# K Bali Construction

Contractor license 965124. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/k-bali-construction-965124
- JSON: https://www.permitgraph.org/api/contractor?license=965124
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=965124

114 permits since 2000: 88 completed, 4 in progress, 11 never finaled, 11 expired or cancelled. Typically 19 days from filing to permit and 158 days from permit to final inspection. Of the 11 never-finaled permits, 2 are 5 to 10 years old, 9 are over 10 years old.

- Based in: Walnut Creek
- On San Francisco permits: Sep 2012 to Oct 2025
- Last 24 months: 5 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2012 | 1 | 0 | 0 | 0 |
| 2013 | 8 | 0 | 0 | 1 |
| 2014 | 9 | 0 | 3 | 3 |
| 2015 | 12 | 0 | 3 | 0 |
| 2016 | 20 | 0 | 3 | 0 |
| 2017 | 8 | 0 | 0 | 0 |
| 2018 | 5 | 0 | 0 | 0 |
| 2019 | 1 | 0 | 0 | 0 |
| 2020 | 5 | 0 | 0 | 1 |
| 2021 | 4 | 0 | 2 | 0 |
| 2022 | 4 | 0 | 0 | 4 |
| 2023 | 4 | 0 | 0 | 2 |
| 2024 | 6 | 0 | 0 | 0 |
| 2025 | 1 | 4 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 10 | 4 | 4 | 1 | 1 | 12 | 146 |
| Kitchen remodel | 19 | 12 | 4 | 1 | 2 | 27 | 198 |
| Roof deck | 1 | 1 | 0 | 0 | 0 | 60 | 90 |
| Stairs | 4 | 4 | 0 | 0 | 0 | 18 | 236 |

## Most recent permits

The 100 most recent of 114.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202510308545](https://www.permitgraph.org/p/202510308545) | Oct 30, 2025 | In progress: issued Nov 2025 | [1530 Leavenworth St](https://www.permitgraph.org/a/0183/022) | units 9-12- remodel (e) kitchen kitchen and remodel (e) bathroom, install (n) washer and dryer and convert (e) kitchen into (n) office space. no additional square footage added. | $300,000 |
| [202509235921](https://www.permitgraph.org/p/202509235921) | Sep 23, 2025 | In progress: issued Oct 2025 | [1530 Leavenworth St](https://www.permitgraph.org/a/0183/022) | units 5, 6, 7 & 8: (e) kitchen relocation, (e) bathroom remodel, (n) washer and dryer. convert (e) kitchen into (n) office. | $300,000 |
| [202509034455](https://www.permitgraph.org/p/202509034455) | Sep 3, 2025 | In progress: issued Sep 2025 | [1530 Leavenworth St](https://www.permitgraph.org/a/0183/022) | revision to pa # 2025-0630-9810. units 1, 2, 3 & 4. (e) kitchen relocation (e) bathroom remodel. (n) washer and dryer- convert (e) kitchen into (n) office. | $28,000 |
| [202508284083](https://www.permitgraph.org/p/202508284083) | Aug 28, 2025 | Completed: final sign-off Apr 2026 | [201 Spear St](https://www.permitgraph.org/a/3741/032) | 18th floor. area of work currently in shell condition. work consist of new partitions, door/frames. new ensuites restroom w/new fixtures. new phone booth, power/data, lighting ,ceiling, millwork and… | $500,000 |
| [202506309810](https://www.permitgraph.org/p/202506309810) | Jun 30, 2025 | In progress: issued Jun 2025 | [1530 Leavenworth St](https://www.permitgraph.org/a/0183/022) | 4 kitchen, 4 bathroom removation. relocation of 4 subpanels and all new circuits w/gfci. 4 new bathroom and 4 kitchen plumbing, new angle stops. 4 new shower pans. | $250,000 |
| [202409120627](https://www.permitgraph.org/p/202409120627) | Sep 12, 2024 | Completed: final sign-off May 2025 | [1004 16th St](https://www.permitgraph.org/a/3833/002) | admin permit to clarify no separate mep permit/plan check required associated with work under ref 202401174087 |  |
| [202408269457](https://www.permitgraph.org/p/202408269457) | Aug 26, 2024 | Completed: final sign-off May 2025 | [1004 16th St](https://www.permitgraph.org/a/3833/002) | revision to pa#202401174087 for valuation only per inspector. | $130,301 |
| [202402065358](https://www.permitgraph.org/p/202402065358) | Feb 6, 2024 | Completed: final sign-off Mar 2024 | [1061 Folsom St](https://www.permitgraph.org/a/3754/041) | administrative permit to document revision to 202205254948(original permit) & 202305097417(rev to original) to an additional of passenger elevator and shaft to replace a demolished elevator and shaft… |  |
| [202401264700](https://www.permitgraph.org/p/202401264700) | Jan 26, 2024 | Completed: final sign-off Mar 2024 | [1200 Market St](https://www.permitgraph.org/a/0355/015) | to obtain final inspection for work approved under pa#: 202206307523, 202206307524, and 202301190368. |  |
| [202401264701](https://www.permitgraph.org/p/202401264701) | Jan 26, 2024 | Completed: final sign-off Mar 2024 | [1200 Market St](https://www.permitgraph.org/a/0355/015) | to obtain final inspection for work approved under pa#: 202202037307, 202202288862, and 202206307517. |  |
| [202401174087](https://www.permitgraph.org/p/202401174087) | Jan 17, 2024 | Completed: final sign-off May 2025 | [1004 16th St](https://www.permitgraph.org/a/3833/002) | change of use to childcare. ti adding 2 restrooms, minor door/wall reconfiguration. mep deferred | $130,289 |
| [202307061574](https://www.permitgraph.org/p/202307061574) | Jul 6, 2023 | Completed: final sign-off Oct 2024 | [1601 Mariposa St](https://www.permitgraph.org/a/4006/006) | tenant improvement new customer area, kitchen and equipment finishes, ceiling and lighting (first time tenant) | $55,000 |
| [202305097417](https://www.permitgraph.org/p/202305097417) | May 9, 2023 | Completed: final sign-off Mar 2024 | [1061 Folsom St](https://www.permitgraph.org/a/3754/041) | rev pa202205254948: updates and addition to details and structural elements. clarification of stair, fire spirnkler and fire alarm reqs and scope. |  |
| [202305097413](https://www.permitgraph.org/p/202305097413) | May 9, 2023 | Completed: final sign-off Mar 2024 | [1061 Folsom St](https://www.permitgraph.org/a/3754/041) | rev pa202204081865: updates to porject scope and changes resulting from building systems coordination. clarification of fire sprinklrs and fire alarm reqs and scope. |  |
| [202305057245](https://www.permitgraph.org/p/202305057245) | May 5, 2023 | Expired or cancelled: cancelled Jan 2024 | [900 16th St](https://www.permitgraph.org/a/3834/001) | change of use to education. t.i., adding (2) restrooms, minor wall/door recongiruation. | $130,289 |
| [202305016834](https://www.permitgraph.org/p/202305016834) | May 1, 2023 | Completed: final sign-off Nov 2023 | [1851 Union St](https://www.permitgraph.org/a/0543/028) | reinstalling (e) demising wall between tenant spaces. new accessible entrance door per 20% rule | $5,000 |
| [202301190368](https://www.permitgraph.org/p/202301190368) | Jan 19, 2023 | Expired or cancelled: expired Mar 2024 | [1200 Market St](https://www.permitgraph.org/a/0355/015) | revision to 202109158511 and 202206307517. relocation of electrical gear and corresponding layout change to kitchen b104. |  |
| [202207289490](https://www.permitgraph.org/p/202207289490) | Jul 28, 2022 | Completed: final sign-off Mar 2024 | [1061 Folsom St](https://www.permitgraph.org/a/3754/041) | revision to pa# 202204081865. removal of fire sprinklers from scope and from approved permit as a deferred submittal. |  |
| [202206307517](https://www.permitgraph.org/p/202206307517) | Jun 30, 2022 | Expired or cancelled: expired Mar 2024 | [1200 Market St](https://www.permitgraph.org/a/0355/015) | basement: revision to 202109158511 to incorporate the modification of size to kitchen b101. the addition of cold storage walk in box b106. removal of kitchen 107 and utility control room is now (e) t… |  |
| [202206307524](https://www.permitgraph.org/p/202206307524) | Jun 30, 2022 | Expired or cancelled: expired Mar 2024 | [1200 Market St](https://www.permitgraph.org/a/0355/015) | 2/f: revision to 202109158499 to incorporate the addition of mechanical chase separation wall and updated finishes. |  |
| [202206307523](https://www.permitgraph.org/p/202206307523) | Jun 30, 2022 | Expired or cancelled: expired Mar 2024 | [1200 Market St](https://www.permitgraph.org/a/0355/015) | ground fl: revision to 202109148433 to incorporate the addition of mechanical chase separation wall updated finishes. |  |
| [202205254948](https://www.permitgraph.org/p/202205254948) | May 25, 2022 | Completed: final sign-off Mar 2024 | [1061 Folsom St](https://www.permitgraph.org/a/3754/041) | upgrade (e) elevator with a new elevator, for the second floor office suite, upgrades include access stair to that space. mechanical and electrical are under a seperate permits pa 202204081865. stair… | $170,526 |
| [202204081865](https://www.permitgraph.org/p/202204081865) | Apr 8, 2022 | Completed: final sign-off Mar 2024 | [1061 Folsom St](https://www.permitgraph.org/a/3754/041) | t.i. ground floor, convert retail store to office space. structural mech, plumbing, electrical upgrades | $999,839 |
| [202202288862](https://www.permitgraph.org/p/202202288862) | Feb 28, 2022 | Expired or cancelled: expired Mar 2024 | [1200 Market St](https://www.permitgraph.org/a/0355/015) | exterior scope includes addition of louvers to existing storefront window. | $1,000 |
| [202202037293](https://www.permitgraph.org/p/202202037293) | Feb 3, 2022 | Completed: final sign-off Mar 2024 | [1200 Market St](https://www.permitgraph.org/a/0355/015) | t.i. mechanical & electrical work associated with food hall and kitchens. | $175,000 |
| [202111172593](https://www.permitgraph.org/p/202111172593) | Nov 17, 2021 | Completed: final sign-off May 2022 | [2104 Hayes St](https://www.permitgraph.org/a/1193/009) | change of use from m occupancy into e occupancy. interior t.i. for pre-school. mep under perferred submittal. all walls to be removed are partition walls. ref pa#201802232088. | $200,000 |
| [202110200873](https://www.permitgraph.org/p/202110200873) | Oct 20, 2021 | Never finaled: issued Oct 2021, no final | [40 Shotwell St](https://www.permitgraph.org/a/3549/055) | for sffd review only ref pa# 202011038082, previoiusly approved by other dept. |  |
| [202109158499](https://www.permitgraph.org/p/202109158499) | Sep 15, 2021 | Completed: final sign-off Mar 2024 | [1200 Market St](https://www.permitgraph.org/a/0355/015) | t.i renovation of 2nd floor. (e) 2 story bldg made of masonary and wood. (n) work includes (n) interior walls, ceilings, lighting, flooring, finises and furnishings. | $330,000 |
| [202109158511](https://www.permitgraph.org/p/202109158511) | Sep 15, 2021 | Completed: final sign-off Mar 2024 | [1200 Market St](https://www.permitgraph.org/a/0355/015) | basement - change of occupancy from restaurant to food preparation factory. t.i renovation of basement. (e) 2 story bldg made of masonary and wood. (n) work includes (n) interior walls, ceiling, ligh… | $496,000 |
| [202109148433](https://www.permitgraph.org/p/202109148433) | Sep 14, 2021 | Completed: final sign-off Mar 2024 | [1200 Market St](https://www.permitgraph.org/a/0355/015) | ti renovation of the ground fl of e 2 story building made of masonry and wood construction. new work in cludes new interior walls, ceilings, lighting, flooring, finishes, furnishings. full nfpa fire… | $350,000 |
| [202106152500](https://www.permitgraph.org/p/202106152500) | Jun 15, 2021 | Never finaled: issued Oct 2021, no final | [518 Brannan St](https://www.permitgraph.org/a/3777/037) | revision to pa 202010096286. life safety plan. additional floor fixtures, wall type, ceiling element added, curb cut note, elevations update to reflect fixtures, finishes update. hvac ducting adjuste… | $10,000 |
| [202011179033](https://www.permitgraph.org/p/202011179033) | Nov 17, 2020 | Completed: final sign-off Oct 2022 | [518 Brannan St](https://www.permitgraph.org/a/3777/037) | repair foundation and retrofit (e) rear of building. ref 202010096286 for ada and change of use & occupancy. | $20,000 |
| [202010096286](https://www.permitgraph.org/p/202010096286) | Oct 9, 2020 | Completed: final sign-off Dec 2022 | [518 Brannan St](https://www.permitgraph.org/a/3777/037) | change of use - white box finishes - for futre retail tenant within an (e) space - demo garage entry door and (e) retail space - demo garage entry door and (e) restroom - install (n) entry door and s… | $352,844 |
| [202009295437](https://www.permitgraph.org/p/202009295437) | Sep 29, 2020 | Expired or cancelled: withdrawn Oct 2020 | [90 Charter Oak Av](https://www.permitgraph.org/a/5370/057) | removed accessibility path of travel in walk-in /freezer. revised landings for the freezer; in freezer remove ramp and fill in with step and added level landing in front of freezer door. revision to… | $500 |
| [202008061212](https://www.permitgraph.org/p/202008061212) | Aug 6, 2020 | Completed: final sign-off Dec 2022 | [518 Brannan St](https://www.permitgraph.org/a/3777/037) | removal of existing drywall(demo work), metal studs, flooring finish work for future t.i. permit.change of use filed under permit #201706028315 | $5,000 |
| [202007220680](https://www.permitgraph.org/p/202007220680) | Jul 22, 2020 | Completed: final sign-off Oct 2020 | [90 Charter Oak Av](https://www.permitgraph.org/a/5370/057) | tenant improvements to the (e) fire sprinkler system 135 sprinklers | $67,500 |
| [202004307282](https://www.permitgraph.org/p/202004307282) | Apr 30, 2020 | Completed: final sign-off Nov 2020 | [90 Charter Oak Av](https://www.permitgraph.org/a/5370/057) | revision to pa#201908300340. split kitchens 101 into (2) kitchens; 101a &101b. corresponding door & finishes revised. enlarge kitchen 140. restrms 143, 154, 153: revised sinks to wall hung sinks. rep… | $8,500 |
| [201908300340](https://www.permitgraph.org/p/201908300340) | Aug 30, 2019 | Completed: final sign-off Jul 2021 | [90 Charter Oak Av](https://www.permitgraph.org/a/5370/057) | (n) interior non-bearing partitions, ceilings & finishes. (n) doors & windows @(e) bldg facade. (n) hvac system & kitchen exhaust system. provide necessary control for all systems. (n) elec throught.… | $3,750,000 |
| [201811216561](https://www.permitgraph.org/p/201811216561) | Nov 21, 2018 | Completed: final sign-off Dec 2019 | [55 Division St](https://www.permitgraph.org/a/3911/001) | change bldg address to tenant addresses filed under permit #2017-09-06-7003, (1 henry adams) to 55 division, 57 division, 61 division. |  |
| [201811065057](https://www.permitgraph.org/p/201811065057) | Nov 6, 2018 | Completed: final sign-off Jan 2019 | [934 Howard St](https://www.permitgraph.org/a/3725/014) | to obtain final inspection for work approved under pa 2013-0416-4687. all work is complete. |  |
| [201809119791](https://www.permitgraph.org/p/201809119791) | Sep 11, 2018 | Completed: final sign-off May 2019 | [633 08th St](https://www.permitgraph.org/a/3783/012) | non-structural interior constructions & (n) finishes in an (e) vacant space. scope includes mep. change of use from vacant mercantile (m) to daycare (i.4) on ground floor, ste a-3 | $25,000 |
| [201803153771](https://www.permitgraph.org/p/201803153771) | Mar 15, 2018 | Completed: final sign-off Aug 2018 | [210 Grant Av](https://www.permitgraph.org/a/0293/007) | ti - finishes, ele & lighting fixtures, da-05 compliance, no structural, plm or mech | $95,000 |
| [201803052885](https://www.permitgraph.org/p/201803052885) | Mar 5, 2018 | Completed: final sign-off Jun 2019 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | soft demo per ab-017. demo (e) mezzanine and first floor partition walls, dog pool, and ramp, chip out concrete, sandblast as noted. exploratory demo at slab to locate underground plumbing. n/a for m… | $10,000 |
| [201711224725](https://www.permitgraph.org/p/201711224725) | Nov 22, 2017 | Completed: final sign-off Jan 2018 | [3233 Sacramento St](https://www.permitgraph.org/a/1022/023) | replace existing (4) windows at same openings of retail level , apply new siding, less than 100 sq ft at rear of bldg, not visible to the street. no interior work. u-factor <0.58, rshgc<0.41, vt>0.42 | $30,000 |
| [201710262311](https://www.permitgraph.org/p/201710262311) | Oct 26, 2017 | Completed: final sign-off Mar 2020 | [525 Phelps St](https://www.permitgraph.org/a/5242/015) | remodel existing warehouse space with new retractable roof, new windows @ phelps st facade. new polycarbonate wall @galvez st facade. extend fire sprinkler where required @ new rooms - sprinkler unde… | $400,000 |
| [201709067003](https://www.permitgraph.org/p/201709067003) | Sep 6, 2017 | Completed: final sign-off Dec 2019 | [1 Henry Adams St](https://www.permitgraph.org/a/3911/001) | first time tenant improvement for restaurant. ** maher: n/a ** | $707,000 |
| [201708296223](https://www.permitgraph.org/p/201708296223) | Aug 29, 2017 | Completed: final sign-off Jan 2019 | [934 Howard St](https://www.permitgraph.org/a/3725/014) | base bldg improvement of e 3 story bldg. replace e freight elevator , new accessible passenger elevator, new partitoins for new tenant spaces and monor storefront modification on mary street facade.… | $160,000 |
| [201707212577](https://www.permitgraph.org/p/201707212577) | Jul 21, 2017 | Completed: final sign-off Jun 2018 | [392 Fulton St](https://www.permitgraph.org/a/0785/064) | administration permit to address change to pa#201608185378, 201704043120, 201704144019, 201707202529, change from 388 fulton to 392 fulton. |  |
| [201706068628](https://www.permitgraph.org/p/201706068628) | Jun 6, 2017 | Completed: final sign-off Jan 2018 | [517 York St](https://www.permitgraph.org/a/4015/007) | to obtain final inspection for work approved under pa #201301319195 & #201511122361. all work is complete. |  |
| [201704043120](https://www.permitgraph.org/p/201704043120) | Apr 4, 2017 | Completed: final sign-off Aug 2018 | [388 Fulton St](https://www.permitgraph.org/a/0785/051) | mep work for deffered submittal 201608185378 for ti- (e) retail space to become a limited bakery | $60,000 |
| [201701197510](https://www.permitgraph.org/p/201701197510) | Jan 19, 2017 | Completed: final sign-off Jun 2017 | [450 Hayes St](https://www.permitgraph.org/a/0808/146) | revision to app#201601207535 - structural as built/field revision, framing conditions. n/a for maher |  |
| [201612134844](https://www.permitgraph.org/p/201612134844) | Dec 13, 2016 | Completed: final sign-off Mar 2017 | [1355 Market St](https://www.permitgraph.org/a/3508/001) | reference app#201610039422. title 24 only. n/a for maher |  |
| [201612074351](https://www.permitgraph.org/p/201612074351) | Dec 7, 2016 | Completed: final sign-off Jun 2018 | [580 Hayes St](https://www.permitgraph.org/a/0807/010) | #2- interior t.i. to consist of a new business space with supporting kitchen, public area & restroom. kitchen to include walk-in cooler with new mechanical, electrical & plumbing. public area to cons… | $250,000 |
| [201611102453](https://www.permitgraph.org/p/201611102453) | Nov 10, 2016 | Completed: final sign-off Apr 2017 | [2201 Fillmore St](https://www.permitgraph.org/a/0630/009) | t. i. an ice cream shop from former evolution fresh (limited restaurant), no added square footage, no change of use, no change in occupancy type. add kitchen, new electrical plumbing work, new awning. | $45,000 |
| [201610200841](https://www.permitgraph.org/p/201610200841) | Oct 20, 2016 | Completed: final sign-off Jun 2017 | [450 Hayes St](https://www.permitgraph.org/a/0808/146) | all work to remain within the interior shell of the (e) building. no exterior work - no increase of sq footage. soft demo, ab-017 | $2,000 |
| [201610200844](https://www.permitgraph.org/p/201610200844) | Oct 20, 2016 | Completed: final sign-off Dec 2016 | [224 Kearny St](https://www.permitgraph.org/a/0288/029) | provide new lighting and branch circuiting to extg panel. maintained some of the extg power and signal outlets and provided additional new power branch circuiting and raceway systems as required to n… |  |
| [201610039422](https://www.permitgraph.org/p/201610039422) | Oct 3, 2016 | Completed: final sign-off Mar 2017 | [1355 Market St](https://www.permitgraph.org/a/3508/001) | 1st floor: ti - to a food service kiosk within an (e) food court. the scope includes new fixtures, finishes and plumbing. mech/ele/plumb, lighting & life safety under sep permit. no exterior work. ma… | $18,941 |
| [201608124889](https://www.permitgraph.org/p/201608124889) | Aug 12, 2016 | Completed: final sign-off Nov 2016 | [2030 Union St](https://www.permitgraph.org/a/0532/009) | ada improvement/parital barrier removal only. | $8,000 |
| [201608013864](https://www.permitgraph.org/p/201608013864) | Aug 1, 2016 | Completed: final sign-off Dec 2016 | [224 Kearny St](https://www.permitgraph.org/a/0288/029) | interior improvements to accomodate new ground flr quick service restaurant. the scope includes new walls, fictures, finishes & plumbing. ele/plumb/light/life safety work under sep permit - design bu… | $46,000 |
| [201607293710](https://www.permitgraph.org/p/201607293710) | Jul 29, 2016 | Completed: final sign-off Mar 2017 | [1000 16th St](https://www.permitgraph.org/a/3833/002) | 1st time tenant improvement new non-structural of tea cafe on the ground floor of multi-story bldg w/ associated arch, plumbing, mechanical & electrical. no exterior work. no new fsd's. new construct… | $75,000 |
| [201606240847](https://www.permitgraph.org/p/201606240847) | Jun 24, 2016 | Never finaled: issued Jun 2016, no final | [2325 Polk St](https://www.permitgraph.org/a/0547/002B) | revision to ref pa 2015 0910 6596: revise bathroom layout | $1,000 |
| [201605207947](https://www.permitgraph.org/p/201605207947) | May 20, 2016 | Completed: final sign-off May 2016 | [8 Octavia St](https://www.permitgraph.org/a/0855/055) | for administrative purposes only to add suite/unit 308 for permits 2015-0623-9674, 2016-0307-1379, 2016-0322-2675 and 2016-0107-6527 |  |
| [201605208028](https://www.permitgraph.org/p/201605208028) | May 20, 2016 | Completed: final sign-off May 2016 | [8 Octavia St](https://www.permitgraph.org/a/0855/055) | erect a non-electric projecting double faced sign. | $400 |
| [201605036435](https://www.permitgraph.org/p/201605036435) | May 3, 2016 | Completed: final sign-off Jul 2016 | [400 Eddy St](https://www.permitgraph.org/a/0334/005) | title 24 only. ref arch #201602038716. n/a for maher | $5,000 |
| [201604265740](https://www.permitgraph.org/p/201604265740) | Apr 26, 2016 | Never finaled: issued Apr 2016, no final | [329 Kearny St](https://www.permitgraph.org/a/0270/003) | added lighting/title 24 work to previous permit #201601257897 | $1,000 |
| [201604225536](https://www.permitgraph.org/p/201604225536) | Apr 22, 2016 | Completed: final sign-off Apr 2016 | [101 Spear St](https://www.permitgraph.org/a/3716/023) | revision to app#201603020962. project under construction. remove ansul from drawings and provide fire protection per ab-005. n/a maher |  |
| [201603081528](https://www.permitgraph.org/p/201603081528) | Mar 8, 2016 | Completed: final sign-off Nov 2016 | [2300 26th St](https://www.permitgraph.org/a/4280/025) | rear building. change of occupancy to b (office) throughout. hvac and lighting under seperate permits. ** maher: n/a ** | $100 |
| [201603020962](https://www.permitgraph.org/p/201603020962) | Mar 2, 2016 | Completed: final sign-off Apr 2016 | [101 Spear St](https://www.permitgraph.org/a/3716/023) | minor non-structural remodel to existing restaurant to include changes to customer serving area. changes to prep room adjacent to serving area. maher na | $35,250 |
| [201602109211](https://www.permitgraph.org/p/201602109211) | Feb 10, 2016 | Completed: final sign-off Nov 2016 | [2300 26th St](https://www.permitgraph.org/a/4280/025) | front building. change of occupancy to b (office) throughout. hvac and lighting under seperate permits. ** maher: n/a ** | $100 |
| [201602038716](https://www.permitgraph.org/p/201602038716) | Feb 3, 2016 | Completed: final sign-off Jul 2016 | [400 Eddy St](https://www.permitgraph.org/a/0334/005) | mechanical revision to 201510190065 | $1,000 |
| [201601257897](https://www.permitgraph.org/p/201601257897) | Jan 25, 2016 | Completed: final sign-off Jun 2016 | [329 Kearny St](https://www.permitgraph.org/a/0270/003) | demolish storage loft, service counter. build new service counter. alter basement to add walk in refrigeration and new office . bring everything up to current sfdph requirements | $26,000 |
| [201601207535](https://www.permitgraph.org/p/201601207535) | Jan 20, 2016 | Completed: final sign-off Jun 2017 | [450 Hayes St](https://www.permitgraph.org/a/0808/039) | change of use: tenant improvement of g/f space previously approved as retail to a new restaurant. ** maher: n/a ** | $312,400 |
| [201601076525](https://www.permitgraph.org/p/201601076525) | Jan 7, 2016 | Never finaled: issued Jan 2016, no final | [119 Ellis St](https://www.permitgraph.org/a/0330/023) | soft demo to make vacant space market ready. remove existing floor tiles | $1,000 |
| [201601076527](https://www.permitgraph.org/p/201601076527) | Jan 7, 2016 | Completed: final sign-off Jan 2016 | [8 Octavia St](https://www.permitgraph.org/a/0855/053) | soft demo non-structural ab-17 | $1,000 |
| [201511203242](https://www.permitgraph.org/p/201511203242) | Nov 20, 2015 | Completed: final sign-off May 2018 | [799 Battery St](https://www.permitgraph.org/a/0165/021) | add & relocate fire sprinklers to the tenant space. ref pa 2015-0508-5771 | $3,500 |
| [201511122361](https://www.permitgraph.org/p/201511122361) | Nov 12, 2015 | Completed: final sign-off Jan 2018 | [517 York St](https://www.permitgraph.org/a/4015/007) | revision to pa 2013-0131-9195, accoustic enclosure for power tool shop room w/in (e) space; add glass walls at production planning room; change exit door to out swinging. hvac, lighting, and sprinkle… | $25,000 |
| [201510190065](https://www.permitgraph.org/p/201510190065) | Oct 19, 2015 | Completed: final sign-off Jul 2016 | [400 Eddy St](https://www.permitgraph.org/a/0334/005) | build out kitchen, restroom , and bar on ground floor. buildout 3 restrooms and bar in basement & storage rooms. new finishes, equipment and lighting. replace extg windows and doors on facade. replac… | $800,000 |
| [201509217598](https://www.permitgraph.org/p/201509217598) | Sep 21, 2015 | Completed: final sign-off Aug 2016 | [330 Gough St](https://www.permitgraph.org/a/0816/009) | revision to pa 2014 0604 7456 r2 restaurant ti- include interior walls, floor & ceiling finishes, kitchen equipment, restrooms, and light fixtures. sprinklers under seperate permit. maher na | $220,000 |
| [201509116733](https://www.permitgraph.org/p/201509116733) | Sep 11, 2015 | Completed: final sign-off Feb 2016 | [799 Battery St](https://www.permitgraph.org/a/0165/021) | revision to appn. 201505085771; framing at storage; maher n/a | $40,000 |
| [201509106596](https://www.permitgraph.org/p/201509106596) | Sep 10, 2015 | Never finaled: issued May 2016, no final | [2325 Polk St](https://www.permitgraph.org/a/0547/002B) | ti- demo (e) space and new build out of leased space in an (e). exterior bld scope includes new structural partitions, new ceiling, new finishes & associated mechanical and plumbing work. maher na | $250,000 |
| [201508184512](https://www.permitgraph.org/p/201508184512) | Aug 18, 2015 | Never finaled: issued Oct 2015, no final | [1001 Guerrero St](https://www.permitgraph.org/a/3633/019) | health dept record keeping - remodel existing restroom to make ada accessible performed under approved permit 2015-0115-5884 |  |
| [201507292755](https://www.permitgraph.org/p/201507292755) | Jul 29, 2015 | Completed: final sign-off Feb 2016 | [1520 Fillmore St](https://www.permitgraph.org/a/0708/012) | cosmetic remodel of extg restaurant. new equipment, finishes, ada restroom, interior ada slope. demolition under seperate permit. lighting, med, deferred submital. | $112,000 |
| [201507080949](https://www.permitgraph.org/p/201507080949) | Jul 8, 2015 | Completed: final sign-off Feb 2016 | [1520 Fillmore St](https://www.permitgraph.org/a/0708/012) | demolition of existing interior space to include removal of all surface mounted fixture, tiles on floor, wood counter bar, kitchen plumbing fixtures, walk in refrigerator, door, and stair railing. de… | $30,000 |
| [201506290169](https://www.permitgraph.org/p/201506290169) | Jun 29, 2015 | Completed: final sign-off Oct 2015 | [1001 Guerrero St](https://www.permitgraph.org/a/3633/019) | electrical work for title 24/lighting interior lighting | $4,000 |
| [201506239674](https://www.permitgraph.org/p/201506239674) | Jun 23, 2015 | Completed: final sign-off May 2016 | [8 Octavia St](https://www.permitgraph.org/a/0855/052) | first time tenant improvement. 312 notification of (n) restaurant. (n) restaurant in (e) shall space, w/ electrical, plumbing, mechanical. n/a for maher ordinance. | $1,000 |
| [201506199482](https://www.permitgraph.org/p/201506199482) | Jun 19, 2015 | Never finaled: issued Jun 2015, no final | [101 Spear St](https://www.permitgraph.org/a/3716/023) | 1st floor suite a2: hair salon t.i. including electrical for new configuration of interior finishes, remove utility sink, new lighting and fixtures. maher n/a. | $50,000 |
| [201505186536](https://www.permitgraph.org/p/201505186536) | May 18, 2015 | Completed: final sign-off Jun 2015 | [755 Brannan St](https://www.permitgraph.org/a/3784/181) | add ramp and landing to connect levels for building maintenance service. barrier removal. | $500 |
| [201503201437](https://www.permitgraph.org/p/201503201437) | Mar 20, 2015 | Completed: final sign-off Sep 2015 | [68 04th St](https://www.permitgraph.org/a/3705/004) | ground level: bar renovation in like kind. equipment replacement, reconfiguring, upgrade finishes and flooring. restrooms to be upgrades to meet acessibility req's. mep to be design/build under seper… | $30,000 |
| [201501155884](https://www.permitgraph.org/p/201501155884) | Jan 15, 2015 | Completed: final sign-off Mar 2015 | [1001 Guerrero St](https://www.permitgraph.org/a/3633/019) | g/f - vacant space; barrier removal for ada bathroom. n/a ordinance #155-13 | $10,000 |
| [201410280147](https://www.permitgraph.org/p/201410280147) | Oct 28, 2014 | Completed: final sign-off Dec 2014 | [3580 California St](https://www.permitgraph.org/a/1018/019) | ste. 202: minor revision to ada restroom only. reference permit # 201409307655. |  |
| [201410239769](https://www.permitgraph.org/p/201410239769) | Oct 23, 2014 | Completed: final sign-off Nov 2014 | [431 Bryant St](https://www.permitgraph.org/a/3775/093) | revision appl. 2014.0521.6408. to add a new kitchenette per plan. maher n/a. | $2,500 |
| [201409307655](https://www.permitgraph.org/p/201409307655) | Sep 30, 2014 | Completed: final sign-off Dec 2014 | [3580 California St](https://www.permitgraph.org/a/1018/019) | suite #202: revision to app#201408214427. revised layout to incorporate extg structural wall to remain. |  |
| [201408284920](https://www.permitgraph.org/p/201408284920) | Aug 28, 2014 | Expired or cancelled: expired Dec 2025 | [919 Cortland Av](https://www.permitgraph.org/a/5660/018) | revision to pa#201405307147, change in plan layout, remove non-ada bath. |  |
| [201408214364](https://www.permitgraph.org/p/201408214364) | Aug 21, 2014 | Completed: final sign-off Jul 2015 | [246 Shipley St](https://www.permitgraph.org/a/3753/113) | shell improvement of existing 1-story building w/mezzanine. enlarge existing windows on falmouth st side & additoin of awnings. additoin of 6 new skylights. n/a maher ordinance | $50,000 |
| [201408194205](https://www.permitgraph.org/p/201408194205) | Aug 19, 2014 | Never finaled: issued Aug 2014, no final | [376 Utah St](https://www.permitgraph.org/a/3961/022) | revision to app#201406097814. sidewalk repair, curb replacement, provide reinstalled driveway for one garage door in lieu of extg 2 garage bays.n/a for the maher ordinance #155-13 | $25,000 |
| [201407010258](https://www.permitgraph.org/p/201407010258) | Jul 1, 2014 | Expired or cancelled: expired Dec 2025 | [919 Cortland Av](https://www.permitgraph.org/a/5660/018) | for planning purpose-change of use only from "limited restaurant" to "full service restaurant", reference work per pa #201405307147. no work under this permit. |  |
| [201406188738](https://www.permitgraph.org/p/201406188738) | Jun 18, 2014 | Completed: final sign-off Dec 2014 | [564 04th St](https://www.permitgraph.org/a/3777/020) | t.i. for (n) a-2 restaurant work includes (n) fixtures, finishes, mechanical lift, equipment, mep. no exterior work. fire protection under separate permit. n/a maher ordinance | $220,000 |
| [201406097814](https://www.permitgraph.org/p/201406097814) | Jun 9, 2014 | Completed: final sign-off Mar 2015 | [376 Utah St](https://www.permitgraph.org/a/3961/022) | chagne of use from auto repair to warehouse storage. tenant improvement, new walls, plumbing (2 restrooms & break area) electrical, lighting, hvac, refrigeration equip. for walk-in, cold rooms, new s… | $275,000 |
| [201406057652](https://www.permitgraph.org/p/201406057652) | Jun 5, 2014 | Completed: final sign-off Sep 2014 | [3245 21st St](https://www.permitgraph.org/a/3616/069) | remodel first floor per plan. kitchen and batroom remodel. new posts and beam. | $75,000 |
| [201405307147](https://www.permitgraph.org/p/201405307147) | May 30, 2014 | Never finaled: issued Jun 2014, no final | [919 Cortland Av](https://www.permitgraph.org/a/5660/018) | change from a pizza restaurant to a fam style dinner restaurant. renovate including (n) plbg, (n) electrical, (n) lighting, (n) kitchen w/new finishes. (n) flooring, (n) gyp bd, ceiling walls, (n) pa… | $150,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.