# Layton Construction Co

Contractor license 795238. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/layton-construction-co-795238
- JSON: https://www.permitgraph.org/api/contractor?license=795238
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=795238

15 permits since 2000: 14 completed, 1 never finaled. Typically 11 days from filing to permit and 755 days from permit to final inspection. Of the 1 never-finaled permit, 1 is 5 to 10 years old.

- Based in: Sandy
- On San Francisco permits: Nov 2012 to Sep 2020
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2012 | 3 | 0 | 0 | 0 |
| 2013 | 1 | 0 | 0 | 0 |
| 2014 | 7 | 0 | 0 | 0 |
| 2018 | 3 | 0 | 0 | 0 |
| 2020 | 0 | 0 | 1 | 0 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202009124065](https://www.permitgraph.org/p/202009124065) | Sep 12, 2020 | Never finaled: issued Dec 2020, no final | [1 Shrader St](https://www.permitgraph.org/a/1191/036) | add receptacle to existing idf room on level 6 to support new server. | $3,000 |
| [201804247184](https://www.permitgraph.org/p/201804247184) | Apr 24, 2018 | Completed: final sign-off Nov 2019 | [2235 Hayes St](https://www.permitgraph.org/a/1213/014) | floors 3 & 5: drywall, framing, elec, mech work to upgrade idf closets. supports and cabling(low voltage) to connect new (2 ea.) and upgraded idf rooms) | $240,000 |
| [201804247187](https://www.permitgraph.org/p/201804247187) | Apr 24, 2018 | Completed: final sign-off Nov 2019 | [1 Shrader St](https://www.permitgraph.org/a/1191/036) | 4/f: idf closets and low voltage cabling framing, drywall, electrical to support | $250,000 |
| [201804247188](https://www.permitgraph.org/p/201804247188) | Apr 24, 2018 | Completed: final sign-off Nov 2019 | [2250 Hayes St](https://www.permitgraph.org/a/1191/041) | 4 existing idf rooms, low voltage cabling for existing idf closets,new ac-0 and ac-1. | $300,000 |
| [201409095918](https://www.permitgraph.org/p/201409095918) | Sep 9, 2014 | Completed: final sign-off Aug 2016 | [942 Mission St](https://www.permitgraph.org/a/3704/015) | update labelling of floors and associated room numbers affected by removal of 13th flr, and renaming as 14th flr, added alcove for pg&e gas meter. addition of canopy on mission st as required by plan… |  |
| [201409095919](https://www.permitgraph.org/p/201409095919) | Sep 9, 2014 | Completed: final sign-off Feb 2016 | [942 Mission St](https://www.permitgraph.org/a/3704/015) | revision to app#201105136051 (s-3). revised fire alarm drawings, smoke control panel to remove reference to 13th floor and relabel as 14th floor and subsequent affected higher floors. corrections/not… |  |
| [201406138390](https://www.permitgraph.org/p/201406138390) | Jun 13, 2014 | Completed: final sign-off Jul 2016 | [942 Mission St](https://www.permitgraph.org/a/3704/015) | to erect an electric sign "hampton inn"; (sign c)), facing jessie street; compliance with ord 155-13 not required | $3,000 |
| [201406138392](https://www.permitgraph.org/p/201406138392) | Jun 13, 2014 | Completed: final sign-off Aug 2016 | [942 Mission St](https://www.permitgraph.org/a/3704/015) | to erect a painted "hampton inn";(sign f)compliance with ord 155-13 not required | $1,000 |
| [201406138391](https://www.permitgraph.org/p/201406138391) | Jun 13, 2014 | Completed: final sign-off Jul 2016 | [942 Mission St](https://www.permitgraph.org/a/3704/015) | to erect 2 electric signs "hampton inn"; (signs d & e)compliance with ord 155-13 not required | $8,000 |
| [201406138393](https://www.permitgraph.org/p/201406138393) | Jun 13, 2014 | Completed: final sign-off Aug 2016 | [942 Mission St](https://www.permitgraph.org/a/3704/015) | to erect an electric sign "hampton inn"; sign a, facing mission street: compliance with ord 155-13 not required | $4,000 |
| [201406138389](https://www.permitgraph.org/p/201406138389) | Jun 13, 2014 | Completed: final sign-off Jul 2016 | [942 Mission St](https://www.permitgraph.org/a/3704/015) | to erect an electric sign "hampton inn" (sign b), facing mission street ; compliance with ord 155-13 not required | $3,000 |
| [201304043808](https://www.permitgraph.org/p/201304043808) | Apr 4, 2013 | Completed: final sign-off Jun 2016 | [948 Mission St](https://www.permitgraph.org/a/3704/017) | install footing for tower crane. erect tower crane for the prupose of hosting for permit #201105136051s1r1 942 mission street 15 story hotel. | $400,000 |
| [201211093930](https://www.permitgraph.org/p/201211093930) | Nov 9, 2012 | Completed: final sign-off Jun 2016 | [936 Mission St](https://www.permitgraph.org/a/3704/013) | continous hand-dug underpinning piers along south side of building. sequential pours are required. | $25,000 |
| [201211093915](https://www.permitgraph.org/p/201211093915) | Nov 9, 2012 | Completed: final sign-off Aug 2016 | [942 Mission St](https://www.permitgraph.org/a/3704/015) | raker brace shoring at (e) vault on mission street. solider beam tieback shoring on jessie street. | $30,000 |
| [201211093923](https://www.permitgraph.org/p/201211093923) | Nov 9, 2012 | Completed: final sign-off Jun 2016 | [948 Mission St](https://www.permitgraph.org/a/3704/017) | continuous hand-dug underpinning, soldier beam tieback, soldier beam & internal bracing at crane mat.main permit appn. 201211093915 | $35,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/layton-construction-co-795238.
