# Jta Construction Inc.

Contractor license 1021185. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/jta-construction-inc-1021185
- JSON: https://www.permitgraph.org/api/contractor?license=1021185
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1021185

9 permits since 2000: 7 completed, 2 never finaled. Typically 0 days from filing to permit and 153 days from permit to final inspection. Of the 2 never-finaled permits, 2 are 3 to 5 years old.

- Based in: Hickman
- On San Francisco permits: Dec 2020 to Sep 2023
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2020 | 1 | 0 | 0 | 0 |
| 2022 | 1 | 0 | 2 | 0 |
| 2023 | 5 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 1 | 1 | 0 | 0 | 0 | 30 | 768 |
| Bathroom remodel | 8 | 6 | 0 | 2 | 0 | 0 | 144 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202309297714](https://www.permitgraph.org/p/202309297714) | Sep 29, 2023 | Completed: final sign-off May 2024 | [10 Miller Pl](https://www.permitgraph.org/a/0224/038) | unit #602: bathroom remodel with shower stall, fixtures, & finishes to be replaced in kind. no structural changes. | $21,000 |
| [202309186842](https://www.permitgraph.org/p/202309186842) | Sep 18, 2023 | Completed: final sign-off Nov 2023 | [826 Moultrie St](https://www.permitgraph.org/a/5810/005) | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $20,000 |
| [202307182423](https://www.permitgraph.org/p/202307182423) | Jul 18, 2023 | Completed: final sign-off Dec 2023 | [835 14th St](https://www.permitgraph.org/a/3541/077) | main bathroom remodel (50 sq t) change layout from tub to walk in curbless shower wall mounted double sink vanity add exhaust fan,fixtures to be replacced in kind | $23,000 |
| [202306270999](https://www.permitgraph.org/p/202306270999) | Jun 27, 2023 | Completed: final sign-off Nov 2023 | [834 Moultrie St](https://www.permitgraph.org/a/5810/008) | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $19,000 |
| [202305097400](https://www.permitgraph.org/p/202305097400) | May 9, 2023 | Completed: final sign-off Sep 2023 | [207 Randall St](https://www.permitgraph.org/a/6664/078) | rev to pa# 2023-0419-6027: to remodel (e) bathroom upper level add one sink fixture |  |
| [202208029738](https://www.permitgraph.org/p/202208029738) | Aug 2, 2022 | Completed: final sign-off Jan 2023 | [1450 Phelps St](https://www.permitgraph.org/a/5320/034) | two bathroom remodels in-kind. no structural. no changes to walls. bath a) 44 sqft 3/4 bath on 2nd floor, replace existing with (n) curbed shower, toilet/bidet & vanity. bath b) 47 sqft full bath on… | $29,000 |
| [202203150024](https://www.permitgraph.org/p/202203150024) | Mar 15, 2022 | Never finaled: issued Mar 2022, no final | [850 Powell St](https://www.permitgraph.org/a/0243/087) | one 100 sqft master bathroom remodel on 6th floor- replace existing with (n) toilet, vanity, all (n) fixtures and finishes curbed shower and soaking tub no structural. no changes to walls or openings. | $15,000 |
| [202203049246](https://www.permitgraph.org/p/202203049246) | Mar 4, 2022 | Never finaled: issued Mar 2022, no final | [850 Powell St](https://www.permitgraph.org/a/0243/087) | unit #603. one 28 sqft bathroom remodel in-kind. no structural, no changes to walls or openings. replace existing with (n) toilet & vanity. all (n) fixtures & finishes. | $14,000 |
| [202012151029](https://www.permitgraph.org/p/202012151029) | Dec 15, 2020 | Completed: final sign-off Feb 2023 | [222 Cherry St](https://www.permitgraph.org/a/0992/027) | 3rd floor unit #222: remodel (e) kitchen. remove non bearing wall between dining room and kitchen. install new light fixtures. | $9,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/jta-construction-inc-1021185.
