# Jian Construction Company

Contractor license 929718. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/jian-construction-company-929718
- JSON: https://www.permitgraph.org/api/contractor?license=929718
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=929718

32 permits since 2000: 23 completed, 2 in progress, 3 never finaled, 4 expired or cancelled. Typically 20 days from filing to permit and 185 days from permit to final inspection. Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.

- Based in: San Francisco
- On San Francisco permits: May 2011 to Nov 2026
- Last 24 months: 2 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2011 | 1 | 0 | 0 | 0 |
| 2013 | 0 | 0 | 0 | 1 |
| 2016 | 1 | 0 | 0 | 0 |
| 2017 | 5 | 0 | 0 | 0 |
| 2018 | 4 | 0 | 2 | 1 |
| 2019 | 2 | 0 | 0 | 0 |
| 2020 | 2 | 0 | 0 | 0 |
| 2021 | 2 | 0 | 0 | 1 |
| 2022 | 1 | 0 | 1 | 1 |
| 2023 | 3 | 0 | 0 | 0 |
| 2024 | 2 | 0 | 0 | 0 |
| 2026 | 0 | 2 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Roof deck | 3 | 2 | 0 | 0 | 1 | 107 | 457 |
| Bathroom remodel | 8 | 6 | 0 | 0 | 2 | 41 | 242 |
| Deck | 2 | 1 | 0 | 1 | 0 | 114 | 218 |
| Kitchen remodel | 7 | 6 | 0 | 1 | 0 | 1 | 199 |
| Stairs | 4 | 4 | 0 | 0 | 0 | 13 | 140 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202611170879](https://www.permitgraph.org/p/202611170879) | Nov 17, 2026 | In progress: issued Nov 2026 | [166 Hale St](https://www.permitgraph.org/a/5879/018) | to comply with nov#202660552. repair fire damage at bedroom #2 on 2nd floor. (no structural or framing damage) | $3,000 |
| [202602186105](https://www.permitgraph.org/p/202602186105) | Mar 9, 2026 | In progress: issued Sep 2026 | [175 Margaret Av](https://www.permitgraph.org/a/7060/027) | remove unauthorized dwelling unit at garage & basement level constructed by previous tenant without owner knowledge; in response to nov 202299348 & 202298988; reinstate garage;remove plyw'd at int. o… | $41,200 |
| [202410314136](https://www.permitgraph.org/p/202410314136) | Oct 31, 2024 | Completed: final sign-off Jan 2025 | [6 Girard St](https://www.permitgraph.org/a/5923/001A) | to comply w/ nov 202426913: remove ground fl wet bar & powder room. legalized ground fl full bathroom, replace 1 damaged post | $15,000 |
| [202405021270](https://www.permitgraph.org/p/202405021270) | May 2, 2024 | Completed: final sign-off Sep 2024 | [648 Sweeny St](https://www.permitgraph.org/a/5862/014) | kitchen remodel: removing old cabinets, faucet, sink, and replace w/ new. no moving walls. | $18,000 |
| [202309086190](https://www.permitgraph.org/p/202309086190) | Sep 8, 2023 | Completed: final sign-off Oct 2023 | [191 18th Av](https://www.permitgraph.org/a/1378/044) | backyard stair repair less than 50%- common area | $4,000 |
| [202306129831](https://www.permitgraph.org/p/202306129831) | Jun 12, 2023 | Completed: final sign-off Sep 2023 | [3420 Balboa St](https://www.permitgraph.org/a/1578/014D) | accessible business entrance program per ordinance 51-16: install power door operator & install beverage work counter. abe 201911128030 | $15,000 |
| [202303143679](https://www.permitgraph.org/p/202303143679) | Mar 14, 2023 | Completed: final sign-off Jun 2023 | [313 02nd Av](https://www.permitgraph.org/a/1434/047) | apt #1: kitchen remodeling (1). no alteration of wall, window and door. | $3,000 |
| [202212309587](https://www.permitgraph.org/p/202212309587) | Dec 30, 2022 | Expired or cancelled: cancelled Jan 2026 | [1521 Burrows St](https://www.permitgraph.org/a/5995/017) | change tile and vanity cabinet. partial remodel of one bathroom. | $3,000 |
| [202209202800](https://www.permitgraph.org/p/202209202800) | Sep 20, 2022 | Completed: final sign-off Feb 2023 | [2915 Yorba St](https://www.permitgraph.org/a/2518/025) | kitchen improvement cabinet replacement at 2nd floor. (e) walk-in closet converted to new master bathroom at 3rd floor. | $25,000 |
| [202207269302](https://www.permitgraph.org/p/202207269302) | Jul 26, 2022 | Never finaled: issued Jan 2023, no final | [7000 Geary Bl](https://www.permitgraph.org/a/1466/016) | foundation and beam improvement @ front of property. wood siding to be repalced inkind where needed - store front tile to be replaced in kind where needed. | $30,000 |
| [202111233016](https://www.permitgraph.org/p/202111233016) | Nov 23, 2021 | Completed: final sign-off Sep 2022 | [174 18th Av](https://www.permitgraph.org/a/1377/029) | revision to application 202102104347 skim coating over existing leaking stucco (street visible). demo existing stucco on the 2nd and 3rd floor and replace with new stucco. |  |
| [202111192832](https://www.permitgraph.org/p/202111192832) | Nov 19, 2021 | Expired or cancelled: cancelled Jan 2026 | [174 18th Av](https://www.permitgraph.org/a/1377/029) | stucco repair in front of the building. | $4,000 |
| [202102104347](https://www.permitgraph.org/p/202102104347) | Feb 10, 2021 | Completed: final sign-off Sep 2022 | [174 18th Av](https://www.permitgraph.org/a/1377/029) | revision to no plan pa# 202011128699. add 1.5 bathroom + bedroom + family room + stairs on 1st floor. reconfigure 2nd fl + add half hathroom. reconfigure 3rd fl + add 1 bathroom + stairs to new roof… | $270,000 |
| [202011128699](https://www.permitgraph.org/p/202011128699) | Nov 12, 2020 | Completed: final sign-off Sep 2022 | [174 18th Av](https://www.permitgraph.org/a/1377/029) | replaceing plaster with sheetrock, remoodeling kitchens & bahtrooms on both units (#172-174). (no moving walls). | $50,000 |
| [202011108633](https://www.permitgraph.org/p/202011108633) | Nov 10, 2020 | Completed: final sign-off Mar 2022 | [4143 24th St](https://www.permitgraph.org/a/6506/038) | building permit under construction 2017.0310.1258. revision shown 7/10/20: change building front windows and door. change existing roof to roof deck at 2/f front. | $8,000 |
| [201909121499](https://www.permitgraph.org/p/201909121499) | Sep 12, 2019 | Completed: final sign-off Nov 2019 | [328 17th Av](https://www.permitgraph.org/a/1448/033) | to obtain final inspection for work approved under pa# 201306199907 |  |
| [201904127858](https://www.permitgraph.org/p/201904127858) | Apr 12, 2019 | Completed: final sign-off Jul 2019 | [1551 Clement St](https://www.permitgraph.org/a/1448/037) | repair and replace in kind dry rot siding at the rear of building. work not visible from street. | $3,000 |
| [201812118033](https://www.permitgraph.org/p/201812118033) | Dec 11, 2018 | Completed: final sign-off Jun 2020 | [139 Denslowe Dr](https://www.permitgraph.org/a/7239A/025) | kitchen remodel and add bathroom on 2nd fl. bathroom remodel on 1st fl. | $40,000 |
| [201809180630](https://www.permitgraph.org/p/201809180630) | Sep 18, 2018 | Completed: final sign-off Mar 2019 | [61 Somerset St](https://www.permitgraph.org/a/5921/011A) | dryrot repair, remove/replace wood studs to gypsum board @ rear bedrooms, approx. 130 sq. ft., replace in-kind. | $5,000 |
| [201809139985](https://www.permitgraph.org/p/201809139985) | Sep 13, 2018 | Completed: final sign-off Oct 2019 | [578 Guerrero St](https://www.permitgraph.org/a/3578/013) | comply with wood frame seismic retrofit program per sfebc ch 4d cebc app a4 | $15,000 |
| [201808167548](https://www.permitgraph.org/p/201808167548) | Aug 16, 2018 | Completed: final sign-off Oct 2018 | [175 Margaret Av](https://www.permitgraph.org/a/7060/027) | dry rot repair interior stair less than 50%. replace in-kind & repair | $5,000 |
| [201807205116](https://www.permitgraph.org/p/201807205116) | Jul 20, 2018 | Expired or cancelled: cancelled Aug 2018 | [328 17th Av](https://www.permitgraph.org/a/1448/033) | renew permit p.a # 201306199907. |  |
| [201806202448](https://www.permitgraph.org/p/201806202448) | Jun 20, 2018 | Never finaled: issued Jun 2018, no final | [25 Cora St](https://www.permitgraph.org/a/6252/037) | interior remodel at 2nd fl only. relocate e kitchen to rear, new storage at e kitchen location | $10,000 |
| [201802151421](https://www.permitgraph.org/p/201802151421) | Feb 15, 2018 | Never finaled: issued Sep 2018, no final | [44 Robblee Av](https://www.permitgraph.org/a/5384/003) | 2nd story deck addition-200 sq ft | $8,000 |
| [201710020122](https://www.permitgraph.org/p/201710020122) | Oct 2, 2017 | Completed: final sign-off Apr 2021 | [30 Rausch St](https://www.permitgraph.org/a/3730/064) | addition of unit @ 1st flr (add unit #8) from 7 units to 8 units. reference legalization under pa #2017-0922-9307 from 6 units to 7 units. maher n/a. | $35,000 |
| [201709269606](https://www.permitgraph.org/p/201709269606) | Sep 26, 2017 | Completed: final sign-off Jul 2018 | [44 Robblee Av](https://www.permitgraph.org/a/5384/003) | alteration including: new bedroom & bath in (e) unfurnished ground fl, remodeling (e) kitchen & bath on upper floor. new mechanical forced air heating & water heater & minor alteration to closet adja… | $150,000 |
| [201709229307](https://www.permitgraph.org/p/201709229307) | Sep 22, 2017 | Completed: final sign-off Apr 2021 | [30 Rausch St](https://www.permitgraph.org/a/3730/064) | legalize (e) 1 unit to (e) 1st flr per ordinance no 43-14. (for 6 units to 7 units. ref separate pa #2017-1022-0122 for adu to make 6 units to 8 units. | $71,000 |
| [201708033775](https://www.permitgraph.org/p/201708033775) | Aug 3, 2017 | Completed: final sign-off Apr 2018 | [1431 26th Av](https://www.permitgraph.org/a/1827/003A) | new: 2 bedrooms, 1 full bathroom, 1 toilet room and laundry room at ground floor. new rear deck and stair at 2nd floor. | $50,000 |
| [201703101258](https://www.permitgraph.org/p/201703101258) | Mar 10, 2017 | Completed: final sign-off Mar 2022 | [4143 24th St](https://www.permitgraph.org/a/6506/038) | change of use. horizontal & vertical addition. convert garage & lower unit into a dental office. extend toward the rear and upward for 2 residential uits on top. | $100,000 |
| [201611042018](https://www.permitgraph.org/p/201611042018) | Nov 4, 2016 | Completed: final sign-off Jul 2017 | [436 South Van Ness Av](https://www.permitgraph.org/a/3553/003) | soft story retrofit per sfbc chapter 34b; 2012 iebc appendix a-4. | $50,000 |
| [201306199907](https://www.permitgraph.org/p/201306199907) | Jun 19, 2013 | Expired or cancelled: expired Nov 2019 | [328 17th Av](https://www.permitgraph.org/a/1448/033) | rear addition including expansion of habitable space bath and fam room into existing first floor of bldg roofdeck over 1st floor addition, 2nd floor addition, 3rd floor expansion of sun room and (n)… | $120,000 |
| [201105266924](https://www.permitgraph.org/p/201105266924) | May 26, 2011 | Completed: final sign-off Jul 2011 | [644 17th Av](https://www.permitgraph.org/a/1628/022) | repair leakage outside wall in the back of the house & replace with siding. replace in kind. | $5,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/jian-construction-company-929718.