# Landmark Construction & Development Inc

Contractor license 848253. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/landmark-construction-development-inc-848253
- JSON: https://www.permitgraph.org/api/contractor?license=848253
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=848253

46 permits since 2000: 43 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 101 days from permit to final inspection. Of the 1 never-finaled permit, 1 is 5 to 10 years old.

- Based in: San Francisco
- On San Francisco permits: Mar 2007 to Sep 2021
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2007 | 4 | 0 | 0 | 0 |
| 2008 | 2 | 0 | 0 | 0 |
| 2009 | 2 | 0 | 0 | 0 |
| 2011 | 2 | 0 | 0 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2013 | 2 | 0 | 0 | 0 |
| 2014 | 4 | 0 | 0 | 0 |
| 2015 | 6 | 0 | 0 | 2 |
| 2016 | 2 | 0 | 0 | 0 |
| 2017 | 6 | 0 | 1 | 0 |
| 2018 | 4 | 0 | 0 | 0 |
| 2019 | 5 | 0 | 0 | 0 |
| 2020 | 2 | 0 | 0 | 0 |
| 2021 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 18 | 18 | 0 | 0 | 0 | 2 | 164 |
| Bathroom remodel | 27 | 27 | 0 | 0 | 0 | 1 | 135 |
| Stairs | 5 | 5 | 0 | 0 | 0 | 12 | 180 |
| Deck | 4 | 4 | 0 | 0 | 0 | 8 | 192 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202109208723](https://www.permitgraph.org/p/202109208723) | Sep 20, 2021 | Completed: final sign-off May 2022 | [427 27th Av](https://www.permitgraph.org/a/1459/002B) | revision to pa #202010287624: re-arrange bathroom, replace partial rotten wood at 2nd floor. remove/replace (e) concrete slab w/ new, replace partial rotten wood at g/f. remove/replace (e) stucco w/… | $48,000 |
| [202011168975](https://www.permitgraph.org/p/202011168975) | Nov 16, 2020 | Completed: final sign-off May 2021 | [710 London St](https://www.permitgraph.org/a/6347/001A) | convert (e) bedroom into 2 bedroom. construct 2 full bathroom & media room at ground floor. remodel (e) kitchen, bathroom, & replace (e) sheetrock w/ new at 2nd floor. construct new deck w/ staircase… | $120,000 |
| [202010287624](https://www.permitgraph.org/p/202010287624) | Oct 28, 2020 | Completed: final sign-off May 2022 | [427 27th Av](https://www.permitgraph.org/a/1459/002B) | construct 2 bedrooms, 2 full bath & family room at ground floor. remodel (e) kitchen, bathroom. add 1 new bathroom & replace (e) sheet rock w/ new at 2nd floor. infill under (e) sun room for new bedr… | $120,000 |
| [201912099052](https://www.permitgraph.org/p/201912099052) | Dec 9, 2019 | Completed: final sign-off Sep 2020 | [581 Arch St](https://www.permitgraph.org/a/6994/003) | structural revision to bpa #201907186289. | $2,000 |
| [201907186289](https://www.permitgraph.org/p/201907186289) | Jul 18, 2019 | Completed: final sign-off Sep 2020 | [581 Arch St](https://www.permitgraph.org/a/6994/003) | 1st fl - infill at rear; 2nd floor - remodel kitchen and bath, add 2 baths | $45,000 |
| [201906274605](https://www.permitgraph.org/p/201906274605) | Jun 27, 2019 | Completed: final sign-off Oct 2019 | [750 23rd Av](https://www.permitgraph.org/a/1665/039) | remove and replace approx. 800 sq ft of stucco at front façade - texture to remain the same. at rear, remove and replace approx. 1,000 sq ft of siding. no other work under this permit. | $20,000 |
| [201905140517](https://www.permitgraph.org/p/201905140517) | May 14, 2019 | Completed: final sign-off Aug 2019 | [610 Moraga St](https://www.permitgraph.org/a/1931/040) | divide one bed room to two bed room, all work at 3rd floor | $15,000 |
| [201903124967](https://www.permitgraph.org/p/201903124967) | Mar 12, 2019 | Completed: final sign-off Oct 2019 | [750 23rd Av](https://www.permitgraph.org/a/1665/039) | construct new deck w/staircase at rear yard (size approx 15'x12'); construct 1 bedrm, 1 full bath rm & media rm @ ground floor; remodel (e) kitchen, relocate half bath rm & re-built (e) interior stai… | $138,000 |
| [201810193691](https://www.permitgraph.org/p/201810193691) | Oct 19, 2018 | Completed: final sign-off Apr 2019 | [1601 Irving St](https://www.permitgraph.org/a/1772/001) | interior tenant improvement for market ready. adding non-load bearing wall and new door. separate one retail into two retail spaces. change from mtl stud to wood stud and wood ceiling joist, new rest… | $25,000 |
| [201808288488](https://www.permitgraph.org/p/201808288488) | Aug 28, 2018 | Completed: final sign-off Aug 2018 | [326 Flood Av](https://www.permitgraph.org/a/3121/012) | comply with complaint #2018011336 enf front yard paving. comply with 50% permiability and no % landscaping area. (permeable area to be small rock.) | $8,000 |
| [201804176526](https://www.permitgraph.org/p/201804176526) | Apr 17, 2018 | Completed: final sign-off Aug 2018 | [326 Flood Av](https://www.permitgraph.org/a/3121/012) | revision to p a 2018-0126-9606 add new tie beam in garage area & re built retaining wall in rear yard | $28,000 |
| [201801269606](https://www.permitgraph.org/p/201801269606) | Jan 26, 2018 | Completed: final sign-off Sep 2018 | [326 Flood Av](https://www.permitgraph.org/a/3121/012) | construct two bedroom 2 full bath & media rm @ ground floor. remodel (e) kitchen, bath room. construct one new bath room. re-built interior stair, upgrade partial ceiling framing. construct two skyli… | $80,000 |
| [201710050482](https://www.permitgraph.org/p/201710050482) | Oct 5, 2017 | Completed: final sign-off Apr 2018 | [1906 22nd Av](https://www.permitgraph.org/a/2113/051) | remodel kitchen and bathroom at upper level. reducing the scope of work to be performed application permit # 201707141908. please remove "replace four front windows" from the scope of the original ap… |  |
| [201708235623](https://www.permitgraph.org/p/201708235623) | Aug 23, 2017 | Completed: final sign-off Sep 2017 | [414 15th Av](https://www.permitgraph.org/a/1530/027) | replace damaged siding facing back yard. | $4,500 |
| [201707141899](https://www.permitgraph.org/p/201707141899) | Jul 14, 2017 | Never finaled: issued Jul 2017, no final | [622 Jackson St](https://www.permitgraph.org/a/0177/005) | to show public assembly (floor area) require by fire department. | $5,000 |
| [201707141908](https://www.permitgraph.org/p/201707141908) | Jul 14, 2017 | Completed: final sign-off Apr 2018 | [1906 22nd Av](https://www.permitgraph.org/a/2113/051) | remodel kitchen and bathroom at upper level. replace four front windows with wood sash. u factor not > .32 | $16,000 |
| [201704244686](https://www.permitgraph.org/p/201704244686) | Apr 24, 2017 | Completed: final sign-off Nov 2017 | [1460 Monterey Bl](https://www.permitgraph.org/a/3077/020) | renew permit under pa# 201504163774 | $25,000 |
| [201704032989](https://www.permitgraph.org/p/201704032989) | Apr 3, 2017 | Completed: final sign-off Jul 2017 | [558 27th Av](https://www.permitgraph.org/a/1518/020A) | revision to pa#201701137112 - construct one 4'x5'-6" skylight & re-arrange one bathroom plumbing fixture at 2nd floor. relocate laundry to garage & change one door to window at ground floor. replace… | $20,000 |
| [201701137112](https://www.permitgraph.org/p/201701137112) | Jan 13, 2017 | Completed: final sign-off Jul 2017 | [558 27th Av](https://www.permitgraph.org/a/1518/020A) | relocate (e) bathroom, remodel (e) kitchen, add one new bath room at 2/f, construct 2 bedrooms, one in-fill under (e) living room, family room, laundry area & one full bathroom at g/f, rebuilt interi… | $82,000 |
| [201607263320](https://www.permitgraph.org/p/201607263320) | Jul 26, 2016 | Completed: final sign-off Jan 2017 | [739 32nd Av](https://www.permitgraph.org/a/1612/006A) | remodel (e) bath room @ 3rd floor. remodel (e) kitchen @ 2nd floor. construct two bedrooms, storage room & 1 full bath room @ ground floor & family room | $62,000 |
| [201601227706](https://www.permitgraph.org/p/201601227706) | Jan 22, 2016 | Completed: final sign-off Feb 2016 | [1915 22nd Av](https://www.permitgraph.org/a/2112/001C) | revision under pa#201509217487, relocate kitchen washer & dryer at ground floor, enlarge bath room & add one closet at 2/f. | $1,000 |
| [201509237809](https://www.permitgraph.org/p/201509237809) | Sep 23, 2015 | Completed: final sign-off Nov 2015 | [172 Jordan Av](https://www.permitgraph.org/a/1063/031) | remodel master bathroom at 2/f. | $7,500 |
| [201509217487](https://www.permitgraph.org/p/201509217487) | Sep 21, 2015 | Completed: final sign-off Feb 2016 | [1915 22nd Av](https://www.permitgraph.org/a/2112/001C) | convert 1 (e) bathroom into 2 (n) full bath room. convert (e) kitchen into ofice & dining room into bedroom. relocate (e) kitchen to ground floor & re-wire electrical, lighting at 2nd floor; construc… | $60,000 |
| [201506259907](https://www.permitgraph.org/p/201506259907) | Jun 25, 2015 | Completed: final sign-off Oct 2015 | [1539 33rd Av](https://www.permitgraph.org/a/1879/001I) | remodel (e) bathroom at second flor with laundry hookup, run new 1" copper pipe from main water shut off valve to meter. upgrade (e) electrical panel to 100 amp. | $10,000 |
| [201505226999](https://www.permitgraph.org/p/201505226999) | May 22, 2015 | Expired or cancelled: cancelled Jan 2026 | [2114 28th Av](https://www.permitgraph.org/a/2190/007) | install bamboo siding at front of bldg. (appox 100 sq ft) | $2,000 |
| [201505196640](https://www.permitgraph.org/p/201505196640) | May 19, 2015 | Completed: final sign-off May 2015 | [2114 28th Av](https://www.permitgraph.org/a/2190/007) | comply w/complaint #201532674 - keep 20% of landscape in front building. | $3,000 |
| [201505015131](https://www.permitgraph.org/p/201505015131) | May 1, 2015 | Completed: final sign-off Jul 2015 | [326 21st Av](https://www.permitgraph.org/a/1452/037) | replace total of 15 windows for two units. 7 front windows to be wood or wood aluminum clad windows. single or double hung. | $4,000 |
| [201504163774](https://www.permitgraph.org/p/201504163774) | Apr 16, 2015 | Expired or cancelled: expired Nov 2017 | [1460 Monterey Bl](https://www.permitgraph.org/a/3077/020) | comply w/complaint #201530001, 201532033, & 201539571 - convert (e) family into bedroom, home office & convert (e) laundry rm into bedroom. all work at ground floor. | $25,000 |
| [201501206047](https://www.permitgraph.org/p/201501206047) | Jan 20, 2015 | Completed: final sign-off May 2015 | [2114 28th Av](https://www.permitgraph.org/a/2190/007) | construct one new bathroom at 2nd flr, legalize (e) bedroom, bathroom, construct one new bedroom and one full bathroom at ground floor. | $46,000 |
| [201411131385](https://www.permitgraph.org/p/201411131385) | Nov 13, 2014 | Completed: final sign-off Feb 2015 | [220 Morningside Dr](https://www.permitgraph.org/a/7261/033) | remodel 2 full bathrooms. (one on ground, one on 2nd fl) | $14,000 |
| [201411131365](https://www.permitgraph.org/p/201411131365) | Nov 13, 2014 | Completed: final sign-off Feb 2015 | [220 Morningside Dr](https://www.permitgraph.org/a/7261/033) | remove a bearing wall (e) breakfast room & laundry rm, relocated (n) laundry rm at garage level, relocated water heater at garage area. | $15,000 |
| [201410179221](https://www.permitgraph.org/p/201410179221) | Oct 17, 2014 | Completed: final sign-off Oct 2015 | [172 Jordan Av](https://www.permitgraph.org/a/1063/031) | remodel bathroom at 2nd floor | $7,000 |
| [201406188713](https://www.permitgraph.org/p/201406188713) | Jun 18, 2014 | Completed: final sign-off Dec 2014 | [378 27th Av](https://www.permitgraph.org/a/1407/024) | remodel (e) kitchen & bathroom at 2nd floor. (no wall to be removed). | $13,500 |
| [201309136780](https://www.permitgraph.org/p/201309136780) | Sep 13, 2013 | Completed: final sign-off Dec 2013 | [1644 Clement St](https://www.permitgraph.org/a/1416/022A) | remodel (e) kitchen & bathroom, no windows & no doors (except bathroom) on this permit | $20,000 |
| [201309126658](https://www.permitgraph.org/p/201309126658) | Sep 12, 2013 | Completed: final sign-off Oct 2013 | [172 Jordan Av](https://www.permitgraph.org/a/1063/031) | remodel extg kitchen. replace countertop, install kitchen appliances, kitchen plumbing fixtures, lighting, outlet, new flooring. | $12,000 |
| [201212136092](https://www.permitgraph.org/p/201212136092) | Dec 13, 2012 | Completed: final sign-off Jun 2013 | [148 28th Av](https://www.permitgraph.org/a/1331/028) | construct a new study room, bathroom & remove/replace (e) conc. stair w/new. all work at ground floor. | $32,000 |
| [201111219353](https://www.permitgraph.org/p/201111219353) | Nov 21, 2011 | Completed: final sign-off Mar 2012 | [1520 Monterey Bl](https://www.permitgraph.org/a/3105A/013) | remodel 2 existing bathrooms (guest bath @ 1st flr & kid bathrm @ 2nd flr) | $7,500 |
| [201111179135](https://www.permitgraph.org/p/201111179135) | Nov 17, 2011 | Completed: final sign-off Nov 2011 | [1520 Monterey Bl](https://www.permitgraph.org/a/3105A/013) | to obtain final inspection for work approved under pa# 200510054878. all work is complete. |  |
| [200906291507](https://www.permitgraph.org/p/200906291507) | Jun 29, 2009 | Completed: final sign-off Feb 2010 | [2020 Kirkham St](https://www.permitgraph.org/a/1829/020) | remodel (e) bathroom at 3rd floor; remodel kitchen, bathroom & add one new bathroom & den. all work at 2nd floor; construct one bedroom, one full bathroom & storage room. all work at ground floor. | $63,000 |
| [200905148373](https://www.permitgraph.org/p/200905148373) | May 14, 2009 | Completed: final sign-off Aug 2009 | [419 22nd Av](https://www.permitgraph.org/a/1522/002) | remodel 1 kitchen, 1 bathroom,1 furnace at unit#419. install 1 main service & 2 panels. | $20,000 |
| [200808290415](https://www.permitgraph.org/p/200808290415) | Aug 29, 2008 | Completed: final sign-off May 2009 | [1001 Greenwich St](https://www.permitgraph.org/a/0093/001) | installation of sprinkler system, 72-heads. nfpa-13 | $15,000 |
| [200803247839](https://www.permitgraph.org/p/200803247839) | Mar 24, 2008 | Completed: final sign-off Jul 2008 | [1654 30th Av](https://www.permitgraph.org/a/1914/014B) | remodel (e) kitchen and bathroom and add one new bathroom at first fl. construct one bed/storage room, laundry area, 2 bathrooms and remodel one (e) bedroom on the ground floor. | $78,000 |
| [200712180693](https://www.permitgraph.org/p/200712180693) | Dec 18, 2007 | Completed: final sign-off Mar 2008 | [500 Sutter St](https://www.permitgraph.org/a/0284/004) | relocate 4 sprinkler heads at break room. (9th floor) | $800 |
| [200711148045](https://www.permitgraph.org/p/200711148045) | Nov 14, 2007 | Completed: final sign-off Dec 2007 | [2434 16th Av](https://www.permitgraph.org/a/2410/022) | remodel 1 bathroom at upstair level. replace (e) fixtures with new fixtures (toilet, sink, & shower). | $7,000 |
| [200707166808](https://www.permitgraph.org/p/200707166808) | Jul 16, 2007 | Completed: final sign-off Aug 2007 | [4431 Cabrillo St](https://www.permitgraph.org/a/1688/040) | kitchen and bathroom remodel. 50% lighting will be flourscent | $20,000 |
| [200703267235](https://www.permitgraph.org/p/200703267235) | Mar 26, 2007 | Completed: final sign-off Apr 2007 | [40 Boardman Pl](https://www.permitgraph.org/a/3779/136) | new 2x4 partition wall and new sheetrock. furring out from existing long wall) ref drawing 200607055687 | $4,500 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/landmark-construction-development-inc-848253.
