# Jose Olmos Construction Inc.

Contractor license 801087. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/jose-olmos-construction-inc-801087
- JSON: https://www.permitgraph.org/api/contractor?license=801087
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=801087

20 permits since 2000: 19 completed, 1 never finaled. Typically 0 days from filing to permit and 72 days from permit to final inspection. Of the 1 never-finaled permit, 1 is over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Feb 2002 to Nov 2013
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2002 | 2 | 0 | 0 | 0 |
| 2003 | 1 | 0 | 0 | 0 |
| 2004 | 4 | 0 | 0 | 0 |
| 2005 | 1 | 0 | 0 | 0 |
| 2008 | 1 | 0 | 0 | 0 |
| 2009 | 1 | 0 | 1 | 0 |
| 2010 | 2 | 0 | 0 | 0 |
| 2011 | 5 | 0 | 0 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2013 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 5 | 5 | 0 | 0 | 0 | 0 | 72 |
| Deck | 1 | 1 | 0 | 0 | 0 | 0 | 54 |
| Bathroom remodel | 4 | 4 | 0 | 0 | 0 | 0 | 168 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201311131765](https://www.permitgraph.org/p/201311131765) | Nov 13, 2013 | Completed: final sign-off Jan 2014 | [570 Roosevelt Wy](https://www.permitgraph.org/a/2628/109) | repair bathrooms: leaking toilet cause damage in 2 bathroom, insurance open walls and floor to dry. repair damage, install 2 shower pan, change 1 bath tub, cover walls, install new tile in kind. no c… | $21,000 |
| [201207195286](https://www.permitgraph.org/p/201207195286) | Jul 19, 2012 | Completed: final sign-off Aug 2012 | [2291 14th Av](https://www.permitgraph.org/a/2335A/015B) | replaced damaged trim & siding around windows located in the back side of the house. | $2,950 |
| [201105176178](https://www.permitgraph.org/p/201105176178) | May 17, 2011 | Completed: final sign-off Aug 2011 | [1030 Brazil Av](https://www.permitgraph.org/a/6073/001D) | remove brick planters. repair exposed stucco as necessary in kind. | $1,400 |
| [201105095601](https://www.permitgraph.org/p/201105095601) | May 9, 2011 | Completed: final sign-off Jul 2011 | [4650 18th St](https://www.permitgraph.org/a/2658/016) | front statirs, fix damage, replace balusters in kind. less than 50% repair | $3,400 |
| [201105095598](https://www.permitgraph.org/p/201105095598) | May 9, 2011 | Completed: final sign-off Jul 2011 | [4652 18th St](https://www.permitgraph.org/a/2658/016A) | front stairs. repair damage replace balusters in kind, less than 50% repair | $3,600 |
| [201105095603](https://www.permitgraph.org/p/201105095603) | May 9, 2011 | Completed: final sign-off Jul 2011 | [4656 18th St](https://www.permitgraph.org/a/2658/017) | front stairs, fix damage, replace balusters in kind. less than 50% repair | $3,150 |
| [201101258934](https://www.permitgraph.org/p/201101258934) | Jan 25, 2011 | Completed: final sign-off Mar 2011 | [538 Munich St](https://www.permitgraph.org/a/6281/004C) | repair dry rot damage to front stairway and landing. (limited to not more than 50% replacement of the structural). | $7,200 |
| [201008178976](https://www.permitgraph.org/p/201008178976) | Aug 17, 2010 | Completed: final sign-off Jul 2011 | [208 Chenery St](https://www.permitgraph.org/a/6685/003) | add 2 new bedrooms, remodel e bathroom and e playroom on 1st floor and connect with 2nd fl with new stair | $110,000 |
| [201003047565](https://www.permitgraph.org/p/201003047565) | Mar 4, 2010 | Completed: final sign-off Mar 2010 | [1030 Brazil Av](https://www.permitgraph.org/a/6073/001D) | (2 rooms) remove carpet on 1st fl. replace sub-floor and its frame joist as needed 2" slab rough proxfing concrete. | $6,700 |
| [200906120385](https://www.permitgraph.org/p/200906120385) | Jun 12, 2009 | Never finaled: issued Jun 2009, no final | [1026 Diamond St](https://www.permitgraph.org/a/6545/005) | replace existing siding exterior wall (north) in kind. 3/8 plywood paper 2 siding is not visable from street. | $6,200 |
| [200905138287](https://www.permitgraph.org/p/200905138287) | May 13, 2009 | Completed: final sign-off Jul 2009 | [40 Hartford St](https://www.permitgraph.org/a/3582/043) | wokk @ unit# 42 only. remodel existing bathroom on the 2nd floor. no structural change. new fixture. toilet, floor. dry wall., lighting, shower. | $12,000 |
| [200803217717](https://www.permitgraph.org/p/200803217717) | Mar 21, 2008 | Completed: final sign-off Apr 2008 | [1518 33rd Av](https://www.permitgraph.org/a/1878/010) | remove non bearing wall and install new non bearing partition to extend studio/office. | $6,500 |
| [200509082359](https://www.permitgraph.org/p/200509082359) | Sep 8, 2005 | Completed: final sign-off Nov 2005 | [35 Hiliritas Av](https://www.permitgraph.org/a/7552/024) | replace (e) dry rotted wood deck in kind. | $6,250 |
| [200411108965](https://www.permitgraph.org/p/200411108965) | Nov 10, 2004 | Completed: final sign-off May 2005 | [1064 Shotwell St](https://www.permitgraph.org/a/6519/010) | rebuild required 2nd means of egress in rear. | $11,000 |
| [200410156874](https://www.permitgraph.org/p/200410156874) | Oct 15, 2004 | Completed: final sign-off May 2005 | [1064 Shotwell St](https://www.permitgraph.org/a/6519/010) | new sheetrock & insulation top unit front rooms.interior work only rev#200408171789. | $4,650 |
| [200409204613](https://www.permitgraph.org/p/200409204613) | Sep 20, 2004 | Completed: final sign-off May 2005 | [1064 Shotwell St](https://www.permitgraph.org/a/6519/010) | replace 6 wood windows sash at the front house (in kind) replace 6 wood windows for wood & vinyl win | $6,280 |
| [200401234677](https://www.permitgraph.org/p/200401234677) | Jan 23, 2004 | Completed: final sign-off Nov 2004 | [1919 Sacramento St](https://www.permitgraph.org/a/0641/010) | remodel existing bathrooms as per plans provided. no structural work. minor interior remodel. | $62,000 |
| [200310238363](https://www.permitgraph.org/p/200310238363) | Oct 23, 2003 | Completed: final sign-off May 2004 | [506 Rockdale Dr](https://www.permitgraph.org/a/2955A/017) | items 4a &6a only of termite report#36875. 4a repair dry rot damage to front stairs, abotment 6a-rep | $8,470 |
| [200208133827](https://www.permitgraph.org/p/200208133827) | Aug 13, 2002 | Completed: final sign-off Sep 2002 | [537 Panorama Dr](https://www.permitgraph.org/a/2792/029) | repair dry rot damage at side of chimney area. re-stucco it. repair framing at front balcony in kind | $2,400 |
| [200202159312](https://www.permitgraph.org/p/200202159312) | Feb 15, 2002 | Completed: final sign-off Mar 2002 | [444 30th St](https://www.permitgraph.org/a/6639/015) | repair the front bay window. open 24 sq feet | $1,500 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/jose-olmos-construction-inc-801087.
