Back to kitchen remodel contractors
Kevin Llorente Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Apr 2022
- Last 24 months
- 0 permits filed
34 permits since 2000: 29 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 10 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2021 | Completed final sign-off May 2022 | 351 Guerrero St | one kitchen remodel: replace cabinets, countertop. update electrical and plumbing. install electrical subpanel. non structural work.Details
one kitchen remodel: replace cabinets, countertop. update electrical and plumbing. install electrical subpanel. non structural work. | $25,000 |
| Mar 8, 2019 | Expired or cancelled withdrawn May 2024 | 544 Garfield St | add single story 630 sq ft. 1st story: adu w/ kitchen & bathroom per adu ordinance 95-17Details
add single story 630 sq ft. 1st story: adu w/ kitchen & bathroom per adu ordinance 95-17 | $180,000 |
| Dec 13, 2018 | Expired or cancelled expired Jun 2024 | 1678 43rd Av | kitchen rehabilitation window replacement rear work repairsDetails
kitchen rehabilitation window replacement rear work repairs | $93,000 |
| Oct 30, 2018 | Completed final sign-off Feb 2020 | 400 San Miguel St | 2nd fl: renovation of (e) bathroom & convert (e) utility rm to bedroom. 3rd fl: renovate (e) kitchen & add closet to (e) bedroom.Details
2nd fl: renovation of (e) bathroom & convert (e) utility rm to bedroom. 3rd fl: renovate (e) kitchen & add closet to (e) bedroom. | $25,000 |
| Aug 2, 2017 | Completed final sign-off Dec 2018 | 4924 California St | convert (e) 610sf workshop area & part of garage to 758sf bedroom, bath with wet bar. 944sf alteration at entry level to kitchen, bath & add bath & laundry. add 272sf deck at 1st level 3. 379sf alteration at 2nd fl level, remodel bath and add bathroom.Details
convert (e) 610sf workshop area & part of garage to 758sf bedroom, bath with wet bar. 944sf alteration at entry level to kitchen, bath & add bath & laundry. add 272sf deck at 1st level 3. 379sf alteration at 2nd fl level, remodel bath and add bathroom. | $180,000 |
| Mar 17, 2017 | Completed final sign-off Feb 2018 | 205 14th Av | correct nov #201636221. remodel of kitchen and two bathrooms. resume recessed lighting installed in dining and living rooms.Details
correct nov #201636221. remodel of kitchen and two bathrooms. resume recessed lighting installed in dining and living rooms. | $58,000 |
| Oct 5, 2016 | Completed final sign-off Oct 2016 | 355 Buena Vista East Av | remodel kitchen & bathroom: replace kitchen cabinets & countertop in-kind. approx 80sf. replace bathroom vanity & top in-kind. approx 50sf.Details
remodel kitchen & bathroom: replace kitchen cabinets & countertop in-kind. approx 80sf. replace bathroom vanity & top in-kind. approx 50sf. | $20,000 |
| Feb 2, 2015 | Completed final sign-off Mar 2015 | 1435 Fulton St | apt #2: bathroom: replace toilet, replace bath tub w/shower stall (no elec). kitchen: replace cabinets, counter tops, sink, faucet, add 2 gfci outlets. built in microwave circuit. like for like.Details
apt #2: bathroom: replace toilet, replace bath tub w/shower stall (no elec). kitchen: replace cabinets, counter tops, sink, faucet, add 2 gfci outlets. built in microwave circuit. like for like. | $10,000 |
| Dec 18, 2013 | Completed final sign-off Mar 2014 | 201 14th Av | @201 - remodel bath & kitchen; update electrical; replace bath waterlines; replace plumbing fixture; replace kitchen cabinets. install gas wall heaters in units 201, 203 & 205. no change of wall window and doorDetails
@201 - remodel bath & kitchen; update electrical; replace bath waterlines; replace plumbing fixture; replace kitchen cabinets. install gas wall heaters in units 201, 203 & 205. no change of wall window and door | $35,000 |
| Dec 15, 2011 | Completed final sign-off Jan 2012 | 1208 Newhall St | comply with nov 199928250. remove bath and kitchen plumbing fixtures (tub, sinks, toilet) capp off plumbing. remove unapproved electrical. convert space to storage at gr fl. to comply with his 199928250 dated 12/28/1999 @ ground floorDetails
comply with nov 199928250. remove bath and kitchen plumbing fixtures (tub, sinks, toilet) capp off plumbing. remove unapproved electrical. convert space to storage at gr fl. to comply with his 199928250 dated 12/28/1999 @ ground floor | $960 |
| May 13, 2011 | Completed final sign-off Aug 2011 | 121 Steiner St | all in kitchen: remove brick flue (unused) relocate elec. receptacle; replace sink/faucet; intall garbage disposal; install dishwasher; install 4-circuits from subpanel. install 1-under cabinet light.Details
all in kitchen: remove brick flue (unused) relocate elec. receptacle; replace sink/faucet; intall garbage disposal; install dishwasher; install 4-circuits from subpanel. install 1-under cabinet light. | $9,000 |
| Mar 16, 2010 | Completed final sign-off Jul 2010 | 2433 Larkin St | remodel kitchen:min half of kitchen lighting watts shall be of high efficency lights.Details
remodel kitchen:min half of kitchen lighting watts shall be of high efficency lights. | $8,000 |