanical, electrical outlets & switches. | $3,000,000 |
| [202001242701](https://www.permitgraph.org/p/202001242701) | Jan 24, 2020 | Completed: final sign-off Mar 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | revision to pa #201908078142 - remove existing lobby doors at level 1 & 7, replace with new ballistic reinforced doors, add ballistic reinforcement panels at level 7 lobby walls, replace millwokr at… | $10,000 |
| [201912169601](https://www.permitgraph.org/p/201912169601) | Dec 16, 2019 | Completed: final sign-off Apr 2021 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | 4th floor: demo of existing walls, doors, ceilings, electrical, plumbing, millwork, finishes, and hvac throughout. | $55,000 |
| [201910033475](https://www.permitgraph.org/p/201910033475) | Oct 3, 2019 | Completed: final sign-off Apr 2022 | [1 Market St](https://www.permitgraph.org/a/3713/006) | 6th fl - ti 6th floor annex, build out of a large meeting room; assembly space plus amenities. scope of work include, mep | $1,425,000 |
| [201909262834](https://www.permitgraph.org/p/201909262834) | Sep 26, 2019 | Completed: final sign-off Sep 2021 | [1 Market St](https://www.permitgraph.org/a/3713/006) | t.i. of floor 11 small employee coffee station and a residential teaching kitchen, related mirco kitchen. 2 roof decks, lighting associate mep.**maher n/a** | $2,500,000 |
| [201909232380](https://www.permitgraph.org/p/201909232380) | Sep 23, 2019 | Completed: final sign-off Mar 2023 | [1 Beach St](https://www.permitgraph.org/a/0018/001) | remodel of interior ground floor entrance lobby to 2 floor hgh space & addition of new roof deck. extension of elevator stop to roof & extension of stair to roof. seismic upgrade. ** maher: n/a ** | $1,200,000 |
| [201909192128](https://www.permitgraph.org/p/201909192128) | Sep 19, 2019 | Completed: final sign-off Sep 2021 | [1 Market St](https://www.permitgraph.org/a/3713/006) | new interconnecting convenience stair connecting floors 6 with floor 9. demo of (e) slabs to create (n) opening. (n) steel for stair, architectural stair includes guard and handrail details. also inc… | $750,000 |
| [201909050711](https://www.permitgraph.org/p/201909050711) | Sep 5, 2019 | Completed: final sign-off Jan 2020 | [1 Market St](https://www.permitgraph.org/a/3713/006) | 7, 8 and 9th floors - ti spaces of commercial office vacant space in existing building per ab-017 no cieling demo approved on this permit. | $500,000 |
| [201909040595](https://www.permitgraph.org/p/201909040595) | Sep 4, 2019 | Completed: final sign-off Sep 2021 | [1 Market St](https://www.permitgraph.org/a/3713/006) | 7th fl - partial ti (approx 26000 sf). scope to include small meeting rooms & open work stations & associated amenitites. includes mep. minor structural work for ada lift | $3,250,000 |
| [201909040591](https://www.permitgraph.org/p/201909040591) | Sep 4, 2019 | Completed: final sign-off Sep 2021 | [1 Market St](https://www.permitgraph.org/a/3713/006) | 9th flr - ti small mtg rooms, open workstations & associated amenities. plus supporting mech, plum, ele work 33000 sf | $4,200,000 |
| [201909040607](https://www.permitgraph.org/p/201909040607) | Sep 4, 2019 | Completed: final sign-off Sep 2021 | [1 Market St](https://www.permitgraph.org/a/3713/006) | 8th fl - small conference rooms & open workstations and associated amenities plus supporting mep work. total 33000 sf | $4,200,000 |
| [201908279944](https://www.permitgraph.org/p/201908279944) | Aug 27, 2019 | Completed: final sign-off Sep 2021 | [1 Market St](https://www.permitgraph.org/a/3713/006) | office ti, aprox 18,000 sf, scope includes architecture mep & lighting in suport of ti n/a maher | $7,028,775 |
| [201908078142](https://www.permitgraph.org/p/201908078142) | Aug 7, 2019 | Completed: final sign-off Mar 2021 | [181 Fremont St](https://www.permitgraph.org/a/3719/450) | replace millwork at level 1 and 7. remove e lobby doors at level 1 and 7. replace with new ballistic reinformced doors. add aballistic reinforcement panels at level 7 lobby walls | $100,000 |
| [201907035080](https://www.permitgraph.org/p/201907035080) | Jul 3, 2019 | Completed: final sign-off Dec 2020 | [1 Market St](https://www.permitgraph.org/a/3713/006) | level 6:build out of new office space b occupancy approx. 33,000 sf. scope includes open offices space, small team office, small meeting rooms and micro kitchen. no exterior work. permit does not inc… | $7,000,000 |
| [201907035075](https://www.permitgraph.org/p/201907035075) | Jul 3, 2019 | Completed: final sign-off Dec 2020 | [1 Market St](https://www.permitgraph.org/a/3713/006) | level 3: build out of (n) office space b occupancy approx. 41,000 sf, including approx 8000 sq ft in "annex". scope includes open offices space, small team office, small meeting rooms and micro kitch… | $7,000,000 |
| [201906274525](https://www.permitgraph.org/p/201906274525) | Jun 27, 2019 | Completed: final sign-off Sep 2021 | [1 Market St](https://www.permitgraph.org/a/3713/006) | demo of existing ti spaces of commercial office over 2 floors (level 3 & 6) in an existing building. per ab-017. maher na | $200,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/level-10-construction-lp-967797.
