Lee And Son Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2011 to Jun 2026
- Last 24 months
- 15 permits filed
105 permits since 2000: 85 completed, 8 in progress, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
6 deck permits: 3 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 18 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2025 | In progress issued Jul 2025 | 2001 42nd Av | add media room & relocate kitchen, dining area, living room, bath & bedroom @ 2/f. propose electrical fireplace in (n) living room @ 2/f. (n) exterior deck pon 2/f w/ spiral staircase to rear yard. add rear (n) sliding doors, 2 @ 2/f & 1 @ 1/f. replace 1 front facade window.Details
add media room & relocate kitchen, dining area, living room, bath & bedroom @ 2/f. propose electrical fireplace in (n) living room @ 2/f. (n) exterior deck pon 2/f w/ spiral staircase to rear yard. add rear (n) sliding doors, 2 @ 2/f & 1 @ 1/f. replace 1 front facade window. | $135,000 |
| Jan 14, 2020 | Completed final sign-off Dec 2020 | 315 Foerster St | revision to 201910154537, 2nd fl reconfigure kitchen, dining and bath. add interior stairway, 1 full bath, rear deck. 1st fl add 2 bedrooms, 2 full media roomDetails
revision to 201910154537, 2nd fl reconfigure kitchen, dining and bath. add interior stairway, 1 full bath, rear deck. 1st fl add 2 bedrooms, 2 full media room | $65,000 |
| May 2, 2019 | Completed final sign-off May 2019 | 1383 17th Av | construct a deck at rear yardDetails
construct a deck at rear yard | $10,000 |
| May 3, 2018 | Never finaled issued Jan 2020, no final | 425 Peru Av | (n) deck at rear of bldg, 2 new sliding glass doors @ rear (not visible from street) infill (1) window (not visible from street)Details
(n) deck at rear of bldg, 2 new sliding glass doors @ rear (not visible from street) infill (1) window (not visible from street) | $10,000 |
| Aug 27, 2013 | Completed final sign-off Dec 2013 | 807 Ashbury St | replace 10 vinyl double pane windows at rear of house, replace (7) damaged wood steps on deck at rear of house. repaint repaired portions (6'x8' sq. ft) all work not street visisble.Details
replace 10 vinyl double pane windows at rear of house, replace (7) damaged wood steps on deck at rear of house. repaint repaired portions (6'x8' sq. ft) all work not street visisble. | $10,000 |
| Jul 3, 2013 | Expired or cancelled expired Aug 2026 | 3521 Clement St | new 2nd story addition over existing single family residence. scope includes new master bedroom facing clement st and seperate family rm. master bath suite & deck on the new 2nd fl. remodel existing g/f w/ new mechanical systems, plumbing & electrical. minor landscape at rear yard.Details
new 2nd story addition over existing single family residence. scope includes new master bedroom facing clement st and seperate family rm. master bath suite & deck on the new 2nd fl. remodel existing g/f w/ new mechanical systems, plumbing & electrical. minor landscape at rear yard. | $275,000 |