# K Lui General Construction Co.

Contractor license 934201. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/k-lui-general-construction-co-934201
- JSON: https://www.permitgraph.org/api/contractor?license=934201
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=934201

97 permits since 2000: 88 completed, 1 in progress, 5 never finaled, 3 expired or cancelled. Typically 1 days from filing to permit and 122 days from permit to final inspection. Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.

- Based in: Millbrae
- On San Francisco permits: Sep 2009 to May 2025
- Last 24 months: 1 permit filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2009 | 3 | 0 | 0 | 0 |
| 2010 | 4 | 0 | 0 | 0 |
| 2011 | 3 | 0 | 0 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2013 | 2 | 0 | 1 | 0 |
| 2014 | 12 | 0 | 0 | 0 |
| 2015 | 11 | 0 | 1 | 1 |
| 2016 | 9 | 0 | 1 | 1 |
| 2017 | 11 | 0 | 1 | 1 |
| 2018 | 13 | 0 | 1 | 0 |
| 2019 | 3 | 0 | 0 | 0 |
| 2020 | 1 | 0 | 0 | 0 |
| 2022 | 6 | 0 | 0 | 0 |
| 2023 | 8 | 0 | 0 | 0 |
| 2024 | 0 | 1 | 0 | 0 |
| 2025 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 5 | 5 | 0 | 0 | 0 | 0 | 84 |
| Bathroom remodel | 5 | 4 | 1 | 0 | 0 | 2 | 148 |
| Stairs | 2 | 2 | 0 | 0 | 0 | 277 | 367 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202505206845](https://www.permitgraph.org/p/202505206845) | May 20, 2025 | Completed: final sign-off Jun 2025 | [210 Clement St](https://www.permitgraph.org/a/1430/022) | accesibilities upgrade at entrance. new handicap ramp (1"-12") auto door opener, pony wall, kick plate, offset handle and threshold | $11,000 |
| [202405061437](https://www.permitgraph.org/p/202405061437) | May 6, 2024 | In progress: filed May 2024, not yet issued | [570 Munich St](https://www.permitgraph.org/a/6281/008) | remove (1) bar sink. remove (1) sink (1) toilet (1) bathtub (bathroom only) | $1,000 |
| [202311060198](https://www.permitgraph.org/p/202311060198) | Nov 6, 2023 | Completed: final sign-off Dec 2023 | [308 Clement St](https://www.permitgraph.org/a/1429/019) | accessible business entrance program per ordinance 51-16, auto door opener, abe# 201806200719. | $3,500 |
| [202310259418](https://www.permitgraph.org/p/202310259418) | Oct 25, 2023 | Completed: final sign-off Dec 2023 | [304 Clement St](https://www.permitgraph.org/a/1429/019) | to comply w/accessible business entrance program/ordinance 51-16, abe#201806200720. auto door opener | $3,500 |
| [202310259415](https://www.permitgraph.org/p/202310259415) | Oct 25, 2023 | Completed: final sign-off Apr 2024 | [306 Clement St](https://www.permitgraph.org/a/1429/019) | to comply w/accessible business entrance program/ordinance 51-16, abe#201806200718. auto door opener, handicap ramp (1-12 ft) & pony wall. | $5,900 |
| [202310118382](https://www.permitgraph.org/p/202310118382) | Oct 11, 2023 | Completed: final sign-off Nov 2023 | [1005 Bush St](https://www.permitgraph.org/a/0281/001) | to comply w/accessible business entrance program/ordinance 51-16, abe#201806200729, install auto door opener at front door | $3,500 |
| [202310118384](https://www.permitgraph.org/p/202310118384) | Oct 11, 2023 | Completed: final sign-off Nov 2023 | [1017 Bush St](https://www.permitgraph.org/a/0281/001) | to comply w/accessible business entrance program/ordinance 51-16, abe#201806200725, install auto door opener at front door | $5,000 |
| [202310118378](https://www.permitgraph.org/p/202310118378) | Oct 11, 2023 | Completed: final sign-off Nov 2023 | [1001 Bush St](https://www.permitgraph.org/a/0281/001) | to comply w/accessible business entrance program/ordinance 51-16, abe#201806200730, install auto door opener at front door | $5,000 |
| [202301180303](https://www.permitgraph.org/p/202301180303) | Jan 18, 2023 | Completed: final sign-off Jun 2023 | [1398 Grant Av](https://www.permitgraph.org/a/0132/051) | to comply w/accessible business entrance program/ordinance 51-16. abe#202209304857. ramp & auto opener | $8,000 |
| [202301180301](https://www.permitgraph.org/p/202301180301) | Jan 18, 2023 | Completed: final sign-off Jun 2023 | [1350 Grant Av](https://www.permitgraph.org/a/0132/051) | to comply w/accessible business entrance program/ordinance 51-16. abe#202209304859. ramp & auto opener, new iron gate. | $9,000 |
| [202212309591](https://www.permitgraph.org/p/202212309591) | Dec 30, 2022 | Completed: final sign-off Jun 2023 | [2129 Taraval St](https://www.permitgraph.org/a/2394/044) | to comply with accessible business entrance program/ordinance 51-16. install power door operator per information sheet da-4/05 with extg sloped landing at exterior side of door. abe #202206211581 | $2,000 |
| [202210194719](https://www.permitgraph.org/p/202210194719) | Oct 19, 2022 | Completed: final sign-off Nov 2022 | [459 Filbert St](https://www.permitgraph.org/a/0104/039) | to comply with complaint #202293894: provide handrail and guardrail at back stairway. | $2,000 |
| [202208190895](https://www.permitgraph.org/p/202208190895) | Aug 19, 2022 | Completed: final sign-off Mar 2023 | [1350 Grant Av](https://www.permitgraph.org/a/0132/051) | residential: soft story retrofit per sfebc chapt 5e national design method accessibilty compliance. | $90,000 |
| [202208190894](https://www.permitgraph.org/p/202208190894) | Aug 19, 2022 | Completed: final sign-off Mar 2023 | [1350 Grant Av](https://www.permitgraph.org/a/0132/051) | commercial: soft story retrofit per sfebc champt 5e national design method accessibilty compliance. (soft story) | $13,000 |
| [202202027166](https://www.permitgraph.org/p/202202027166) | Feb 2, 2022 | Completed: final sign-off Feb 2023 | [301 Columbus Av](https://www.permitgraph.org/a/0146/002) | commercial. soft story retrofitting per sfebc chapter 5e national design method. accessiblity compliance (soft story) | $15,000 |
| [202202027171](https://www.permitgraph.org/p/202202027171) | Feb 2, 2022 | Completed: final sign-off Feb 2023 | [301 Columbus Av](https://www.permitgraph.org/a/0146/002) | residential. soft story retrofitting per sfebc chapter 5e national design method. | $125,000 |
| [202002063747](https://www.permitgraph.org/p/202002063747) | Feb 6, 2020 | Completed: final sign-off Jul 2020 | [2439 Larkin St](https://www.permitgraph.org/a/0524/004) | revise location of shear wall rev to pa 2019-1031-6079 (soft story) |  |
| [201910316079](https://www.permitgraph.org/p/201910316079) | Oct 31, 2019 | Completed: final sign-off Jul 2020 | [2439 Larkin St](https://www.permitgraph.org/a/0524/004) | soft story retrofitting per sfebc chapter 4d, other rational design method | $120,000 |
| [201904057209](https://www.permitgraph.org/p/201904057209) | Apr 5, 2019 | Completed: final sign-off Jun 2019 | [241 Cervantes Bl](https://www.permitgraph.org/a/0417B/004) | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $28,000 |
| [201903276353](https://www.permitgraph.org/p/201903276353) | Mar 27, 2019 | Completed: final sign-off Aug 2019 | [260 26th Av](https://www.permitgraph.org/a/1385/022) | soft storey retrofitting per sfbc chapter 4d national design method | $70,000 |
| [201812138197](https://www.permitgraph.org/p/201812138197) | Dec 13, 2018 | Completed: final sign-off Mar 2019 | [369 10th Av](https://www.permitgraph.org/a/1442/015) | soft story retrofit per sfbc chapter 4d national design method | $75,000 |
| [201811297006](https://www.permitgraph.org/p/201811297006) | Nov 29, 2018 | Completed: final sign-off Jul 2019 | [14 Clement St](https://www.permitgraph.org/a/1432/018) | soft story accessiblity compliance, commercial | $40,000 |
| [201811297004](https://www.permitgraph.org/p/201811297004) | Nov 29, 2018 | Completed: final sign-off Jul 2019 | [14 Clement St](https://www.permitgraph.org/a/1432/018) | soft story retrofit per sfbc chapter 4d national design method, residential | $65,000 |
| [201810032110](https://www.permitgraph.org/p/201810032110) | Oct 3, 2018 | Completed: final sign-off Jan 2019 | [801 25th Av](https://www.permitgraph.org/a/1668/001) | soft story retrofitting per cfbc chapter 4d other rational design method. | $90,000 |
| [201809079450](https://www.permitgraph.org/p/201809079450) | Sep 7, 2018 | Completed: final sign-off Oct 2020 | [293 04th Av](https://www.permitgraph.org/a/1429/019) | residential soft story retrofit per sfebc chapter 4d: other rational design. ref pa#201809079449-commercial | $45,000 |
| [201809079449](https://www.permitgraph.org/p/201809079449) | Sep 7, 2018 | Completed: final sign-off Oct 2020 | [293 04th Av](https://www.permitgraph.org/a/1429/019) | commercial soft story retrofit per sfebc chapter 4d: other rational design. ref pa#201809079450-residential | $20,000 |
| [201808318889](https://www.permitgraph.org/p/201808318889) | Aug 31, 2018 | Completed: final sign-off Sep 2018 | [1847 Stockton St](https://www.permitgraph.org/a/0076/003) | revision of 201709148124 (soft story) new open wall location | $4,000 |
| [201808207813](https://www.permitgraph.org/p/201808207813) | Aug 20, 2018 | Completed: final sign-off Mar 2020 | [1400 Taraval St](https://www.permitgraph.org/a/2353/008) | (residential)soft story retrofit sfebc chapter 4d: other rational design | $63,000 |
| [201808207811](https://www.permitgraph.org/p/201808207811) | Aug 20, 2018 | Never finaled: issued Aug 2018, no final | [1400 Taraval St](https://www.permitgraph.org/a/2353/008) | (commercial)soft story retrofit sfebc chapter 4d: other rational design | $12,000 |
| [201808107053](https://www.permitgraph.org/p/201808107053) | Aug 10, 2018 | Completed: final sign-off Dec 2018 | [300 Hill St](https://www.permitgraph.org/a/3620/005) | soft story retrofit per sfbc chapter 4d, 2016 cebc appendix national design method | $80,000 |
| [201806293346](https://www.permitgraph.org/p/201806293346) | Jun 29, 2018 | Completed: final sign-off Dec 2019 | [600 34th Av](https://www.permitgraph.org/a/1576/018) | soft story retrofitting per sfbc chapter 4d rational design method | $80,000 |
| [201806111471](https://www.permitgraph.org/p/201806111471) | Jun 11, 2018 | Completed: final sign-off Oct 2019 | [530 06th Av](https://www.permitgraph.org/a/1548/042) | soft story retrofit per sfebc chapter 4d engineering criteria: national design method. | $80,000 |
| [201804136266](https://www.permitgraph.org/p/201804136266) | Apr 13, 2018 | Completed: final sign-off Jun 2018 | [444 22nd Av](https://www.permitgraph.org/a/1523/036) | soft story retrofit per sfebc chapter 4d engineering criteria: other rational design method. | $75,000 |
| [201802211808](https://www.permitgraph.org/p/201802211808) | Feb 21, 2018 | Completed: final sign-off Feb 2018 | [154 Cole St](https://www.permitgraph.org/a/1194/014) | revision to 201401236911, soft story retrofit per sfbc ch 4d national design method. clarify scope of work, building inrormation, applicable codes and drawing index as shown on a-1 |  |
| [201712045347](https://www.permitgraph.org/p/201712045347) | Dec 4, 2017 | Never finaled: issued Dec 2017, no final | [1691 47th Av](https://www.permitgraph.org/a/1896/020) | to comply with nov 201717273: soft story retr0fitting per sfbc chapter 4d national design method | $28,000 |
| [201712015236](https://www.permitgraph.org/p/201712015236) | Dec 1, 2017 | Completed: final sign-off May 2018 | [430 Warren Dr](https://www.permitgraph.org/a/2635/041) | soft story retrofit per sfebc chapter 4d, other rational design | $84,000 |
| [201711274788](https://www.permitgraph.org/p/201711274788) | Nov 27, 2017 | Completed: final sign-off Jul 2020 | [86 Parker Av](https://www.permitgraph.org/a/1036/020) | to comply with nov#201716251, soft story retrofit per sfebc chapter 4d, other rational design. | $48,000 |
| [201709289843](https://www.permitgraph.org/p/201709289843) | Sep 28, 2017 | Completed: final sign-off Jan 2018 | [1436 48th Av](https://www.permitgraph.org/a/1806/054) | soft story retrofit per sfebc chapter 4d engineering criteria other rational design | $85,000 |
| [201709148113](https://www.permitgraph.org/p/201709148113) | Sep 14, 2017 | Completed: final sign-off Sep 2021 | [4801 17th St](https://www.permitgraph.org/a/1290/001) | soft story retrofitting per sfebc chpater 4d engineering criteria rational method method. 2016 cebc appendix a-4 | $47,000 |
| [201709148124](https://www.permitgraph.org/p/201709148124) | Sep 14, 2017 | Completed: final sign-off Sep 2018 | [1847 Stockton St](https://www.permitgraph.org/a/0076/003) | front bldg - soft story retrofitting epr sfebc chpater 4d engineering criteria rational method method. | $49,000 |
| [201709087324](https://www.permitgraph.org/p/201709087324) | Sep 8, 2017 | Completed: final sign-off Jun 2021 | [3720 Scott St](https://www.permitgraph.org/a/0440B/010) | soft story retrofit per sfebc chapter 4d rational design method. na for maher. | $85,000 |
| [201709087322](https://www.permitgraph.org/p/201709087322) | Sep 8, 2017 | Completed: final sign-off Mar 2021 | [1925 Chestnut St](https://www.permitgraph.org/a/0492/022) | soft story retrofit per sfebc chapter 4d national design method. | $85,000 |
| [201708245750](https://www.permitgraph.org/p/201708245750) | Aug 24, 2017 | Completed: final sign-off Oct 2017 | [1400 26th Av](https://www.permitgraph.org/a/1828/011) | soft story retrofit per 2016 sfebc chapter 4d, other rational design method | $48,000 |
| [201707202494](https://www.permitgraph.org/p/201707202494) | Jul 20, 2017 | Completed: final sign-off Dec 2017 | [2411 23rd Av](https://www.permitgraph.org/a/2402/033) | soft story retrofitper sfbc chapter 4d, rational design method | $65,000 |
| [201706300821](https://www.permitgraph.org/p/201706300821) | Jun 30, 2017 | Expired or cancelled: cancelled Apr 2019 | [241 Cervantes Bl](https://www.permitgraph.org/a/0417B/004) | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher | $28,000 |
| [201701046513](https://www.permitgraph.org/p/201701046513) | Jan 4, 2017 | Completed: final sign-off Jun 2017 | [241 10th Av](https://www.permitgraph.org/a/1423/011) | soft story retrofitting per sfbc chapter 34 b national design method | $65,000 |
| [201701046514](https://www.permitgraph.org/p/201701046514) | Jan 4, 2017 | Completed: final sign-off Feb 2017 | [1960 Clay St](https://www.permitgraph.org/a/0617/007) | revision to soft story 201609127356 shear wall instead of steel frame |  |
| [201612225771](https://www.permitgraph.org/p/201612225771) | Dec 22, 2016 | Completed: final sign-off Jun 2017 | [1133 Dolores St](https://www.permitgraph.org/a/6511/030) | soft story retrofit per sfbc chapter 34b engineering criteria for other rational design. | $120,000 |
| [201609127356](https://www.permitgraph.org/p/201609127356) | Sep 12, 2016 | Completed: final sign-off Feb 2017 | [1960 Clay St](https://www.permitgraph.org/a/0617/007) | soft story retrofit per sfbc chapter 34b engineering criteria other rational design | $49,000 |
| [201608195469](https://www.permitgraph.org/p/201608195469) | Aug 19, 2016 | Completed: final sign-off Nov 2016 | [1231 16th Av](https://www.permitgraph.org/a/1734/005) | soft story retrofitting per sfbc chapeter 34b rational design method. | $42,000 |
| [201608175195](https://www.permitgraph.org/p/201608175195) | Aug 17, 2016 | Expired or cancelled: cancelled Aug 2018 | [300 Hill St](https://www.permitgraph.org/a/3620/005) | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $100,000 |
| [201607152434](https://www.permitgraph.org/p/201607152434) | Jul 15, 2016 | Completed: final sign-off Nov 2016 | [438 15th Av](https://www.permitgraph.org/a/1530/034) | soft story retrofit per sfbc chapter 34b, other rational design method. | $59,000 |
| [201607152437](https://www.permitgraph.org/p/201607152437) | Jul 15, 2016 | Never finaled: issued Jul 2016, no final | [2015 Stockton St](https://www.permitgraph.org/a/0053/002A) | revision to pa #201605207985 (soft story retrofit) - relocation of new steel frame. |  |
| [201605207985](https://www.permitgraph.org/p/201605207985) | May 20, 2016 | Completed: final sign-off Sep 2016 | [2015 Stockton St](https://www.permitgraph.org/a/0053/002A) | soft story retrofitting per sfbc chapter 34b other rational design. | $42,000 |
| [201604285975](https://www.permitgraph.org/p/201604285975) | Apr 28, 2016 | Completed: final sign-off Jul 2016 | [1556 Taylor St](https://www.permitgraph.org/a/0158/025A) | soft story retrofit per national design method | $42,000 |
| [201603141923](https://www.permitgraph.org/p/201603141923) | Mar 14, 2016 | Completed: final sign-off Jul 2016 | [320 11th Av](https://www.permitgraph.org/a/1442/047) | sf soft story seimic upgrade per ordinance 66-13, per sfbc, chapter 34b, 2012 iebc appendix a-4. | $8,000 |
| [201602250458](https://www.permitgraph.org/p/201602250458) | Feb 25, 2016 | Completed: final sign-off Jun 2016 | [3049 Sacramento St](https://www.permitgraph.org/a/1024/027) | soft storey retrofit per natural dessign method maher na | $32,000 |
| [201601267940](https://www.permitgraph.org/p/201601267940) | Jan 26, 2016 | Completed: final sign-off Jul 2016 | [4153 20th St](https://www.permitgraph.org/a/3603/082) | soft storey retrofit per sfbc chapter 34b per rational design | $30,000 |
| [201512175330](https://www.permitgraph.org/p/201512175330) | Dec 17, 2015 | Completed: final sign-off Aug 2016 | [1901 Beach St](https://www.permitgraph.org/a/0441B/001) | soft story retrofit per sfbc chapter 34b per other rational design. n/a maher ordinance | $30,000 |
| [201511243458](https://www.permitgraph.org/p/201511243458) | Nov 24, 2015 | Completed: final sign-off Feb 2016 | [969 Valencia St](https://www.permitgraph.org/a/3609/029) | soft story retrofit per sfbc chapter 34b engineering criteria other rational design. maher na | $30,000 |
| [201511243454](https://www.permitgraph.org/p/201511243454) | Nov 24, 2015 | Never finaled: issued Nov 2015, no final | [969 Valencia St](https://www.permitgraph.org/a/3609/029) | soft story retrofit per sfbc chapter 34b engineering criteria other rational design. accessibility compliance triggered by soft story retrofit. install automatic door opener. maher na | $15,000 |
| [201511182929](https://www.permitgraph.org/p/201511182929) | Nov 18, 2015 | Expired or cancelled: cancelled Nov 2018 | [801 25th Av](https://www.permitgraph.org/a/1668/001) | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $28,000 |
| [201511182931](https://www.permitgraph.org/p/201511182931) | Nov 18, 2015 | Completed: final sign-off Sep 2016 | [491 30th Av](https://www.permitgraph.org/a/1462/017) | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $18,000 |
| [201510190033](https://www.permitgraph.org/p/201510190033) | Oct 19, 2015 | Completed: final sign-off Mar 2016 | [1529 Taylor St](https://www.permitgraph.org/a/0157/004) | soft story retrofit per sfbc chapter 34b, other rational design. | $28,000 |
| [201510058809](https://www.permitgraph.org/p/201510058809) | Oct 5, 2015 | Completed: final sign-off Jan 2016 | [2349 27th Av](https://www.permitgraph.org/a/2356/002) | mandatory soft story seismic retrofit on ground floor per chapter 34b rational design method | $30,000 |
| [201509167118](https://www.permitgraph.org/p/201509167118) | Sep 16, 2015 | Completed: final sign-off Mar 2016 | [1245 Filbert St](https://www.permitgraph.org/a/0096/046) | soft story retroffit per other rational method . n/a for maher | $30,000 |
| [201507282597](https://www.permitgraph.org/p/201507282597) | Jul 28, 2015 | Completed: final sign-off Apr 2016 | [1490 Chestnut St](https://www.permitgraph.org/a/0480/004A) | soft story retrofit per other rational design | $35,000 |
| [201506017594](https://www.permitgraph.org/p/201506017594) | Jun 1, 2015 | Completed: final sign-off Nov 2015 | [400 26th Av](https://www.permitgraph.org/a/1457/034) | soft story retrofit per rational method. | $30,000 |
| [201504284759](https://www.permitgraph.org/p/201504284759) | Apr 28, 2015 | Completed: final sign-off Sep 2015 | [274 26th Av](https://www.permitgraph.org/a/1385/020) | soft story retrofit per sfbc chapter 34b per national method | $30,000 |
| [201504072933](https://www.permitgraph.org/p/201504072933) | Apr 7, 2015 | Completed: final sign-off Jul 2015 | [367 04th Av](https://www.permitgraph.org/a/1436/012) | soft story retrofit per sfbc chapter 34b, other rational design. | $20,000 |
| [201501296974](https://www.permitgraph.org/p/201501296974) | Jan 29, 2015 | Completed: final sign-off Feb 2016 | [160 08th St](https://www.permitgraph.org/a/3728/006) | soft story retrofit per sfbc chapter 34b other rational design. n/a ordiance #155-13 | $30,000 |
| [201412103457](https://www.permitgraph.org/p/201412103457) | Dec 10, 2014 | Completed: final sign-off Apr 2015 | [367 Chestnut St](https://www.permitgraph.org/a/0062/023) | soft story retrofitting per rational method. | $30,000 |
| [201411202066](https://www.permitgraph.org/p/201411202066) | Nov 20, 2014 | Completed: final sign-off Jul 2015 | [1560 Great Hy](https://www.permitgraph.org/a/1894/051) | soft story retrofit per sfbc chapter 34b other rational design. | $24,000 |
| [201411101078](https://www.permitgraph.org/p/201411101078) | Nov 10, 2014 | Completed: final sign-off Feb 2015 | [523 05th Av](https://www.permitgraph.org/a/1548/006) | soft story retrofitting per rational design method. | $28,000 |
| [201410158933](https://www.permitgraph.org/p/201410158933) | Oct 15, 2014 | Completed: final sign-off Dec 2014 | [280 Euclid Av](https://www.permitgraph.org/a/1044/015) | soft story retrofit per sfbc chapter 34b other rational design. | $25,000 |
| [201409085626](https://www.permitgraph.org/p/201409085626) | Sep 8, 2014 | Completed: final sign-off Mar 2015 | [305 02nd Av](https://www.permitgraph.org/a/1434/001) | soft story retrofit per national design method | $20,000 |
| [201409085727](https://www.permitgraph.org/p/201409085727) | Sep 8, 2014 | Completed: final sign-off Mar 2015 | [305 02nd Av](https://www.permitgraph.org/a/1434/001) | accessibility compliance triggered by soft story retrofit. upgrade bathroom to full accessible. soft story building permit pa#201409085626 | $6,000 |
| [201408113545](https://www.permitgraph.org/p/201408113545) | Aug 11, 2014 | Completed: final sign-off Dec 2014 | [1946 Washington St](https://www.permitgraph.org/a/0600/006) | soft story retrofitting per national deisgn method soft story retrofit per sfbc ch 34b); maher n/a | $18,000 |
| [201407080719](https://www.permitgraph.org/p/201407080719) | Jul 8, 2014 | Completed: final sign-off Nov 2014 | [356 26th Av](https://www.permitgraph.org/a/1408/027) | soft story retrofitting per national design method. other rational design | $17,000 |
| [201406168416](https://www.permitgraph.org/p/201406168416) | Jun 16, 2014 | Completed: final sign-off Sep 2014 | [1215 Bay St](https://www.permitgraph.org/a/0473/001) | soft story retrofit pe national design method. | $14,000 |
| [201406037335](https://www.permitgraph.org/p/201406037335) | Jun 3, 2014 | Completed: final sign-off Aug 2014 | [300 02nd Av](https://www.permitgraph.org/a/1433/034) | soft story retrofitting per national design method. soft story retrofit per sfbc chapter 34b, other national design. | $18,000 |
| [201402249096](https://www.permitgraph.org/p/201402249096) | Feb 24, 2014 | Completed: final sign-off May 2014 | [154 Cole St](https://www.permitgraph.org/a/1194/014) | revision to pa 201401236911 to clarify the powered door operator control is to be mounted between 36" and 44" above teh finished floor with 30" x 48" adjacent clear floor verify in field existing slo… |  |
| [201401236911](https://www.permitgraph.org/p/201401236911) | Jan 23, 2014 | Completed: final sign-off May 2014 | [154 Cole St](https://www.permitgraph.org/a/1194/014) | seismic upgrade. of first floor. ada door on separate permit. jjc | $18,000 |
| [201312184538](https://www.permitgraph.org/p/201312184538) | Dec 18, 2013 | Completed: final sign-off Jan 2014 | [1695 20th Av](https://www.permitgraph.org/a/1923/016A) | voluntary install holdowns, anchor bolts and plywood on wall on 1/f only. | $5,000 |
| [201310048573](https://www.permitgraph.org/p/201310048573) | Oct 4, 2013 | Never finaled: issued Dec 2013, no final | [2246 Jones St](https://www.permitgraph.org/a/0073/017F) | (1) proposed new retaining wall in front of existing concrete walll with no footing; (2) add 2-c/0205 to (e) 8x10 | $8,000 |
| [201310048570](https://www.permitgraph.org/p/201310048570) | Oct 4, 2013 | Completed: final sign-off May 2014 | [2238 Jones St](https://www.permitgraph.org/a/0073/017) | (1) proposed new retaining wall in front of existing concrete wall with no footing: (2) replacing (e) damaged 8 x 10 with steel beam. | $8,000 |
| [201205090115](https://www.permitgraph.org/p/201205090115) | May 9, 2012 | Completed: final sign-off May 2012 | [1410 32nd Av](https://www.permitgraph.org/a/1822/035) | to comply with notice of violation # 201221641. disconnect and detached roof drain leader on west facing exterior wall. no structural work. | $500 |
| [201111189220](https://www.permitgraph.org/p/201111189220) | Nov 18, 2011 | Completed: final sign-off Dec 2011 | [1626 North Point St](https://www.permitgraph.org/a/0445A/052) | unit # 101 - kitchen remodel: replace cabinet hood/fan. dgi outlet, count4er, faucet, sink, ceiling light, microwaves, ranges, dishwasher | $9,000 |
| [201108051842](https://www.permitgraph.org/p/201108051842) | Aug 5, 2011 | Completed: final sign-off Dec 2011 | [525 Cole St](https://www.permitgraph.org/a/1229/030) | voluntary structural strengthening at 1st floor | $28,000 |
| [201105055397](https://www.permitgraph.org/p/201105055397) | May 5, 2011 | Completed: final sign-off Jun 2011 | [843 Clement St](https://www.permitgraph.org/a/1441/030) | to install new mens and womens handicapped restroom | $15,000 |
| [201012036049](https://www.permitgraph.org/p/201012036049) | Dec 3, 2010 | Completed: final sign-off Feb 2013 | [1731 15th St](https://www.permitgraph.org/a/3555/056) | umb strengthening | $70,000 |
| [201009281752](https://www.permitgraph.org/p/201009281752) | Sep 28, 2010 | Completed: final sign-off Mar 2014 | [1731 15th St](https://www.permitgraph.org/a/3555/056) | life safety improvements including 2 enclosed stairways & lightwell access to bedrooms in rear. new bathrooms & community kitchens. new elevator. new roof terrace. increase number of rooms from 27 to… | $780,000 |
| [201007076078](https://www.permitgraph.org/p/201007076078) | Jul 7, 2010 | Completed: final sign-off Nov 2010 | [655 05th Av](https://www.permitgraph.org/a/1639/013) | kitchen remodel: replace cab. hood/fan. outlet, switches, counter, tile flr. disposal, faucet, sink, ceiling light, diswasher, dryer, stove, washer. bath remodel: replaces tub sink, faucet tile, cab.… | $12,000 |
| [201005031572](https://www.permitgraph.org/p/201005031572) | May 3, 2010 | Completed: final sign-off Jul 2010 | [2361 28th Av](https://www.permitgraph.org/a/2357/004) | kitchen remodel: replace cabinets, hood fan,outlet, switch, counter, hardwood floor, disposal, faucets, sink, dishwasher, cooktop, oven. lighting fixtures to comply with title energy codes. | $9,239 |
| [200911181500](https://www.permitgraph.org/p/200911181500) | Nov 18, 2009 | Completed: final sign-off Jan 2010 | [217 Virginia Av](https://www.permitgraph.org/a/5617/019) | kitchen: replace cabinet, sink, counter top, faucet, outlet(gfi) switch, light, dishwasher & stove. in-kind, non-structural. | $10,800 |
| [200910058328](https://www.permitgraph.org/p/200910058328) | Oct 5, 2009 | Completed: final sign-off Nov 2009 | [1616 16th Av](https://www.permitgraph.org/a/1861B/005C) | new sill anchor bolt on (e) wall footing | $3,800 |
| [200909146720](https://www.permitgraph.org/p/200909146720) | Sep 14, 2009 | Completed: final sign-off Dec 2009 | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | bathroom upgrade: replace toilet, sink, faucet ceiling light, switch. gfi outlet, towel bar tile. | $4,500 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.